Minnesota Department of Transportation Office of Materials & Road Research 1400 Gervais Avenue, Maplewood, MN 55109 Memo An Equal Opportunity Employer DATE: October 1 st , 2018 TO: Mike Gerbensky, Project Manager Metro District FROM: Hossana Teklyes, Assist. Foundations Engineer Geotechnical Engineering Section Foundations Unit CONCUR: Derrick Dasenbrock, Geomechanics/LRFD Engineer Geotechnical Engineering Section Foundation Unit Paul Martin, Assistant Foundations Engineer Geotechnical Engineering Section Foundation Unit SUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan Foundations Investigation and Recommendations Project Description This report provides a Foundation Analysis and Recommendations for constructing foundations for 12 new High Mast Light Towers (HMLTs) on TH13 at junction TH77 in Eagan. This report also provides a request to keep 3 tower bases intact for an active research project with the University of Minnesota as part of a cooperative effort with the Bridge Office to determine unknown pile lengths of HMLT installations for a future investigation/retrofit program. Field Investigation and Foundation Conditions Ten Cone Penetration Tests (CPT Soundings) and one Standard Penetration Test (SPT Borings) were taken by MnDOT in May of 2018 at the High Mast Light Tower foundation locations. One additional old boring taken in 1979 (TE8) for an old light tower near the location of light tower E8 was also used. The soils at the light tower locations predominantly consist of medium dense silty sand to dense sandy soil. Water was encountered 15 ft. below existing ground (elevation 778.6 ft.) in the one boring (T09) taken at the location of light tower E9. Copies of the CPT & SPT logs are attached with this report.
Transcript
Page 1: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

Minnesota Department of Transportation Office of Materials & Road Research 1400 Gervais Avenue, Maplewood, MN 55109

Memo

An Equal Opportunity Employer

DATE: October 1st, 2018

TO: Mike Gerbensky, Project Manager Metro District

FROM: Hossana Teklyes, Assist. Foundations Engineer Geotechnical Engineering Section

Foundations Unit

CONCUR: Derrick Dasenbrock, Geomechanics/LRFD Engineer Geotechnical Engineering Section Foundation Unit Paul Martin, Assistant Foundations Engineer Geotechnical Engineering Section Foundation Unit SUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan Foundations Investigation and Recommendations Project Description This report provides a Foundation Analysis and Recommendations for constructing foundations for 12 new High Mast Light Towers (HMLTs) on TH13 at junction TH77 in Eagan. This report also provides a request to keep 3 tower bases intact for an active research project with the University of Minnesota as part of a cooperative effort with the Bridge Office to determine unknown pile lengths of HMLT installations for a future investigation/retrofit program. Field Investigation and Foundation Conditions Ten Cone Penetration Tests (CPT Soundings) and one Standard Penetration Test (SPT Borings) were taken by MnDOT in May of 2018 at the High Mast Light Tower foundation locations. One additional old boring taken in 1979 (TE8) for an old light tower near the location of light tower E8 was also used. The soils at the light tower locations predominantly consist of medium dense silty sand to dense sandy soil. Water was encountered 15 ft. below existing ground (elevation 778.6 ft.) in the one boring (T09) taken at the location of light tower E9. Copies of the CPT & SPT logs are attached with this report.

Page 2: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

S.P.1901-184, TH13 @ JCT TH77, High Mast Light Towers Subsurface Investigation & Foundation Analysis October 1st, 2018

An Equal Opportunity Employer

Foundation Analysis The proposed light tower locations and ground elevations were provided by the Metro District. The proposed light towers will be 100 or 120 ft. in height. The HMLT Foundation Standard Design sheets, developed by the Bridge office in December of 2011, provide standard details for supporting light towers on spread footings. At this time, details for pile foundations are being developed by the Bridge office and will be available for use on this project. Review of Shallow Foundation Option The spread footing design option utilizes three different square footings depending on tower height and a minimum bottom of footing embedment of 5 ft. below existing ground. Table 1 below shows the minimum soil strength parameters for a minimum effective unit weight, friction angel and cohesion required for the standard spread footing foundation design. Table 1: Minimum soil strength parameters for Spread Footing (Standard Plans 5-297.321)

Soil Type Effective Unit Weight (pcf) Friction Angle (Φ) Cohesion (psf)

Sandy Soil 52.5 30 0

Clay Soil 57.5 0 1000

Pile Foundation Option The tower locations were also assessed for the use of 10x42 and 12-inch diameter CIP piles. Anticipated pile lengths were calculated to meet both compression and tension design requirements. Pile capacity was evaluated using the software Unipile. It is assumed that the project will be more cost effective if all tower foundation use the driven pile design because the tower base is smaller, requiring less excavation and concrete. The contractor will also have equipment and materials for installing piling at over half of the towers, so the additional work would not require significantly different mobilization or material shipping costs. Please contact our office if spread footing foundations are preferred for other project reasons. Table 2 below includes minimum pile depth requirement and type of foundation that can be used for the high mast light towers. A factored structural uplift requirement of 25 tons was used in our calculations, with a LRFD resistance factor of 0.3, for a Nominal geotechnical uplift resistance of 83 tons.

Page 3: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

S.P.1901-184, TH13 @ JCT TH77, High Mast Light Towers Subsurface Investigation & Foundation Analysis October 1st, 2018

An Equal Opportunity Employer

Table 2: Summary of Foundation Recommendations for Light Towers.

Pole # Pole

height (ft.)

CPT Soundings or

Borings

Estimated Pile depth for Nominal

200 ton Compression

(ft.)

Required

Minimum Pile depth for

Nominal 83 ton Tension (Uplift)

(ft.)*

Estimated Pile embedment for

10x42 H-Pile for 200 ton Nominal

Bearing Capacity(ft.)*

Spread

Footing is an option at

this location**

C1 100 c01 35 35 40 Yes

C2 120 c02 20 25 30 No

C3 100 c03a 20 30 30 Yes

C4 120 c04 25 30 30 Yes

C5 100 c05 20 25 25 Yes

C6 100 c06c 10 25 25 Yes

C7 100 c07c 15 25 25 No

E8 120 TE-8 40 40 40 No

E9 120 T09 45 40 45 No

E10 100 c10 30 25 35 No

E11 100 c11 25 25 25 No

E12 100 c12c 35 25 35 No *The minimum required pile depth reflects the minimum length of pile below ground to satisfy the uplift requirement. Using the MPF 12 formula, piles could achieve 200 ton nominal capacity prior to this criterion. If 200 tons Nominal Bearing Resistance, using the MPF 12 formula, is not satisfied at this minimum tip elevation, then driving should continue until the bearing resistance is achieved. **Tower locations C2, C7, E8, E9, E10, E11, and E12 are not suitable for the standard spread footing design. A project specific set of pile design sheets will be required where piling is driven; refer to the recommendations section (piling can be used for all HMLT foundations, as rock was not encountered). HMLT Unknown Pile Length and Pile Uplift Research As part of the cooperative project between the Bridge Office and the Office of Materials & Road Research to potentially retrofit existing towers, several sites are needed to study techniques for determining unknown pile lengths. As part of this work, it is desirable to have 3 light tower bases remain above grade (with the towers and power systems removed) for use in testing various methods. We are interested, as part of this contract, in preserving 3 intact pile-supported tower foundations which are easily accessible, but sufficiently far or protected from traffic so as not to be a safety hazard during the testing

Page 4: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

S.P.1901-184, TH13 @ JCT TH77, High Mast Light Towers Subsurface Investigation & Foundation Analysis October 1st, 2018

An Equal Opportunity Employer

and research work, or accessing the towers. After the multi-year instrumentation study and as part of a future contract project, the selected tower foundations would be abandoned similarly to the methods called for in this plan where the top collars are removed and turf established. The anticipated impact to this project would be a slight reduction in the amount of work for tower base removal. The preferred tower locations are at in-place towers T2C T1, T2C T2 and T2E T10. Refer to Figures 1-3 for the tower site conditions and Figure 4 for a map showing the selected locations.

Figure 1: T2C T1 is located off of MN 77 and is behind protective guardrail with good CPT truck access.

Figure 2: T2C T2 is located in the SE cloverleaf ramp with good sight distances and CPT truck access. This is the deepest existing foundation at the site and different than the estimated depths of the other two towers, making it a preferred location.

T2C T2

T2C T1

Page 5: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

S.P.1901-184, TH13 @ JCT TH77, High Mast Light Towers Subsurface Investigation & Foundation Analysis October 1st, 2018

An Equal Opportunity Employer

Figure 3: T2E T10 is the most preferred location, from an access and safety perspective; it is along MN 13, where traffic is lighter and the location is well off both the mainline and the ramp. The ground is relatively flat for good CPT truck access. The towers have been selected for safety, access with a CPT truck rig, and length of foundation piling. The proposed new tower locations are 242 feet from tower T2C T1, 45 feet from tower T2C T2 and 71 feet from tower T2E T10, which should allow adequate space for new towers to be installed without conflicting with the existing foundations. The proposed geotechnical monitoring and instrumentation work will not be concurrent with the project; as such, no delays to the HMLT project work or cost are anticipated.

T2E T10

Page 6: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

S.P.1901-184, TH13 @ JCT TH77, High Mast Light Towers Subsurface Investigation & Foundation Analysis October 1st, 2018

An Equal Opportunity Employer

Figure 4: Selected HMLT bases for preservation (remaining in place after towers are removed). Recommendations Based on the existing conditions along with an analysis of the project soils, we recommend:

1. Support the HMLT foundations using 10x42 driven H-pile foundations as described in the following recommendations using driven pile foundations for all towers.

2. Contact the Bridge Office for a project specific footing design sheet; a standard plan is not available

for HMLT founded on piling at this time.

3. Provide piling with the minimum required embedment (tip depth) of piling as shown in Table 3 and repeated in Table 5 in the plan sheet format (below) for the piles supporting the HMLT structures. The minimum embedment requirement is to ensure that driven piles have a sufficient embedded length to provide the required uplift resistance. When developing the plan drawings or associated special provisions (if not shown on the plans), provide minimum pile tip embedment as described in

T2E T10

T2C T2

T2C T1

Page 7: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

S.P.1901-184, TH13 @ JCT TH77, High Mast Light Towers Subsurface Investigation & Foundation Analysis October 1st, 2018

An Equal Opportunity Employer

Table 3 to ensure adequate uplift capacity. The piles may need to be driven beyond the minimum tip depth to satisfy the Nominal Geotechnical Bearing requirement of 200 tons. Table 3: Summary of Foundation Recommendations for Light Towers.

Pole # Pole height (feet)

Minimum Pile Embedment for Uplift(Tension) Design 10x42 H-

Pile

Nominal

Geotechnical Bearing

(MPF 12)

C1 100 35

167 tons

C2 120 25

C3 100 30

C4 120 30

C5 100 25

C6 100 25

C7 100 25

E8 120 40

E9 120 40

E10 100 25

E11 100 25

E12 100 25

4. Use the MnDOT dynamic pile driving formula, MPF12, as the pile driving construction control

method. Use the required loads in the Pile Bearing Resistance Table on the standard plan. As this project uses only H-type piles, the information for CIP piles may be crosses out as shown below with an “X” for items not used in this project.

Pile Bearing Resistance Table Required Nominal Pile Bearing Resistance Rn – Tons/Pile

CIP PILES HP PILES φ dyn Rn φ dyn Rn MnDOT Pile Formula 2012 (MPF 12) 0.50 200 0.6 167 PDA (Pile Driving Analysis w/CAPWAP)

0.65 155 0.65 155

Factored Design Load = 100 Tons Rn = (Factored design load / φ dyn)

Page 8: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

S.P.1901-184, TH13 @ JCT TH77, High Mast Light Towers Subsurface Investigation & Foundation Analysis October 1st, 2018

An Equal Opportunity Employer

5. Include the following information in the “PILE TABLE” located on the HMLT plan sheet as follows:

Tower No. Type of Pile

Bottom of Footing

Elevation* (ft.)

Estimated Length (ft)

Required Min. Pile

Length (ft.)

Actual Driven Length of Each

Pile**

C1 H 10x42 [See plan*] 40 35 . .

C2 H 10x42 [See plan*] 30 25 . .

C3 H 10x42 [See plan*] 30 30 . .

C4 H 10x42 [See plan*] 30 30 . .

C5 H 10x42 [See plan*] 25 25 . .

C6 H 10x42 [See plan*] 25 25 . .

C7 H 10x42 [See plan*] 25 25 . .

E8 H 10x42 [See plan*] 40 40 . .

E9 H 10x42 [See plan*] 45 40 . .

E10 H 10x42 [See plan*] 35 25 . .

E11 H 10x42 [See plan*] 25 25 . .

E12 H 10x42 [See plan*] 35 25 . .

*Designer to establish this value based on the project specific plan locations of the towers and proposed final project grading. **This column to be filled in by contractor with as-built information for submittal to the Bridge Office for transportation asset management.

Information is this table is site specific and is not applicable

Recommendations continue on next page

Page 9: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

S.P.1901-184, TH13 @ JCT TH77, High Mast Light Towers Subsurface Investigation & Foundation Analysis October 1st, 2018

An Equal Opportunity Employer

For this project: As an aid to the unknown foundation length research project (driven piling):

6. Develop contract plans and special provisions to allow for 3 intact foundations to remain in-place

above ground. After removing the light tower steel structure, leave the complete concrete foundations intact (including anchor assemblies) at existing towers T2C T1, T2C T2 and T2E T10. A future contract will include removal of the above ground concrete portion of the towers and restoration of vegetation when the HMLT research is complete and a project to determine unknown tower lengths in the metro district is established.

If you have any additional questions regarding these recommendations, or require further assistance, please contact this office. Attachments: Boring/Sounding Plan CPT Index Sheet CPT Sounding Logs (C01 – C12c) (MnDOT Unique Numbers 83094 - 83122) SPT Index Sheet SPT Boring Logs (T09 & TE-8) (MnDOT Unique Numbers 83116 & 51284) cc: B. Skow T. Clyne

P. Rowekamp File

Page 10: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

712

712

712

713

714

714

715

715

716

717

718

718

718

719

719

719

719

719

719

719

719

719

720

720

720

720720

720

720

720

720

720

720

720

720

720

720

720

720

721

721

721

721

721

721

721

721

721

721

722

722

722

722

722

722

722

722

722 722

722

722

722

722

722

722

722

723

723

723

723

723

723

723

723

723

723

723

723

723

723

723

723

723

723

724

724

724

724

724

724

724

724

724

724

724

724

724

724

724

725

725

725

725

725

725

725

725

725

725

725

725

725

726

726

726

726

726

726

726

726

726

726

726

726

727

727

727

727

727

727

727

727

727

727

727

727

727

728

728

728

728

728

728

728

728

728

728

728

728

728

728728

729

729

729

729

729

729

729

729

729

729

729

729

729

730

730

730

730

730

730

730

730

730

730

730

730

730

730

730

73073

0

730

730

730730

730

730

730

731

731

731

731

731

731

731

731

731

731

73173

1

731

732

732

732

732

732

732

732

732

732

732

732732

732

733

733

733

733

733

733

733

733

733

733

733

733

733

734

734

734

734

734 734

734

734

734

734

734

734

734

735

735

735

735

735

735

735

735

735

735

735

735

735

735

736

736

736

736

736

736

736

736

736

736

736

736

736

736

736

736

736

737

737

737

737

737

737

737

737

737

737

737

737

737

737

737

738

738

738

738

738

738

738

738

738

738

738

738

738

738

738

738

738

739

739

739

739

739

739

739

739

739

739

739

739

739

739

739

739

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

740

741

741

741

741

741

741

741

741

741

741

741

741

741

741

741

742

742

742

742

742

742

742

742

742

742

742

742

742

742

742

743

743

743

743

743

743

743

743

743

743

743

743

743

743

743

743

744

744

744

744

744

744

744

744

744

744

744

744

744

744

744

744

744

745

745

745

745

745

745

745

745

745

745

745

745

745

745

746

746

746

746

746

746

746

746

746

746

746

746

746

746

747

747

747

747

747

747

747

747

747

747

747

747

747

747

748

748

748

748

748

748

748

748

748

748

748

748

748

749

749

749

749

749

749

749

749

749

749

749

749

749

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

750

751

751

751

751

751

751

751

751

751

751

751

751

751

752

752

752

752752

752

752

752

752

752

752

752

752

753

753

753

753

753753

753

753

753

753

753

753

754

754

754

754

754

754

754

754

754

754

754

754

754

755

755

755

755

755

755

755

755

755

755

755

755

756

756

756

756

756

756

756

756

756

756

75675

6

757

757

757

757

757

757

757

757

757

757

757

757

757

758

758

758

758

758

758

758

758

758

758

758

758

758

759

759

759

759759

759

759

759

759

759

759

759

760

760

760

760

760

760

760

760

760

760

760

760

760

760

760

760

760760760

761

761

761

761

761

761

761

761

761761

762

762

762

762

762

762

762

762

762

762

763

763

763

763

763

763

763

763763

764

764

764

764

764

764

764

764

764

764

764

765

765

765

765

765

765

765

765

765

765

766

766

766

766

766

766

766

766

766

766

767

767

767

767

767

767

767

767

767

767

767

767

767

767

768

768

768

768

768

768

768

768

768

768

768

768768

768

769

769

769

769

769

769

769

769

76

9

769

769

769

769

769

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770

770770

770

770

770771

771

771

771

771

771

771

771

771

771771

771

771

771

772

772

772

772

772

772

772

772

772

772

772

772

772

772

772

773

773

773

773

773

773

773

773

773

773

773

773

773

773773

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

774

775

775

775

775

775

775

775

775

775

775

775

775

775775

775

775

775

77

5

775

776

776

776

776

776

776

776

776

776

7767

76

776

776776

776

776

776

776

776

776

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

777

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

778

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

779

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780

780780780

780

780

780

780

780

780

780

780

780

780

780

780

780

781

781

781

781

781

781

781

781

781

781

781

781

781

781

781

781

781

781

781

781

781

781

781

781

781

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

782

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

783

7837

83

783

783

783

783

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

784

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

785

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

786

787

787

787787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

7877

87

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

787

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

788

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789

789 7

89

790790790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

79

0

790

790

790

790

790

79

0 79

0

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

790

791

791

791

791

791

791

791

791

791

791

791

791

7917

91

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791 7

91

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

791

7917

91

791

791

791

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

7927

92

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

792

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793 793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

793

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

794

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

795

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796 7

96

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

796

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797 7

97

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797797797

797

797

797797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

797

798 7

98

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798 7

98

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

7987

98

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

798

799

799

799

799

799

799

799

799

799

799

799

799 7

99

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799 7

99

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

799

800

800

800

800

800

800

800

800

800

800

800 8

00

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800800

800

800

800 800 800

800

800800

800

800

800

800

800

800

800

800

800

800

80

0

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800 8

00

80

0

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

800

801

801

801

801

801

801 8

01

801

801

801

801

801

801

801

801

8018

01

801

801

801

801

801

801801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

801

802 8

02

802

802

802

802

802

802

802

802

802

802

802

802802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

80280

2

802

802

802

802802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802

802802

802

803

803

803

803

80380

3

803 8

03

803

803

803

803

803

803

803

803

803

803

803

803803

803

803

803 803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

8038

03

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

803

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804 8

04

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

804

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805 805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

80580

5

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

805

806

806

806

806

806

806

806

806

806806

806

806

806

806

806

806

806

806

806

806

806 806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806 8

06

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

806

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

807

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

8088

08

808

808

808

808

808

808

808808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

808

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

809

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

81

0810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

81

0

810

810

810

810

810

810

810

810

810

810

810

810

810 810810

810

810

810810

810810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

810

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811811

811

811811

811

811811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

811

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812 812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

812

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

813

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

814

8148

14

814

814

814

814

814

814

814

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

815

816

816

816

816

816

816

816

816

816

81681

6

81681

6

816

816

816

816

816

816

816

816

816

816

816

816

816

816

816

816

816

816

816

816

816

816

816

816

816

816

816 816

816

816

816

816

816

816

816

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

817

818

818

818

818

818

818

818

81881

8

818

818

818

818

818

818

818

818

818

818

818

818

818

818

818

818

818

818

818

818

818

818

818

818

818

818

818

818 8

18

818

818

819

819

819

819

819

819819

819

819

819

819

819

819

819

819

819

819

819

819

819

819

819

819

819

819

819

819

819

819

819

819

819

819

819

820

820

820

820

820

820

820

820

820

820

820

820

820820

820

820

820

820

820

820

820

820820

820

820

820

820

820

820

820

820

820

820

820

820

820

820

820

820

820 82

0

820

820

820

820

820

820

820

820

820

820

820

820

820

820

821

821

821

821

821

821

821821

821821

821

821

821

821

821

821

821

821

821

821

821

821

821

821 8

21

821

821

822

822

822

822

822

822

822822

822

822

822

822

822

822

822

822 822

822

822

822

822

822

822

822

822

823

823

823

823

823

823

823

823

823823

823

823

823

823

823

823

823

823

823

823

823

823

824

824

824

824

824

824

824

824

824

824

824

824

824

824

824 82

4

824

824

825

825

825

825

825

825

825

825

825

825

825

825

825

825

825

825

826

826

826

826

826

826

826

826

826

826

826

826

826

826

826

827

827

827

827

827

827

827

827

827

827

827

827

827

828

828

828

828

828

828

828

828

828

828

828

828

828

828

829

829

829

829

829

829

829

829

829

829

829

829

829

829

829

829

830

830

830

830

830

830

830

830

830

830

830

830

830

830

830

830830

830

830

830830

830

830

830

830

830

831

831

831

831

831

831

831

831

831

831

831

831

831

831

832

832

832

832

832

832

832

832

832

832

832

832

832

832

832

833

833

833

833

833

833

833

833

833

833

833

833

833

833

833

834

834

834

834

834

834

834

834

834

834

834

834

834

834

834

834

835

835

835

835

835

835

835

835

835

835

835

835

835

835

835

835

836

836

836

836

836

836

836

836

836

836836

836

836

836

836

836

836

837

837

837

837

837

837

837

837

837

837837

837

837

837

837

837

837

837

838

838

838

838

838

838

838

838

838

838

838

838

838

838

838

838

838

838

838

839

839

839

839

839

839

839

839

839

839

839

839

839

839

839

839

839

839

839

840

840

840

840

840

840

840

840

840

840

840

840

840

840

840

840

840840

840

840

840

840

840

840

840

840

840

840

840

840

840

840

840

840

840

841

841

841

841

841

841

841

841

841

841

841

841

841

841

841

841

841

841

841

842

842

842

842

842

842

842

842

842

842842

842

842

842

842

842

842

842

842

843

843

843

843

843

843

843

843

843

843

843

843

843

843

843

843

843

843

844

844

844

844

844

844

844

844

844

844

844

844

844

844

844

844

844

844

845

845

845

845

845

845

845

845

845

845

845

845

845

845

845

845

845

845

846

846

846

846

846

846

846

846

846

846

846

846

846

846

846

846

846

846

846

847

847

847

847

847

847

847

847

847

847

847

847

847

847

847

847

847

847

847

847

848

848

848

848

848

848

848

848

848

848

848

848

848

848

848

848

848

848

848

848

848

849

849

849

849

849

849

849

849

849

849

849

849

849

849

849

849

849

849

849

849

849

849

850

85

0

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

850

851851

851

851

851

851

851

851

851

851

851

851

851

851

851

851

851

851

851

851

851

851

851

851

851

851

851

852

852

852

852

852

852

852

852

852

852

852

852

852

852

852

852

852

852

852

852

852

852

852

853

853

853

853

853

853

853

853

853

853

853

853

853

853

853

853

853

853

853

853

853

853

854

854

854

854

854

854

854

854

854

854

854

854

854

854

854

854

854

854

854

854

854

855

855

855

855

855

855

855

855

855

855

855

855

855

855

855

855

855

855

856

856

856

856

856

856

856

856

856

856

856

856

856

856

856

856

856

856

856

857

857

857

857

857

857

857

857

857

857

857

857

857

857

857

857

857

857

858

858

858

858

858

858

858

858

858

858

858

858

858

858

858

858

858

858

859

859

859

859

859

859

859

859

859

859

859

859

859

859

859

860

860

860

860

860

860

860

860

860

860

860

860

860

860

860

860

860

860

860

860

861

861

861

861

861

861

861

861

861

861

862

862

862

862

862

862

862

862

862

862

863

863

863

863

863

863

863

863

863

864

864

864

864

864

864

864

864

864

865

865

865

865

865

865

865

865

865

866

866

866

866

866

866

866

867

867

867

867

867

867

867

868

868

868

868

868

868

869

869

869

869

869

869

870

870

870

870

870

870

870

870

870

871

871

871

871

871

872

872

872

872

872

872

872

873

873

873

873

TC-1

TC-3

TC-5

TC-7

?

TE-11

?

TE-12?

TE-8

T-1

T-2

T-3

T-4 T-5

T-6

c77-8

(1925-xx)

C77-7b

T-10

9

T-110

T-2

c01

c02

c03a

c05

c07c

c04T09

c10

c11

c12

c

C06c

C07c

C12c

HIGH MAST LIGHT TOWERS

SP 1901-184 TH13 @ TH77

(C1)

(C5)(C2)

(E9)(C4)

(C6)

(C7)

(E8)

(C3)

(E11)

(E12)

(E10)

T-100

T-100

T-100

T-120

T-120

T-120

T-120

T-100

T-100

T-100

T-100

T-100

INPLACE TOWER

PROPOSED TOWERS

3

LEGEND

XC

XC

XC

XC

XC

XC

XC

XC

XC

CB

CUL END

P

P

P

CB

CB

P

P

CUL END

P

P

P

CUL END

CUL END

CUL END

CB

CB

CUL END

CUL END

CUL END

CUL END

CUL END

P

P

P

CB

CB

CB

P

P

P

XC

XC

P

CB

CB

XC

XC

XC

XC

XC

XC

XC XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

CUL END

CUL END

CB

P

POOL

X

X

X

X

GP

GP

PP P

X

MH

CB

CUL END

CUL END

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

MH

X

X

CUL END

CB

CB

P

P

XC

XCXC

XC

XC

XC

XC

X

X

X

X

X

PLAYGROUND

MH

P

P

P

CUL END

AREA

UNDER

CONSTRUCTION

XC

MH

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC XC XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XC XCXC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

P

P

XCXC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

CUL END

CBCUL

END

CUL END

MH

CB

CUL END

CB

PLAYGROUND

P

P

P

P

P

P

P

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XC

XCXC

XC

XC

XC

XC

XC

XC

XCXC

TH 13

TH 13

TH 13

TH 13

TH 13

TH 13

CEDARVALE BLVD.

CEDARVALE BLVD.

NICOLS

RD.

NICOLS

RD.

GARNET DR.

GARNET POI

NT

SA

PHI

RE

LN.

OL

D SIBLE

Y

ME

MORI

AL

HW

Y.

CA

RN

ELI

AN

LN.

CE

DAR

GR

OVE P

KW

Y.

CE

DA

R

GR

OV

E

TR

AI

L

SI

LV

ER

BE

LL

RD.

SILVER BELL RD.

NICOLS

RD.

EAGAN OUTLETS PKWY.

CE

DA

RV

AL

E

DR.

CE

DA

RV

AL

E

DR.

TH 77

TH 77

TH 77

TH 77

23710

NB

TH77

23712

NB

TH77

23713

NB

TH77

23780

SB

TH77

23782

SB

TH77

1075

1080

1085

Sta 1085+66.99 B

K =

EQ

UATI

ON:

Sta 1084+78.60

AH

PI

1085

1090

1095

1100

1105

1110

CU

RV

E 23710

PI 1075

+49.31

X 525,550.147

Y 223,424.041

T 1,112.71

L 2,130.39

R 2,988.77

PC 1064

+36.60

PT 1085

+66.99

NBT

H77 PT. 1085+66.99

1075

1080

PI

1085

1090

1095

1100

1105

1110

CU

RV

E 23780

PI 1075

+03.15

X 525,417.929

Y 223,418.966

T 1,066.55

L 2,042.00

R 2,864.77

PC 1064

+36.60

PT 1084

+78.60

NB

TH77

SBT

H77 PT. 1084+78.60

SB

TH77

Page 11: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

Minnesota Department of Transportation Geotechnical Section

Cone Penetration Test Index Sheet 1.0 (CPT 1.0)

USER NOTES, ABBREVIATIONS AND DEFINITIONS This Index sheet accompanies Cone Penetration Test Data. Please refer to the Boring Log Descriptive Terminology Sheet for information relevant to conventional boring logs. This Cone Penetration Test (CPT) Sounding follows ASTM D 5778 and was made by ordinary and conventional methods and with care deemed adequate for the Department's design purposes. Since this sounding was not taken to gather information relating to the construction of the project, the data noted in the field and recorded may not necessarily be the same as that which a contractor would desire. While the Department believes that the information as to the conditions and materials reported is accurate, it does not warrant that the information is necessarily complete. This information has been edited or abridged and may not reveal all the information which might be useful or of interest to the contractor. Consequently, the Department will make available at its offices, the field logs relating to this sounding. Since subsurface conditions outside each CPT Sounding are unknown, and soil, rock and water conditions cannot be relied upon to be consistent or uniform, no warrant is made that conditions adjacent to this sounding will necessarily be the same as or similar to those shown on this log. Furthermore, the Department will not be responsible for any interpretations, assumptions, projections or interpolations made by contractors, or other users of this log. Water pressure measurements and subsequent interpreted water levels shown on this log should be used with discretion since they represent dynamic conditions. Dynamic Pore water pressure measurements may deviate substantially from hydrostatic conditions, especially in cohesive soils. In cohesive soils, water pressures often take extended periods of time to reach equilibrium and thus reflect their true field level. Water levels can be expected to vary both seasonally and yearly. The absence of notations on this log regarding water does not necessarily mean that this boring was dry or that the contractor will not encounter subsurface water during the course of construction. CPT Terminology CPT .............Cone Penetration Test CPTU...........Cone Penetration Test with Pore Pressure measurements SCPTU.........Cone Penetration Test with Pore Pressure and Seismic measurements Piezocone...Common name for CPTU test (Note: This test is not related to the Dynamic Cone Penetrometer DCP) qT TIP RESISTANCE The resistance at the cone corrected for water pressure. Data is from cone with 60 degree apex angle and a 10 cm2 end area. fs SLEEVE FRICTION RESISTANCE The resistance along the sleeve of the penetrometer. FR Friction Ratio

Ratio of sleeve friction over corrected tip resistance. FR = fs/qt Vs Shear Wave Velocity A measure of the speed at which a siesmic wave travels through soil/rock. PORE WATER MEASUREMENTS Pore water measurements reported on CPT Log are representative of water pressures measured at the U2 location, just behind the cone tip, prior to the sleeve, as shown in the figure below. These measurements are considered to be dynamic water pressures due to the local disturbance caused by the cone tip. Dynamic water pressure decay and Static water pressure measurements are reported on a Pore Water Pressure Dissipation Graph.

SBT SOIL BEHAVIOR TYPE Soil Classification methods for the Cone Penetration Test are based on correlation charts developed from observations of CPT data and conventional borings. Please note that these classification charts are meant to provide a guide to Soil Behavior Type and should not be used to infer a soil classification based on grain size distribution. The numbers corresponding to different regions on the charts represent the following soil behavior types: 1. Sensitive, Fine Grained 2. Organic Soils - Peats 3. Clays - Clay to Silty Clay 4. Silt Mixtures - Clayey Silt to Silty Clay 5. Sand Mixtures - Silty Sand to Sandy Silt 6. Sands - Clean Sand to Silty Sand 7. Gravelly Sand to Sand 8. Very Stiff Sand to Clayey Sand 9. Very Stiff, Fine Grained Note that engineering judgment, and comparison with conventional borings is especially important in the proper interpretation of CPT data in certain geo-materials. The following charts are used to provide a Soil Behavior Type for the CPT Data. Robertson CPT 1990 Soil Behavior type based on friction ratio

Robertson CPTU 1990 Soil Behavior type based on pore pressure

U2

where ... QT.......................... normalized cone resistance Bq.......................... pore pressure ratio Fr ........................... Normalized friction ratio σvo ........................ overburden pressure σ’vo ....................... effective over burden pressure u2 .......................... measured pore pressure u0 .......................... equilibrium pore pressure G:\GEOTECH\PUBLIC\FORMS\CPTINDEX.DOC January 30, 2002

Page 12: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

End of Data

Bottom of Hole 35.5,Planned Depth

State Project

LIGHTING BASEBridge No. or Job Desc.

Tip Resistance(psi)UBC 1990 FR

Pore Pressure(psi)

Depth

Sounding No.

Elevation

Ground Elevation

c01Trunk Highway/Location

(DTM)TH 13 / TH 771901-184

Friction Ratio(%)

Interpreted SoilBehavior Type Sleeve Friction

(psi)

830.5Location CPT Machine

5/23/18

ODonnel

SHEET 1 of 1

CPT-STD

203094 CPT Truck

Latitude (North)=44°48'39.65"

(ft.)

No Station-Offset Information Available

Longitude (West)=93°13'07.69" CPT Operator

Hole Type

Date Completed

Index Sheet Code 3.0

Dakota Co. Coordinate: X=525400 Y=223639

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

Soil Class: Rock Class: Edit: Date: 7/16/18

CONE PENETRATION TEST RESULTS

0

5

10

15

20

25

30

35

UNIQUE NUMBER 83094

G:\GINT\PROJECTS-ACTIVE\1901-184 HMLT.GPJ

830.5

825.5

820.5

815.5

810.5

805.5

800.5

795.5

U.S. Customary Units

20 16 12 8 4 0 0 2 4 6 8 101000 2000 3000 4000 5000

G:\geotech\cptdata\th13\1901-184-Pat (05-23-2018)\1901184a\test(289)_PD.DAT

0 2 4 6 8 10 0 10 20 30 40

Page 13: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

End of Data

Bottom of Hole 45.49,Planned Depth

State Project

LIGHTING BASEBridge No. or Job Desc.

Tip Resistance(psi)UBC 1990 FR

Pore Pressure(psi)

Depth

Sounding No.

Elevation

Ground Elevation

c02Trunk Highway/Location

(DTM)TH 13 / TH 771901-184

Friction Ratio(%)

Interpreted SoilBehavior Type Sleeve Friction

(psi)

798.1Location CPT Machine

5/22/18

ODonnel

SHEET 1 of 1

CPT-STD

203094 CPT Truck

Latitude (North)=44°48'52.65"

(ft.)

No Station-Offset Information Available

Longitude (West)=93°13'10.29" CPT Operator

Hole Type

Date Completed

Index Sheet Code 3.0

Dakota Co. Coordinate: X=525211 Y=224955

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

Soil Class: Rock Class: Edit: Date: 7/16/18

CONE PENETRATION TEST RESULTS

0

5

10

15

20

25

30

35

40

45

UNIQUE NUMBER 83089

G:\GINT\PROJECTS-ACTIVE\1901-184 HMLT.GPJ

798.1

793.1

788.1

783.1

778.1

773.1

768.1

763.1

758.1

753.1

U.S. Customary Units

20 16 12 8 4 0 0 2 4 6 8 101000 2000 3000 4000 5000

G:\geotech\cptdata\th13\1901-184-Pat (05-22-2018)\1901184TH13Pat(05222018)-ECP File\test(283)_PD.ECP

0 2 4 6 8 10 0 10 20 30 40

Page 14: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

End of Data

Bottom of Hole 35.51,Planned Depth

State Project

LIGHTING BASEBridge No. or Job Desc.

Tip Resistance(psi)UBC 1990 FR

Pore Pressure(psi)

Depth

Sounding No.

Elevation

Ground Elevation

c03aTrunk Highway/Location

(DTM)TH 13 / TH 771901-184

Friction Ratio(%)

Interpreted SoilBehavior Type Sleeve Friction

(psi)

794.8Location CPT Machine

5/23/18

ODonnel

SHEET 1 of 1

CPT-STD

203094 CPT Truck

Latitude (North)=44°49'00.59"

(ft.)

No Station-Offset Information Available

Longitude (West)=93°12'54.61" CPT Operator

Hole Type

Date Completed

Index Sheet Code 3.0

Dakota Co. Coordinate: X=526340 Y=225761

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

Soil Class: Rock Class: Edit: Date: 7/16/18

CONE PENETRATION TEST RESULTS

0

5

10

15

20

25

30

35

UNIQUE NUMBER 83095

G:\GINT\PROJECTS-ACTIVE\1901-184 HMLT.GPJ

794.8

789.8

784.8

779.8

774.8

769.8

764.8

759.8

U.S. Customary Units

20 16 12 8 4 0 0 2 4 6 8 101000 2000 3000 4000 5000

G:\geotech\cptdata\th13\1901-184-Pat (05-23-2018)\1901184a\test(291)_PD.DAT

0 2 4 6 8 10 0 10 20 30 40

Page 15: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

End of Data

Bottom of Hole 40.55,Refusal on unknown layer

State Project

LIGHTING BASEBridge No. or Job Desc.

Tip Resistance(psi)UBC 1990 FR

Pore Pressure(psi)

Depth

Sounding No.

Elevation

Ground Elevation

c04Trunk Highway/Location

(DTM)TH 13 / TH 771901-184

Friction Ratio(%)

Interpreted SoilBehavior Type Sleeve Friction

(psi)

799.8Location CPT Machine

5/22/18

ODonnel

SHEET 1 of 1

CPT-STD

203094 CPT Truck

Latitude (North)=44°48'50.60"

(ft.)

No Station-Offset Information Available

Longitude (West)=93°13'18.38" CPT Operator

Hole Type

Date Completed

Index Sheet Code 3.0

Dakota Co. Coordinate: X=524628 Y=224747

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

Soil Class: Rock Class: Edit: Date: 7/16/18

CONE PENETRATION TEST RESULTS

0

5

10

15

20

25

30

35

40

UNIQUE NUMBER 83090

G:\GINT\PROJECTS-ACTIVE\1901-184 HMLT.GPJ

799.8

794.8

789.8

784.8

779.8

774.8

769.8

764.8

759.8

U.S. Customary Units

20 16 12 8 4 0 0 2 4 6 8 101000 2000 3000 4000 5000

G:\geotech\cptdata\th13\1901-184-Pat (05-22-2018)\1901184TH13Pat(05222018)-ECP File\test(282)_PD.ECP

0 2 4 6 8 10 0 10 20 30 40

Page 16: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

End of Data

Bottom of Hole 35.07,Refusal on unknown layer

State Project

LIGHTING BASEBridge No. or Job Desc.

Tip Resistance(psi)UBC 1990 FR

Pore Pressure(psi)

Depth

Sounding No.

Elevation

Ground Elevation

c05Trunk Highway/Location

(DTM)TH 13 / TH 771901-184

Friction Ratio(%)

Interpreted SoilBehavior Type Sleeve Friction

(psi)

813.1Location CPT Machine

5/22/18

ODonnel

SHEET 1 of 1

CPT-STD

203094 CPT Truck

Latitude (North)=44°48'45.12"

(ft.)

No Station-Offset Information Available

Longitude (West)=93°13'12.83" CPT Operator

Hole Type

Date Completed

Index Sheet Code 3.0

Dakota Co. Coordinate: X=525029 Y=224192

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

Soil Class: Rock Class: Edit: Date: 7/16/18

CONE PENETRATION TEST RESULTS

0

5

10

15

20

25

30

35

UNIQUE NUMBER 83091

G:\GINT\PROJECTS-ACTIVE\1901-184 HMLT.GPJ

813.1

808.1

803.1

798.1

793.1

788.1

783.1

778.1

U.S. Customary Units

20 16 12 8 4 0 0 2 4 6 8 101000 2000 3000 4000 5000

G:\geotech\cptdata\th13\1901-184-Pat (05-22-2018)\1901184TH13Pat(05222018)-ECP File\test(288)_PD.ECP

0 2 4 6 8 10 0 10 20 30 40

Page 17: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

End of Data

Bottom of Hole 10.31,Refusal on unknown layer

State Project

LIGHTING BASEBridge No. or Job Desc.

Tip Resistance(psi)UBC 1990 FR

Pore Pressure(psi)

Depth

Sounding No.

Elevation

Ground Elevation

c06aTrunk Highway/Location

(DTM)TH 13 / TH 771901-184

Friction Ratio(%)

Interpreted SoilBehavior Type Sleeve Friction

(psi)

807.8Location CPT Machine

5/22/18

ODonnel

SHEET 1 of 1

CPT-STD

203094 CPT Truck

Latitude (North)=44°48'47.13"

(ft.)

No Station-Offset Information Available

Longitude (West)=93°13'27.27" CPT Operator

Hole Type

Date Completed

Index Sheet Code 3.0

Dakota Co. Coordinate: X=523987 Y=224395

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

Soil Class: Rock Class: Edit: Date: 7/16/18

CONE PENETRATION TEST RESULTS

0

5

10

UNIQUE NUMBER 83092

G:\GINT\PROJECTS-ACTIVE\1901-184 HMLT.GPJ

807.8

802.8

797.8

U.S. Customary Units

20 16 12 8 4 0 0 2 4 6 8 101000 2000 3000 4000 5000

G:\geotech\cptdata\th13\1901-184-Pat (05-22-2018)\1901184TH13Pat(05222018)-ECP File\test(287)_PD.ECP

0 2 4 6 8 10 0 10 20 30 40

Page 18: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

End of Data

Bottom of Hole 47.2,Planned Depth

State Project

LIGHTING BASEBridge No. or Job Desc.

Tip Resistance(psi)UBC 1990 FR

Pore Pressure(psi)

Depth

Sounding No.

Elevation

Ground Elevation

C06cTrunk Highway/Location

(DTM)TH 13 / TH 771901-184

Friction Ratio(%)

Interpreted SoilBehavior Type Sleeve Friction

(psi)

807.4Location CPT Machine

6/12/18

ODonnel

SHEET 1 of 1

CPT-STD

205146 CPT Truck (H)

Latitude (North)=44°48'47.09"

(ft.)

No Station-Offset Information Available

Longitude (West)=93°13'27.21" CPT Operator

Hole Type

Date Completed

Index Sheet Code 3.0

Dakota Co. Coordinate: X=523992 Y=224391

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

Soil Class: Rock Class: Edit: Date: 7/16/18

CONE PENETRATION TEST RESULTS

0

5

10

15

20

25

30

35

40

45

UNIQUE NUMBER 83120

G:\GINT\PROJECTS-ACTIVE\1901-184 HMLT.GPJ

807.4

802.4

797.4

792.4

787.4

782.4

777.4

772.4

767.4

762.4

U.S. Customary Units

20 16 12 8 4 0 0 2 4 6 8 101000 2000 3000 4000 5000

G:\geotech\cptdata\th13\1901-184-Pat (06-14-2018)\1901184E\(058)_PD.DAT

0 2 4 6 8 10 0 10 20 30 40

Page 19: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

End of Data

Bottom of Hole 13.26,Refusal on unknown layer

State Project

LIGHTING BASEBridge No. or Job Desc.

Tip Resistance(psi)UBC 1990 FR

Pore Pressure(psi)

Depth

Sounding No.

Elevation

Ground Elevation

c07aTrunk Highway/Location

(DTM)TH 13 / TH 771901-184

Friction Ratio(%)

Interpreted SoilBehavior Type Sleeve Friction

(psi)

812.2Location CPT Machine

5/22/18

ODonnel

SHEET 1 of 1

CPT-STD

203094 CPT Truck

Latitude (North)=44°48'42.50"

(ft.)

No Station-Offset Information Available

Longitude (West)=93°13'32.55" CPT Operator

Hole Type

Date Completed

Index Sheet Code 3.0

Dakota Co. Coordinate: X=523607 Y=223926

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

Soil Class: Rock Class: Edit: Date: 7/16/18

CONE PENETRATION TEST RESULTS

0

5

10

UNIQUE NUMBER 83093

G:\GINT\PROJECTS-ACTIVE\1901-184 HMLT.GPJ

812.2

807.2

802.2

U.S. Customary Units

20 16 12 8 4 0 0 2 4 6 8 101000 2000 3000 4000 5000

G:\geotech\cptdata\th13\1901-184-Pat (05-22-2018)\1901184TH13Pat(05222018)-ECP File\test(285)_PD.ECP

0 2 4 6 8 10 0 10 20 30 40

Page 20: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

End of Data

Bottom of Hole 45.42,Planned Depth

State Project

LIGHTING BASEBridge No. or Job Desc.

Tip Resistance(psi)UBC 1990 FR

Pore Pressure(psi)

Depth

Sounding No.

Elevation

Ground Elevation

C07cTrunk Highway/Location

(DTM)TH 13 / TH 771901-184

Friction Ratio(%)

Interpreted SoilBehavior Type Sleeve Friction

(psi)

812.2Location CPT Machine

6/12/18

ODonnel

SHEET 1 of 1

CPT-STD

205146 CPT Truck (H)

Latitude (North)=44°48'42.36"

(ft.)

No Station-Offset Information Available

Longitude (West)=93°13'32.63" CPT Operator

Hole Type

Date Completed

Index Sheet Code 3.0

Dakota Co. Coordinate: X=523602 Y=223911

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

Soil Class: Rock Class: Edit: Date: 7/16/18

CONE PENETRATION TEST RESULTS

0

5

10

15

20

25

30

35

40

45

UNIQUE NUMBER 83121

G:\GINT\PROJECTS-ACTIVE\1901-184 HMLT.GPJ

812.2

807.2

802.2

797.2

792.2

787.2

782.2

777.2

772.2

767.2

U.S. Customary Units

20 16 12 8 4 0 0 2 4 6 8 101000 2000 3000 4000 5000

G:\geotech\cptdata\th13\1901-184-Pat (06-14-2018)\1901184E\(057)_PD.DAT

0 2 4 6 8 10 0 10 20 30 40

Page 21: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

End of Data

Bottom of Hole 35.18,Planned Depth

State Project

LIGHTING BASEBridge No. or Job Desc.

Tip Resistance(psi)UBC 1990 FR

Pore Pressure(psi)

Depth

Sounding No.

Elevation

Ground Elevation

c10Trunk Highway/Location

(DTM)TH 13 / TH 771901-184

Friction Ratio(%)

Interpreted SoilBehavior Type Sleeve Friction

(psi)

805.9Location CPT Machine

5/23/18

ODonnel

SHEET 1 of 1

CPT-STD

203094 CPT Truck

Latitude (North)=44°48'59.01"

(ft.)

No Station-Offset Information Available

Longitude (West)=93°13'05.44" CPT Operator

Hole Type

Date Completed

Index Sheet Code 3.0

Dakota Co. Coordinate: X=525560 Y=225600

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

Soil Class: Rock Class: Edit: Date: 7/16/18

CONE PENETRATION TEST RESULTS

0

5

10

15

20

25

30

35

UNIQUE NUMBER 83096

G:\GINT\PROJECTS-ACTIVE\1901-184 HMLT.GPJ

805.9

800.9

795.9

790.9

785.9

780.9

775.9

770.9

U.S. Customary Units

20 16 12 8 4 0 0 2 4 6 8 101000 2000 3000 4000 5000

G:\geotech\cptdata\th13\1901-184-Pat (05-23-2018)\1901184a\test(292)_PD.DAT

0 2 4 6 8 10 0 10 20 30 40

Page 22: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

End of Data

Bottom of Hole 35.71,Planned Depth

State Project

LIGHTING BASEBridge No. or Job Desc.

Tip Resistance(psi)UBC 1990 FR

Pore Pressure(psi)

Depth

Sounding No.

Elevation

Ground Elevation

c11Trunk Highway/Location

(DTM)TH 13 / TH 771901-184

Friction Ratio(%)

Interpreted SoilBehavior Type Sleeve Friction

(psi)

774.1Location CPT Machine

5/23/18

ODonnel

SHEET 1 of 1

CPT-STD

203094 CPT Truck

Latitude (North)=44°49'02.88"

(ft.)

No Station-Offset Information Available

Longitude (West)=93°13'19.83" CPT Operator

Hole Type

Date Completed

Index Sheet Code 3.0

Dakota Co. Coordinate: X=524522 Y=225991

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

Soil Class: Rock Class: Edit: Date: 7/16/18

CONE PENETRATION TEST RESULTS

0

5

10

15

20

25

30

35

UNIQUE NUMBER 83097

G:\GINT\PROJECTS-ACTIVE\1901-184 HMLT.GPJ

774.1

769.1

764.1

759.1

754.1

749.1

744.1

739.1

U.S. Customary Units

20 16 12 8 4 0 0 2 4 6 8 101000 2000 3000 4000 5000

G:\geotech\cptdata\th13\1901-184-Pat (05-23-2018)\1901184a\test(294)_PD.DAT

0 2 4 6 8 10 0 10 20 30 40

Page 23: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

End of Data

Bottom of Hole 24.15,Refusal on unknown layer

State Project

LIGHTING BASEBridge No. or Job Desc.

Tip Resistance(psi)UBC 1990 FR

Pore Pressure(psi)

Depth

Sounding No.

Elevation

Ground Elevation

c12Trunk Highway/Location

(DTM)TH 13 / TH 771901-184

Friction Ratio(%)

Interpreted SoilBehavior Type Sleeve Friction

(psi)

761.1Location CPT Machine

5/23/18

ODonnel

SHEET 1 of 1

CPT-STD

203094 CPT Truck

Latitude (North)=44°49'08.19"

(ft.)

No Station-Offset Information Available

Longitude (West)=93°13'22.68" CPT Operator

Hole Type

Date Completed

Index Sheet Code 3.0

Dakota Co. Coordinate: X=524316 Y=226528

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

Soil Class: Rock Class: Edit: Date: 7/16/18

CONE PENETRATION TEST RESULTS

0

5

10

15

20

UNIQUE NUMBER 83098

G:\GINT\PROJECTS-ACTIVE\1901-184 HMLT.GPJ

761.1

756.1

751.1

746.1

741.1

U.S. Customary Units

20 16 12 8 4 0 0 2 4 6 8 101000 2000 3000 4000 5000

G:\geotech\cptdata\th13\1901-184-Pat (05-23-2018)\1901184a\test(293)_PD.DAT

0 2 4 6 8 10 0 10 20 30 40

Page 24: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

End of Data

Bottom of Hole 49.21,Planned Depth

State Project

LIGHTING BASEBridge No. or Job Desc.

Tip Resistance(psi)UBC 1990 FR

Pore Pressure(psi)

Depth

Sounding No.

Elevation

Ground Elevation

C12cTrunk Highway/Location

(DTM)TH 13 / TH 771901-184

Friction Ratio(%)

Interpreted SoilBehavior Type Sleeve Friction

(psi)

761.8Location CPT Machine

6/14/18

ODonnel

SHEET 1 of 1

CPT-STD

205146 CPT Truck (H)

Latitude (North)=44°49'08.22"

(ft.)

No Station-Offset Information Available

Longitude (West)=93°13'22.87" CPT Operator

Hole Type

Date Completed

Index Sheet Code 3.0

Dakota Co. Coordinate: X=524302 Y=226531

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

Soil Class: Rock Class: Edit: Date: 7/16/18

CONE PENETRATION TEST RESULTS

0

5

10

15

20

25

30

35

40

45

UNIQUE NUMBER 83122

G:\GINT\PROJECTS-ACTIVE\1901-184 HMLT.GPJ

761.8

756.8

751.8

746.8

741.8

736.8

731.8

726.8

721.8

716.8

U.S. Customary Units

20 16 12 8 4 0 0 2 4 6 8 101000 2000 3000 4000 5000

G:\geotech\cptdata\th13\1901-184-Pat (06-14-2018)\1901184E\(059)_PD.DAT

0 2 4 6 8 10 0 10 20 30 40

Page 25: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

Vane Shear Test Washed Sample (Collected during plug drilling)

Minnesota Department of Transportation Geotechnical Section

Boring Log Descriptive Terminology (English Units)

USER NOTES, ABBREVIATIONS AND DEFINITIONS - Additional information available in Geotechnical Manual. This boring was made by ordinary and conventional methods and with care deemed adequate for the Department's design purposes. Since this boring was not taken to gather information relating to the construction of the project, the data noted in the field and recorded may not necessarily be the same as that which a contractor would desire. While the Department believes that the information as to the conditions and materials reported is accurate, it does not warrant that the information is necessarily complete. This information has been edited or abridged and may not reveal all the information which might be useful or of interest to the contractor. Consequently, the Department will make available at its offices, the field logs relating to this boring. Since subsurface conditions outside each borehole are unknown, and soil, rock and water conditions cannot be relied upon to be consistent or uniform, no warrant is made that conditions adjacent to this boring will necessarily be the same as or similar to those shown on this log. Furthermore, the Department will not be responsible for any interpretations, assumptions, projections or interpolations made by contractors, or other users of this log. Water levels recorded on this log should be used with discretion since the use of drilling fluids in borings may seriously distort the true field conditions. Also, water levels in cohesive soils often take extended periods of time to reach equilibrium and thus reflect their true field level. Water levels can be expected to vary both seasonally and yearly. The absence of notations on this log regarding water does not necessarily mean that this boring was dry or that the contractor will not encounter subsurface water during the course of construction. WATER MEASUREMENT

Augered Plug Drilled Split Tube Sample (SPT N60 2 in. spilt tube with liners) Thin Wall Sample (3 in. Shelby Tube) Core Drilled (NV Core Barrel unless otherwise noted) Continuous Soil Sample Augered & Jetted Jetted Augered & Plug Drilled

WS

PD

CS

A/J Jet A/P

AB ........................ After Bailing AC ........................ After Completion AF......................... After Flushing w/C ....................... with Casing

Index Sheet No. 3.0 March 2003 G:\geotech\Public\Forms\INDEX30.doc

w/M ...................... with Mud WSD ..................... While Sampling/Drilling w/AUG.................. with Hollow Stem Auger MISCELLANEOUS NA ........................ Not Applicable w/ ......................... with w/o ....................... with out sat ........................ saturated DRILLING OPERATIONS AUG ................. Augered CD .................... Core Drilled DBD.................. Disturbed by Drilling DBJ .................. Disturbed by Jetting PD .................... Plug Drilled ST..................... Split Tube (SPT test) TW.................... Thinwall (Shelby Tube) WS.................... Wash Sample NSR.................. No Sample Retrieved

WH ................... Weight of Hammer WR ................... Weight of Rod Mud.................. Drilling Fluids in Sample CS .................... Continuous Sample SOIL/CORE TESTS SPT N60 ............ ASTM D1586 Modified Blows per foot with 140 lb. hammer and a standard energy of 210 ft-lbs. This energy represents 60% of the potential energy of the system and is the average energy provided by a Rope & Cathead system. MC.................... Moisture Content COH ................. Cohesion γ ....................... Sample Density LL..................... Liquid Limit PI...................... Plasticity Index Φ ...................... Phi Angle REC.................. Percent Core Recovered RQD ................. Rock Quality Description (Percent of total core interval consisting of unbroken pieces 4 inches or longer) ACL .................. Average Core Length (Average length of core that is greater than 4 inches long) Core Breaks .... Number of natural core breaks per 2-foot interval. DISCONTINUITY SPACING Fractures Distance Bedding Very Close........ <2 inches ............Very Thin Close ................ 2-12 inches .........Thin Mod. Close ....... 12-36 inches .......Medium Wide................. >36 inches ..........Thick DRILLING SYMBOLS

RELATIVE DENSITY Compactness - Granular Soils BPF

very loose....................................0-4 loose ...........................................5-10 medium dense ............................11-24 dense ..........................................25-50 very dense...................................>50

Consistency - Cohesive Soils BPF

very soft.......................................0-1 soft ..............................................2-4 firm ..............................................5-8 stiff ..............................................9-15 very stiff.......................................16-30 hard.............................................31-60 very hard .....................................> 60

COLOR blk .................. Black wht ...........White grn ................. Green brn............Brown orng ............... Orange yel.............Yellow dk ................... Dark lt ...............Light IOS ................. Iron Oxide Stained GRAIN SIZE /PLASTICITY VF............. Very Fine pl ............Plastic F ............... Fine slpl .........Slightly Cr ............. Coarse Plastic SOIL/ROCK TERMS C............... Clay Lmst .......Limestone L ............... Loam Sst ..........Sandstone S............... Sand Dolo........Dolostone Si.............. Silt wx...........weathered G .............. Gravel (No. 10 Sieve to 3 inches) Bldr .......... Boulder (over 3 inches) T ............... till (unsorted, nonstratified glacial deposits) Mn/DOT Triangular Textural Soil Classification System

100%

100%

C

90807060 50 40 302010

90

80

70

60

50

40

30

20

10

(plastic)

(slightly plastic)

SC

SCL CL

L SL SiL

Si

SiCL

LSS Si

90

80

70

60

50

40

30

20

10

100 %

% Sand % Clay

% Silt

Page 26: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

5.0788.6

10.0783.6

13.7779.9

38.0755.6

41.5752.1

49.5744.1

4

5

18

13

14

118

12

12

13

12

21

13

11

Fine Sand with a little Gravel, dark-brown to brown, damp,medium dense

plastic to slightly plastic very fine grained Sandy Loam with highSilt content, brown, moist, very stiff to hard

Clay Loam with a few pebbles, gray, moist, very stiff to hard

slightly plastic to plastic fine grained Sandy Loam with pebbles,browns, moist to saturated, hard

Silty Clay Loam, gray, wet, hard

slightly plastic Sandy Loam, brown to gray, wet, very stiff

Bottom of Hole -49.5'Water measured at 14.9' with auger

19

26

34

22

59

38

47

35

32

46

28

26

State Project Bridge No. or Job Desc.

T09Trunk Highway/Location

LIGHTING BASEGround Elevation

(DTM)MN Trunk Highway TH 13 / TH 77Boring No.

1901-184 793.6(ft.) Drill Machine

HammerLongitude (West)=93°13'14.08"Drilling

SHEET 1 of 1

Latitude (North)=44°48'57.83"

Dakota Coord:X=524937 Y=225480Location 217270 CME 55 Track

No Station-Offset Information Available

CME Automatic Calibrated 6/7/18Completed

or Member

UNIQUE NUMBER 83116

Depth

COH

Soil Class:JAH Rock Class: Edit: Date: 7/16/18

Breaks

Or Remarks

Elev.

SPT

REC ACL

Dril

ling

Ope

ratio

n

Lith

olog

y

RQD Core

Index Sheet Code 3.0G:\GINT\PROJECTS-ACTIVE\1901-184 HMLT.GPJ

Roc

k

DE

PT

H

(psf)

(%)

U.S. Customary Units

5

10

15

20

25

30

35

40

45

(%) (ft)

(pcf)N60

Formation

Soi

lMC(%)

Classification

Other Tests

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

LABORATORY LOG & TEST RESULTS - SUBSURFACE EXPLORATION

rough drilling at 5.0'

driller note possible watertable

rough drilling 22.5'-23.5'

rough drilling 37.0'-38.0'

Page 27: Minnesota Department of Transportation 1400 Gervais … Mast Light Tower.pdfSUBJECT: S.P. 1901-184, Replace High Mast Tower Lighting Systems (Metro District) TH13 at JCT TH77 in Eagan

6.0779.3

13.5771.8

18.5766.8

23.5761.8

38.5746.8

41.5743.8

11

12

11

13

18

14

13

14

19

slightly plastic Sandy Loam Till, with Loamy Sand layer appro.5.5 feet, brown, wet, very stiff

plastic Sandy Loam Till with traces of Fine Sand, brown, wet,very stiff

Silty Clay Loam with some Thin Fine Sand seams brown, moist

Sand, brown, saturated and dense

Silty Clay Loam Till, damp, hard to very hard

Sand, brown, saturated, medium dense

End boring at 41.5 feet, elevation 743.8Water measurement taken is not conclusive

8370

5270

16

22

23

30

34

50

71

80

24

State Project Bridge No. or Job Desc.

TE-8Trunk Highway/Location

LIGHT TOWERGround Elevation

()MN Trunk Highway 13Boring No.

1925-16 785.3(ft.) Drill Machine

HammerLongitude (West)=93°13'22.54"Drilling

SHEET 1 of 1

Latitude (North)=44°48'55.53"

Dakota Coord:X=524327 Y=225246Location 69792

LOOP B, 4+20, 102' RT

Rope & Cathead 3/6/79Completed

or Member

UNIQUE NUMBER 51284

Depth

COH

Soil Class: Rock Class: Edit: Date: 7/19/18

Breaks

Or Remarks

Elev.

SPT

REC ACL

Dril

ling

Ope

ratio

n

Lith

olog

y

RQD Core

Index Sheet Code 3.0G:\GINT\PROJECTS-ARCHIVE-UUID\19DAKOTA\1925-16(ADB1).GPJ

Roc

k

DE

PT

H

(psf)

(%)

U.S. Customary Units

5

10

15

20

25

30

35

40

(%) (ft)

(pcf)N60

Formation

Soi

lMC(%)

Classification

Other Tests

MINNESOTA DEPARTMENT OF TRANSPORTATION - GEOTECHNICAL SECTION

LABORATORY LOG & TEST RESULTS - SUBSURFACE EXPLORATION


Recommended