18
Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 November and reply in this regard from BPCL
Transcript
Page 1: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Minutes of Meeting of SEAC,

Maharashtra Meeting dated 18 November

and reply in this regard from BPCL

Page 2: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Abhay Pimparkar (SecretarySEAC-I)

SEAC Meeting No: 144 Meeting Date:November 18, 2017 ( SEIAA-STATEMENT-0000000748 )

SEAC-MINUTES-0000000303Page 1 of

13Dr. Umakant Dangat(Chairman SEAC-I)

144 th Meeting of SEAC-1 (DAY-2)SEAC Meeting number: 144 Meeting Date November 18, 2017

Subject: Environment Clearance for Proposed Construction of Mounded storage vessel (2 x 300 MT) at Solapur LPGPlant

1.Name of Project Construction of Mounded storage vessel (2 x 300 MT) at Solapur LPG Plant2.Type of institution Semi Government3.Name of Project Proponent Bharat Petroleum Corporation Limited4.Name of Consultant ERM India Private Limited5.Type of project Industrial Project6.New project/expansion in existingproject/modernization/diversificationin existing project

Expansion in existing project

7.If expansion/diversification,whether environmental clearancehas been obtained for existingproject

No (since the plant was established prior to EC notification 1994)

8.Location of the project Plot no. 189 and 190 in Chincholi village9.Taluka Mohol10.Village ChincholiCorrespondence Name: Rakesh SihagRoom Number: NAFloor: NABuilding Name: BPCL LPG PlantRoad/Street Name: Village- Chnicholi (Kati), Post – Sawaleshwer, Taluka – Mohol, Solapur, Maharashtra -413213Locality: Near Chnicholi MIDC areaCity: NA11.Area of the project Gram Panchyath area

12.IOD/IOA/Concession/PlanApproval Number

PESO ApprovalIOD/IOA/Concession/Plan Approval Number: NAApproved Built-up Area: 1728

13.Note on the initiated work (Ifapplicable) NA

14.LOI / NOC / IOD from MHADA/Other approvals (If applicable) PESO Approval

15.Total Plot Area (sq. m.) 49.11 acres16.Deductions NA17.Net Plot area 49.11 acres

18.Proposed Built-up Area (FSI &Non-FSI)

FSI area (sq. m.): NANon FSI area (sq. m.): NATotal BUA area (sq. m.): 1728

19.Total ground coverage (m2) NA20.Ground-coverage Percentage (%)(Note: Percentage of plot not opento sky)

NA

21.Estimated cost of the project 226200000

22.Number of buildings & its configurationSerial

number Building Name & number Number of floors Height of the building (Mtrs)

1 NA NA NA

23.Number oftenants and shops NA

SEAC-M

INUTES-0

0000

0030

3

Page 3: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Abhay Pimparkar (SecretarySEAC-I)

SEAC Meeting No: 144 Meeting Date:November 18, 2017 ( SEIAA-STATEMENT-0000000748 )

SEAC-MINUTES-0000000303Page 2 of

13Dr. Umakant Dangat(Chairman SEAC-I)

24.Number ofexpected residents /users

NA

25.Tenant densityper hectare NA

26.Height of thebuilding(s)27.Right of way(Width of the roadfrom the nearest firestation to theproposed building(s)

NA

28.Turning radiusfor easy access offire tendermovement from allaround the buildingexcluding the widthfor the plantation

NA

29.Existingstructure (s) if any NA

30.Details of thedemolition withdisposal (Ifapplicable)

NA

31.Production DetailsSerial

Number Product Existing (MT/M) Proposed (MT/M) Total (MT/M)

1 LPG Storage1800 MT (4 X 125 MTBullets, 2 x 650 MT

spheres)600 MT (MSV of 2x

300 MT)

1900 MT (Considering existingLPG Bullets of 4 Nos. X 125 MTwill be decommissioned after

construction of new MSV)

32.Total Water Requirement

Dry season:

Source of water MIDC ChincholiFresh water (CMD): 27Recycled water -Flushing (CMD): 00

Recycled water -Gardening (CMD): 19.8

Swimming poolmake up (Cum): 00

Total WaterRequirement (CMD):

27

Fire fighting -Underground watertank(CMD):

00

Fire fighting -Overhead watertank(CMD):

6875

Excess treated water 00

SEAC-M

INUTES-0

0000

0030

3

Page 4: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Abhay Pimparkar (SecretarySEAC-I)

SEAC Meeting No: 144 Meeting Date:November 18, 2017 ( SEIAA-STATEMENT-0000000748 )

SEAC-MINUTES-0000000303Page 3 of

13Dr. Umakant Dangat(Chairman SEAC-I)

Wet season:

Source of water MIDC ChincholiFresh water (CMD): 27Recycled water -Flushing (CMD): 00

Recycled water -Gardening (CMD): 00

Swimming poolmake up (Cum): 00

Total WaterRequirement (CMD):

27

Fire fighting -Underground watertank(CMD):

00

Fire fighting -Overhead watertank(CMD):

6875

Excess treated water 19.8Details of Swimmingpool (If any) Not applicable

SEAC-M

INUTES-0

0000

0030

3

Page 5: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Abhay Pimparkar (SecretarySEAC-I)

SEAC Meeting No: 144 Meeting Date:November 18, 2017 ( SEIAA-STATEMENT-0000000748 )

SEAC-MINUTES-0000000303Page 4 of

13Dr. Umakant Dangat(Chairman SEAC-I)

33.Details of Total water consumedParticula

rs Consumption (CMD) Loss (CMD) Effluent (CMD)

WaterRequire

mentExisting Proposed Total Existing Proposed Total Existing Proposed Total

Domestic 10 00 10 2 00 2 8 00 8IndustrialProcess 17 00 17 3 00 3 14 00 14

34.Rain WaterHarvesting(RWH)

Level of the Groundwater table: NA

Size and no of RWHtank(s) andQuantity:

NA

Location of the RWHtank(s): NA

Quantity of rechargepits: NA

Size of recharge pits: NA

Budgetary allocation(Capital cost) : NA

Budgetary allocation(O & M cost) : NA

Details of UGT tanksif any : NA

35.Storm waterdrainage

Natural waterdrainage pattern: The project site is flat land and its slope is towards south-west

Quantity of stormwater: 14416 m3/year

Size of SWD: Pucca open drain of approx 825 m length

36.Sewage andWaste water

Sewage generationin KLD: 8

STP technology: Aerobic treatementCapacity of STP(CMD): 1 nos of 15 KLD capacity

Location & area ofthe STP: Modular STP is located near canteen building

Budgetary allocation(Capital cost): NA

Budgetary allocation(O & M cost): INR 30000 /- per year

SEAC-M

INUTES-0

0000

0030

3

Page 6: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Abhay Pimparkar (SecretarySEAC-I)

SEAC Meeting No: 144 Meeting Date:November 18, 2017 ( SEIAA-STATEMENT-0000000748 )

SEAC-MINUTES-0000000303Page 5 of

13Dr. Umakant Dangat(Chairman SEAC-I)

37.Solid waste Management

Waste generation inthe Pre Constructionand Constructionphase:

Waste generation:Approx 6 kg/day of municipal solid waste would be generated duringconstruction phase would be disposed at disposal site of Solapurmunicipality

Disposal of theconstruction wastedebris:

Construction debris will be used for filling work

Waste generationin the operationPhase:

Dry waste: 7.2 kgWet waste: 4.8 kg

Hazardous waste: Paint sludge- 0.3 kg/day, Tank bottom sludge- 500 Litres (once in 5years), ETP Sludge- 180 kg/year

Biomedical waste (Ifapplicable): NA

STP Sludge (Drysludge): 500 gm/day

Others if any: NA

Mode of Disposalof waste:

Dry waste: Disposed off at the disposal site of Solapur municipalityWet waste: Disposed off at the disposal site of Solapur municipality

Hazardous waste: Disposed at Hazardous Waste Treatment, Storage and Disposal Facility(CHWTSDF) at Ranjangaon, Pune

Biomedical waste (Ifapplicable): NA

STP Sludge (Drysludge): Composting and manure usage for landscaping

Others if any: NA

Arearequirement:

Location(s): Within the plant premisesArea for the storageof waste & othermaterial:

12 m2

Area for machinery: NABudgetary allocation(Capital cost andO&M cost):

Capital cost: NA

O & M cost: NA

38.Effluent CharecteresticsSerial

Number Parameters Unit Inlet EffluentCharecterestics

Outlet EffluentCharecterestics

Effluent dischargestandards (MPCB)

1 pH - 5.5-7.5 7-8 5.5-92 Oil and Grease mg/l 20 <10 103 BOD (3 days at 27oC) mg/l 500 <30 304 TSS mg/l 100 20-30 100

Amount of effluent generation(CMD): 14

Capacity of the ETP: 15Amount of treated effluentrecycled : 12.6

Amount of water send to the CETP: NAMembership of CETP (if require): NA

Note on ETP technology to be used The treatement process involved primary and secondary treatement. Treated wateris reused .

SEAC-M

INUTES-0

0000

0030

3

Page 7: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Abhay Pimparkar (SecretarySEAC-I)

SEAC Meeting No: 144 Meeting Date:November 18, 2017 ( SEIAA-STATEMENT-0000000748 )

SEAC-MINUTES-0000000303Page 6 of

13Dr. Umakant Dangat(Chairman SEAC-I)

Disposal of the ETP sludge Disposed at Hazardous Waste Treatment, Storage and Disposal Facility (CHWTSDF)at Ranjangaon, Pune

SEAC-M

INUTES-0

0000

0030

3

Page 8: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Abhay Pimparkar (SecretarySEAC-I)

SEAC Meeting No: 144 Meeting Date:November 18, 2017 ( SEIAA-STATEMENT-0000000748 )

SEAC-MINUTES-0000000303Page 7 of

13Dr. Umakant Dangat(Chairman SEAC-I)

39.Hazardous Waste DetailsSerial

Number Description Cat UOM Existing Proposed Total Method of Disposal

1 Paint sludge frompainting booth 21.1, 21.2 kg/day 0.3 NA 0.3

Disposed at HazardousWaste Treatment,

Storage and DisposalFacility (CHWTSDF) at

Ranjangaon, Pune

2Sludge from cleaningof petroleum product

storage tanks2.2

liters(once in 5

years)500 28 528

Disposed at HazardousWaste Treatment,

Storage and DisposalFacility (CHWTSDF) at

Ranjangaon, Pune

3 Sludge from ETP 35.3 kg/year 180 00 180

Disposed at HazardousWaste Treatment,

Storage and DisposalFacility (CHWTSDF) at

Ranjangaon, Pune

40.Stacks emission Details

SerialNumber Section & units Fuel Used with

Quantity Stack No.Heightfrom

groundlevel (m)

Internaldiameter

(m)Temp. of Exhaust

Gases

1 65 KVA DG set HSD 1 1.61 0.1 550 oK2 250 KVA DG set HSD 2 3.16 0.1 550 oK3 500 KVA DG set HSD 3 4.77 0.1 500 oK

41.Details of Fuel to be usedSerial

Number Type of Fuel Existing Proposed Total

1High Speed Diesel (as

alternative sources of powersupply during power failure)

150 l/hr 00 150 l/hr

42.Source of Fuel BPCL COCO (company owned company operated) petrol pump43.Mode of Transportation of fuel to site Fuel tanker by road

44.Green BeltDevelopment

Total RG area : 28.36 acres (approx. 59%) of the project site is covered by green belt.No of trees to be cut: 100 nos

Number of trees tobe planted : NA

List of proposednative trees : NA

Timeline forcompletion ofplantation :

NA

45.Number and list of trees species to be planted in the groundSerial

Number Name of the plant Common Name Quantity Characteristics & ecologicalimportance

1 NA NA NA NA46.Total quantity of plants on ground

47.Number and list of shrubs and bushes species to be planted in the podium RG:

SEAC-M

INUTES-0

0000

0030

3

Page 9: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Abhay Pimparkar (SecretarySEAC-I)

SEAC Meeting No: 144 Meeting Date:November 18, 2017 ( SEIAA-STATEMENT-0000000748 )

SEAC-MINUTES-0000000303Page 8 of

13Dr. Umakant Dangat(Chairman SEAC-I)

SerialNumber Name C/C Distance Area m2

1 NA NA NA

SEAC-M

INUTES-0

0000

0030

3

Page 10: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Abhay Pimparkar (SecretarySEAC-I)

SEAC Meeting No: 144 Meeting Date:November 18, 2017 ( SEIAA-STATEMENT-0000000748 )

SEAC-MINUTES-0000000303Page 9 of

13Dr. Umakant Dangat(Chairman SEAC-I)

48.Energy

Powerrequirement:

Source of powersupply : Maharashtra State Electricity Board

During ConstructionPhase: (DemandLoad)

Two DG sets (of 125 KVA each)

DG set as Powerback-up duringconstruction phase

Two DG sets (of 125 KVA each)

During Operationphase (Connectedload):

721 KW

During Operationphase (Demandload):

380 KVA

Transformer: 750 KVADG set as Powerback-up duringoperation phase:

DG sets of 500 KVA, 250 KVA and 65 KVA capacity

Fuel used: High Speed DieselDetails of hightension line passingthrough the plot ifany:

NA

49.Energy saving by non-conventional method:10 no Solar Panels installed in 2016. Detail of the solar panel is provided below;o Solar Panel Module- 12 V/150 Wo Battery- 12 V/150 AHo LED/Induction Luminaries- 12 V/80

10 no Solar Panels installed in 2016. Detail of the solar panel is provided below.o Solar Panel Module- 12 V/150 Wo Battery- 12 V/100 AHo LED/Induction Luminaries- 12 V/85 W

50.Detail calculations & % of saving:Serial

Number Energy Conservation Measures Saving %

1 Solar street Light 25 nos x 80W2 LED High Mast 3 no x 12 Lights x 200 Watt

3 LED Shed/Flood Light 50 nos x 60 Watt, 80 no x 40 Watt, 12 no x200W, 100nox 20W

51.Details of pollution control SystemsSource Existing pollution control system Proposed to be installedProcess

effluent of14 KLD

ETP of 15 KLD capacity NA

Sewage of8 KLD STP of 15 KLD capacity NA

DG sets Stack attached with DG sets and acoustic enclosourprovided

BPCL would upgrade the stack to make themcompliant with the CPCB requirements

SEAC-M

INUTES-0

0000

0030

3

Page 11: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Abhay Pimparkar (SecretarySEAC-I)

SEAC Meeting No: 144 Meeting Date:November 18, 2017 ( SEIAA-STATEMENT-0000000748 )

SEAC-MINUTES-0000000303Page 10

of 13Dr. Umakant Dangat(Chairman SEAC-I)

Hazardouswaste

Disposed at Hazardous Waste Treatment, Storageand Disposal Facility (CHWTSDF) at Ranjangaon,

PuneNA

Budgetary allocation(Capital cost and

O&M cost):

Capital cost: NA

O & M cost: INR 600000 /- per year

52.Environmental Management plan Budgetary Allocationa) Construction phase (with Break-up):

SerialNumber Attributes Parameter Total Cost per annum (Rs. In Lacs)

1 Ambient Air QualityMonitoring

4 monitoring locationx 2 weeks per locationx 3 seasons per year x1 years of construction

period

0.40

2 DG set stackmonitoring

1 samples x 2 seasonsduring construction

period0.06

3 Ambient noise qualitymonitoring

4 locations around xone time in a season x

3 seasons duringconstruction phase

0.12

4 Surface water qualitymonitoring

2 monitoring locationx 2 seasons 0.24

5 Work place noisemonitoring

2 locations in theconstruction site x 12

months0.36

SEAC-M

INUTES-0

0000

0030

3

Page 12: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Abhay Pimparkar (SecretarySEAC-I)

SEAC Meeting No: 144 Meeting Date:November 18, 2017 ( SEIAA-STATEMENT-0000000748 )

SEAC-MINUTES-0000000303Page 11

of 13Dr. Umakant Dangat(Chairman SEAC-I)

b) Operation Phase (with Break-up):Serial

Number Component Description Capital cost Rs. InLacs

Operational and Maintenancecost (Rs. in Lacs/yr)

1 Periodical ambient airquality monitoring

4 locations x 2 times ina week x 2 weeks per

season00 0.2

2 Periodical stackmonitoring

3 stacks x once perseason x 2 seasons 00 0.18

3 Periodic monitoring ofambient noise quality 4 locations x 2 seasons 00 0.12

4 Monitoring of groundwater 3 locations x 2 seasons 00 0.36

5 Monitoring of soilquality 3 locations x 2 seasons 00 0.36

6 Monitoring of surfacewater quality 3 locations x 2 seasons 00 0.36

7 Wildlife ManagementPlan

Awareness GenerationMeetings at Villages,Capacity Building ofForest Department

Staffs

00 1

52. Storage of chemicals (inflamable/explosive/hazardous/toxicsubstances)

Description Status LocationStorageCapacity

in MT

MaximumQuantity

ofStorageat any

point oftime in

MT

Consumption/ Month in

MTSource of

SupplyMeans of

transportation

LPG Gas

Bullet- 4nos x 125

MT ;Sphere- 2nos x 650

MT

Within the plant 1800 MT 1800 MT10000 MT (it’s

throughput,not

consumption)

MangloreLPG Plantof BPCL

Bulk TankLorry

53. Any Other InformationNo Information Available

54. Traffic Management

Nos. of the junctionto the main road &design ofconfluence:

NASEAC-M

INUTES-0

0000

0030

3

Page 13: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Abhay Pimparkar (SecretarySEAC-I)

SEAC Meeting No: 144 Meeting Date:November 18, 2017 ( SEIAA-STATEMENT-0000000748 )

SEAC-MINUTES-0000000303Page 12

of 13Dr. Umakant Dangat(Chairman SEAC-I)

Parking details:

Number and area ofbasement: NA

Number and area ofpodia: NA

Total Parking area: 4.41 acresArea per car: Bulk Tank Lorry -32 m2, Truck (Box Lorry) – 17 m2Area per car: Bulk Tank Lorry -32 m2, Truck (Box Lorry) – 17 m2Number of 2-Wheelers asapproved bycompetentauthority:

NA

Number of 4-Wheelers asapproved bycompetentauthority:

NA

Public Transport: NAWidth of all Internalroads (m): Main internal road – 8 m, Other internal road – 4 m

SEAC-M

INUTES-0

0000

0030

3

Page 14: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Abhay Pimparkar (SecretarySEAC-I)

SEAC Meeting No: 144 Meeting Date:November 18, 2017 ( SEIAA-STATEMENT-0000000748 )

SEAC-MINUTES-0000000303Page 13

of 13Dr. Umakant Dangat(Chairman SEAC-I)

CRZ/ RRZ clearanceobtain, if any: NA

Distance fromProtected Areas /Critically Pollutedareas / Eco-sensitiveareas/ inter-Stateboundaries

2.4 km

Category as perschedule of EIANotification sheet

Industrial Project categorised as 6(b), 'B' as per EIA Notification 2006and its further amendments

Court cases pendingif any NA

Other RelevantInformations None

Have you previouslysubmittedApplication onlineon MOEF Website

Yes

Date of onlinesubmission 07-06-2016

Brief information of the project by SEACPP submitted their application for the grant of TOR under category 6(b)B1 as per EIA Notification,2006. PP presented draft TOR based on standard TOR issued by MoEF & CC published in April, 2015in the 129th meetin gof SEAC-1 held on 16th to 18th June,2016wherein ToR was approved with oneof the condition that the distance from the boundary of the Great Indian Bustard Bird Sanctury maybe indicated in the EIA report.

DECISION OF SEACDuring deliberations with the PP and his accrediated consultant it came to the notice of the SEAC that, the distance ofthe proposed site from the Great Indian Bustard Bird Sanctury is 2.4 Kms. As per General Condition mentioned in theEIA Notification, 2006 and amendments dated 25.06.2014 states as below,

"Any project or activity specified in Category "B" will be appraised at the Central Level as Cayegory "A", iflocated in whole or in part within 5 km. from the boundary of: (i) Protected ares notified under the Wild Life(Protection) Act, 1972 (53 of 1972)........"

With reference to the above provision, PP informed that, the Forest Department has issued new notification reducing thedistances of above referred Bird Sanctury and requsted to allow some time to submit the same before makig finaldecision in the matter.

On request of PP, SEAC decided to give 30 days time to PP to submit clarification and NOC from competent authrotiyshowing distance of proosed project site from the Great Indian Bustard Bird Sanctury. In case PP fails to submit thesame, the proposal shall be forwarded to the SEIAA as per above mentioned provision for further necessary decision.

Specific Conditions by SEAC:

FINAL RECOMMENDATIONSEAC-I decided to defer the proposal till PP submits the additional information as per above conditions within 30 days

SEAC-M

INUTES-0

0000

0030

3

Page 15: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6
Page 16: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6
Page 17: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

NABET Accreditation

Page 18: Minutes of Meeting of SEAC, Maharashtra Meeting dated 18 ...environmentclearance.nic.in/writereaddata/online/... · Capacity of the ETP: 15 Amount of treated effluent recycled : 12.6

Recommended