One Academic Medical Center’s Approach December 12, 2011 Jack Billi [email protected] University of Michigan Health System Michigan Quality System: med.umich.edu/mqs sitemaker.umich.edu/jbilli Michigan Quality System : Quality Safety Efficiency Appropriateness Service Using Lean Thinking to Cross the Quality Chasm
Transcript
Page 1: MIT webinar 12..12.2011 Billi.pptx

1

One Academic Medical Center’s Approach

December 12, 2011 Jack Billi [email protected] University of Michigan Health System Michigan Quality System: med.umich.edu/mqs sitemaker.umich.edu/jbilli

Michigan Quality System:

•  Quality

•  Safety

•  Efficiency

•  Appropriateness

•  Service

Using Lean Thinking to Cross the Quality Chasm

Page 2: MIT webinar 12..12.2011 Billi.pptx

UMHS in a Slide

Integrated academic health system, within major public research university: •  UM Hospitals and Health Centers

–  1100 beds –  1.8 million outpatient visits/year

•  UM Medical School –  1600 faculty physicians –  1000 resident physicians –  700 medical students

•  Total 20,000 employees & trainees, $3.5B/y

Page 3: MIT webinar 12..12.2011 Billi.pptx

Lean Thinking at UM Health System Summary A3 J Billi Oct 2011

•  Background –  University of Michigan has problems:

Quality – 13% readmits on a med service Safety – wrong site surgery, sponge counts Efficiency – missing instruments in OR Appropriateness – MRI for back pain Service – 90 min. wait in a clinic

–  Problems harm patients, raise costs, frustrate workers

•  Current state –  >20,000 faculty, staff, trainees –  >100,000 processes – all have problems –  Great workers trying to do a good job

•  Goals –  Ideal Patient Care Experience –  Ideal Clinician/Staff Experience –  Ideal Trainee/Research Experience –  Safest health system in US –  Financial stability

•  Analysis –  Workers/managers: little std work –  Few trained in problem solving –  Problems complex, cross units –  Work often invisible –  Unclear responsibility for problems –  Unclear priorities –  Time, cost pressures: stress –  Great scientists & clinicians: in silos

•  Strategies –  Spread a consistent improvement

model across UM Health System –  Michigan Quality System – MQS –  UMHS workers build it –  Build on our CQI base –  Adapt lessons from Lean Thinking –  Balance people development and

process improvement –  20,000 problem solvers

Page 4: MIT webinar 12..12.2011 Billi.pptx

Burning Platform for Change?

Page 5: MIT webinar 12..12.2011 Billi.pptx

Gaps at UMHS “No problem” is problem…

•  Quality: Not all coronary patients get statin, aspirin, flu shot

•  Safety: •  Medication errors (10x infusion pump dose) •  Labs labeled with wrong patient name •  Results sent to wrong clinician •  Retained surgical objects

•  Efficiency: •  Nurse, doctor searching for equipment, forms, pts… •  Weeks waiting for appointment to the right physician •  Higher LOS: fewer admissions, less $$, lay-offs

•  Appropriateness: •  Antibiotics for resp. infection; MRI for low back pain

•  Service: Patients lost, staff look too busy to help

Page 6: MIT webinar 12..12.2011 Billi.pptx

1.  Patient Centered Medical Home 2.  Patient/Family Centered Care 3.  Clinical Quality 4.  Safety as a System Property 5.  Environment of Service Excellence 6.  Care Coordinated Around Patient Needs 7.  Facilities and Amenities that Promote a

Healing Environment

Ideal Patient Care Experience The care we want for our family, our friends, ourselves

Page 7: MIT webinar 12..12.2011 Billi.pptx

The Ideal Patient Care Experience

•  The Institute of Medicine 2001 “Chasm” Report gives us a vision of where to go

•  Lean Thinking gives us the holistic approach and business system to get there

Page 8: MIT webinar 12..12.2011 Billi.pptx

•  The Institute of Medicine 2001 “Chasm” Report gives us a vision of where to go

•  Lean Thinking gives us the holistic approach and business system to get there

The Ideal Patient Care Experience

Page 9: MIT webinar 12..12.2011 Billi.pptx

9

What is Lean Thinking? Several perspectives…

“The endless transformation of waste into value from the customer’s perspective”.

---Womack and Jones, Lean Thinking

Page 10: MIT webinar 12..12.2011 Billi.pptx

10

“20,000 Problem Solvers”

Every worker applying the scientific method to every part of daily work.

Turn all daily work into an experiment and every worker into an investigator. - Steven Spear

If this is just the scientific method, then who is the scientist? - John Shook

Page 11: MIT webinar 12..12.2011 Billi.pptx

PURPOSE PEOPLE

PROCESS PROBLEM SOLVING

Adapted from J Womack, J Liker

Lean Thinking: Grass-roots scientific problem solving

How can we fit these together? We need a plan!

Page 12: MIT webinar 12..12.2011 Billi.pptx

Lean Quotes Guide to Michigan: 1. Plans…

•  Half the plans you make are wrong. You just don’t know which half.

•  “I haven't failed, I've found 10,000 ways that don't work.” Thomas Edison

•  “A plan is an experiment you run to see what you don’t understand about the work” . Stephen Spear

•  “If you want to make God laugh, tell him your plans”. Woody Allen

•  “If there’s one thing I never see in a modern company, it’s a plan”. John Shook

12

Page 13: MIT webinar 12..12.2011 Billi.pptx

Process Improvement People Development

• ? • ? • ?

• ? • ? • ?

Origins We knew we were supposed to do 2 things, we just didn’t know how.

Page 14: MIT webinar 12..12.2011 Billi.pptx

Lean Quotes Guide to Michigan: 2. Origins…

•  No matter where you start, it’s the wrong place.

•  “Forget grand strategy for the moment, just get started”. Womack and Jones

•  “When you’re not sure what to do next, that’s a good time to try something”. John Long, MD

•  “Every new program looks good as you start. I call this Uninformed Optimism”. Dave LaHote

14

Page 15: MIT webinar 12..12.2011 Billi.pptx

Uninformed optimism… -Dave LaHote

•  Process Improvement –  “Let’s fix everything…” – Lots of learning projects led by coaches

•  People Development –  “Let’s train everybody…” –  “Then they can fix everything!”

15

Page 16: MIT webinar 12..12.2011 Billi.pptx

Initial “Learning” Projects •  Facilitators from GM •  Help from John Long •  Reflections, teaching and questions from

John Shook •  Projects scattered like popcorn

– Door to balloon for heart attack – Pre-Op – From “decision to incision” in surgery – HR – From “decision to incision” for new doctor – Misdirected lab results – Appointments in a Sports Medicine clinic – Radiation for patients with brain metastases

•  We expected them to succeed, sustain. Most did, but few spread 16

Page 17: MIT webinar 12..12.2011 Billi.pptx

Initial Results from the Michigan Quality System

Door to Balloon Time for MI •  From 75% within 90 minutes •  To 93% in 90 minutes (mean time now 56 minutes) Patients Referred for Brain Metastases •  From 3 visits over 5 days (consult, simulation, treatment) •  To 95% of patients have all 3 parts within 24 hours Getting Lab Results to the Right Physician •  From 13% with no ordering physician •  To < 2% (over 4 years) Scheduling to MedSport Clinic •  From 23 days (27 minutes of work) •  To 2 ½ minutes - first phonecall for 90% of patients PICC Line Placement for Inpatients •  From 35% placed in 12 hours •  To 71%; 46% fewer needed Interventional Radiology

13.0%

10.0%

10.0%

9.0% 10

.0%8.8

%9.1

%8.8

%8.6

% 9.1% 9.5%

9.4%

8.4%

6.6%

6.7%

6.9%

6.3%

6.0%

6.3%

5.9%

5.6%

5.8%

5.6%

5.3%

5.1%

4.4%

3.5%

2.9%

3.0%

2.4%

2.0%

2.1%

2.0%

2.1%

0

5,000

10,000

15,000

20,000

25,000

30,000

Aug-0

6Se

p-06

Oct-0

6No

v-06

Dec-0

6Ja

n-07

Feb-0

7Ma

r-07

Apr-0

7Ma

y-07

Jun-0

7Ju

l-07

Aug-0

7Se

p-07

Oct-0

7No

v-07

Dec-0

7Ja

n-08

Feb-0

8Ma

r-08

Apr-0

8Ma

y-08

Jun-0

8Ju

l-08

Aug-0

8Se

p-08

Oct-0

8No

v-08

Dec-0

8Ja

n-09

Feb-0

9Ma

r-09

Apr-0

9Ma

y-09

0%

2%

4%

6%

8%

10%

12%

14%

16%

18%

20%

Unidentified Ordering Clinician CountUnidentified Ordering Clinician PercentGoal (2%)

Lab Results: Not Associated with Ordering Physician

Page 18: MIT webinar 12..12.2011 Billi.pptx

Vascular Access Supply Cart 5S

Page 19: MIT webinar 12..12.2011 Billi.pptx

Drawer: Pre-5S

Page 20: MIT webinar 12..12.2011 Billi.pptx
Page 21: MIT webinar 12..12.2011 Billi.pptx

Drawer: Post- 5S Saved each nurse an hour a day!

Page 22: MIT webinar 12..12.2011 Billi.pptx

Engaged team: front line workers

and managers

Page 23: MIT webinar 12..12.2011 Billi.pptx

Initial Approach to Training

•  Anyone can pull training •  Singly or in groups •  1 hour, 4 hours, 4 days… •  Hope you use it when you get back… •  Created “islands of lean in a sea of waste”

–  “Not sure what to do” –  “No one around me knows what I’m doing” – Efforts often lost steam

23

Page 24: MIT webinar 12..12.2011 Billi.pptx

Reflections on Initial Approach •  Process Improvement

–  “Let’s fix everything…” – Lots of learning projects led by coaches – What did we learn??? Little spread – What did they learn??? –  “Lean done in projects by coaches”

•  People Development –  “Let’s train everybody so they can fix everything” – Training ahead of need is… – How can we train Just-In-Time? 24

Inventory!

Page 25: MIT webinar 12..12.2011 Billi.pptx

Process Improvement People Development

• Point improvements

• Individual learning

Evolving Strategy We began in the basement of two buildings

Page 26: MIT webinar 12..12.2011 Billi.pptx
Page 27: MIT webinar 12..12.2011 Billi.pptx

How do we get to 20,000 problem solvers?

We all must learn to:

•  Do our work every day in a standard way that we created

–  Not just the way the work evolved! •  Be alert to things going wrong

–  They always do! •  Fix the problem now

–  For this patient or co-worker

•  Find and fix the root causes of the problem –  So it never happens again!

Modified after Spear; Billi

Page 28: MIT webinar 12..12.2011 Billi.pptx

Lean Quotes Guide to Michigan: 3.The team, the team, the team…

•  The goal is 20,000 problem solvers

•  “Opportunity is missed by most people because it is dressed in overalls and looks like work.” Thomas Edison

•  “Toyota has average people, brilliant processes, and produce superb results.

You have brilliant people, broken processes and produce mediocre results”. Fujio Cho to Jim Womack

•  We squander workers’ brilliance passing patients across the gaps in our processes.

28

Page 29: MIT webinar 12..12.2011 Billi.pptx

Value Stream Mapping: Learning to See…Together

•  “Ah ha” moments: –  I never knew this is how it worked! –  I can’t believe what a mess this process is! –  No wonder we’re frustrated! –  It’s a miracle a patient (investigator, trainee, grant, bill…)

ever gets through it! -All heard from physicians, nurses, staff, managers

Page 30: MIT webinar 12..12.2011 Billi.pptx

30

CSVSMPsychReferral.igx

Patient Arrival

Intake

Total C/T = 20 mins.3

Patient Info Assembled

Total C/T = 10 mins.

Care Web

20% Referred80% Patient Initiated

Information

20 mins. 5 mins. 5 mins. 20 mins. 15 mins. 20 mins. 15 mins. 10 mins.Lead Time = 6600 secs.VA / T = 110 mins.

Schedule

Total C/T = 5 mins.

Registration

Total C/T = 5 mins.

1

Insurance Verification

Total C/T = 20 mins.

Authorization

Total C/T = 15 mins.1

Contact Patient

Total C/T = 20 mins.

Update Insurance

Total C/T = 15 mins.

4

EWS

M-Strides

PM

CBW

IDX

Filemaker

Referal providers not

able to schedule own apts. Send

patients to call in w/o referral

Patients referred that we don't treat

Referring physicians &

patients do NOT understand process

Total C/T = 5 days Total C/T = 3 daysTotal C/T = 5 weeks

Reduce Wait

Rework: Clinicians change schedule reschedule apt.

Rework: Duplicate insurance

verification

Physician Schedule

Rework: Insurance Auth

contact

Patient not available, re-call

High $ personal pay

33.2 days

Referring physician feedback

40% require additional call

Insurance authorization contact

(3-5 wks1 wk perinatal)

Supply--New Patient Slots: 22 Residents 6 NPs 9 Non-Prescribers + 0 Faculty 37/wk37/wk x 4 wks/month = 148 available slots/wk

Demand:Oct: 215 NPSJan: 242 NPS

Private Pay Written

Notification

Appointment Written

Notification

May arrive after apt. changed w/original apt date

Psychiatry Referral Process

Current State Map

Page 31: MIT webinar 12..12.2011 Billi.pptx

The Broken Office Visit

Page 32: MIT webinar 12..12.2011 Billi.pptx

32

Page 33: MIT webinar 12..12.2011 Billi.pptx

33

Page 34: MIT webinar 12..12.2011 Billi.pptx

34

Page 35: MIT webinar 12..12.2011 Billi.pptx

Lean Quotes Guide to Michigan : 4. Who owns the problem??

•  “A nurse, a pharmacist, and a resident physician walk into a patient room…”

•  “If we don’t know who owns the problem, it won’t get solved.” John Shook

35

Page 36: MIT webinar 12..12.2011 Billi.pptx

University of Michigan Health System

Medical School /

Faculty Group Practice

Hospital and

Health Centers

Executive VP Medical Affairs

Michigan Health Corporation

Is this any match…

Page 37: MIT webinar 12..12.2011 Billi.pptx

Older patients experience complex care

Nursing Home

Hospital

Disease Mgmt

Physicians

Family Caregiver

Home Care

Pharmacy

For this?????

Page 38: MIT webinar 12..12.2011 Billi.pptx

BOOST

Gen Med Transition

Clinic

Sub-Acute Care

ED Consult/ Referral

Social Work

Geriatrics Consult Service

Geriatrics Palliative

Care Clinic

Palliative Care Consults

Geriatrics Transitional

Clinic

Complex

Care

MVN House

Calls

Michigan Visiting Nurses

Post- Discharge

Calls

Multiple Clinical Interventions

Preventing Readmissions

Do all these people have to work for the same boss???

Page 39: MIT webinar 12..12.2011 Billi.pptx

Home or Assisted Living

Home, Assisted Living, Nursing Home

Hospital

Emergency Department

Sub-acute nursing home

Nursing Home

Home or Assisted Living

Hospital

Common Patient Transitions

Who will build these bridges???

Page 40: MIT webinar 12..12.2011 Billi.pptx

Primary Care

Medical Clinics

Surgical Clinics

ED

ORs

MOU

Medical Inpatient

Home or ECF

Home or ECF

Surgical Inpatient

Patient Journeys

Ambulatory

Acute Medical (unscheduled)

Surgical (scheduled)

Who owns the problem??

Page 41: MIT webinar 12..12.2011 Billi.pptx

What kind of organizations can do this?

•  Structure is not the answer… Power or control is not the answer… Size is not the answer…

•  Do we have agreement? – On the vision? – On the problems? On their owners? – On their root causes? – On which experiments to try first?

Page 42: MIT webinar 12..12.2011 Billi.pptx

42

Page 43: MIT webinar 12..12.2011 Billi.pptx

43

Page 44: MIT webinar 12..12.2011 Billi.pptx

44

Page 45: MIT webinar 12..12.2011 Billi.pptx

45

Page 46: MIT webinar 12..12.2011 Billi.pptx

Process Improvement People Development

• System level • Flow improvements (Value Streams)

• Point improvements

• Learning organization • Area transformation (Ambulatory Care)

• Work group learning (Children’s Operating Rooms, Lean Implementation Teams)

• Individual learning

Current Strategy: one building Balance & Align Efforts

2 sides of the same coin…

Page 47: MIT webinar 12..12.2011 Billi.pptx

Primary Care

Medical Clinics

Surgical Clinics

ED

ORs Major Proce- dure Rooms

Obs Unit

Medical Inpatient

Home or ECF

Home or ECF

Surgical Inpatient

Agreed on Common Adult Patient Journeys

Ambulatory

Acute Medical (unscheduled)

Surgical (scheduled)

Page 48: MIT webinar 12..12.2011 Billi.pptx

Clinical: Major Patient Journeys (Value streams across areas/units)

Modified from John Shook

Clinical Stream Chief Engineer Ambulatory Care

Medical Stream - Adult

Surgical Stream - Adult

Unscheduled Inpt - Child

Scheduled Inpt - Child

Department Leaders: ED Med/Peds Surg Anes Nursing

Page 49: MIT webinar 12..12.2011 Billi.pptx

Major Patient Journey Value Streams

Better Discharge Planning (med ward) •  Appointment in hand •  Decreased readmissions by 33%; 72h ER returns by 81% CT scheduling and throughput for inpatients •  Standard request process eliminated daily workaround •  Like drycleaners: In by 9AM, out by 6 PM for inpatients

Neurosurgery nurses round with interns 5PM and 11PM •  Fewer phonecalls, problems discovered earlier •  Nurses and interns empowered, families love involvement •  1 day decrease LOS for inpatients

Cardiac Surgery Length of Stay – vent wean protocol •  Standard work handoffs: 2 day decrease in LOS

Page 50: MIT webinar 12..12.2011 Billi.pptx

Neurosurgery Length of Stay

Goal: Create capacity to grow Neurosurgery activity Results: •  Adding evening rounds with house officer

and floor nurse + weekend discharges reduced LOS by 1 day

•  Patients’ families liked being able to interact with care team in the evening

50

Page 51: MIT webinar 12..12.2011 Billi.pptx

Cardiac Surgery Length of Stay

Goal: for uncomplicated pts, reverse 2 day increase (due to new building) Results: •  Used standardized clinical pathway,

handoff tool, no-interrupt zone •  OR team completes SBAR tool,

triggers the pathway, identifies rapid wean ventilator patients

•  LOS reduced 2 days 51

Page 52: MIT webinar 12..12.2011 Billi.pptx

Cardiac Surgery LOS

52

Page 53: MIT webinar 12..12.2011 Billi.pptx

Process Improvement People Development

• System level • Flow improvements (Value Streams)

• Point improvements

• Learning organization • Area transformation (Ambulatory Care)

• Work group learning (Children’s Operating Rooms, Lean Implementation Teams)

• Individual learning

Current Strategy: one building Balance & Align Efforts

2 sides of the same coin…

Page 54: MIT webinar 12..12.2011 Billi.pptx

• Committed leader, staff engaged • Track Value Metric continuously • Standard work: workers and manager • Manager rounds daily, worker shows problems • Workers create Everyday Lean Ideas (A4)

Lean Implementation Teams (LIT)

Page 55: MIT webinar 12..12.2011 Billi.pptx

55

Page 56: MIT webinar 12..12.2011 Billi.pptx

56

Page 57: MIT webinar 12..12.2011 Billi.pptx

Ambulatory Care Transformation Plan

•  80 Ambulatory Care Leader Teams – Medical director and clinic manager train

together, 2 day workshop – Work on common problem

•  Satisfaction, access, wait in clinic, margin

– Pull central coaching help as needed – Report progress to peers at regular meetings –  Integrated into standard management

meetings 57

Page 58: MIT webinar 12..12.2011 Billi.pptx

Add photo of obeya

58

Page 59: MIT webinar 12..12.2011 Billi.pptx

59

Page 60: MIT webinar 12..12.2011 Billi.pptx

60

Page 61: MIT webinar 12..12.2011 Billi.pptx

61

IHI Open School – student organized QI learning – MD, RN, Pharm, Soc Work, Engineer, MPH, MBA A3 workshop: multidisciplinary problem solving

Page 62: MIT webinar 12..12.2011 Billi.pptx

62

Practice in A3 problem-solving, presenting, critiquing

Page 63: MIT webinar 12..12.2011 Billi.pptx

Lean Quotes Guide to Michigan : 5. Improvement v. daily work

•  Daily work beats out improvement work every time.

•  Everyone loves the firefighter, no one loves the fire marshal.

•  “If your house is on fire, by all means put it out…” Jim Womack

63

Page 64: MIT webinar 12..12.2011 Billi.pptx

64

Fire Marshall: Halls must be “Clear as Built”

Page 65: MIT webinar 12..12.2011 Billi.pptx

65

Clear as Built ???

Page 66: MIT webinar 12..12.2011 Billi.pptx

66

Clear as Built ???

Page 67: MIT webinar 12..12.2011 Billi.pptx

67

Page 68: MIT webinar 12..12.2011 Billi.pptx

68

Page 69: MIT webinar 12..12.2011 Billi.pptx

69

Page 70: MIT webinar 12..12.2011 Billi.pptx

Front line workers still fixing problems… Early ICU Mobility Project

•  Collaboration between nursing & PT Goal: ICU patients on their feet, walking Results: •  Reduced Medical ICU LOS for vent patients from

8.4 to 6.4 days •  Reduced Hospital LOS from 22 to 16 days Spread: •  Collaborating with Neurosurgery and Surgery

ICUs

70

Page 71: MIT webinar 12..12.2011 Billi.pptx

71

Physical Therapist Nurse

Grandson

A3

Pull-Based Authority

Early Mobilization of ICU Ventilator Patients

Page 72: MIT webinar 12..12.2011 Billi.pptx

Lean Quotes Guide to Michigan : 6. Leadership…

•  “A critical role for the leader is to reduce overburden” John Shook

•  I got to this exalted position by being a good firefighter, I now realize I am the arsonist.

•  “UMHS may have the highest complexity per worker of any place I have seen.” John Shook

•  “How can I get my people to do this?”

“You must do this” John Shook

•  Sometimes UMHS feels like a place where mandatory programs are optional…

72

Page 73: MIT webinar 12..12.2011 Billi.pptx

Where are we now? •  Slow steady progress

– Lots of workers and managers running experiments

– Experimenting with courses: •  Intact work-teams on real problems •  Managing to Learn: Problem Solving. 3d over 8 wks

•  Multiple top priorities, overburden: •  Workers have variable knowledge, skill •  Leaders have variable knowledge, skill

73

Page 74: MIT webinar 12..12.2011 Billi.pptx

P-D-C-A - Adjust… Where do we need to go?

•  Continue to learn from major experiments – Major Patient Journey Value Streams – Lean in Daily Work (Lean Implementation Teams) – Area Transformation Plans

•  Leaders learning by doing – Go see, ask why, respect people – Strategy deployment – alignment through:

gemba, catchball, prioritization, tiered A3s, visual management (Visual Room for clinical mission)

– Explore the many chief engineer roles within UMHS

74

Page 75: MIT webinar 12..12.2011 Billi.pptx
Page 76: MIT webinar 12..12.2011 Billi.pptx

Old Mindset" New Mindset

Autonomy (my way) valued Standard work (our way) valued

as basis for improvement & creativity

Command & control Engaged employees " " 20,000 problem solvers

Specialists mainly do improvement, using complex methods

Everyoneʼs job (workers & managers) is improvement, using simple methods whenever possible

Cutting budgets = efficiency Creating capacity by increasing

throughput through existing resources

Shift Mental Models

Page 77: MIT webinar 12..12.2011 Billi.pptx

People development- A little help from our friends…

•  GM – Early coaches, intro to John Long and John Shook

•  Lean Enterprise Institute – Courses, workshops, webinars –  LEI Partners:

•  Coca Cola, Textron, Cardinal Health, Medtronic, UMHS •  Workshops, gemba visits, experienced mentors

•  Lean Thinkers series – site visits to UMHS •  Womack, Shook, Liker, Jones, Toussaint, Bennett,

Gruner… •  Gemba visits to ThedaCare, Virginia Mason… •  Healthcare Value Network (gemba, shared

learning) 77

Page 78: MIT webinar 12..12.2011 Billi.pptx

•  Pacing by Demand •  Continuous Flow •  Pull Systems

Just-in-Time

Built-in Quality

•  Error Proof •  Surface Problems •  Stop and Respond to Abnormalities •  Solve Problems at Root Cause

MQS House – Master version (All Missions) Sources: J. Shook, J. Billi, J. Liker, S. Hoeft, J. Womack, Park-Nicollet /jmk 06.23.07

MQS

Make Value Flow by Eliminating Errors and Waste

Leveled Workload

Continuous Improvement (P-D-C-A) and Learning

Standardized Work

Michigan Quality System Quality – Safety – Efficiency – Appropriateness – Service

Customer DefinesValue

Page 79: MIT webinar 12..12.2011 Billi.pptx

Michigan Quality System & Lean References Books: •  Womack, Jones. Lean Thinking. (An overview) •  Liker. Toyota Way. Liker, Meier. Toyota Way Fieldbook. Liker, Hoseus. Toyota Culture. •  Shook. Managing to Learn. (Best book on leadership in a lean organization and A3 use) •  Sobek, Smalley. Understanding A3 Thinking. (Problem solving and A3 detailed guide) •  Dennis. Getting the Right Things Done. (Strategy deployment or hoshin kanri) •  Rother, Shook. Learning to See. (Value stream mapping) •  Baker, Taylor. Making Hospitals Work (From Lean Enterprise Academy, UK) •  Graban. Lean Hospitals. (Applies Lean principles to health examples) •  Toussaint, Gerard. On the Mend. (Thedacare Health System’s lean journey) •  Kenney, Transforming Health Care. (Virginia Mason’s lean journey) Articles: •  Kim, Spahlinger, Kin, Billi. Lean health care: what can hospitals learn from a world-class

automaker? J Hosp Med. 2006;1:191. •  Kim, Spahlinger, Kin, Coffey, Billi. Implementation of Lean Thinking: One Health System's

Journey. Joint Commission J Quality and Safety 2009;35:406. •  Kim, Hayman, Billi, Lash, Lawrence. The Application of Lean Thinking to the Care of Patients

With Bone and Brain Metastasis With Radiation Therapy. J Oncology Practice. 2007;3:189. •  Bush. Reducing Waste in the US Healthcare System. JAMA 2007;297:871. •  Spear. (all Harvard Business Review) Fixing Health Care from the Inside, Today (9/05);

Learning to Lead at Toyota. (4/04); Decoding the DNA of Toyota Production System. (9/99) •  IHI. Going Lean in Health Care www.ihi.org/IHI/Results/WhitePapers/GoingLeaninHealthCare Web: •  Michigan Quality System at UMHS: med.umich.edu/mqs •  Lean Enterprise Institute: www.lean.org webinars, books, meetings… •  Lean Healthcare Value Network www.healthcarevalueleaders.org •  Ideal Patient Care Experience sitemaker.umich.edu/jbilli/ideal_patient_care_experience_-_quality_chasm

10/31/2011


Recommended