+ All Categories
Home > Documents > MLB ® 2-in-1 Pitch ‘N Field SWITCH-HITTER™ · 2016-11-02 · MLB ® 2-in-1 Pitch ‘N Field...

MLB ® 2-in-1 Pitch ‘N Field SWITCH-HITTER™ · 2016-11-02 · MLB ® 2-in-1 Pitch ‘N Field...

Date post: 14-Jun-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
2
MLB ® 2-in-1 Pitch ‘N Field SWITCH-HITTER™ ASSEMBLY INSTRUCTIONS ITEM #24803 Franklin Sports Inc. Stoughton, MA 02072 Made in China For Replacement Parts Call: 1-781-341-5178 or 1-800-225-8649 OR visit www.franklinsports.com PITCH TARGET RETURN TRAINER
Transcript
Page 1: MLB ® 2-in-1 Pitch ‘N Field SWITCH-HITTER™ · 2016-11-02 · MLB ® 2-in-1 Pitch ‘N Field SWITCH-HITTER™ ASSEMBLY INSTRUCTIONS ITEM #24803 Franklin Sports Inc. Stoughton,

MLB ® 2-in-1 Pitch ‘N FieldSWITCH-HITTER™

ASSEMBLY INSTRUCTIONSITEM #24803

Franklin Sports Inc.Stoughton, MA 02072

Made in ChinaFor Replacement Parts Call:

1-781-341-5178 or 1-800-225-8649OR visit www.franklinsports.com

PITCH TARGET

RETURN TRAINER

Page 2: MLB ® 2-in-1 Pitch ‘N Field SWITCH-HITTER™ · 2016-11-02 · MLB ® 2-in-1 Pitch ‘N Field SWITCH-HITTER™ ASSEMBLY INSTRUCTIONS ITEM #24803 Franklin Sports Inc. Stoughton,

DESCRIPTION REPLACEMENT PART#AMOUNTPART1 1 Top Elbow Tube 19083-R12 1 Top Elbow Tube 19083-R23 2 Bottom Middle Tubes 19083-R34 2 “Y” Tube 19083-R45 2 Back Middle Tubes 19083-R56 1 Bottom Elbow Tubes 19083-R67 1 Bottom Elbow Tubes 19083-R78 1 Back Bottom Elbow Tube 19083-R89 1 Back Bottom Elbow Tube 19083-R910 1 Net 19083-R1011 1 Strike Zone Ribbon 19083-R1112 32 S-Hook Bungees 19083-R1213 4 Plastic Blocks 19083-R1314 4 Ground Stakes 19083-R1415 1 Target w/ Batter Graphic 24803-R116 1 Ball Collection Bag 24803-R2

Assembly:- Remove all components from the package and confirm all parts are included. Please reference the frame assembly diagram below (see figure 1).- Spread evenly 28 S-Hook Bungees on the following tubes: 1, 2, 3, 4, 6, 7 - for the net.- For the remaining 8 S-Hook bungees, place 2 additional ones on each of the following tubes: 1, 2, 9 & 8 - for the target.- Place the 4 Plastic Blocks on the following tubes: 6, 7, 8, 9- Attach all of the tubes together to assemble the frame as pictured in the assembly drawing- Attach the net: Spread out the net and find the red tabs. Red tabs indicate the corners. Start by attaching all of the corners of the net to the frame with the bungees and then proceed with the sides of the net until all bungees are secure.

- Attach the Strike Zone Ribbon by weaving through the net and connecting the Velcro at the end (see figure 2).

- Attach the Target: On the opposite side from the net, attach

the Target to the frame with 4 S-Hook Bungees on the top

and 4 S-Hook Bungees on the bottom. Snap on the ball

collection bag to the bottom of the Target.

- Use the Ground Stakes for extra stability when needed.

(Figure 2)

Parts List:

86

9

3

5

4

2 1

4

3

5

7

(Figure 1)

Net SideTarget Side

Original Artist: Mary Ellen MazzoliProduct Division:Job Number: Date Created: 9-10-13 Date Approved On: Baseball Train. Product Line: Target 2014File Name: Last Modified By: Chris Pimentel110502-1 24803_2in1ReturnNPitchTarget.ai

Pantone Spot Color

Secondary Pantone Color Pallette4 color process

Logo Color Pantone Pallette4 color process

Primary Pantone Color Pallette4 color process

Creative Manager Approval:

Fonts Used: Style Guide Referenceor Job Number Reference:

Product Manager Approval: Traffic Manager Approval: Legal Approval:

Black Cool Gray 6 C


Recommended