Appendix B Summary of Field Data: Freeway and Arterial Speeds
Transcript
  • Appendix BSummary of Field Data: Freeway and Arterial Speeds

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    Cambridge Systematics, Inc. B-1

    Appendix BSummary of Field Data:Freeway and Arterial Speeds

    This appendix presents a summary of findings from the travel time and speed surveysconducted on freeway and arterial segments as part of the evaluation of the rampmetering system in the Twin Cities region.

    In the figures, the arterial routes are identified as follows:

    • CR-61 = County Route 61;

    • Vick = Vicksburg Avenue;

    • TH-77 = TH-77;

    • Univ = University Avenue;

    • Marsh = Marshall Avenue;

    • Rice = Rice Avenue; and

    • Edge = Edgerton Avenue.

    The colors in the graphics indicate the day of the week in which the travel time surveyswere performed, as follows:

    • Red = Travel time surveys performed on a Monday;

    • Blue = Travel time surveys performed on Tuesday through Thursday; and

    • Yellow = Travel time surveys performed on a Friday.

    The two evaluation study periods are represented as follows:

    • “With” = With ramp metering; and

    • “Without” = Without ramp metering.

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    B-2 Cambridge Systematics, Inc.

    I-494 NB P.M. Peak (With)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    Glea

    son L

    k

    Carls

    on on

    ramp

    CR-6

    TH-55

    Rock

    ford

    49th

    Bass

    Lk

    Fish L

    k

    Fish L

    k Int

    erchg

    Wea

    ver L

    k

    95th

    Ave

    Location

    Sp

    eed

    (mp

    h)

    I-494 SB A.M. Peak (With)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    Wea

    ver L

    k

    Fish L

    k Int

    erchg

    Fish L

    k

    Bass

    Lk 49th

    Rock

    ford

    TH-55

    CR-6

    Carls

    on on

    ramp

    Glea

    son L

    k

    Carls

    on To

    wers

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    Cambridge Systematics, Inc. B-3

    I-494 NB P.M. Peak (Without)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    Glea

    son L

    k

    Carls

    on on

    ram

    pCR

    -6

    TH-55

    Rock

    ford

    49th

    Bass

    Lk

    Fish L

    k

    Fish L

    k Int

    erchg

    Wea

    ver L

    k

    95th

    Ave

    Location

    Sp

    eed

    (mp

    h)

    I-494 SB A.M. Peak (Without)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    Wea

    ver L

    k

    Fish L

    k Int

    erch

    g

    Fish L

    k

    Bass

    Lk 49th

    Rock

    ford

    TH-55

    CR-6

    Carls

    on on

    ram

    p

    Glea

    son L

    k

    Carls

    on To

    wers

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    B-4 Cambridge Systematics, Inc.

    I-35W NB A.M. Peak (With)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    Crys

    tal Lk

    So. C

    ross

    CR-42

    CR-38

    Burn

    svill

    e

    Hwy 1

    3Cl

    iff

    Blac

    k Dog

    106th 98

    th

    Location

    Sp

    eed

    (mp

    h)

    I-35W NB A.M. Peak (Without)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    90.00

    Crys

    tal Lk

    So. C

    ross

    CR-42

    CR-38

    Burn

    svill

    e

    Hwy 1

    3Cl

    iff

    Blac

    k Dog

    106th 98

    th

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    Cambridge Systematics, Inc. B-5

    I-94 EB P.M. Peak (With)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    Union

    Pac R

    R

    Dunw

    oody

    I-94 I

    nter

    chg

    Grov

    eland

    I-35W 11

    thCe

    dar

    25th

    W. R

    iver

    27th

    Hwy 2

    80

    Pelha

    m

    Vand

    alia

    Fairv

    iew

    Snell

    ing

    Ham

    line

    Lexin

    gton

    Victo

    riaDa

    le

    Wes

    tern

    John

    Irela

    nd

    Jacks

    on

    Lafay

    ette

    Mou

    nds

    Location

    Sp

    eed

    (mp

    h)

    I-94 WB A.M. Peak (With)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    Lafay

    ette

    Jacks

    on

    John I

    relan

    d

    Wes

    tern

    Dale

    Victo

    ria

    Lexin

    gton

    Ham

    line

    Snell

    ing

    Fairv

    iew

    Vand

    alia

    Pelha

    m

    Hwy 2

    8027

    th

    W. R

    iver

    25th

    Ceda

    r11

    thI-3

    5W

    Grov

    eland

    I-94 I

    nterc

    hg

    Dunw

    oody

    Union

    Pac R

    RPe

    nn

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    B-6 Cambridge Systematics, Inc.

    I-94 WB P.M. Peak (With)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    Lafay

    ette

    Jacks

    on

    John I

    relan

    d

    Wes

    tern

    Dale

    Victo

    ria

    Lexin

    gton

    Ham

    line

    Snell

    ing

    Fairv

    iew

    Vand

    alia

    Pelha

    m

    Hwy 2

    8027

    th

    W. R

    iver

    25th

    Ceda

    r11

    thI-3

    5W

    Grov

    eland

    I-94 I

    nterc

    hg

    Dunw

    oody

    Union

    Pac R

    RPe

    nn

    Location

    Sp

    eed

    (mp

    h)

    I-94 EB P.M. Peak (Without)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    Union

    Pac R

    R

    Dunw

    oody

    I-94 I

    nter

    chg

    Grov

    eland

    I-35W 11

    thCe

    dar

    25th

    W. R

    iver

    27th

    Hwy 2

    80

    Pelh

    am

    Vand

    alia

    Fairv

    iew

    Snell

    ing

    Ham

    line

    Lexin

    gton

    Victo

    riaDa

    le

    Wes

    tern

    John I

    relan

    d

    Jacks

    on

    Lafay

    ette

    Mou

    nds

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    Cambridge Systematics, Inc. B-7

    I-94 WB A.M. Peak (Without)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    Lafay

    ette

    Jacks

    on

    John

    Irela

    nd

    Wes

    tern

    Dale

    Victo

    ria

    Lexin

    gton

    Ham

    line

    Snell

    ing

    Fairv

    iew

    Vand

    alia

    Pelh

    am

    Hwy 2

    8027

    th

    W. R

    iver

    25th

    Ceda

    r11

    thI-3

    5W

    Grov

    eland

    I-94 I

    nter

    chg

    Dunw

    oody

    Union

    Pac R

    RPe

    nn

    Location

    Sp

    eed

    (mp

    h)

    I-94 WB P.M. Peak (Without)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    Lafay

    ette

    Jacks

    on

    John I

    relan

    d

    Wes

    tern

    Dale

    Victo

    ria

    Lexin

    gton

    Ham

    line

    Snell

    ing

    Fairv

    iew

    Vand

    alia

    Pelha

    m

    Hwy 2

    8027

    th

    W. R

    iver

    25th

    Ceda

    r11

    thI-3

    5W

    Grov

    eland

    I-94 I

    nterc

    hg

    Dunw

    oody

    Union

    Pac R

    RPe

    nn

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    B-8 Cambridge Systematics, Inc.

    I-35E NB P.M. Peak (With)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    Unive

    rsity

    Penn

    sylva

    nia

    BNSF

    Sout

    h

    Mar

    yland

    Arlin

    gton

    Larp

    enteu

    r

    Rose

    lawn

    CR-B

    Hwy 3

    6

    Littl

    e Can

    ada

    Owas

    so

    I-35E

    /I-69

    4 Merg

    e

    Edge

    rton

    I-35E

    /I-69

    4 Spl

    itCR

    -E

    BNSF

    Nor

    thCR

    -FCR

    -96

    Location

    Sp

    eed

    (mp

    h)

    I-35E SB A.M. Peak (With)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    90.00

    CR-F

    BNSF

    Nor

    thCR

    -E

    I-35E

    /I-69

    4 Merg

    e

    Edge

    rton

    I-35E

    /I-69

    4 Spl

    it

    Owas

    so

    Littl

    e Can

    ada

    Hwy 3

    6CR

    -B

    Rose

    lawn

    Larp

    enteu

    r

    Arlin

    gton

    Mar

    yland

    BNSF

    Sout

    h

    Penn

    sylva

    nia

    Unive

    rsity

    Wac

    outa

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    Cambridge Systematics, Inc. B-9

    I-35E NB P.M. Peak (Without)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    Unive

    rsity

    Penn

    sylva

    nia

    BNSF

    Sout

    h

    Mar

    yland

    Arlin

    gton

    Larp

    enteu

    r

    Rose

    lawn

    CR-B

    Hwy 3

    6

    Littl

    e Can

    ada

    Owas

    so

    I-35E

    /I-69

    4 Mer

    ge

    Edge

    rton

    I-35E

    /I-69

    4 Spl

    itCR

    -E

    BNSF

    Nor

    thCR

    -FCR

    -96

    Location

    Sp

    eed

    (mp

    h)

    I-35E SB A.M. Peak (Without)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    CR-F

    BNSF

    Nor

    thCR

    -E

    I-35E

    /I-69

    4 Merg

    e

    Edge

    rton

    I-35E

    /I-69

    4 Spl

    it

    Owas

    so

    Littl

    e Can

    ada

    Hwy 3

    6CR

    -B

    Rose

    lawn

    Larp

    enteu

    r

    Arlin

    gton

    Mar

    yland

    BNSF

    Sout

    h

    Penn

    sylva

    nia

    Unive

    rsity

    Wac

    outa

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    B-10 Cambridge Systematics, Inc.

    I-494 CR-61 NB P.M. Peak (With)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    50.00

    Carls

    onCR

    -6

    TH-55

    Rock

    ford

    Schm

    idt L

    kCR

    -47

    Bass

    LkI-4

    94

    Bass/

    Wed

    gwd

    Fish\

    Wed

    gwd

    Wea

    ver/

    Wed

    gwd

    Vick

    sbur

    g

    Dunk

    irk

    Targ

    et

    Location

    Sp

    eed

    (mp

    h)

    I-494 CR-61 SB A.M. Peak (With)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    Dunk

    irk

    Vick

    sbur

    g

    Wea

    ver/

    Wed

    gwd

    Fish\

    Wed

    gwd

    Bass/

    Wed

    gwd

    I-494

    Bass

    LkCR

    -47

    Schm

    idt L

    k

    Rock

    ford

    TH-55

    CR-6

    Carls

    on

    Carls

    on/I

    -494

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    Cambridge Systematics, Inc. B-11

    I-494 CR-61 NB P.M. Peak (Without)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    Carls

    onCR

    -6

    TH-55

    Rock

    ford

    Schm

    idt L

    kCR

    -47

    Bass

    LkI-4

    94

    Bass/

    Wed

    gwd

    Fish\

    Wed

    gwd

    Wea

    ver/

    Wed

    gwd

    Vick

    sbur

    g

    Dunk

    irk

    Targ

    et

    Location

    Sp

    eed

    (m

    ph

    )

    I-494 CR-61 SB A.M. Peak (Without)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    Dunk

    irk

    Vick

    sbur

    g

    Wea

    ver/

    Wed

    gwd

    Fish\

    Wed

    gwd

    Bass/

    Wed

    gwd

    I-494

    Bass

    LkCR

    -47

    Schm

    idt L

    k

    Rock

    ford

    TH-55

    CR-6

    Carls

    on

    Carls

    on/I

    -494

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    B-12 Cambridge Systematics, Inc.

    I-494 Vick NB P.M. Peak (With)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    50.00

    Glea

    son

    CR-6

    Hwy 5

    5

    Rock

    ford

    Schm

    idt L

    kCR

    -47

    Bass

    Lk

    Wea

    ver

    Wea

    ver L

    k95

    th

    Location

    Sp

    eed

    (mp

    h)

    I-494 Vick SB A.M. Peak (With)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    50.00

    Wea

    ver L

    k

    Wea

    ver

    Bass

    LkCR

    -47

    Schm

    idt L

    k

    Rock

    ford

    Hwy 5

    5CR

    -6

    Glea

    son

    Carls

    on To

    wers

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    Cambridge Systematics, Inc. B-13

    I-494 Vick NB P.M. Peak (Without)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    50.00

    Glea

    son

    CR-6

    Hwy 5

    5

    Rock

    ford

    Schm

    idt L

    kCR

    -47

    Bass

    Lk

    Wea

    ver

    Wea

    ver L

    k95

    th

    Location

    Sp

    eed

    (mp

    h)

    I-494 Vick SB A.M. Peak (Without)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    Wea

    ver L

    k

    Wea

    ver

    Bass

    LkCR

    -47

    Schm

    idt L

    k

    Rock

    ford

    Hwy 5

    5CR

    -6

    Glea

    son

    Carls

    on To

    wers

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    B-14 Cambridge Systematics, Inc.

    I-35W TH-77 NB A.M. Peak (With)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    McA

    ndre

    ws12

    7thI-3

    5E Cliff

    Diffl

    ey

    Hwy 1

    3

    Blac

    k Dog

    Old S

    hako

    pee

    Location

    Sp

    eed

    (mp

    h)

    I-35W TH-77 NB A.M. Peak (Without)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    70.00

    80.00

    McA

    ndrew

    s12

    7thI-3

    5E Cliff

    Diffl

    ey

    Hwy 1

    3

    Blac

    k Dog

    Old S

    hako

    pee

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    Cambridge Systematics, Inc. B-15

    I-94 Univ WB A.M. Peak (With)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    7th

    Lafay

    ette

    Jacks

    on Rice

    Wes

    tern

    Dale

    Victo

    ria

    Lexin

    gton

    Haml

    ine

    Snell

    ing

    Fairv

    iew

    Vand

    alia

    Hwy 2

    8027

    th

    Huro

    n

    Chur

    ch

    Was

    hingto

    n

    Location

    Sp

    eed

    (mp

    h)

    I-94 Univ WB P.M. Peak (With)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    7th

    Lafay

    ette

    Jacks

    on Rice

    Wes

    tern

    Dale

    Victo

    ria

    Lexin

    gton

    Haml

    ine

    Snell

    ing

    Fairv

    iew

    Vand

    alia

    Hwy 2

    8027

    th

    Huro

    n

    Chur

    ch

    Was

    hingto

    n

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    B-16 Cambridge Systematics, Inc.

    I-94 Univ EB P.M. Peak (Without)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    Chur

    ch

    Huro

    n27

    th

    Hwy 2

    80

    Vand

    alia

    Fairv

    iew

    Snell

    ing

    Haml

    ine

    Lexin

    gton

    Victo

    riaDa

    le

    Wes

    tern

    Rice

    Jacks

    on

    Lafay

    ette

    7th

    Mou

    nds

    Location

    Sp

    eed

    (mp

    h)

    I-94 Univ WB A.M. Peak (Without)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    7th

    Lafay

    ette

    Jacks

    on Rice

    Wes

    tern

    Dale

    Victo

    ria

    Lexin

    gton

    Ham

    line

    Snell

    ing

    Fairv

    iew

    Vand

    alia

    Hwy 2

    8027

    th

    Huro

    n

    Chur

    ch

    Was

    hingt

    on

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    Cambridge Systematics, Inc. B-17

    I-94 Univ WB P.M. Peak (Without)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    7th

    Lafay

    ette

    Jacks

    on Rice

    Wes

    tern

    Dale

    Victo

    ria

    Lexin

    gton

    Ham

    line

    Snell

    ing

    Fairv

    iew

    Vand

    alia

    Hwy 2

    8027

    th

    Huro

    n

    Chur

    ch

    Was

    hingto

    n

    Location

    Sp

    eed

    (mp

    h)

    I-94 Marsh EB P.M. Peak (With)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    Ceda

    r/Rv

    rside

    Ceda

    r/M

    innhh

    Fran

    k/M

    innh

    h26

    th33

    rd27

    thLa

    ke

    Creti

    n

    Fairv

    iew

    Snell

    ing

    Ham

    line

    Lexin

    gton

    Victo

    ria Dale

    Wes

    tern

    Sum

    mit

    John

    Irela

    nd

    Rice

    /Uni

    v

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    B-18 Cambridge Systematics, Inc.

    I-94 Marsh WB A.M. Peak (With)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    Rice

    /Univ

    John

    Irela

    nd

    Sum

    mit

    Wes

    tern

    Dale

    Victo

    ria

    Lexin

    gton

    Ham

    line

    Snell

    ing

    Fairv

    iewCr

    etin

    Lake 27

    th33

    rd26

    th

    Fran

    k/M

    innhh

    Ceda

    r/M

    innh

    h

    Ceda

    r/Rv

    rside

    Location

    Sp

    eed

    (m

    ph

    )

    I-94 Marsh WB P.M. Peak (With)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    Rice

    /Uni

    v

    John

    Irela

    nd

    Sum

    mit

    Wes

    tern

    Dale

    Victo

    ria

    Lexin

    gton

    Ham

    line

    Snell

    ing

    Fairv

    iewCr

    etin

    Lake 27

    th33

    rd26

    th

    Fran

    k/M

    innh

    h

    Ceda

    r/M

    innhh

    Ceda

    r/Rv

    rside

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    Cambridge Systematics, Inc. B-19

    I-94 Marsh EB P.M. Peak (Without)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    Ceda

    r/Rv

    rside

    Ceda

    r/M

    innh

    h

    Fran

    k/M

    innh

    h26

    th33

    rd27

    thLa

    ke

    Creti

    n

    Fairv

    iew

    Snell

    ing

    Ham

    line

    Lexin

    gton

    Victo

    riaDa

    le

    Wes

    tern

    Sum

    mit

    John

    Irela

    nd

    Rice

    /Univ

    Location

    Sp

    eed

    (mp

    h)

    I-94 Marsh WB A.M. Peak (Without)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    Rice

    /Uni

    v

    John

    Irela

    nd

    Sum

    mit

    Wes

    tern

    Dale

    Victo

    ria

    Lexin

    gton

    Ham

    line

    Snell

    ing

    Fairv

    iewCr

    etin

    Lake 27

    th33

    rd26

    th

    Fran

    k/M

    innh

    h

    Ceda

    r/M

    innhh

    Ceda

    r/Rv

    rside

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    B-20 Cambridge Systematics, Inc.

    I-94 Marsh WB P.M. Peak (Without)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    Rice

    /Univ

    John

    Irela

    nd

    Sum

    mit

    Wes

    tern

    Dale

    Victo

    ria

    Lexin

    gton

    Ham

    line

    Snell

    ing

    Fairv

    iewCr

    etin

    Lake 27

    th33

    rd26

    th

    Fran

    k/M

    innhh

    Ceda

    r/M

    innh

    h

    Ceda

    r/Rv

    rside

    Location

    Sp

    eed

    (m

    ph

    )

    I-35E Rice NB P.M. Peak (With)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    Penn

    sylva

    nia

    Hatch

    Mar

    yland

    Arlin

    gton

    Larp

    enteu

    r

    Rose

    lawn

    CR-B

    Hwy 3

    6CR

    -C

    Owas

    soI-6

    94CR

    -F

    Hwy 9

    6

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    Cambridge Systematics, Inc. B-21

    I-35E Rice SB A.M. Peak (With)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    CR-F

    I-694

    Owas

    soCR

    -C

    Hwy 3

    6CR

    -B

    Rose

    lawn

    Larp

    enteu

    r

    Arlin

    gton

    Mar

    yland

    Hatch

    Penn

    sylva

    nia

    Unive

    rsity

    Location

    Sp

    eed

    (mp

    h)

    I-35E Rice NB P.M. Peak (Without)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    Penn

    sylva

    nia

    Hatch

    Mar

    yland

    Arlin

    gton

    Larp

    enteu

    r

    Rose

    lawn

    CR-B

    Hwy 3

    6CR

    -C

    Owas

    soI-6

    94CR

    -F

    Hwy 9

    6

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    B-22 Cambridge Systematics, Inc.

    I-35E Rice SB A.M. Peak (Without)

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    60.00

    CR-F

    I-694

    Owas

    soCR

    -C

    Hwy 3

    6CR

    -B

    Rose

    lawn

    Larp

    enteu

    r

    Arlin

    gton

    Mar

    yland

    Hatch

    Penn

    sylva

    nia

    Unive

    rsity

    Location

    Sp

    eed

    (mp

    h)

    I-35E Edge NB P.M. Peak (With)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    Min

    neha

    haCa

    se

    Mar

    yland

    Arlin

    gton

    Larp

    enteu

    r

    Rose

    lawn

    CR-B

    Hwy 3

    6

    Littl

    e Can

    ada

    Labo

    re

    I-35E

    /I-69

    4

    Vadn

    aisCR

    -ECR

    -F

    Hwy 9

    6

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    Cambridge Systematics, Inc. B-23

    I-35E Edge SB A.M. Peak (With)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    CR-F

    CR-E

    Vadn

    ais

    I-35E

    /I-69

    4

    Labo

    re

    Littl

    e Can

    ada

    Hwy 3

    6CR

    -B

    Rose

    lawn

    Larp

    enteu

    r

    Arlin

    gton

    Mar

    yland

    Case

    Minn

    ehah

    a

    Payn

    e

    Location

    Sp

    eed

    (mp

    h)

    I-35E Edge NB P.M. Peak (Without)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    Minn

    ehah

    aCa

    se

    Mar

    yland

    Arlin

    gton

    Larp

    enteu

    r

    Rose

    lawn

    CR-B

    Hwy 3

    6

    Littl

    e Can

    ada

    Labo

    re

    I-35E

    /I-69

    4

    Vadn

    aisCR

    -ECR

    -F

    Hwy 9

    6

    Location

    Sp

    eed

    (mp

    h)

  • Twin Cities Ramp Meter Evaluation – Appendix to the Final Report

    B-24 Cambridge Systematics, Inc.

    I-35E Edge SB A.M. Peak (Without)

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    40.00

    45.00

    50.00

    CR-F

    CR-E

    Vadn

    ais

    I-35E

    /I-69

    4

    Labo

    re

    Littl

    e Can

    ada

    Hwy 3

    6CR

    -B

    Rose

    lawn

    Larp

    enteu

    r

    Arlin

    gton

    Mar

    yland

    Case

    Min

    neha

    haPa

    yne

    Location

    Sp

    eed

    (mp

    h)

    AppA.pdfAppendix A�Dates and Locations of License Plate Number Data Collection

    AppB.pdfAppendix B�Summary of Field Data: Freeway and Arterial Speeds

    AppE.pdfAppendix€E�Socioeconomic Distribution of Market Research Samples

    AppF.pdfAppendix€F�Geocoding of Respondents’ �Origin-DestinationTripsData PreparationGeocoding Methodology

    AppG.pdfTOC.pdf1.0Project Background1-12.0Evaluation Team2-13.0Evaluation Objectives3-14.0Performance Measures and Evaluation Methodologies4-14.1Evaluation Measures4-14.2Overview of Evaluation Methodologies4-4

    5.0Test Plan for Field Data Collection5-15.1Corridor Selection Process5-15.1.1Identify the Corridor Selection Criteria5-25.1.2Identify Candidate Corridors5-25.1.3Apply Corridor Selection Criteria and Select Corridors �To Be Studied5-3

    5.2Field Data Collection Plan5-35.2.1Field Data Collection Schedule5-115.2.2Evaluation Objectives5-12

    5.3Field Data Analysis Plan5-285.4Field Data Management Plan5-295.4.1Field Data Collection, Transfer, and Storage5-295.4.2Field Data Security5-295.4.3Configuration Control5-295.4.4Documentation of External Influences5-305.4.5Quality Control and Quality Assurance5-30

    6.0Test Plan for Focus Groups and Surveys6-16.1Qualitative Research€– Focus Groups6-16.2Quantitative Research€– Traveler Surveys6-3

    7.0Test Plan for Benefit/Cost Analysis7-18.0Test Plan for Secondary Research8-19.0Schedule, Meetings, and Deliverables9-19.1Project Schedule9-19.2Meetings9-29.3Reports and Presentations9-3

    LOT&LOF.pdf3.1Evaluation Goals and Objectives3-24.1Evaluation Measures4-25.1Candidate Corridors for Ramp Meter Evaluation5-45.2Candidate Corridors for Ramp Meter Evaluation Versus Criteria5-75.3Field Data Collection Schedule5-115.4.Ramps Selected for Manual Field Data Collection5-215.5Summary of Performance Measures and Data Sources5-282.1Evaluation Team2-35.1Candidate Corridors for Ramp Meter Evaluation5-65.2Twin Cities Corridors Selected for Detailed Evaluation5-105.3I˚494 Corridor5-155.4I˚35W Corridor5-165.5I˚94 Corridor5-185.6I˚35E Corridor5-199.1Project Schedule9-2

    Text.pdf1.0Project Background22.0Evaluation Team3.0Evaluation Objectives44.0Performance Measures and Evaluation Methodologies(4.1Evaluation Measures(4.2Overview of Evaluation Methodologies

    55.0Test Plan for Field Data Collection(5.1Corridor Selection Process5.1.1Identify the Corridor Selection Criteria5.1.2Identify Candidate Corridors5.1.3Apply Corridor Selection Criteria and Select Corridors To Be Studied

    (5.2Field Data Collection Plan5.2.1Field Data Collection Schedule5.2.2Evaluation Objectives5.2.2.1Objective€1: Assess Traffic Flow Impacts5.2.2.2Objective€2: Assess Travel Time Impacts5.2.2.3Objective€3: Assess Ramp Impacts5.2.2.4Objective€4: Assess Safety Impacts5.2.2.5Objective€5: Assess Transit Impacts5.2.2.6Summary of Performance Measures and Data Sources

    (5.3Field Data Analysis Plan

    (5.4Field Data Management Plan5.4.1Field Data Collection, Transfer, and Storage5.4.2Field Data Security5.4.3Configuration Control5.4.4Documentation of External Influences5.4.5Quality Control and Quality Assurance

    66.0Test Plan for Focus Groups and Surveys(6.1Qualitative Research€– Focus Groups(6.2Quantitative Research€– Traveler Surveys

    77.0 Test Plan for Benefit/Cost Analysis8.0Test Plan for Secondary Research99.0Schedule, Meetings, and Deliverables(9.1Project Schedule(9.2Meetings(9.3Reports and Presentations

    LOT&LOF.pdf3.1Evaluation Goals and Objectives3-24.1Evaluation Measures4-25.1Candidate Corridors for Ramp Meter Evaluation5-45.2Candidate Corridors for Ramp Meter Evaluation Versus Criteria5-75.3Field Data Collection Schedule5-115.4.Ramps Selected for Manual Field Data Collection5-215.5Summary of Performance Measures and Data Sources5-282.1Evaluation Team2-35.1Candidate Corridors for Ramp Meter Evaluation5-65.2Twin Cities Corridors Selected for Detailed Evaluation5-105.3I˚494 Corridor5-155.4I˚35W Corridor5-165.5I˚94 Corridor5-185.6I˚35E Corridor5-199.1Project Schedule9-2

    TOC.pdf1.0Project Background1-12.0Evaluation Team2-13.0Evaluation Objectives3-14.0Performance Measures and Evaluation Methodologies4-14.1Evaluation Measures4-14.2Overview of Evaluation Methodologies4-4

    5.0Test Plan for Field Data Collection5-15.1Corridor Selection Process5-15.1.1Identify the Corridor Selection Criteria5-25.1.2Identify Candidate Corridors5-25.1.3Apply Corridor Selection Criteria and Select Corridors �To Be Studied5-3

    5.2Field Data Collection Plan5-35.2.1Field Data Collection Schedule5-115.2.2Evaluation Objectives5-12

    5.3Field Data Analysis Plan5-285.4Field Data Management Plan5-295.4.1Field Data Collection, Transfer, and Storage5-295.4.2Field Data Security5-295.4.3Configuration Control5-295.4.4Documentation of External Influences5-305.4.5Quality Control and Quality Assurance5-30

    6.0Test Plan for Focus Groups and Surveys6-16.1Qualitative Research€– Focus Groups6-16.2Quantitative Research€– Traveler Surveys6-3

    7.0Test Plan for Benefit/Cost Analysis7-18.0Test Plan for Secondary Research8-19.0Schedule, Meetings, and Deliverables9-19.1Project Schedule9-19.2Meetings9-29.3Reports and Presentations9-3

    AppI.pdfText.pdfQualitative Research with TravelersOverviewChapter 1: “With Meters”Key FindingsGeneral Ramp Meter PerceptionsAwareness of Ramp Meter BenefitsRamp Meter Performance MeasuresAttitudes toward Ramp Meter ShutdownsInformation Needs for Ramp Meter Shutdowns

    Implications

    Chapter 2: “Without Meters”Key FindingsGeneral Reactions toward Ramp Meter ShutdownsImpact of Ramp Meter Shutdowns on Travel BehaviorsMedia Coverage of Ramp Meter ShutdownsEvaluation of Ramp Meter Shutdown ExperimentPreferences for Alternative Ramp Meter Solutions

    Implications

    BeforeGroupSession.pdfRAMP METER STUDY – QUALITATIVE RESEARCH

    AfterGroupSession.pdfRAMP METER STUDY – QUALITATIVE RESEARCH

    FocusGroupScreener.pdfINTRODUCTIONGROUP ASSIGNMENT GRID

    AppK.pdfAppendix K�Technical Memorandum€– Secondary Research(1.0Basics of Ramp Metering

    (2.0Extent, Type, and Usage of Ramp MeteringExtentSystem WarrantLocations for Ramp MeteringControllersHours of Operation

    (3.0Ramp Metering Goals and Strategies

    (4.0Ramp ConfigurationGeometric ConfigurationExperiences in Several CitiesQueue Detectors

    ((5.0Measures of Effectiveness(6.0Public Relations Efforts and Public Feedback(7.0Enforcement Issues(8.0Future Plans for Ramp Metering Systems by Implementing Agencies(9.0Keys to a Successful Ramp Metering Program(10.0Keys to a Good Ramp Metering Study/Evaluation(11.0Suggested Interviewees(12.0Peer City InterviewsSeattle, WashingtonPhoenix, Arizona