Image: Google Earth
Mobility Corridor Concepts :Mira Mesa Community Plan Update
www.PlanMiraMesa.org
Planning Department March 16, 2020
5:30 p.m. to 6:50 p.m. – Mira Mesa Community Plan Update Advisory Committee – Recorded Presentation
2
Alex Frost
Project ManagerCity of San Diego
Planning Department
Amy Jackson
Project Engineer Kimley-Horn Associates
Claudia Brizuela
Associate Traffic EngineerCity of San Diego Planning
Department
PresenterPlanning Department
3
1. Mira Mesa Community Plan Update Schedule
2. Recap - Miramar Gateway Urban Design Concepts
3. Mobility Corridor Concepts
Planning Department
Item 2 postponed
Agenda
4
Planning Department Mira Mesa Plan Update Schedule
TECHNICAL STUDY (Mobility, Land Use, Urban Design, & Environment)
Urban Design III:Employment Centers
Community Workshop• Land Use,
Urban Design, & Mobility Concepts
2019
Nov18
2020
Feb20
Online Tool
2019
Oct31
Forum on Employment Area: @Qualcomm
Mobility Vision & Recap (10/21 Meeting & Forum)
2020
April 20
2020
Mar16
Mobility Corridor Concepts
TBD
2020
June3
2020
Aug17
Land Use Scenarios• Workshop
& Online Tool Results
2020
May18
Urban Design IV:Shopping Center Revision
2020
June15
No Meeting
@ Mira Mesa High School
Tentative
SCENARIO 2:EMPLOYMENT VILLAGE
~1,892 units
~535,000 SF of office
~40,000 SF of retail
~22 acres of pedestrian space
~13 acres of open space
SCENARIO 3:FLEX VILLAGE
Market to Determine(TBD with KMA input)
MIRAMAR GATEWAY
BLACK MOUNTAIN RD – ALL OPTIONSSCENARIO 1:
BUSINESS & INDUSTRIAL~1,144 units
~3.6 million SF of office
~85,000 SF of retail
~46 acres of pedestrian space
~33 acres of open space
Discussion
postponed
Mobility Corridor Concepts
Outline
Planning Department
Feedback to Community Concerns
Review of Approach to Mobility
Recommended Networks
Proposed Corridors and Intersections
Next Steps
What We’ve Heard
Planning Department
•Carroll Canyon Road
•Need to invest in transit first
•Miramar Road
•Pedestrian safety around MM Town Center
• Improve access across I-15
•Rails to Trails
Carroll Canyon Road
Planning Department
• Public Works Dept project
• Alignment Study for City segment
• Coordination:• MTS – Elevate SD
2020
• SANDAG –April 2020 Presentation to Board
• Center Median BRT
Transit First
Planning Department
•Elevate SD 2020
•How does BRT/Flex Lane compare to trolley?
• Transit along Miramar Road
Miramar Road
Planning Department
• Transit down the middle
• Remove center lane
• Consider semi truck traffic
• Security around MCAS Miramar (Nothing elevated near base)
• City has taken all input into consideration • Shared with MCAS Miramar – received no objections
Increase Access to Scripps Ranch
Planning Department
Update:
• Caltrans Coordination
• Pedestrian activated crossing
• Class I Multi-Use Path
• Structure across I-15
Rails to Trails
Planning Department
• “Rails to Trails”
• New Orleans, LA Case Study
WHEAT
TRADE
MIRAMAR
PLESS
ARJONS
CA
M S
AN
TA
FE
DO
WD
Y
AN
DE
RS
ON
CA
BO
T
OB
RE
GO
N
BAUER
DIS
TR
IBU
TIO
N
PR
OD
UC
TIO
N
SILVERTON
CONSOLIDATED
CA
RR
OLL
DAVIS
CO
MM
ER
CE
ED
SO
N
RE
HC
O
KENAMAR
DUNBROOK
UNNAMED MILITARY
MIR
ALA
NI
FORMULA
SUMMERS RIDGE
WA
RE
MIRAMAR WEST GATE
CR
ES
TM
AR
MIR
A E
ST
E
ALE
SM
ITH
SP
EC
TR
UM
BIO
LE
GE
ND
MIL
CH
PLE
SS
MIRAMAR
E1 inch = 1,000 feet
Fallow Railway Parcels
Coordination
Traffic Operations: Traffic control, Parking, Bicycle & Pedestrian facilities
Bus Operations & ServiceElevateSD 2020
Regional Transportation ImprovementsFrom Now to 2050
Development Projects, Temporary Traffic Control, Permitting
Freeway & Highway Operations
Land Use and Mobility
Planning Department
Community PlanOpen
Space & Parks
Mobility Planning
Land Use Planning
Process Flow
Planning Department
NETWORK CORRIDOR INTERSECTION
Primary Strategies for Recommended Networks
Planning Department
Create a network of separated bikeways & parallel low-stress routes for local trips
Enhance walkable connections for residents, students, employees, and retail visitors
Maximize roadway efficiency to move more people
Make transit a competitive and reliable option
MOBILITYNETWORK
Revise recommendations based on public input
Proposed Transit Network
Planning Department
Proposed Bike Network
Planning Department
Proposed Pedestrian Network
Planning Department
Proposed Vehicle Modifications
Planning Department
Planning Department
Focus Corridors
Planning Department
Camino Ruiz
Primary Focus Corridors
Planning Department
Camino Ruiz
Primary Focus Corridors
• Corridor-wide Improvements• Complete corridor
• Separated bikeways
• Flexible Lanes
Planning Department
Camino Ruiz at Mira Mesa Blvd
Primary Focus Corridors – Intersection Concept
Planning Department
Westview Parkway
Primary Focus Corridors
Planning Department
Westview Parkway
Primary Focus Corridors
• Corridor-wide Improvements• Complete corridor
• Separated bikeways
• Flexible Lanes
Planning Department
Westview Pkwy at Mira Mesa Blvd
Primary Focus Corridors – Intersection Concept
Planning Department
Mira Mesa Boulevard
Primary Focus Corridors
Planning Department
Mira Mesa Boulevard
Primary Focus Corridors
• Corridor-wide Improvements• Separated bikeways
• Sustainable Mobility for Adaptable and Reliable Transportation (SMART) corridor
Planning Department
Mira Mesa Blvd at Pacific Heights Blvd
Primary Focus Corridors – Intersection Concept
Planning Department
Miramar Road
Primary Focus Corridors
Planning Department
Miramar Road
Primary Focus Corridors
• Corridor-wide Improvements• Regional bikeways
• SMART corridor
• Dynamic lane
Planning Department
Miramar Rd at Kearny Villa Dr
Primary Focus Corridors – Intersection Concept
Planning Department
Black Mountain Road
Primary Focus Corridors
Planning Department
Black Mountain Road
Primary Focus Corridors
• Corridor-wide Improvements• Complete
corridor
• Separated bikeways
Planning Department
Black Mountain Rd at Mira Mesa Blvd
Primary Focus Corridors – Intersection Concept
Planning Department
Camino Santa Fe
Primary Focus Corridors
Planning Department
Camino Santa Fe
Primary Focus Corridors
• Corridor-wide Improvements• Separated bikeways
Planning Department
Camino Santa Fe at Flanders Dr
Primary Focus Corridors – Intersection Concept
Planning Department
Carroll Canyon Road
Primary Focus Corridors
Planning Department
Carroll Canyon Road
Primary Focus Corridors
Planning Department
Activity Road
Secondary Focus Corridors
(looking east)
Planning Department
Barnes Canyon Rd/ Scranton Rd
Secondary Focus Corridors
(looking north/east)
Planning Department
Capricorn Way
Secondary Focus Corridors
(looking east)
Planning Department
Flanders Drive
Secondary Focus Corridors
(looking east)
Planning Department
Gold Coast Drive
Secondary Focus Corridors
(looking east)
Planning Department
Kearny Villa Road
Secondary Focus Corridors
(looking north)
Planning Department
Lusk Boulevard
Secondary Focus Corridors
(looking east)
Planning Department
Pacific Heights Boulevard
Secondary Focus Corridors
(looking north)
Planning Department
Vista Sorrento Parkway
Secondary Focus Corridors
(looking north)
Planning Department
Sorrento Valley Pkwy/Calle Cristobal
Secondary Focus Corridors
(looking east)
Next Steps
• Community workshop for Mobility, Land Use, and Urban Design (June 3rd)
• Refine networks/concepts based on feedback
• Model and analyze future network
• Questions/comments?Email: [email protected]
For more information please visit:
www.PlanMiraMesa.org
Planning Department