MOBLAS 7 Timer Test. Howard Donovan NASA SLR HTSI. ILRS Fall Workshop 2005 – Eastbourne, UK. Test Parameters. Aluminum Bar ~8 feet in length Bar fixed to Calibration Pier and Aligned with Beam Path Retro placed on Bar and moved 6 inches each data set - PowerPoint PPT Presentation
Popular Tags:
6
ILRS Fall Workshop 2005 – Eastbourne, UK 1 MOBLAS 7 Timer Test ILRS Fall Workshop 2005 – Eastbourne, UK Howard Donovan NASA SLR HTSI
Transcript
Page 1: MOBLAS 7 Timer Test

ILRS Fall Workshop 2005 – Eastbourne, UK 1

MOBLAS 7 Timer Test

ILRS Fall Workshop 2005 – Eastbourne, UK

Howard DonovanNASA SLRHTSI

Page 2: MOBLAS 7 Timer Test

ILRS Fall Workshop 2005 – Eastbourne, UK 2

Test Parameters

• Aluminum Bar ~8 feet in length

• Bar fixed to Calibration Pier and Aligned with Beam Path

• Retro placed on Bar and moved 6 inches each data set

• Standard Calibration Test of ~1000 Returns (~5 minutes)

• Maintained Receive Energy from Data Set to Data Set

• No Changes to Telescope Pointing

Page 3: MOBLAS 7 Timer Test

ILRS Fall Workshop 2005 – Eastbourne, UK 3

Calibration Pier C

Page 4: MOBLAS 7 Timer Test

ILRS Fall Workshop 2005 – Eastbourne, UK 4

M7 & T4 Simultaneous Stability TestsTLRS-4 Stability Test August 26, 2005 @ 09:13 GMT

17.45

17.5

17.55

17.6

17.65

9:07:12 9:14:24 9:21:36 9:28:48 9:36:00 9:43:12 9:50:24 9:57:36 10:04:48 10:12:00 10:19:12

Sys

Del

ay (

ns)

System Delay (ns)

Avg. RMS = 5.61 mm Peak -to- Peak External Temperature Variation = 0.60 c

Peak -to- Peak System Delay Variation Target C= 3.30 mm

Moblas-7 Stability Test August 26, 2005 @ 09:13 GMT

97.3

97.35

97.4

97.45

97.5

9:07:12 9:14:24 9:21:36 9:28:48 9:36:00 9:43:12 9:50:24 9:57:36 10:04:48 10:12:00 10:19:12

Sys

Del

ay (

ns)

System Delay (ns)

Avg. RMS = 4.78 mm Peak -to- Peak External Temperature Variation = 0.55c

Peak -to- Peak System Delay Variation Target C= 1.50 mm

TLRS-4 Closeout Stability Test Sept 26, 2005 @ 07:02 GMT

17.45

17.5

17.55

17.6

17.65

6:57:36 7:04:48 7:12:00 7:19:12 7:26:24 7:33:36 7:40:48 7:48:00 7:55:12 8:02:24

Sys

Del

ay (

ns)

System Delay (ns)

Avg. RMS = 5.46 mm Peak -to- Peak External Temperature Variation = 0.60 c

Peak -to- Peak System Delay Variation Target C= 1.80 mm

Moblas-7 Closeout Stability Test Sept 8, 2005 @ 07:02 GMT

97.3

97.35

97.4

97.45

97.5

6:57:36 7:04:48 7:12:00 7:19:12 7:26:24 7:33:36 7:40:48 7:48:00 7:55:12 8:02:24

Sys

Del

ay (

ns)

System Delay (ns)

Avg. RMS = 4.63 mm Peak -to- Peak External Temperature Variation = 0.46c

Peak -to- Peak System Delay Variation Target C= 1.95 mm

Page 5: MOBLAS 7 Timer Test

ILRS Fall Workshop 2005 – Eastbourne, UK 5

MOBLAS 7 Range Residual vs Target Range

-50

-40

-30

-20

-10

0

10

20

30

40

50

0.00 0.50 1.00 1.50 2.00 2.50

Target Range Change (m)

On

e W

ay

Ra

ng

e R

es

idu

al (

mm

)

MOBLAS 7 Timer Test

Page 6: MOBLAS 7 Timer Test

ILRS Fall Workshop 2005 – Eastbourne, UK 6

TLRS 4 Stability TestTLRS-4 Stability Test Jun 1, 2005 @22:26 GMT

15.15

15.2

15.25

15.3

15.35

22:19:12 22:26:24 22:33:36 22:40:48 22:48:00 22:55:12 23:02:24 23:09:36 23:16:48 23:24:00 23:31:12

Sys

Del

ay (

ns)

System Delay (ns)

Peak -to- Peak System Delay Variation Target C= 5.1mm

Peak -to- Peak external Temperature Variation = 2.15cAvg. RMS = 5.4mm

TLRS-4 Stability Test July 12, 2005 @ 00:47 GMT

17.45

17.5

17.55

17.6

17.65

0:40:19 0:47:31 0:54:43 1:01:55 1:09:07 1:16:19 1:23:31 1:30:43 1:37:55 1:45:07 1:52:19

Sys

Del

ay (

ns)

System Delay (ns)

Avg. RMS = 5.14 mm Peak -to- Peak external Temperature Variation = 1.8 c

Peak -to- Peak System Delay Variation Target C= 1.8 mm

After Installation of Low-Loss Receive Cable (System Delay Change)


Recommended