EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 1
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
Klaus-Dieter Warnatzehem. Landesumweltamt Brandenburg
E-mail: [email protected]. 0049 355 535434
Model de raport pentru masuratorile emisiilorAnexa F EN 15259:2007
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 2
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
Modelul de raport al masuratorilor de emisii conform EN 1525 9 Anexa F
Raportarea emisiilor in legislatia UEOperatorul catre autoritateDirectiva IPPC - articolul 24 (2) din OUG 152/2005:
Raportarea regulata asupra emisiilor unei instalatii
Directiva de incinerare a deseurilor, articolul 11 (20 00/76/EG)
Toate rezultatele masuratorilor trebuie sa fie inregistrate intr-un mod adecvat, prelucrate sireprezentate pentru a permite autoritatilor competente respectarea conditiilor de functionareautorizate si a valorilor limita de emisie (..).
Directiva instalatiilor mari de ardere, Art. 13 (2001/ 80/EC)
Statele membre iau masuri adecvate pentru ca operatorul sa informeze autoritatilecompentente (..) asupra rezultatelor masuratorilor continue, verificarii dispozitivelor de masurare si asupra masuratorilor discontinue (..).
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 3
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
Raportarea emisiilor in legislatia UEStatele membre catre ComisieObligatia raportarii asupra emisiilor de ex. conform Directivei IPPC, Art.15, alin.3 sau Dir. LCP Anexa VIII, litera B
ComisiaRegistrul european al emisiilor de poluanti (EPER)
Registrul european pentru eliberarea si transferul poluantilor (E-PRTR)
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 4
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
Sunt necesare standarde unitare pentru monitorizarea emis iilorin statele membre ale Uniunii Europene.
-Incinerarea deseurilor si Directiva LCP
Prelevarea de probe si analiza poluantilor precum si metodele de referinta pentrumasuratori pentru calibrarea sistemelor automate de masuarre se vor desfasuraconform standardelor CEN.
Daca nu sunt disponibile standarde CEN, atunci se vor aplica standardele ISO, standardele nationale sau alte standarde internationale care asigura determinareadatelor stiintifice similare.
- BREF „Principiile generale ale monitorizarii “
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 5
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
Expectatiile de la un raport al masuratorilor de emisii
� Cum s-a ajuns la rezultatul masuratorii?
- Ce metode de masurare s-au utilizat?- S-au facut masuratori la un serviciu reprezentativ in cosul de evacuare a gazelor?
- Cat de des s-a masurat?- Cat de mari sunt marjele de eroare?
� Cum a functionat instalatia?
- A functionat instalatia intr-o stare de emisii maxime?- Ce substante s-au utilizat (combustibili, substante utilizate)?- Cum s-a exploatat instalatia inclusiv instalatia de epurare a gazelor emise?
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 6
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
� Informatiile referitoare la instalatie- Amplasamentul instalatiei- Din ce parti se compune instalatia /descrierea instalatiei?- Ce substante se pot utiliza in instalatie?- Datele tehnice ale instalatiei?- Ce surse de emisie exista?- Ce valori limita de emisie s-au stabilt, raportat la autorizatie?
� Alte informatii
- Cine a desfasurat masuratorile (persoanele implicate cu numarul de telefon)? - Cine este respeonsabil pentru rezultate masurate ?- Ocazia masuratorilor
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
Expectatiile catre un raport al masuratorilor de emisii
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 7
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
Cuprins
1. Formularea obiectivului masuratorii
2. Descrierea instalatiei si a substantelor utilizate
3. Descrierea punctului de prelevare
4. Metodele de masurare si analiza, aparatura
5. Starea de functionare a instalatiei in timpul masurator ilor
6. Listarea rezultatelor masurate si discutarea
7. Anexe1. Planul masuratorilor (dupa caz)2. Valori masurate si calculate (documentatia datelor ori ginale)3. Catalogul informatiilr asupra instalatiilor de reducere a emisiilor4. Catalogul datelor de functionare a instalatiilor de epurare a gazelor emise
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 8
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
1. Formularea obiectivului de masurat1.1 - 1.3 Clientul, operatorul, operatorul
1.4 Tipul instalatiei (de ex. instalatia de ardere, combustibili utilizati, incadrarea conform autorizatiei)
1.5 Data masuratorii
1.6 Ocazia masuratorii (de ex. masuratorile de verificare pentru respectarea limitelor de emisii)
1.7 Descrierea obiectivului
- Descrierea anvergurii masuratorii (in ce parti de instalatie se fac masuratori)
- Raportarea la autorizatie si la conditiile din aceasta
- Listarea valorilor limita din autorizatie
1.8 Mentionarea componentelor de masurat (de ex. pulberile, monoxidul de carbon, NO, NO2, SO2, PCCD/F)
1.9 Mentionarea persoanelor implicate la prelevarea d e probe
1.11 Implicarea altor institute
1.12 Numele responsabililor pentru masuratori (incl. nu mar telefon)
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 9
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
Cauza masuratorilor discontinue ale emisiilorDe ex.:
• Masurarea la receptie (demonstratia pentru garantie)
• Verificarea respectarii limitelor de emisie
• Masuratorile de ex. in cazul sesizarilor
• Masuratorile pentru inceperea procedurii de autorizare
• Masuratorile in cadrul auto-monitorizarii
• Masuratorile la disturbarile in functionare
• Masuratorile in cadrul verificarilor tehnice de siguranta
• Masuratorile pentru calibrarea dispozitivelor de masurare cont inua a emisiilor
• Masuratorile de verificare a functionarii dispozitivelor d e masurare continua
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 10
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
2. Descrierea instalatiei, substantele manipulate
2.1 – 2.2 Tipul instalatiei, descrierea instalatiei- Descrierea pe scurt a instalatiei si a proceselor incl. a dispozitivelor de epurare a gazelor- Nominalizarea partilor de instalatie, importante pentru aparitia poluantilor atmosferici- Mentionarea datelor tehnice ale capacitatiiExemplu fabrica ciment:
- Cuptor rotativ cu preincalzirea prin ciclon, incl. schema de proces a cuptorului- Datele capacitatii: puterea termica, capacitatea de clincher- alte instalatii relevante pentru emisii (moara, siloz, etc.)
2.3 Amplasamentul instalatiei si descrierea surselor de em isiede ex. amplasamentul instalatiei, sursele de emisie, inaltimea de la sol, suprafata de iesire, longitudine si
latitudine2.4 Mentionarea materialelor posibil a fi utilizate confo rm autorizatiei
2.5 Timpii de functionare
2.6 Instalatia de captare si reducere a emisiilor
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 11
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
3. Descrierea punctului de prelevare
3.1 Pozitia sectiunii de masurare
Pozitia sectiunii de masurare:
Lungimea distantei de intrare:Lungimea distantei de iesire:Mentionarea pozitiei exacte a sectiunii de masurare in sistemul de conducte a gazelor emise. Precizarea pozitiei sectiunii de masurare se va face in asa fel incat din descriere sa se poata inteleagadaca pozitia punctului de prelevare este reprezentativa pentru conditiile de evacuare a gazului(prelevarea isocinetica).
3.3 Numarul axelor de masurare si pozitia punctelor de ma surare in sectiunea de masurare
Pentru prelevarea emisiilor poate fi necesar sa se determine punctul de masurare reprezentativ pentrusectiunea de masurare. La mentionarea doar a unui punct de masurare in sectiunea de masurare trebuiesa fie dovedita reprezentativitatea sa intr-un mod coerent.
3.2 Diametru conductei de gaz la o inaltime a sectiunii de masurare sau cu precizareadimensiunilor sectiunii de masurare
Dimensiunile sectiunii de masurare: - Diametru: - Suprafata sectionata:
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 12
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
Lungimea de masurare:
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
1 Punct de masurare
2 Axa de masurare
3 Sectiunea de masurare
4 Stutul de masurare
5 Suprafata transversata
6 Locul de masurare
7 dispozitive manuale de prelevare
8 Lungimea de masurare
9 Lungimea de iesire
10 Lungimea de intrare
Simboluri
D Diametrul intern al cosului
• In sectiunea de masuraretrebuie sa fie posibilemasuratori reprezentative ale debitului volumic si ale concentratiei masice
• Intr-un domeniu in care suntpreconizate conditii de curgere si concentratratiiomogene (la o sectiunedreapta de canal) : Lungimeade intrare ≥ 5* Dh; lungimeade iesire ≥ 2* Dh; Distantapana la capatul canalului ≥ 5* Dh)
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 13
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
Descrierea prelevarii de probe – axele de masurare
Axa de masurare
Axa de masurare
Canalul pentrugazul evacuat
Exemplu pentru o platformade masurare la un cosperpendicular pe sol cu douaaxe de masurare si patrudeschideri pentrudesfasurarea masuratorilor in treverse
(sunt posibile mai multeproceduri de masurareconcomitente)
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 14
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
Descrierea punctului de prelevare – masurarea in retea
Sectiunea rotunda cu 2 axe de masurare si 8 puncte de masurare pro axa de masurare
Sectiune patrata cu 9 puncte de masurare in total
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 15
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
Descrierea punctului de prelevare – masurarea in retea
Distribuirea debitului masic
neomogen
omogen
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 16
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
4. Metoda de masurare si analiza, aparatele utilizate
4.1 Determinarea conditiilor marginale pentru evacuare a gazelor
4.1.1 Determinarea vitezei de curgere (de ex. prin conducta Prandtl):
4.1.2 Determinarea presiunii statice in cosul gazului de evacuat
4.1.3 Determinarea presiunii aerului in inaltimea punct ului de prelevare
4.1.4 Determinarea temperaturii gazelor evacuate
- Informatii asupra aparatelor de masurare utilizate: de ex. termometru de rezistenta, termoelement, Ni-Cr-Ni,
- Informatii asupra reprezentativitatii punctului de masurare- Inregistrarea valorilor masurate cu dispozitive de inregistrare, prelucrarea valorilor medii la
jumatate de ora
4.1.5 Determinarea umiditatii gazelor emise (de ex. Adsorptia apen silicagel/clorura de calciu)
4.1.5 Determinarea densitatii gazelor emise (de ex. metoda de calcul)
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 17
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
4.2 Emisiile gazoase si sub forma de aburi
4.2.1 Metode de masurare continue (informatia pentru fie care obiect masurat)
4.2.1.1 Obiectul de masurare (de ex. O2, NOx, SO2, CO, C total)4.2.1.2 Metoda de masurare/Directiva:4.2.1.3 Analizator (Producator/Tip)4.2.1.4 Domeniu de masurare4.2.1.5 Tipul dispozitivelor este verificat asupra aplic abilitatii
4.2.1.6 Construirea locului de masurare (sonda de prelevare, tipul conductei de prelevare a gazului, racitorul gazului de masurare, debitul)
4.2.1.7 Verificarea liniei caracteristice cu gaze de ver ificare (gazul utilizat la verificare, garantiastabilitatii)
4.2.1.8 90 %-timp de reglare al intregii structuri de m asurare
4.2.1.9 Inregistrarea valorilor masurate (de ex. continuu cu dispozitiv de scriere, integrator al valorilor masurate)
4.2.2 Metoda discontinua de masurare4.2.2.1 Obiectul masurat (de ex. HCl, HF, aldehida)
4.2.2.2 Metoda de masurare/directiva:4.2.2.3 Dispozitivele pentru prelevarea de probe (sonda de prelevare, sistemul de absorptie)
4.2.2.4 Stabilirea analitica (de ex. ioncromatografia, dispozitiv, producator, limitele de detectare)
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 18
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
4.3 Emisiile sub forma de particule
4.3.1 Metoda de masurare /Directiva:
4.3.2 Dispozitivele de prelevare
o Filtru plan: o capatul de filtrare cu invelis de lana de cuart:o Impactor cascada:
Sonda de prelevare: Material: incalzit/neincalzit:
4.3.3 Pregatirea si evaluarea mediului de separare
– Temperatura de uscare si timpul de uscare al mediumului de separare inainte si dupaincarcare:
– Spatiu climatizat: da / nu
4.3.4 Parametrii de proces (limitele de detectare, marja de eroare, analiza erorilor)
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 19
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
Masuratorile de pulberi
Exemplu de instalatie pentru prelevarea probei de pulberi cu aparat cu capat de filtrare plat (in cos) si sistem de absorptie pentru substantele continute in pulberice trec de filtru
1: turn de uscare 2: manometru3: dispozitiv volumetric al gazelor (uscat) cu termometru4: Dispozitiv de masurare al debitului (corp plutitor)5: Ventil de reglare 6: Pompa de vacuum
Canalul de gaz evacuat
Sonda de exhaustare
Filtruplan
Coloana aspirare, incalzita
Sistemde absorptie
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 20
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
Masuratori ale pulberilor – prelevare izocinetica
Viteza la exhaustare ok prea mic prea mare
Influenta erorilor la exhaustare (prelevarea izocinetica)
Particulemari
Particulemici
Deschidereasondei
Dire
ctia
de c
urge
re
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 21
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
• Prelevarea particulelor din debitul gazului emis trebuie sa ai ba loc in conditiiizocinetice:
Vitezele particulelor si a gazelor trebuie sa fie egale pentru a preveni o separare sau o deranjare a distribuirii granulatiei corespunzator portanteiparticulelor.
• Altfel, rezultate false ale analizei pentru substantele sol ide masurate:Daca rata de prelevare este prea mare, atunci continutul de pulberi masurat
este prea mic si invers.
Acest mecanism depinde de distribuirea granulatiei. La particulele cu un diametruaerodinamic <5 - 10 µm este neglijabil practic efectul portant.
Masuratorile de pulberi – prelevarea izocinetica
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 22
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
4.5 Substantele continute in pulberi (substantele sub fo rma de particule sinefiltrabile)
4.4.1 Obiectul masurat4.4.2 Bazele metodei de masurare/Directiva:
4.4.3 Dispozitivele pentru prelevare
4.4.4 Pregatirea si evaluarea filtrelor masurate si a mat erialelor absorbibile
4.4.5 Parametrii de proces: interferente, abateri standard, limite de detectare
4.4 Emisiile de miros
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 23
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
5. Starea de functionare a instalatiei in timpul masurato rilor
5.1 Instalatia de productie
5.1.1 Modul de functionare (de ex. starea de functionare, incarcarea, pornierea, starea de functionarereprezentativa, starea speciala de functionare relevanta pentru emisii)
5.1.2 Debit/putere (datele de proces, abur, productia de clincher)
– Substante utilizate /combustibilii / combustibilii secundari
– marimile de functionare caracteristice (de ex. puterea termica actionata, puterea de topire)
5.2 Instalatiile de epurare a gazelor reziduale– Datele de functionare (de ex. electrofiltru: inregistrarea curentului; spalator: valoarea pH, debitului, mediu
de spalare; abssorptia uscata conditionata: cantitatea de agenti de sorptie)
– Temperaturile de functionare (post-arderea termica, spalator, catalizator)
– parametrii ce influenteaza emisiile (de ex. timpul de functionare al catalizatorului)
– abaterea functionarii conforme- ultima mentenanta
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 24
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
6. Compunerea rezultatelor masurate si discutiile
6.1 Evaluarea conditiilor de functionare in timpul masurat orilor
- Informatii asupra evenimentelor deosebite
Datele vor trebui sa inregistreze abaterile pentru functionarea normala si efectele asupra comportamentuluiemisiilor provenite din instalatie. Trebuie sa se mentioneze daca a fost suprins la momentul masuratorii stareade functionare a instalatiei care provoaca emisiile maxime.
6.2 Rezultatele masuratorilor- Documentatia tuturor rezultatelor discontinue (de ex. valorile medii la jumatate de ora) cu parametrii
(presiunea, umiditatea,temperatura, continutul O2) in forma tabelara. - Mentionarea concentratiilor si a debitelor masice ca si valori maxime si valori medii. La utilizarea
dispozitivelor de masurare ce pot inregistra este necesara adaugarea inregistrarii prin imprimare. - Pentru toate valorile masurate se vor preciza si marjele de eroare.
6.3 Verificarea plauzibilitatiiSe va derula o verificare a plauzibilitatii rezultatelor masurate raportate la utilizarea la capacitate
maxima a instalatiilor in timpul masuratorii.
Modelul de raport al masuratorilor de emisii conform EN 15259 Anexa F
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 25
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;
ExempluRezultatele masuratorilor
Raportate la gazul emis uscatRaportate la gazul emis uscat
Debit masic
Valoareamedie
continutDebitul volumic
Nr. masruratoare
Data
Inceput
Sfarsit
EU-Twinning Project RO2006/IB/EN-09“Implementation and Enforcement of the Environmenta l Acquis
at National Level and Coordination of 8 Regional Tw inning Projects” Phase II
Klaus-Dieter WarnatzMember State Short Term ExpertBucharest, 16tth to 20thof March 2009 26
Component 4: Operational Duties / Integrated Permitting Procedure / Emission MonitoringActivity 4.1: Harmonization of the permitting procedure;