MODERN PROJECT MANAGEMENT
SYSTEM MATURITY MODELS : THE ESSENCE AND
COMPARISONS
Strelchuk Yulia
Maturity model of project management system is a set of parameters that correspond to a certain stage of the development of
the project management system.
MODERN MATURITY MODEL OF PROJECT MANAGEMENT SYSTEM
Kerzner's technological maturity model; Berkeley PM Maturity Model (5-Level (PM)2 Model) Organizational Project Management Maturity Model
(OPM3); Capability Maturity Model for Software (SW CMM)
Kerzner's technological maturity model
Berkeley PM Maturity Model
Organizational Project Management Maturity Model or OPM3
Capability Maturity Model for Software
Existing PMM models differ in their scope, structure, and areas of analyzed organizational project management. These differences include the following: "maturity" definition in the logical structure of the model, project management knowledge areas are used and the scope of maturity model. However, various maturity models typically describe the specific project management dimensions, related to maturity levels. The basic principle of construction for all models is the transition from a lower level of maturity (a general awareness of project management) to a higher level, which provides continuous process of the improvement of the project management
system.