Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav
Transcript
Page 1: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Modifications of infrastructure for Smart Grids

„Wake up from dreams to tough reality“

18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav

Page 2: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Content

Overall information:

•Works range and their time intensity

•Power outage planning and complications

Chosen accomplishments:

•Installation of smart meters at the CEZ Headquarters

•Installation of repeaters of the BPL technology

New solutions for installation of Smart Grids technology:

•Electrical distributor with a Smart Grids Module

•Distribution substation with a Smart Grids Module

Page 3: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Overall information

Within the WPP AMM project the AMM technology was installed in almost

1000 distribution substations

Furthermore was installed:

•over 100 couplers of the PLC MV technology;

•tens of repeaters of the BPL technology;

•and many others.

3-membered team → installation of AMM technology into one substation/day

Installation of the AMM technology includes:

•creation of interface in substation

•installation and start up of the AMM technology

Necessary power outage for installation → limitation of consumers

Power outage is necessary to plan at least 2 months in advance!!

Precise coordination → alpha and omega of AMM technology installations…

Page 4: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Coordination: what is connected with installation of AMM technology?„Decalogue of AMM“

Coordination of several outages and teams during one day:

1.Logistics of power outages…

2.Preparation for the day „D“ (material, possible complications etc.)

3.Verification of the right phase rotation before power outage

4.Acceptance of worksite by AZ Elektrostav before installation

5.Drawing of circuit diagram in Microstation in field

6.Creation of detailed photo documentation before and after installation

7.Functionality verification of the installed technology with the control

8.Acceptance of worksite by ČEZ Distribuční služby after installation

9.Issuance of works inspector‘s report

10.Preparation and signing of completion certificates and complete

documentation with ČEZ Měření and ČEZ Distribuce

Page 5: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Installation of smart meters at the CEZ Headquarters

„Able to measure – able to economize“:

• Installation of the AMM technology for power

circuits of each individual floor

• Measured data transmission and its display in

foyer → on-line consumption monitoring

Page 6: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Black-out simulation at the CEZ Headquarters:outcomes

CEZ News: CEZ Headquarters in Prague became best measured

office building in Central Europe…

Page 7: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Repeaters installation of the BPL technology

High-speed transmission→ high frequency → shorter range

Smart Region Vrchlabí:

• task to install about 30 repeaters in a plastic box

• indicated as routine installations → each box „4 screws and a

cord“

• drawn ambitious plan „2-membered team will install in 3 days“

i.e. 10 boxes a day…

Repeaters installation Ad hoc:

1. do we have project documentation ???

2. is settlement of property rights carried out ???

3. is power outage for installation planned???

• I will rather stop asking…

Page 8: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Repeaters installation of the BPL technology

1) Installation of box

with repeater

2) Repeater installation

on the door (outside)

3) Repeater installation

inside the stand

4) Repeater installation

on the cover

5) Repeater installation

on the door (inside)

Installations carried

out without outages!!i.e. without consumer limitations

Page 9: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Electrical distributor with a Smart Grids Module

Dimensions of Smart

Grids Module [mm]:

• 750x500

• 750x750

• 1000x500

• 1000x750

Out of 800 modules

only 7 modules were

greater than 1000x750

→ less than 1%

Page 10: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Distribution substationwith a Smart Grids Module

Dimensions of Smart

Grids Module [mm]:

• 750x500

• 750x750

• 1000x500

• 1000x750

In the picture is AMM

technology for

double distribution

substation

Page 11: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Lack of space in doubledistribution substation

Page 12: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Distribution substationwith a Smart Grids Module:KO_1174

KO_1174 became

best measured

distribution

substation in

Central Europe:

Smart Meter PLC MV

Quality Meter E-GPRS

MEG

2 sets of convertors

Inside temp. sensor

Outside temp. sensor

Page 13: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Distribution substationwith a Smart Grids Module:temperature development in KO_1174

Max. operating

temperature of

smart meters is

usually around

70°C (some types

only 55°C)

•All-concrete

substation balances

temperature

oscillation

•in CZ is max. load in

winter

-15

-10

-5

0

5

10

0:00

1:00

2:00

3:00

4:00

5:00

6:00

7:00

8:00

9:00

10:0

0

11:0

0

12:0

0

13:0

0

14:0

0

15:0

0

16:0

0

17:0

0

18:0

0

19:0

0

20:0

0

21:0

0

22:0

0

23:0

0

0:00

Tem

pera

ture

Cold Winter Day

3.2.2012 in

3.2.2012 out

0,0

5,0

10,0

15,0

20,0

25,0

30,0

0:00

1:00

2:00

3:00

4:00

5:00

6:00

7:00

8:00

9:00

10:0

0

11:0

0

12:0

0

13:0

0

14:0

0

15:0

0

16:0

0

17:0

0

18:0

0

19:0

0

20:0

0

21:0

0

22:0

0

23:0

0

0:00

Tem

pera

ture

Warm Spring Day

11.4.2012 in

11.4.2012 out

Page 14: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Distribution substationwith a Smart Grids Module:advantages

All-concrete

compact

substations are a

phenomenon of

these days:

•minimum visual

interference

External boxes:

•on the edge of the

Construction Law

•complications with

other laws

Page 15: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

„Make it smart is the way to the future“

Thank you for your attention!

Milan Kloubec

Page 16: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

Milan KloubecSmart Grids Expert

Milan Kloubec manages installations and modifications of infrastructure for Smart Grids carried out by AZ Elektrostav in the framework of the AMM Pilot Project of CEZ Group. Together with his colleagues designed and implemented various solutions for installation of Smart Grids technology not only into existing infrastructure of the distribution system but also into its new types. Hand in hand with such solutions helps to increase efficiency of processes connected with installation of Smart Grids technology.

From 2001 to 2008, Milan Kloubec successively worked as an IT specialist at the CSOB bank, as an assistant to business director of E.ON Czech Republic, as an inventory management specialist at Pauwels Trafo Ireland and as an specialist of transmission system operation at E.ON Netz in Germany.

Milan Kloubec graduated from the Czech Technical University in Prague, Faculty of Electrical Engineering and from the University of Economics in Prague, Faculty of Business Administration. He also studied at the VitusBering University in Denmark, Saint Petersburg Polytechnical University in Russia, Instituto Tecnológico y de Estudios Superiores de Monterrey in Mexico, Université de Montréal and McGill University in Canada.

Page 17: Modifications of infrastructure for Smart Grids „Wake up from dreams to tough reality“ 18. 4. 2012 Špindlerův Mlýn Milan Kloubec, AZ Elektrostav.

AZ Elektrostav, a.s. & Eltraf, a.s.

AZ Elektrostav, a.s.www.az-elektrostav.cz

AZ Elektrostav – privately held joint-stock company – was founded in 1992 and since then has become one of the most complex and important electrical engineering companies in the Czech Republic with many activities also in abroad. Its field of activity permanently expands hand in hand with its credo to realize power engineering projects and constructions from A to Z.

Promoting synergy and efficiency, AZ Elektrostav closely cooperates with its subsidiaries – among others with the joint-stock company Eltraf that has become one of the most progressive producers of transformer stations of various types.

In the framework of the Advanced Metering Management Pilot Project of CEZ Group, AZ Elektrostav carried out key installations of the AMM technology and interfaces in Distribution Substations. Also, in cooperation with its subsidiary Eltraf produced Distribution Substations and Electrical Distributors ready for installation of Smart Grids Modules.

AZ Elektrostav is a member of the Czech Committee of CIRED, the Leading Forum where the Electricity Distribution Community meets.