of 22
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
1/22
888-320-8050
www.MBSI.com
http://www.mbsi.com/http://www.mbsi.com/7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
2/22
Key ContactPatricia Berk - President & Owner of MBSI Patricia Berk incorporated MBSI in April of 2000.
MBSI has become the leading environmentally consciousmodular company in the State of Florida.
Prior to MBSI, Ms. Berk held positions as Executive VicePresident and was a shareholder of ASAP Office Buildingsin Orlando, Florida, 1996-1999.
Branch Manager for the Central Florida branch of SpaceMaster International, 1993-1996.
Account Executive for Diamond Engineered Space, 1989-1993.
Phone 888-320-8050GUATEMALA HOUSING REVITALIZATION
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
3/22
About MBSI MBSI is a solely owned corporation based in the
State of Florida, United States.
MBSI is a certified general contracting firm,specializing in modular construction with Turn KeyServices.
The Company was established April 10, 2000 withits primary business in the South East, USA.
MBSI has established themselves in the alternativebuilding marketplace as a leader with energy
efficient and environmentally friendly buildings.
GUATEMALA HOUSING REVITALIZATION
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
4/22
MBSIs Mission To exceed client expectations through
honest communication, quality construction
and sensitivity for the environment, whilefostering a safe, creative and ethicalworkplace that provides unlimitedopportunities.
To be major contributor to the developmentand quality of modular construction whileproviding impeccable customer service and
communication.
GUATEMALA HOUSING REVITALIZATION
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
5/22
MBSI Business Philosophy To attain successful long-term relationshipsthrough truthful and honest business
procedures.
- Utilize proven manufacturers, qualitymaterials, and provide cost effective
construction.- Committed to meeting all client
requirements, for total customer satisfaction.
GUATEMALA HOUSING REVITALIZATION
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
6/22
Environmental Focus Provider of the first platinum-level
Leadership, Energy and Environmental
Design (LEED) Certified modular school inthe State of Florida Introduced green building practices in allaspects of MBSI as standard practices.
We use use certified green products in ourmodular buildings in order to minimize offgassing and conserve energy
GUATEMALA HOUSING REVITALIZATION
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
7/22
Market Sectors Commercial Housing
- Group treatment homes, Dormitories, Military Housing,Worker Camps
Schools
- Charter, Public and Private, Gymnasiums, Classrooms,Auditoriums
Medical
- CT/MRI Buildings, X-Ray Storage, AdministrativeBuildings, Doctors Offices, Hospitals, Laboratories
Churches/Places of Worship- Daycare & Child Care, Offices, Fellowship Halls,
Sanctuary's, Business Offices
Government
- Administrative Offices, dormitories, field stations,Grelocatable medical centers
http://mbsi.com/building-types/commercial-sales-centers.html/http://mbsi.com/building-types/education.htmlhttp://mbsi.com/building-types/medical.htmlhttp://mbsi.com/building-types/places-of-worship.htmlhttp://mbsi.com/building-types/government.htmlhttp://mbsi.com/building-types/government.htmlhttp://mbsi.com/building-types/places-of-worship.htmlhttp://mbsi.com/building-types/medical.htmlhttp://mbsi.com/building-types/education.htmlhttp://mbsi.com/building-types/commercial-sales-centers.html/7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
8/22
Types of Products Provided
Factory Built Modular Structures
Pre-engineered Steel Buildings
Turn Key Site Services
Building Accessories
GUATEMALA HOUSING REVITALIZATION
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
9/22
Recent Completed Projects
Shands Hospital MRI/CT Scan ModularFacility
Learning Gate Community School, PlatinumLevel LEED Certified Hillsboro CountyPublic Charter School.www.learninggate.org
Terrace Community Charter Middle School-Hillsboro County Public Charter School
50,000 sq. ft. classroom space EmbryRiddle Aeronautical University
GUATEMALA HOUSING REVITALIZATION
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
10/22
Jacksonville Medical Center MRI/CT can, type II non
combustible modularmedical facility.
5000 Square feet.
Contracted November2007
Finished March 2008
To know about MBSIs other medical buildings and projects,
visit http://mbsi.com/building-types/medical.html
http://mbsi.com/building-types/medical.htmlhttp://mbsi.com/building-types/medical.htmlhttp://mbsi.com/building-types/medical.htmlhttp://mbsi.com/building-types/medical.html7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
11/22
Learning Gate School
9 Classrooms, 8000
Sq. Feet
First Platinum LEEDCertified ModularSchool in U.S.
Receiving NationalAttention
www.learninggate.org
To know about MBSIs other educational buildings and projects,
visit http://mbsi.com/building-types/education.html
http://mbsi.com/building-types/education.htmlhttp://mbsi.com/building-types/education.htmlhttp://mbsi.com/building-types/education.htmlhttp://mbsi.com/building-types/education.html7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
12/22
Terrace Community
Charter School Built in 2007
Two Buildings
totaling 36,000 sq.feet. Administrative
Offices
Gymnasium
30 Classrooms
Cafeteria
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
13/22
An Overview of the
Permanent/Relocatable Modular Construction
Engineering & SubmittalsSite Development
Modular Construction
Staging & InstallationInterior & Exterior FinishesProject Completion
2000 Modular Building Systems Intl.
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
14/22
Design Engineering Unlimited Design Assistance
FL Engineered Blueprints
PE /Architect Coordination
Local Permitting Administration
Design Site Development
Modular Construction
Staging and Installation Finishout Completion
2000 Modular Building Systems Intl.
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
15/22
Site Development Site preparation
Foundations
Logistics and receiving for staging
Design Site Development
Modular Construction
Staging and Installation Finishout Completion
2000 Modular Building Systems Intl.
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
16/22
Modular Construction Process Begin Manufacturing Modules Quality control/Documentation
State of FL building approval
Delivery to Site
Design Site Development
Modular Construction
Staging and Installation
2000 Modular Building Systems Intl.
Finishout Completion
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
17/22
Staging & Installation
Foundation Development prior toDelivery
Staging on or near existing site
Set-up and installation
Begin on-site finishes
Design Site Development
Modular Construction
GUATEMALA
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Finishout Completion
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
18/22
Begin On Site Finishes
As modular building is installed, on site Interior &Exterior finishes Begin
Full Time Construction Management
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
On Site CompletionFinishes
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
19/22
Interior Finishes Interior finishes are completed
Full Time Construction Management and Coordination of
Interior Contractors
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Interior Completion
Finishes
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
20/22
Finish OutExterior finishes completed:Exterior siding, sidewalks, canopies, etc
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Exterior Completion
Finishes
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
21/22
Completion Final walkthrough of building Test HVAC, Electrical & Plumbing
Substantial Completion Signed Off
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Finishout Completion
7/28/2019 Modular Building Systems International (MBSI)_Modular Buildings and Construction
22/22
Project Completed
Design Site Development
Modular Construction
Staging and Installation
Begin Finishout
2000 Modular Building Systems Intl.
Finishout Completion