  • 8/14/2019 Module 3_ Project Design and Plan

    1/44

    1

    200

  • 8/14/2019 Module 3_ Project Design and Plan

    2/44

    2

    PROJECT MANAGEMENT TRAINING PROGRAM

    FRAMEWORKModule Topic Highlights Learning

    ResourcesEstimatedMinimumTimeRequirements

    1 Introduction toProjectManagement

    A. Key learning principlesB. Introductions and logisticsC. What is a project?D. Elements of a projectE. Project management toolkit and

    case studyF. Personal experience with projectsG. Individual commitment to learning

    TrainersGuide andTraineeGuide areresourcesavailable tosupport theentiretrainingprogram

    1.5 hours

    2 Project

    ProposalsA. Project proposalsB. Evaluating alternatives

    C. Getting approvals

    Project

    Proposal Tool

    1.5 2 hours

    3 Project Designand Plan

    A. Project CharterPlan first, then do!What is a project charter?Key elements of a project charter

    ProjectCharter Tool

    Case Study

    30 hours

    B. Team CreationEstablishing Project Team valuesRoles and ResponsibilitiesConducting Project Team meetings

    ProjectCharter Tool

    Team Tools

    1.5-2 hours

    C. The Project PlanIntroduction to the Detailed ProjectPlanUsing the MilestonesSetting TasksCompleting the Project Plan

    ProjectCharter Tool

    DetailedProjectPlanningTool

    1-2 hours

    D. BudgetingIntroduction to cash budgetsCreating a budget

    Cash BudgetTemplate

    BudgetDetailWorksheetTemplate

    2 hours

    E. Risk ManagementAnticipating and Mitigating Risks

    Risk MatrixTool

    1 hour

    4. ProjectImplementation

    A. Implementing the ProjectTasking and TrackingScope managementRisk Monitoring

    ProjectCharter Tool

    DetailedProjectPlanningTool

    1.5 hours

    B. Change Management 2 hours

  • 8/14/2019 Module 3_ Project Design and Plan

    3/44

    3

    The Human Dynamics of Change andTransitionLeading changeBuilding change into your project plan

    5. PostImplementationReview

    A. Evaluating projects

    B. Lessons learnedC. Project Management training

    evaluation

    PostImplementation Review

    Tool

    1.5 hours

    Menu of Icons :

    Discussion question. Can be facilitated by the trainer in a large group, or byfacilitators in smaller groups. Use the group discussion questions as anopportunity to reinforce that we learn from our positive and negativeexperiencesand that we can learn from others experiences (shared-learning).

    Toolkit. Refer to a specific tool in the Project Management Toolkit.

    Key Learning. Focus on ensuring this key learning is understood.

    Individual Exercise: A reflective, individual exercise facilitated by thetrainer. Allow trainees to consider personal experiences and individual leadershipobjectives.

    Activity: An activity to be facilitated by the trainer, including for example, areview of a project management tool with a case study question, a cash budgetactivity etc.

    Additional Resources: Refer the trainee to additional information (e.g.books, articles, materials on www.canadabridges.com website or on otherwebsites, videos).

    http://www.canadabridges.com/http://www.canadabridges.com/http://www.canadabridges.com/http://www.canadabridges.com/
  • 8/14/2019 Module 3_ Project Design and Plan

    4/44

    4

    MODULE 3: PROJECT DESIGN AND PLAN

    A. Project CharterPlan first, then do!What is a project charter?Key elements of a project charter

    Project CharterTool

    Case Study

    40 hours

    B. Team CreationEstablishing Project Team valuesRoles and ResponsibilitiesConducting Team Meetings

    Project CharterTool

    Team Tools

    1.5-2 hours

    C. The Project PlanIntroduction to the Detailed Project PlanUsing the MilestonesSetting TasksCompleting the Project Plan

    Project CharterTool

    Detailed ProjectPlanning Tool

    1-2 hours

    D. Budgeting

    Introduction to Cash BudgetsCreating a budget

    Cash BudgetTemplate

    Budget DetailWorksheetTemplate

    2 hours

    E. Risk ManagementAnticipating and Mitigating Risks

    Risk Matrix Tool 1 hour

    MODULE 3A: PROJECT CHARTER

    A. Project CharterPlan first, then do!What is a project charter?Key elements of a project charter

    Project CharterTool

    Case Study

    30 hours

    Pre-Project

    Stage

    1. Project

    Design

    and Planning

    2. Plan

    Implementati

    on

    3. Post

    Implementati

    on

  • 8/14/2019 Module 3_ Project Design and Plan

    5/44

    5

    Why? What?

    How?

    Do!

    Monitor

    Revise

    Review

    Celebrate

    MODULE 3A PROJECT CHARTER: PLAN FIRST, THEN DO!

    Discuss how a project is started how ideas move from abstract to tangible.Review the stages of a project from design of the business case for theproject...alternatives need to be explored and choices made on the best options.

    This was discussed in Module 2.

    Reinforce that the focus of training on project management is to plan first, thenact. Taking the time (and resources) to plan is critical. The Project Charterrequires a lot of work before you can move to project implementation.

    Brainstorming Discussion:Following on the discussion in Module 1F aboutpersonal experiences with projects, BRAINSTORM examples of projects (healthcare

    and non-healthcare) that have not been successful. What do you believe made the

    porjects unsuccessful? E.g. budget deficits, lack of resources, lack of clear goals,

    lack of leadership? Record answers on flip chart.

    Introduce and explain the brainstorming technique from the toolkit .

    MODULE 3A PROJECT CHARTER: WHAT IS A PROJECT CHARTER?

    Powerpoint presentation: What is a Project Charter?

    Use the powerpoint to guide your teaching. The Training Guide encourages you to

    use lots of activities, questions, discussions and to record key ideas on flipcharts.

    The powerpoint is only a guide to training.

    What is a Project Charter?

  • 8/14/2019 Module 3_ Project Design and Plan

    6/44

    6

    Formal agreement between the project manager and the key stakeholders

    Tool for managing the expectations of the project sponsor and stakeholders

    Why should I write a Project Charter?

    All future decisions in the project should be evaluated for alignment to theProject Charter

    More likely to get approvals and resources with a formal written ProjectCharter

    Discussion: What are the differences between a Project Proposal andProject Charter?

    Project Proposal Project CharterPurpose: Suggests that a projectshould be initiated

    Purpose: Defines how a project will becompleted

    Often led by sponsor or manager Led by Project ManagerContains a high level estimate ofcosts

    Contains a detailed budget

    Suggests resources and what/whomay be required

    Names resources and gives detailed timerequirements

    Requires review and approval for

    proposal by Project Sponsor

    Requires signoff by Project Sponsor (and

    sometimes key stakeholders)Approval to proceed to detailedplanning

    Approval to proceed with project andbudget

    MODULE 3A PROJECT CHARTER : KEY ELEMENTS

    Toolkit: Go to the Project Management Toolkit and pull out the Project

    Charter Tool. Looking at the tool, review its key elements.

    Project Purpose :

    Describe the opportunity or problem the project will address

    Provide background on why the project has been considered

    Identify the key needs the project will meet

  • 8/14/2019 Module 3_ Project Design and Plan

    7/44

    7

    ACTIVITY #1: Creating a Project Purpose: Create a project purpose forthe Triage Centre using the Case Study

    Key Elements of the Project Charter : Roles

    CASE STUDY: The Mulkulla Mother-Child Hospital (MCH) is located inMulkulla, a coastal city located in the Hadhramout region of Yemen. TheMulkulla MCH is being established as a teaching hospital associated withthe adjacent University of Mulkullas medical school.

    At present, there is an out-patientclinic at the Mulkulla MCH thatcurrently operates 12 hours/day. The leadership team at the hospitalwants to expand the operating hours of the out-patient clinic to 24/hoursper day. The public is really putting pressure on the hospital to open

    24/hours/day.In addition to out-patient services, the Mulkulla MCH has plans in place toestablish a 10-bed pediatric emergency ward.

    To achieve these objectives, the leadership team at the Mulkulla MCH hasdecided to set up a triage station(sorting station) to help the MCH staffrespond to the patients needs. If a triage station is set up in the hospital,the MCH staff can assess patients arriving at the hospital and ensure thatthe right patients get the right treatment at the right time.

    Initially, doctors at the Mulkulla MCH can do the assessing of patients. But,the leadership team ultimately can train nurses to do this triaging with

    focused training (5 days) and support. Nurses wont need to know how todiagnosis the y will need to decide how sick, how quick? Residentpediatric doctors can teach these nurses.

    The idea to set up a triage centre has been discussed with the MCHleadership team and there is enthusiasm for this project. Yet fundingparameters are not clear and a Project Sponsor has not been clearlyidentified. The leadership team is uncertain about how to proceed.

    Mulkulla MCH leadership team and front-line workers have met to discussthe potential project. There is some confusion and lots of questions: Howwill the triage centre work? Will patients being admitted for maternal care

    be assessed at the triage centre? Who should conduct the assessments ofin-patients?

    And, there is concern: existing systems will need to be enhanced: systemsfor admission, transfer, referral and discharge and filing systems must bein lace to make a tria e centre work smoothl .

  • 8/14/2019 Module 3_ Project Design and Plan

    8/44

    8

    The Project Sponsor

    He or she is responsible for approving whether the project can proceedand approve when a deliverable has been met

    The Project Manager

    The primary point of contact for stakeholders

    Responsible for ensuring that the project is completed on time and onbudget

    Key Elements of the Project Charter : Budget

    A budget includes all costs that will be incurred as a result of the project

    Costs that are incurred as a result of operations start- up are also included

    ACTIVITY #2: Would these Items be Included in your Project Budget inthe Triage Centre Case Study?

    1. Project Managers Salary

    2. Medical Supplies

    3. Computer for reception

    4. Project Sponsors Salary

    5. Travel expenses

    6. Computer software

    7. Administrative Expenses

    8. Ambulances

    Key Elements of the Project Charter : Success Criteria

    Define the elements that are critical to the addressing the issues that startedthe project and creating value

    E.g.:

    Decrease patient wait times

    Decrease cost of operations

    Refer back to these success criteria to assist in resolving issues and conflictover scope, budget etc in the future

  • 8/14/2019 Module 3_ Project Design and Plan

    9/44

    9

    Key Elements of the Project Charter : Scope

    This is one of the most important parts of the Project Charter

    Adding or eliminating too many items will make it impossible for you tosucceed

    Consider which things really need to be part of the project and which are justnice to have

    Limiting your scope to those actions that are absolutely necessary toachieving your goal will make it much easier to succeed

    Ask yourself If we dont do this will we still get the results we need?

    Key Elements of the Project Charter: Assumptions

    Typically assumptions, if true would be favourable to the project (e.g. if thisproves to be true, the project benefits)

    These include things like:

    Staff resources will be available in a timely fashion

    Building approvals are not required

    Existing computers could be used for the project

    Use these assumptions to consider contingencies or options in case yourassumptions do not prove true

    Key Elements of a Project Charter : Dependencies

    Those activities or events upon which your project depends on to besuccessful

    Dependencies may include things such as:

    The completion of a related project

    The completion of earlier projects as part of a larger program

    The availability of technology

    Key Elements of a Project Charter : Constraints

  • 8/14/2019 Module 3_ Project Design and Plan

    10/44

    10

    Constraints are typically not favourable to the project if this thing provesto be true, the project suffers

    Constraints may make your project harder to manage or impact your ability todeliver

    Constraints on a project would include such things as:

    Equipment order lead times are unpredictable

    Computer resources can only be accessed weekdays

    No overtime payment is permitted

    Your project plan should incorporate these restrictions and address ways tomanage or mitigate them

    Key Elements of a Project Charter: Milestones

    Accomplishments, results, deliverables and events used to measure overallproject progress

    Milestones should be specific and measurable We can say definitively if theyhave been achieved

    Milestones typically mark the end of a phase such as design, development orconstruction

    ACTIVITY #3: How would you classify the items in the list below:Milestone or Task in the Triage Centre Case Study?

    1. Project Plan Completed

    2. Design approval received

    3. Fence built around construction zone

    4. Communication session for nurses

    5. Construction completed6. Electrical Installed

    7. Training Delivered

  • 8/14/2019 Module 3_ Project Design and Plan

    11/44

    11

    Key Elements of a Project Charter:Resources

    Who do you need to be able to complete your project?

    Consider subject matter experts (such as computer, construction etc) andother team mates you might require. Will there be any new hires or

    consultants required?

    Name Position ProjectResponsibilities

    Current or New % of Time

    Key Elements of a Project Charter: Risks

    Every project has risks. By identifying risks early, you can ensure youminimize them.

    Risks should span the entire project and include everything from resourcingissues, to government and regulatory changes, to budget risks, toconstruction delays and more

    Risks are usually measured according to their likelihood and their severity.

    Risks are discussed in detail later in this module.

    Ensure that all questions are asked, and answered. It is critical thattrainees understand the Project Charter.

  • 8/14/2019 Module 3_ Project Design and Plan

    12/44

    12

    MODULE 3B: TEAM CREATION

    B. Team Creation

    Establishing Project Team valuesRoles and ResponsibilitiesConducting Project Team meetings

    Project CharterTool

    Team Tools

    1.5-2 hours

    MODULE 3B TEAM CREATION : ESTABLISHING PROJECT TEAM VALUES

    SMALL GROUP ACTIVITY #1: Talk about the characteristics and valuesof a highly-effective team using brainstorming and consensus techniques from theteam toolkit.

    Objectives:

    Discuss individual experiences from your best teams Using the consensus technique, develop a list of the characteristics of effective

    teams

    Introduce the team tools from the toolkit and practice brainstorming andconsensus techniques

    Suggested Process for small groups:

    1. Read over the exercise to ensure everyone understands.

    2. Facilitator to introduce the team tools in the toolkit.2. Select a recorder to collect information generated by your team.

    3. Individually, take one minute and think about the best team of which you

    have ever been a member.

    4. Individually, take four minutes and jot down whatever comes to mind that

    makes you think of this as your best team.

    - What did your team do?- How did it work together?- What did you feel?- What characteristics of this team stand out?

    5. Use brainstorming technique and list individual responses (use

    Flipchart in each small group).

  • 8/14/2019 Module 3_ Project Design and Plan

    13/44

    13

    6. Use consensus technique and list what you think are the five most

    importantcharacteristics ofeffective teamsas experienced by your team

    members.

    7. Share your five most important characteristics and any questions about

    consensus with the larger group.

    LARGE GROUP ACTIVITY #2: Highlight the Characteristics of an EffectiveTeam: point to each of the values on the circular chart and explain in a little moredetail. Refer to the materials in the trainees guide.

    Clear Purpose The vision, mission, goal, or task of the team hasbeen defined and is now accepted by everyone.

    Informality The environment tends to be informal, comfortable, andrelaxed.

    There are no obvious tensions or signs of boredom.

    Participation There is much discussion and everyone is encouragedto participate.

    Listening The team uses effective listening techniques such as

    questioning, paraphrasing, and summarizing to get outideas.

    Civilized Disagreement There is a disagreement, but the team is comfortable with thand

    shows no signs of avoiding, smoothing over, or suppressingconflict.

    Consensus Decision For important decisions, the goal is substantial butnot necessarily

    unanimous agreement through open discussion ofeveryones

    ideas, avoidance of formal voting, or easycompromises.

    Open Team members feel free to express their feelings onthe tasks

    Communication as well as on the groups operation. There are fewhidden

  • 8/14/2019 Module 3_ Project Design and Plan

    14/44

    14

    agendas. Communication takes place inside ofmeetings.

    Clear Roles and There are clear expectations about the roles played byeach

    Work Assignments team member. When action is taken, clear

    assignments are madeaccepted, and carried out. Work is fairly distributed.

    Shared Leadership While the team has a formal leader, leadership functionsshift from time to time depending upon the circumstances,the needs of the group, and the skills of the members. Theformal leader models the appropriate behavior and helpsestablish positive norms.

    External Relations The team spends time developing key outside relationships,mobilizing resources, and building credibility with importantplayers in other parts of the organization.

    Style Diversity The team has a broad spectrum of team player types.

    Self-Assessment Periodically, the team stops to examine how well it isfunctioning and what may be interfering with itseffectiveness.

    LARGE GROUP ACTIVITY #3: After the review of the characteristics of an

    effective team, discuss the use of the brainstorming and consensus

    techniques. Did your team follow the rules set out in the Toolkit?

    MODULE 3B TEAM CREATION: TEAM ROLES AND RESPONSIBILITIES

    KEY LEARNINGS: Share the chart below to identify some of the most likelycauses of team dysfunction. Assure trainees that using the tools, and beingproactive in designing and managing project teams, can avoid or minimize theserisks. Emphasize the importance of defining the roles and responsibilities for eachmember of the team.

    Identify the Team Selection Worksheet in the Toolkit as a tool that can helpin identifying members of the Project Team.

  • 8/14/2019 Module 3_ Project Design and Plan

    15/44

    15

    Individual Exercise: Think of a project team that you worked on in

    the last two years. Answer the following questions:

    1. What was your role on the project team? What duties and activities were you

    responsible for? How did you contribute to the accomplishment of the teamsobjectives?

    2. What did you need from others in order to do your job the way you liked to?Be specific, e.g. information, mutual support, communication, careerdevelopment, organization training, workload priorities:-

    What: From Whom:

    3. What did you need to know about other team members jobs and expertise tohelp you do your own work?

    What: From Whom:

    Alternative Small Group Exercise: If the group would prefer more activity, divide

    the trainees into small groups of 5-7 per team. Give each team some building

    materials (e.g. childrens blocks, LEGO blocks, or ask them to use natural items like

    branches and rocks, and ask each team to create a boat or another specific

    structure in 20 minutes. After the building session, ask them to answer the questions

    above.

    KEY LEARNINGS: Make the connection from the past to the present to enable

    team members to see how they can be successful in their new project team roles.Clarify the objectives as:

    MODULE 3B TEAM CREATION: CONDUCTING PROJECT TEAM MEETINGS

    SMALL GROUP ACTIVITY #4: Establishing Team Meeting Norms using

    Brainstorming and Consensus Techniques from the Toolkit

    Suggested Process:

    1. Read over the exercise to ensure that everyone understands.

  • 8/14/2019 Module 3_ Project Design and Plan

    16/44

    16

    2. Select a recorder to collect the information generated by your team.

    3. Use Brainstorming and develop a set of five norms by Consensus

    that your team will use to govern how team members will perform during your

    team meetings (use Flipchart).

    4. Review your Team Meeting Norms. Are they clear and specific? (If

    not, change them.)

    5. Bring your norms to the facilitator for discussion.

    MODULE 3C: THE PROJECT PLAN

    C. The Project Plan

    Introduction to the Detailed Project PlanUsing the MilestonesSetting TasksCompleting the Project Plan

    Project CharterTool

    Detailed ProjectPlanning Tool

    1-2 hours

    MODULE 3C THE PROJECT PLAN: INTRODUCTION TO THE DETAILED PROJECT

    PLAN

    The Detailed Project Plan should be developed after the Project Charterhas been completed, and the Project Team has been identified.

  • 8/14/2019 Module 3_ Project Design and Plan

    17/44

    17

    Review the tool and explain its purpose:

    The purpose of the Detailed Project Plan is to identify specific milestones

    and tasks, and assign timing and accountability to each task.

    The Detailed Project Plan tells us who is going to do whatby when.

    The Detailed Project Plan is used throughout the life of the Project as a tool

    to track progress on each task.

    Pre-Project

    Stage

    1. Project

    Design

    and Planning

    2. Plan

    Implementati

    on

    3. Post

    Implementati

    on

    Why? What?

    How?

    Do!

    Monitor

    Revise

    Review

    Celebrate

  • 8/14/2019 Module 3_ Project Design and Plan

    18/44

    18

    KEY LEARNINGS: Use this chart to discuss the detailed Project Plan

    Phases

    Project PlanPhases

    Description

    PLAN During the Planning Phase, the Project is describedin detail.

    In this phase, the Project Manager will create:

    The Project Proposal

    The Project Charter

    The Project Team

    The Project Budget

    The Detailed Project Plan

    The Risk Assessment

    DO This phase of the project is about putting the ProjectPlan into action.

    The Tasks that were identified in the Project Plan areassigned to individuals on the Project Team, to becompleted by a certain date.

    The Project Manager monitors the Project Teamsprogress, and adjusts resourcing or tasks as required inorder to meet specific milestones.

    REVIEW This phase of the project occurs after the projectactivities are complete.

    In this phase, the Project Monitor will complete the Post-Implementation Review.

  • 8/14/2019 Module 3_ Project Design and Plan

    19/44

    19

    MODULE 3C THE PROJECT PLAN: USING THE MILESTONES

    Discussion Question: The Project Manager will use the timing and high-levelmilestones described in the Project Charter to identify key milestones in theproject. What is a milestone? What are some examples of milestones in the PLAN

    phase...and in the DO phase? Why is it critical to track milestones?

    Use a flipchart to record answers:

    Definition: Milestone

    A Milestone indicates the end of a group of tasks or the

    completion of a key deliverable in the Project. A Milestone is

    used to determine if the Project is on track, according to the

    Detailed Project Plan

    Milestones in the PLAN Phase might, for example, include:

    Project Charter Complete

    Project Budget Complete

    Project Team in Place

    Milestones in the DO Phase might, for example, include:

    Requirements Identified

    Process Design Complete

    Physical Space Secured

    Physical Space Upgrades Complete Health Care Staff Training Complete

    Facility is Ready to Treat Patients (Go Live)

    CASE STUDY ACTIVITY #1: Review the Milestones identified in theProject Charter for the Mulkulla Mother-Child Hospital Triage Centre(Module 3A). Ensure that the Milestones address:

    Physical changes (building, equipment, computers, etc.) that must

    occur

    Regulatory or government approvals that are required

    Hiring, training or other human resources activities that must occur

    Are there any Milestones that have been missed? Insert all Milestones into the

    Detailed Project Plan

  • 8/14/2019 Module 3_ Project Design and Plan

    20/44

    20

    Once the Milestones are identified for a given Project, they should be placed

    in the order in which they will occur

    In the Detailed Project Plan, the Project Manager will assign dates to the

    Milestones

    These dates establish the timing for the entire project, and set the dates forthe beginning, and end, of the Project

    Some dates associated with Milestones may be mentioned in the Project

    Charter; all dates for completion of milestones should be consistent in all

    Project documents

    MODULE 3C THE PROJECT PLAN: SETTING TASKS

    There are a number oftasks that will need to be accomplished to meet

    each Milestone. Use a flipchart to explain tasks and their importance.

    Definition: Task

    A Task is an activity that needs to be accomplished within a defined

    period of time

    Tasks can be described at a very detailed level, and any task might

    have several more detailed tasks, or sub-tasks associated with it

    Tasks should be included that address the Risks identified in the

    Risk Matrix Tool: refer to that document when identifying tasks

    E.g.: Task: Determine training requirements for nursing staff

    Subtask 1: Survey nurses to determine currentpractices

    Subtask 2 : Speak to doctors and ask for their inputon nurses training requirements (i.e. what trainingdo the nurses need to be successful?)

    Subtask 3: Review new processes, and compare tocurrent processes to identify gaps in knowledge

    Subtask 4: Based on gaps, identify trainingrequirements for nurses

  • 8/14/2019 Module 3_ Project Design and Plan

    21/44

    21

    Discussion Question: Once Tasks have been identified and are in the

    appropriate order in the Detailed Project Plan, why is important that each Task be

    assigned to an individual?

    The responsibility for completing each Task should be assigned to a

    single individual, rather than a group, wherever possible.

    Other people may need to be involved or consulted in order to

    complete the Task, but only one person should be named as

    responsible.

    Project Managers may choose to involve the Project Team in this

    exercise in order to encourage buy-in and ownership over individual

    tasks.

    Discussion Question: Now, timing should be assigned to each Task. To

    determine timing, what should you think about? What can we do if we find that

    the Tasks cannot be accomplished by the date assigned to the Milestone? Why

    would a Project Manager involve the Project Team when assigning timing to each

    Task?

    When we think about timing, we need to consider:

    Dependencies: Which tasks must be complete before another can

    start?

    Resources: Can the same people accomplish all of the tasks theyre

    assigned to within a particular period of time?

    Duration: How long will it take to complete each task?

    Project Managers may find that the Tasks they have identified cannot be

    accomplished by the date assigned to the Milestone. In this case, the Project

    Manager can:

    Add resources to the Project Team to accomplish the Tasks faster

    Move the Milestone date

    Remove Tasks that are not critical

    Project Managers may wish to involve the Project Team in assigning timing to

    each Task

    This will ensure that those who are responsible for completing the Tasks

    agree that they can be completed within the given time frame

  • 8/14/2019 Module 3_ Project Design and Plan

    22/44

    22

    MODULE 3C THE PROJECT PLAN: COMPLETING THE PROJECT PLAN

    Once the Detailed Project Plan is completed, it should be shared with:

    The Project Team

    The Project Sponsor

    Copies of this document have been issued to:

    Version

    Name Title DateIssued

    Initials

    Note that the Detailed Project Plan may change as the Project progresses,and dates and resources change

    Each version of the Detailed Project Plan should be saved; when changes

    are made, it is important to be able to refer back to the original Project Plan to

    determine how timing has changed

    The Detailed Project Plan is now ready to be used to monitor progress

    against tasks!

  • 8/14/2019 Module 3_ Project Design and Plan

    23/44

    23

    MODULE 3D: BUDGETING

    D. BudgetingIntroduction to Cash BudgetsCreating a Budget

    Cash BudgetTemplate

    Budget DetailWorksheet

    Template

    2 hours

    MODULE 3D BUDGETING: INTRODUCTION TO CASH BUDGETS

    Key Learning: Introduce the concept of cash budgets

    Discussion Question: Start a discussion to see if people know what a budget is.

    Discuss the importance of budgeting to ensure that a project is well planned and

    sufficient funding is in place.

    Powerpoint presentation: Introduction to Cash Budgets

    Use the powerpoint to guide your teaching. The Training Guide encourages you to

    use lots of activities, questions, discussions and to record key ideas on flipcharts.

    The powerpoint is only a guide to training.

  • 8/14/2019 Module 3_ Project Design and Plan

    24/44

    24

    ACTIVITY: Review the Introduction to Cash Budgets with Examples in theTrainee Workbook. Go though the examples with the students and have themindependently complete Example 2 to ensure they understand.

  • 8/14/2019 Module 3_ Project Design and Plan

    25/44

    25

    Introduction to Cash Budgets With Examples

    A Cash Budget is an estimation of the cash inflows and outflows for a business or

    organization or individual for a specific period of time. Cash budgets are often usedto assess whether the entity has sufficient cash to fulfill regular operations and/or

    whether too much cash is being left in unproductive capacities. It also helps to plan

    for special projects and equipment expenditures.

    A cash budget is extremely important, especially for small businesses, because it

    allows a company to determine how much credit it can extend to customers before

    it begins to have liquidity problems.

    For individuals, creating a cash budget is a good method for determining where

    their cash is regularly being spent. This awareness can be beneficial because

    knowing the value of certain expenditures can yield opportunities for additionalsavings by cutting unnecessary costs.

    For example, without setting a cash budget, spending US $1 a day on a small item

    seems fairly unimpressive. However, upon setting a cash budget to account for

    regular annual cash expenditures, this seemingly small daily expenditure comes out

    to an annual total of US $365, which may be better spent on other things.

    A surplus budget means there is extra cash at the end of a period, while a

    balanced budget means that the cash inflows equal the cash outflows. A deficit

    budgetmeans cash outflows will exceed the cash inflows. Cash Budgets are usually

    compiled and re-evaluated on a periodic basis. Adjustments are made to budgetsbased on the goals of the budgeting organization. In some cases, budget makers are

    happy to operate at a deficit, while in other cases, operating at a deficit is seen as

    financially irresponsible.

    EXAMPLE #1: GROUP ACTIVITY

    Lets use a simple example to show the basics of preparing a cash budget.

    a) Your hospital has US $2,750 in its bank account.b) Your hospital receives US $4,125 per month.c) You want to buy a vehicle for the hospital which will cost US $13,750d) You can arrange to pay US $6,875 this month (after some government funding

    comes in) and US $6,875 next month.

    What will be the balance of the hospitals bank account after you have paid for thevehicle? How will you fund this cash deficit?

  • 8/14/2019 Module 3_ Project Design and Plan

    26/44

    26

    EXAMPLE #1

    This Month Next Month

    Beginning Balance 2,750 0

    Cash Inflow 4,125 4,125

    Total Cash Inflow6,875 4,125

    Cash Outflow6,875 6,875

    Ending Balance0 (2,750)

    EXAMPLE #2: INDIVIDUAL ACTIVITY

    a) You are running an out-patient clinic and you need to install a new telephonesystem. This will cost US $15,000. The telephone company will provide thisnew system and you will need to pay for it over the next several months.

    b) Currently you have US $7,000 in your clinic bank account.c) Your clinic receives US $5,000 each month in user fees.d) You have agreed to pay US $3,000 per month for the new telephone system,

    starting now (Month 1).

    In addition, you will be able to sell your old telephone equipment and you will

    receive US $6,000 in 2 months time (Month 3). At that time, you will pay all the

    money you get from the sale of the old telephone equipment towards the newtelephone equipment, in addition to your normal US $3,000 monthly payment.

    What will your End Balance be at the end of Month 4?

    Month 1 Month 2 Month 3 Month 4Beginning Balance 7,000 9,000 11,000Cash Inflows

    Monthly User Fees5,000 5,000 5,000

    Sale of Old Equipment 6,000Sub Total 12,000 14,000 22,000Cash Outflows 3,000 3,000 9,000

  • 8/14/2019 Module 3_ Project Design and Plan

    27/44

    27

    Ending Balance 9,000 11,000 13,000

    Individual Exercise #1: Student Cash Budget

    Introduce the Exercise #1 Scenario (Student Cash Budget) for students tocomplete an individual exercise in creating a cash budget.

    Use a handout or work on EXCEL to complete the template on the Student BudgetExercise.

    After students have finished, share the answer in a handout (or show from yourcomputer and project onto a screen).

    Then handout the answer (or show on the screen).

    Lets complete a Cash Budget for the next 6 days. Todays Date is Saturday 23rd

    October.

    The template has already been set up for you with the days of the week, startingwith Saturday.

    The following information will help you to complete the budget accurately.

    The amount of cash in your wallet is US $50

    On Monday your father will give you US $1,650 as your weekly allowance

    Your friend, Assim, owes you us $100. He has promised to pay you half of thismoney on Tuesday. He will repay the rest of the money next week.

  • 8/14/2019 Module 3_ Project Design and Plan

    28/44

    28

    You spend US $5 every day in the cafeteria at your college. You attend collegefrom Saturday to Wednesday

    Your car needs to be filled with petrol today. This costs US $35 On Monday you will need to pay your mobile phone bill which is US $25

    On Thursday night you will go out with your friends. You will spend the followingamounts under entertainment.

    Dinner US $10 Coffee at Caf US $ 1 Sweets US $ 3 Music CD US $ 7

    Required:

    1. Complete a Cash Budget using this information.

    2.Identify the day you have the least cash

    3. How much money will you have when you wake up on Friday morning?

    Exercise #1 Template: Student Cash Budget

    Saturday

    Sunday

    Monday

    Tuesday

    Wednesday

    Thursday

    Friday

    Beginning Balance

    CASH INFLOWS

    Weekly Allowance

    Assim Pays you

    Total Cash Inflow

    CASH OUTFLOWS

  • 8/14/2019 Module 3_ Project Design and Plan

    29/44

    29

    Cafeteria

    Petrol

    Mobile Phone

    Entertainment

    Total Cash Outflow

    ENDING BALANCE

    Notes:

    1. Your beginning balance on Saturday is what you have when you start or the balance atthe end of the Friday before.

    2. Your Beginning Balance each day is the Ending Balance from the day before.

    Exercise #1 Answer

    aSaturday

    Sunday

    Monday

    Tuesday

    Wednesday Thursday Friday

    B 50 10 5

    1,625

    1,670 1,665

    1,644

    C

    W

    1,650

    A 50

    T 50 10 1,65

    1,67

    1,670

    1,665 1,644

  • 8/14/2019 Module 3_ Project Design and Plan

    30/44

    30

    5 5

    C

    C5 5 5 5 5

    P 35

    M 25

    E 21

    T 40 5 30 5 5 21

    E 10 5

    1,625

    1,670

    1,665 1,644

    1,644

    Notes:1. Your beginning balance on Saturday is what you have when you start or thebalance at the end of the Friday before.

    2. Your Beginning Balance each day is the Ending Balance from the day before.

    Additional Resources: Answers to these exercises on cash budgetscan be found on the Bridges website in EXCEL formatting, complete withformulas and comments.

    MODULE 3D BUDGETING: CREATING A BUDGET

    Small Group Activity: Now you will want to create a Cash Budget for the MCHCase Study. Refer back to the Case Study in the training materials. Review therequirements of this exercise. The trainees will use information from the case tobuild the budget for this triage centre project. Allow the trainees to work in smallgroups.

  • 8/14/2019 Module 3_ Project Design and Plan

    31/44

    31

    Budget Tools in the Project Management Toolkit are introduced refer to theBudget Detail Worksheet Template and the Cash Budget Template in thetoolkit.

    The Mulkulla Mother-Child Hospital (MCH): Case Study Scenario

    Using your Case Study details and the Excel Template that has been prepared for

    you, create a budget for the year for the MCH for this project.

    The template has already been set up for you with the months of the year, starting

    with January. If you wish to start in another month, other than January, just change

    the column headings to reflect any full 12 month period.

    Also, you are free to change the row headings where you feel it is appropriate andsome blank rows have been left for you to add other cash inflows and outflows that

    you determine may be necessary.

    For many of the cash outflows, you may need to do another schedule before you get

    your final numbers for each month. For instance, for the cost of Nurses, you may

    need to create a separate spreadsheet showing how many you need for each month,

    and their hours and their salaries. The total of this sub schedule will be carried

    forward into your final yearly budget.

    Required:

    1.Complete the Budget Detail Worksheet to determine your overall costs andfunding for the project.

    2.Complete the MULKULLA MOTHER-CHILD HOSPITAL Cash Budget using theworksheet from #1 above. Determine when you will need to plan for cash inflowsand outflows.

    3. Do you identify any problems and if so, can you adjust your budget to try tocorrect them?

    __________________________________________________________________________________

    _________________________________________________________________________________

    4. Does the budget help you in your overall planning of for the MCH Triage Project?

  • 8/14/2019 Module 3_ Project Design and Plan

    32/44

    32

    __________________________________________________________________________________

    Budget Detail Worksheet

    Trainees should work in small groups to BRAINSTORM about the costs of the

    project. How much will this project cost? Are we on budget? How much have we

    spent on the various expense items? These are all questions you must be able to

    answer when planning a project. The Budget Detail Worksheet may be used as a

    guide to assist you in the preparation of the budget and the budget narrative (which

    explains the how and why).

    Once you have your total budget numbers, you can put them into your Cash Flow

    Budget to plan, month by month (or week by week if you wish) when you will be

    receiving your Cash Inflows and when you will be incurring your Cash Outflows.

    Refer to the attached Budgeting Excel spreadsheet in your training materials.

    List each position by title and name of employee, if available. Show the annual, or

    hourly or monthly rate and the percentage of time to be devoted to the project.

    1. Professional Staff

    Name/Position Computation

    Estimated Cost

    Dr. ? - Paediatrician ($ x 100%) $

    Dr. ? - GP ($ x 100%) $

    # Full-time nurses ($ x 100% x #) $

    # Lab Technicians ($ x % x #) $

    Pharmacist ($ x %) $

    TOTAL

    $_________

    2. Administrative Staff

    Name/Position Computation

    Estimated Cost

  • 8/14/2019 Module 3_ Project Design and Plan

    33/44

    33

    Receptionist ($ x % x 1) $

    Secretary ($ x % x 1) $

    Security ($ x % x #) $

    Cleaners ($ x % x #) $Porter ($ x % x 1) $

    Transport/other ($ x % x 1) $

    Laundry Services ($ x % x 1) $

    Maintenance Staff ($ x % x 1) $

    Food Services Staff ($ x % x 1) $

    TOTAL $_________

    Budget Narrative:

    Discuss here your rationale for the professional and administrative staff costs you

    are budgeting and why they are required.

    3. Set Up Costs for Triage Unit

    Item Computation Estimated

    Cost

    Medical Equipment ( ) $ Itemize if necessary ( ) $

    Beds ( ) $Sheets ( ) $Blankets ( ) $Medical Supplies ( ) $

  • 8/14/2019 Module 3_ Project Design and Plan

    34/44

    34

    Itemize if necessary ( ) $

    ( ) $( ) $

    Laboratory Supplies ( ) $ Itemize if necessary ( ) $

    ( ) $Additional Furniture ( ) $ Itemize if necessary ( ) $

    ( ) $Development & Printing of forms ( ) $Patient Records System ( ) $Initial Training Costs ( ) $

    Total $_________

    Budget Narrative:

    Discuss here your rationale for the setup costs for the triage unit.

  • 8/14/2019 Module 3_ Project Design and Plan

    35/44

    35

    4. General Operating Costs

    Item Computation Estimated

    Cost

    Rent or Lease Cost ( ) $

    Electricity ( ) $

    Water ( ) $

    Cleaning & Laundry Supplies ( ) $

    Fees/taxes of any sort ( ) $

    Other Miscellaneous Costs ( ) $

    Opening Celebration Costs ( ) $

    Community Communication Plan ( ) $

    Total $_________

    Budget Narrative:

    Discuss here your rationale for the General Operating Costs.

    BUDGET SUMMARY

    When you have completed the budget worksheet, transfer the totals for each

    category to the spaces below.

  • 8/14/2019 Module 3_ Project Design and Plan

    36/44

    36

    1. Professional Staff $_________

    2. Administrative Staff $_________

    3. Set Up Costs for Triage Unit $_________

    4. General Operating Costs $_________

    TOTAL PROJECT COSTS $_________

    PROJECT FUNDING

    You will now have to look at what your sources of Cash Inflows will be.

    1. Government Funding / Grants $_________

    2. Municipal or Local Funding / Grants $_________

    3. Donations $_________

    4. User Fees $_________

    5. Fundraising Activities $_________

    TOTAL PROJECT FUNDING $_________

  • 8/14/2019 Module 3_ Project Design and Plan

    37/44

    37

    MCH Case Study Exercise Template

    Note to Trainers: Ensure the Cash Budget Template is printed off on legalor long paper to ensure enough width. You may wish to provide copies of this

    template for students. Alternatively, have students work on the budget on EXCELand complete it on their computer.

    All amounts are in US $Jan.

    Feb.

    Mar.

    Apr.

    May

    Jun Jul

    Aug.

    Sep.

    Oct.

    Nov.

    Dec.

    Beginning Balance

    CASH INFLOWS Government Funding /GrantsMunicipal or localFunding / Grants

    Donations

    User FeesLocal FundraisingActivities

    TOTAL CASH INFLOWS

    CASH OUTFLOWS

    ADMINISTRATIVE STAFF:

    Receptionist

    Secretary

    Security

    CleanersPorter

    Transport/Driver

    Laundry Services

    Maintenance Staff

    Food Services Staff

    PROFESSIONAL STAFF:

    Physicians - GPs

    Physicians - Pediatric

    Nurses

    Lab TechniciansPharmacist

    Other

    SET UP COSTS FORTRIAGE UNIT:

    Medical Equipment

    Beds, sheets, blankets

  • 8/14/2019 Module 3_ Project Design and Plan

    38/44

    38

    Medical Supplies

    LaboratoryAdditional Furniture,

    desks, chairsDevelopment & Printing

    of forms

    Patient Records System

    Initial Training Costs

    Other

    GENERAL OPERATINGCOSTS:

    Rent or Lease Costs

    Electricity

    WaterCleaning & Laundry

    Supplies

    Fees/taxes of any sort

    Other

    OTHR MISCELLANEOUSCOSTS:Opening Celebration

    CostsCommunity

    Communication Plan

    Other

    TOTAL CASH OUTFLOW

    ENDING BALANCE

  • 8/14/2019 Module 3_ Project Design and Plan

    39/44

    39

    MODULE 3E: RISK MANAGEMENT

    E. Risk ManagementAnticipating and Mitigating Risks

    Risk Matrix Tool 1 hour

    MODULE 3E RISK MANAGEMENT: ANTICIPATING AND MITIGATING RISKS

    Key Learning: Introduce the Risk Matrix Tool and means to assess andmitigate risks associated with projects.

    Powerpoint presentation: The Impact of Risk Management

    Use the powerpoint to guide your teaching. The Training Guide encourages you to

    use lots of activities, questions, discussions and to record key ideas on flipcharts.

    The powerpoint is only a guide to training.

  • 8/14/2019 Module 3_ Project Design and Plan

    40/44

    40

    Toolbox: Introduce the Risk Matrix Tool.

    Risk Matrix Tool Exercise: Refer to the Risk Matrix Tool Exercise in thetrainers workbooks. The Exercise has 3 parts: A, B & C.

    LETS ASSESS THE RISK OF THE PROJECT

    When you assess risk, you have to think about all the possible things that could go

    right or go wrong. This process gives you an opportunity to grasp and determine the

  • 8/14/2019 Module 3_ Project Design and Plan

    41/44

    41

    impact of the worst case scenario and then plan ahead to try to mitigate (reduce)

    the risks.

    The next exercise is one in which you are to BRAINSTORM all the possible

    things that could go wrong in your project. You may want to use the template from

    your MCH Cash Budget exercise (Module 3D) as a tool in identifying some of the

    line items that could cause / be affected by a risk.

    Part A:

    Using the Risk Matrix Tool record the risks, the impact on the project, the

    probability (how likely it is that the risk would occur), describe the specific risk you

    foresee and then record how you could mitigate the identified risk.

    In order to get you started on the Risk Matrix which follows, here are someexamples of potential risks:

    Delay in training of people responsible to manage the triage desk

    Construction delay in installation of the triage desk

    Budget shortfall during the project operations

    Medical personnel dont have time to commit to the project

    Medical supplies and equipment Supply sources? Costs? Delivery Problems?

    Establishing trust with patients/families and does the facility reflect aperceived real need?

    Cultural issues will people go to a hospital for these issues will it be easilyacceptable in the community?

    Cannot get qualified staff

    Cannot get supplies/equipment

    RISK MATRIX TOOL

    What are

    the

    Risks?

    What is the

    impact?

    High/Medium/L

    ow

    What is the

    probability of

    this risk?

    High/Medium/L

    ow

    Describe

    the risk

    How can

    you

    mitigate

    it?

  • 8/14/2019 Module 3_ Project Design and Plan

    42/44

    42

  • 8/14/2019 Module 3_ Project Design and Plan

    43/44

    43

    Part B:

    Key Learning Part B:Teach trainees how to use the matrix to determinewhere the Impact and the Probability intersect to determine if the risk is High,

    Medium or Low for each identified item.

    You will note that you entered the risk as High, Medium or Low.

    You also entered the probability of the risk occurring as High, Medium or Low.

    Using the table below, for each risk identified, determine each ones overall risk tothe project.

    What is the

    Probability?

    What is the Impact?

    High Medium LowHigh High High MediumMedium High Medium MediumLow Medium Medium Low

    Key Learning: After the students have completed the Risk Matrix Tool, andassessed whether the impact and probability is High, Medium or Low, you will havethem use the matrix shown in Part B to determine the overall risk of each item.Show the students how to use a matrix and to see where the boxes intersect.

    Part C:

    What would be the impact &/or cost if you did not proceed with this project?

    _____________________________________________________________________________________

  • 8/14/2019 Module 3_ Project Design and Plan

    44/44

    44

    _____________________________________________________________________________________

    _____________________________________________________________________________________

    _____________________________________________________________________________________

    __________________________________________________________________________________________________________________________________________________________________________

    _____________________________________________________________________________________

    ___________________________________________________________________________________

    ___________________________________________________________________

    ___________________________________________________________________

    Key Learning: It is important to explain to students that not all projectsshould necessarily proceed. Often there is a momentum when management decidesto move forward on a project, and they have blinders on in terms of risks. One of thehardest things to do is to get the parties involved to answer the question posed inPart C of this exercise. Sometimes it is best to walk away from a project if the risksare too great.