Navy presentation to the Moffett Field Restoration Advisory Board on March 13, 2008, regarding the structural analysis and revised Engineering Evaluation/Cost Assessment for the hangar.
Popular Tags:
23
BRAC BRAC PMO WEST PMO WEST 1 Former NAS Moffett Field Former NAS Moffett Field Hangar 1 Progress Review Hangar 1 Progress Review Scott Gromko Navy Project Manager March 13, 2008 RAB Meeting
Transcript
Page 1: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

1

Former NAS Moffett FieldFormer NAS Moffett Field

Hangar 1 Progress ReviewHangar 1 Progress Review

Scott GromkoNavy Project Manager

March 13, 2008RAB Meeting

Page 2: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

2

Presentation OverviewPresentation Overview

• Background• Structural Analysis Update• Next Steps• Questions

Page 3: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

3

BackgroundBackground

• Built in 1932

• Uses:– Used for lighter-than-air program– Used for fixed winged aircraft– Offices and museum

Page 4: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

4

BackgroundBackground

Page 5: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

5

BackgroundBackground

• 1997 - PCBs detected in settling basin sediment

• 2003 - NASA studies identified Hangar 1 as a source

• NASA sampled:– Building materials– Stormwater– Air– Wipe-samples inside

Page 6: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

6

BackgroundBackground

Page 7: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

7

BackgroundBackground

Page 8: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

8

Structural Analysis UpdateStructural Analysis Update

• Exceltech Consulting, Inc.• Established in 1987

• - Site Civil Engineering- Structural Engineering- Seismic Retrofit and Analysis- Blast/Anti-Terrorist Force Protection (ATFP) Design- Construction Services

Page 9: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

9

Structural Analysis UpdateStructural Analysis Update

• Abdul Chahim, P.E., S.E.– 28 years of structural engineering experience

• Steel structure projects– VAQ Trainer Building Whidbey Island, WA– West Farm Food Processing Plant, ID– Shore Operation Building, Seattle, WA– Air National Guard fire/crash rescue station, Portland, OR – 10-story Woodland Condominium, Lexington, KY– 76,000-square-foot Federal Way community center

Page 10: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

10

Structural Analysis UpdateStructural Analysis Update

• Hangar 1 structural system

– Gravity system• Three-hinged arch system supported on A-Frames

– Lateral resisting system• The arch and the steel bracing trusses between

the arches

Page 11: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

11

Structural Analysis UpdateStructural Analysis Update

Page 12: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

12

Structural Analysis UpdateStructural Analysis Update

• Conducted structural analysis inspections• Dec. 12, 2007• Jan. 11, 2008• Feb. 7, 2008

• Built computer model• Includes entire building• Over 25,000 structural members• Numbering system based on drawings

Page 13: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

13

Page 14: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

14

Structural Analysis UpdateStructural Analysis Update

Page 15: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

15

Structural Analysis UpdateStructural Analysis Update

Page 16: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

16

Structural Analysis UpdateStructural Analysis Update

Page 17: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

17

Structural Analysis UpdateStructural Analysis Update

Page 18: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

18

Structural Analysis UpdateStructural Analysis Update

Page 19: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

19

Structural Analysis Structural Analysis

Page 20: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

20

Structural Analysis UpdateStructural Analysis Update

– Inspect and summarize site conditions– Build the computer model– Calculate input parameters– Identify any areas of unacceptable structural integrity– Present options and costs for areas of retrofit, if

necessary

Page 21: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

21

Next StepsNext Steps

– Complete structural analysis– Incorporate structural analysis findings into revised

EE/CA– Release revised EE/CA for review and comment– Public meeting to receive comments– Issue Action Memorandum

Page 22: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

22

QuestionsQuestions

Page 23: Moffett Hangar One Progress Review

BRACBRACPMO WESTPMO WEST

23

Point of ContactPoint of Contact

Mr. Darren NewtonBRAC Environmental CoordinatorProgram Management Office West1455 Frazee Road, Suite 900San Diego, CA [email protected]