13
CURRICULAM VITAE MOHAMMAD ABU TAHER APPLY FOR : QA/QC (Senior Piping Welding Inspector) PERSONAL DETAILS NATIONALITY : BANGLADESHI (SINGAPORE PERMANENT RESIDENT) DATE OF BIRTH : 27 JULY 1982 LANGUAGES : BENGALI, ENGLISH & HINDI CONTACT NO : +65 82333415, 84001048 EMAIL : [email protected] SUMMARY OF CAREER & EXPERIENCE: Present project FPSO OKHA (Woodside) at Sembawang shipyard. Accumulated Approximately 15 Years plus Experience with QA/QC (Mechanical, Piping, Tank Construction), Vendor Inspection of (Marine Engineering, Mechanical Engineering, Construction & Manufacturing Engineering) Excellent Knowledge and Experience in Welding Technology & Painting Inspection, Safety, Fabrication/ Erection of Piping & Pressure vessel and Mechanical Installation activities in Oil/Petrochemical construction projects, Live Plant and Shipyard. Assignments in the Construction and Expansion Projects of Oil Refineries, Power & Petrochemical Plants, Marine base Construction & Fabrication in Bangladesh, Singapore, and Brazil. Well aware and worked in ISO 9001 systems. Capable to prepare, establishes the procedures and Control the Execution and Quality Piping & welding with GDP. EDUCATION Bachelor of Engineering (Hons) Mechanical Engineering University of Sunderland (UOS) U.K. Diploma in Mechanical Engineering BTEC Higher National Diploma (HND), Pearson U.K. Adv. Diploma in Industrial Engineering & Management NGEE ANN Polytechnic, Singapore. Diploma in Marine Engineering Bangladesh Institute of Marine Technology (BIMT) MOHAMAD ABU TAHER Page 1
Transcript
Page 1: Mohammad taher qa qc piping-welding

CURRICULAM VITAE

MOHAMMAD ABU TAHER

APPLY FOR : QA/QC (Senior Piping Welding Inspector)

PERSONAL DETAILS NATIONALITY : BANGLADESHI (SINGAPORE PERMANENT RESIDENT)DATE OF BIRTH : 27 JULY 1982LANGUAGES : BENGALI, ENGLISH & HINDICONTACT NO : +65 82333415, 84001048EMAIL : [email protected]

SUMMARY OF CAREER & EXPERIENCE:

Present project FPSO OKHA (Woodside) at Sembawang shipyard. Accumulated Approximately 15 Years plus Experience with QA/QC (Mechanical, Piping, Tank Construction), Vendor Inspection of (Marine Engineering, Mechanical Engineering, Construction & Manufacturing Engineering) Excellent Knowledge and Experience in Welding Technology & Painting Inspection, Safety, Fabrication/ Erection of Piping & Pressure vessel and Mechanical Installation activities in Oil/Petrochemical construction projects, Live Plant and Shipyard. Assignments in the Construction and Expansion Projects of Oil Refineries, Power & Petrochemical Plants, Marine base Construction & Fabrication in Bangladesh, Singapore, and Brazil. Well aware and worked in ISO 9001 systems. Capable to prepare, establishes the procedures and Control the Execution and Quality Piping & welding with GDP.

EDUCATION Bachelor of Engineering (Hons) Mechanical Engineering

University of Sunderland (UOS) U.K.

Diploma in Mechanical Engineering BTEC Higher National Diploma (HND), Pearson U.K.

Adv. Diploma in Industrial Engineering & Management NGEE ANN Polytechnic, Singapore.

Diploma in Marine Engineering Bangladesh Institute of Marine Technology (BIMT)

Higher Secondary Certificate (HSC) ‘A’ level Equivalent R.K.Chowdhary Degree College, Bangladesh Secondary School Certificate (SSC) ‘O’ level Equivalent Bawany Adarsha Biddyalaya, Bangladesh

PROFICIENCY CERTIFICATION COURSES (WELDING TECHNOLOGY)

Senior Welding Inspector (CSWIP-3.2.2) Level 3

MOHAMAD ABU TAHER

Page 1

Page 2: Mohammad taher qa qc piping-welding

CURRICULAM VITAE

Welding Inspector (CSWIP-3.1) Level 2

Institute name: The Welding Institute (TWI), UK

ASNT Level II (RT, UT, MT, PT)

WeldTeck Inspection Services (S) Pte Ltd. Singapore

Material Test (Ferrite Number) on SS Steel

Ferritescope MP30E-S. NDT Instruments (S) Pte Ltd.

QUALITY MANAGEMENT SYSTEM (QMS):

IRCA AUDITOR / LEAD AUDITOR ISO 9001:2008

Quest Certification Private Limited, India. February 2011

OCCUPATIONAL SAFETY & HEALTH SUPERVISORY COURSES:

Risk Management Course

Absolute Kinetics Consultancy, May 2011. Singapore

Building Construction Supervisor Safety Course BCSS (MOM)

(Absolute Kinetics Consultancy, May 2011. Singapore

Oil/Petrochemical Industry Safety Course for Supervisors (MOM)

NTUC Learning Hub, December 2009. Singapore

Exxon Mobil Leadership in safety Workshop

100, Exxon Mobil Chemical, March 2009. Singapore

Safety Instruction Course for Supervisor (Manhole) MOM

NTUC Learning Hub, September 2009. Singapore

Construction Safety Orientation Course (CSOC) MOM

NTUC Learning Hub (Ministry of Manpower Accredited)

Fire Prevention & Fire Fighting. ii) Elementary First Aid

(STCW Code Table A VI/1-3 & 1-2), Singapore Polytechnic

PROFESSION ENGINEERING & TECHNICIAN MEMBERSHIP

Registered Senior Welding Inspector EngTech

Cert No: R/45741, Engineering Council UK

MOHAMAD ABU TAHER

Page 2

Page 3: Mohammad taher qa qc piping-welding

CURRICULAM VITAE

Full Member of Welding Technology SWS (F1881)

Singapore Welding Society

General Member of Engineering Organization. ID: 00048 (IDMEABS)

Competencies and Skills Workforce in SPT Project in Exxon Mobil

Achieving Best Supervisor Certificate month of July 2010 In-Refinery in the SPT Project Exxon Mobil Plant

Achieving the Certificate of Appreciation 20, 000, 000 Safe Work Hours without LTI in SPT ExxonMobil.

Achieving the Certificate of Completion Code of Business Conduct & Ethics 2009 & 2010 Training in FW.

Achieving the Certificate of Appreciation 14 Million Safe Work Hours without LTI in SPT ExxonMobil.

EMPLOYMENT HISTORY

Company Name: Intertek Industry Services

Owner Representative: Woodside Energy Ltd (WEL)

Position: Senior Piping Welding Inspector

Project Name: FPSO OKHA

Date: 10 Nov 2015 to till now

Responsibility:

Study the construction drawing, ISO drawing, Update the spread sheet, register welder list, WPS and monitoring the daily progress and report to the higher authority of WEL. Attended the Quality and Productivity meeting with the main contractor Sembcorp.

Daily inspection for Super Duplex Stainless Steel (A790 Gr UNS S32750), LTCS A333, A106 Gr. B Piping materials inspection heat no, cutting mark up, length and beveling of the fittings such as Elbow, Flange, Tee, Reducer for fit-up preparation .

Daily inspection for spools fit-up, no’s of tack welding, root land, Hi-Lo, alignment, dimension & orientation as per ISO drawing, 2D and model for various system e.g Seawater line, export gas line for jumper deck, offtake system, glycol system etc.

Daily in process welding monitoring, surveillance the welding technic, process, welding parameters such verify and record for interpass temperature, the heat input <100OC for root, cold, hot & capping pass against the approved WPS. Demonstrate site engineer for production and quality inspector of SCM.

Guide to the sembcrop shipyard QA/QC, welding foreman, supervisor for sound welding, purging gas flow rate, and record the Oxygen (O2) level <0.5%, sponge plug position, cleanness the joint, filler rod with Acetone prior to the welding activities & workmanship.

Monitoring the daily progress fit-up & welding, keep surveillance for the repair welding with approved repair procedure.

MOHAMAD ABU TAHER

Page 3

Page 4: Mohammad taher qa qc piping-welding

CURRICULAM VITAE

Final welding visual inspection, surveillance for the NDT request. Review the Radiography test Films & report and witness the Dye Penetrant (PT) test.

Daily update & track the record and direct report to the woodside QA/QC lead. Review the inspection report, endorsed and surveillance the MDR filling.

Inspection pipe support, base plate blasting with surface profile, painting (primer, 2nd coat, final coat with IP paint according to AS, SSPC & ISO standard and project ITP, spec.

Position: Technical Specialist (Mechanical/Piping)

Client Representatives: Woodgroup PSN / GS E&C Korea / Technip Malaysia / Saipem Italy

Date: Oct 2015 to Nov 2015

Responsibility:

Client and Third Party Inspector for assignments on Site and at Vendor Facilities for O&G MNC clients.

Represent Owner for Inspection and FAT. Onsite inspection for welding and NDT operations. Review WPS & PQR and ensure that specifications are adhered to. Checking of consumables used in welding to ensure compliance with specification. Monitor the Welding activities (Before, During & After) and Visual Inspection of welds. Onsite inspection to witness installation of Equipment. Third Party Inspection for Mechanical Tests (Destructive and Non-Destructive Test) and Chemical Analysis

Tests. Final Inspection, Hydrostatic Test and Pre-shipment Inspection of pressure vessels. Functional Acceptance Test of Valves. Final, Packaging and Pre-shipment Inspection of Gaskets, valves. Inspect and ensure that all work is executed as per client’s requirement and specifications. Review progress against the vendor schedule and provide daily inspection report. Review respective documents, specifications, standards, calibration certificates and approved construction

drawings and all other applicable requirements and regulations as stated in client’s specifications. Prior to shipment, perform document review on PO/packing list/material certificates for authenticity and

compliance as per client’s P.O.  Check quantities, shipping mark etc. Issue inspection release note (IRN) upon satisfactory final inspection.

Company Name: GL Noble Denton (DNV-GL Oil & Gas)

Position: Mechanical / Piping Inspector (Owner Rep)

Project Name: Jack up Rig Drilling Construction B-Class (B337 (CP Latina), B338 (CP Latina), B339 (Arab Drilling), B340 (UMW Naga 5, B349 (Pemex), B350 (Pemex), B376 (UMW Naga 8) & B371 & B372 (Fecon #1 #2), B351, B352 (Arab Drilling)

Date: 05-03-2013 to Sep 2015

Responsibility:

Attend with joint inspection for Vendor supply equipment with Procurement Quality Plan.

MOHAMAD ABU TAHER

Page 4

Page 5: Mohammad taher qa qc piping-welding

CURRICULAM VITAE

Review and verified construction drawing such as VCD, GA, P&ID under customers approved supplier list. To

check all the certificates, Equipment physical condition such as JIS check sheet as per Project specification or

VCD. The inspection covers the Mechanical/ Structural parts dimension, piping, spare parts and workmanship

for Valve, Diverter, Oilfield Equipment etc. Prepare the Quality Observation report, Non Conformity Reports &

Punch list if the items not comply the specification.

To make sure that specific references to technical specification requirements and applicable codes and

standards such as ASME IX, B31.3 & Section VIII, Div 1, API 16D, 16C, API 6A referenced in the

specification, Purchase order and contact etc.

Attended daily basis Inspection for Piping alloy material ASTM A519 Gr 4130 such as high pressure tubing

welding with GTAW, GMAW, FCAW & SMAW welding process, preheat & PWHT, erection, line check, hydro

testing & reinstatement

Surveillance the in-progress work, project progress as per project planning schedule.

Manage the work, monitoring the Keppel Fels QMRS, piping status, NDT progress, RT film review. Guiding

the QA/QC Inspector to achieve the project & class ABS requirement.

Attended weekly management & production meeting

Surveillance and monitoring the vessel endurance test, cantilever skidding test and drill floor load test, jack up

trail and incline test before ship delivery.

Review the final reports, WPS, punch items, PCM and prepare weekly progress report, direct report to project

Manager and Director.

Company Name: Shaw Stone & Webster Asia, Inc. (EPCM)

Position: (Piping Welding Inspector & Pre Commissioning)

Project Name: SPT Olefins Recovery Project (ExxonMobil)

Date: 24-07-2012 to 01-03-2013

Responsibility:

Review the daily basis piping test packages for pre-test and post test. Review the welder performance

and NDT completion as per line class and SHAW, GP’s requirement.

Pre Commissioning and daily site basis piping inspection, surveillance, line walk-down raise and clear the

punch items.

To check and make sure before and after post test all the welding, NDT, PMI, PWHT and erected

materials MTR completed, and reported in accordance and comply the ASME & ASTM code.

Plan, organize, coordinate and monitoring and Leading subcontractor QC and give guidance to perform

the job as accordingly.

Daily completed package updated list report to direct ExxonMobil QA/QC Lead and Shaw stone QA/QC

Manager.

Attend the QC internal audit with ExxonMobil and weekly progress meeting.

MOHAMAD ABU TAHER

Page 5

Page 6: Mohammad taher qa qc piping-welding

CURRICULAM VITAE

Attend inspection for pre commissioning activities, such as flange box-up, re-instatement according code

ASME 16.5 & 40 and coordinate with ExxonMobil Representative.

Witness leak test, Tightness test, and final box-up, prepares rejection report for the damage items and

equipments.

Company Name: Foster Wheeler Asia Pacific Ltd (EPCM) Position: (Senior Welding Inspector)

Project Name: LanXess BTR Singapore Project

Date: 07-Dec-2011 to 23-July-2012

Responsibility:

Daily welding visual inspection for Carbon Steel, Stainless Steel 316L/304L, 22% Cr Duplex Stainless

Steel, and 25% Cr Super Duplex Stainless Steel.

Witness for PQR for the Materials such as Hastelloy C ASTM B622 (P No. 43) to A 106 Gr B (P No.1),

Duplex Stainless Steel ASTM B729 UNS N08020 beside having experience SA 790 UNS S31803 (P

no.P10H) and 25% Cr Super Duplex Stainless Steel UNS S32550 and ASTM A790 UNS S32750 with the

welding process GTAW.

Monitoring the surface preparing before welding, and checked the welding parameter, purging and heat

input rate.

Monitoring the Quality of work such as Piping, Painting, Fireproofing as per code SSPC & NACE.

Review the daily welder welding Dia-inch, Weekly welder performance and RT film review, rejection rate.

PWHT report, hardness test report and coordination on Safety matter at site Radiography test.

To make sure job is being carried out as per Foster wheeler and Laxness project spec and subcon

approved procedure.

Attend internal quality audit and meeting. Monitoring and maintain Test Pack, RT Rejection Rate

statistics. Raised QDR/NCR and report to QC Lead Engineer.

Project Name: SPT In-Refinery Project (IRF) and IC&T Project (ExxonMobil)

Date: 16-Jul 2008 to 14-Jan 2011

Responsibility:

Inspection for Shut-down Turnaround SRU-1 & 2, Oil Tankage and Subsea Line and piping welding in

Chemical plant.

Daily basis inspection on Piping oxygen line, Cement line, Impact tested Carbon steel, Acid service line and

other lines welding process for the materials UNS alloys NO4400 ('Monel 400') UNS alloys NO6600

('Inconel 600') UNS alloys N10276 ('Hastelloy C-276') UNS alloys NO8020 (‘Alloy 20’) with GTAW & SMAW,

as per WPS shall contain full details of backing gas conditions including gas composition, flowrate, closing

down type and maximum oxygen content in backing gas closure.

MOHAMAD ABU TAHER

Page 6

Page 7: Mohammad taher qa qc piping-welding

CURRICULAM VITAE

Surveillance and visual inspection carried out daily basis activity flange, valves conditions, valve tags on the

construction plant according to ASME B31.3, ASME IX, and API 650 and Foster Wheeler Fabrication

standard.

Review RT films, PAUT reports, PWHT report and review the piping and Tankage test package as per GP’s

requirement, Project Spec & Procedure. Regular RT performance statistics, NCR/ QDR status report to QC

Lead Engineer

Company Name: BNF Engineering

Position: Project QA Engineer

Project Name:

1. Fuel Gas Compressor System for CCPP 10 & 20 POWER SERAYA Project.

2. Power Gas Banyan OTS Project (Gas Transmission Pipe Line)

Date: 15-Aug-2011 to 06-Dec-2011

Responsibility:

Performed incoming inspection on Vendor equipment’s, Materials, Valves, Electrical Panel, Pumps,

Motors liaison with client’s engineering/QA Purchase Order & Delivery Order at workshop & site.

Prepare for design change notes, rejection criteria and non-conformance report (NCR) quality observation

reports (QOR) according to project Specification & VCD instruction.

Verified the customer purchased order package list, Vendor data & erection manuals, quantities etc.

Preparation of WPS, Construction method of statements, ITP’s and inspection test methodology, weld

joint repairing methodology, Organizing WPS, WQT and verification of test results and records, issuing

welder ID. Cards.

Review the Subcon blasting & painting procedure, HSE requirements and conducting Inspection of the

surface preparation blasting & painting, wrapping, coating, holiday testing and insulation. sign of the final

paint reports to meet the Quality requirements and code SSPC

Inspection of various types of Heat Exchangers as per ASME Section VIII Div 1

Company Name: Gammon Construction

Position: QA/QC Engineer (Lead)

Project Name: LanXess BTR Singapore Project

Date: 17-Jan 2011 to 08-July-2011

Responsibility:

MOHAMAD ABU TAHER

Page 7

Page 8: Mohammad taher qa qc piping-welding

CURRICULAM VITAE

Supervision of site engineering activities, Maintain quality activities of underground cooling water pipe line

& Permanent Services pipe line. Prepare daily inspection report, Coordination with NDT and prepare

MDR.

Worked with QA/QC Inspector in a project organizing and job monitoring a crew having Welding

inspectors, NDT & PWHT, painting inspector Interaction with them and reviewing their reports. Attend

internal auditing of Subcon progress reports, review Welder register, Welding consumables controlling

system , Materials receiving procedure and record keeping etc.

Attended the Quality & Safety meeting with Foster Wheeler QA Manager and report to direct Gammon

Project Manager (M&E).

Company Name: Hiap Seng Engineering Pte Ltd

Position: QC (Welding/ Piping Inspector)

Date: 09-Sep-2006 to 23-Jun-2008

Project Name: SHELL HOUDINI ECC Singapore Project

Client; ABB Lummus Global B.V, CB&I.

NWS LNG Phase V Expansion

Client: Foster Wheeler Eastern Pte Ltd

Dung Quat Refinery

Client: Emerson process Management

Responsibility:

Process control and monitoring piping and welding process like GTAW and SMAW as per the project

Specification, international Standards. Worked and Dealt with ASME B31.3, B31.1, ASME SEC VIII, ASME SEC V, ASME SEC IX, ISO 9001, AWS D1.1, API 1104, 650, 653 and various standards..

Prepare PQR, Welder performance report Welding Inspection for piping welding with GTAW, SMAW &

SAW welding process, Control daily welding and report to QC Manager.

Company Name: Jurong Shipyard Pte Ltd & Maua Jurong Shipyard Brasil Position: Marine Engineering Fitter & Assembler & QA Inspector Date: 13-July-2001 to 24-Aug-2006

Project Name: FPSO Conversion BRIGHT JEWEL

Client: Modec Int. LLC Singapore

FPSO Conversion RONCADOR Field Development (Petrobras P-54)

MOHAMAD ABU TAHER

Page 8

Page 9: Mohammad taher qa qc piping-welding

CURRICULAM VITAE

Client: PNBV Brasil

FPSO Conversion CNR Baobab Field Development. (T. T. NINA)

Client: Modec Int. LLC Singapore

FSO Conversion Chad Offshore Facilities (Companion)

Owner: Exxon Mobil Client: Modec Int. LLC

SEMI SUBMERSIBLE RIGS:

1. Development Driller Global SantaFe I2. Development Driller Global SantaFe II

Client: Global SantaFe Corporation

Responsibility:

Attend daily quality & safety meeting. Update the database for NDT test report and WQR

Attend Inspection in fabrication shop to check welding on piping & hull structure.

Daily basis inspection with client inspector on board and direct coordination with the Surveyor. Report to

JSL QA/QC Manager.

Study of, ISO’s, GA, P & ID’s, and project specifications in order to observe the variety, size and

thickness of pipes and structural to be welded

Daily basis Inspection for new ship building hull structural, Plate material and coordinate with the

classification surveyor such as ABS, LRS, NK, BV etc. Repair ships (Oil Tanker, LNG, LPG and Container

vessel)

SAFETY TRAINING & SEMINARS IN DIFFERENT PROJECT:

1) SOC, SMAW -3G (Shipyard_JSL)

2) ESOC/ SOC (Mom accredited) (SPT_Exxon Mobil)

3) Confined Space Entry Awareness (SPT_FWP)

4).Safety Induction at work Place (SPT_FWP)

5) Bicycle Training, CORE Behavior (SPT_FWP)

6) Working at Height & Suspension Trauma (SPT_FWP)

7) Enhance SHE rules & responsibility, SHE Supervisor (SPT_FWP)

8) Pre-start & Tool box meeting (SPT_FWP)

9) Permits to Work System (SPT& LanXess_Exxon Mobil & FW)

10) Demobilization Hazards Talk, Emergency First Aid Training (SPT_FWP)

MOHAMAD ABU TAHER

Page 9

Page 10: Mohammad taher qa qc piping-welding

CURRICULAM VITAE

11) NDT RT Safety Coordination (SPT_Exxon Mobil)

12) Zero Harm Training (LanXess_Gammon)

13) Harm Elimination and Recognition training (Heart) (LanXess_FW)

14) Occupational First Aid Refresher Course (LanXess_FW)

6 MONTHS JOB TRAINING ON BOARD INLAND OIL TANKER VESSEL:

Position Held: Cadet Engineer (Apprentice)

Period : 1st March 2000 to 31st August 2000

Vessel description: Name- M.T.SAIMA Type-Tanker, DWT/GRT-1230 tons Main Engine-Akasaka Diesel-800 BHP, 420 RPM Generator Engine-Yanmer Diesel Model no-6KFL, 120KVA 1200 RPM 220V, Carrying capacity-1400 tons.

Company Address: High Speed Group of Companies (Japan JV) 103, (ground floor) Motijheel C/A, Dhaka-1000. Bangladesh

End of CV

MOHAMAD ABU TAHER

Page 10


Recommended