MOM report:MOM report:
08May08 -- 21May08 08May08 -- 21May08
M. Apollonio, P. Kyberd, M. Ellis, K. Long
Who, when:Who, when:Marco Ken Paul
MondayTuesdayWednesdayThursday 08-May-08Friday 09-May-08Saturday 10-May-08Sunday 11-May-08Monday 12-May-08Tuesday 13-May-08Wednesday 14-May-08Thursday 15-May-08Friday 16-May-08Saturday 17-May-08Sunday 18-May-08Monday 19-May-08Tuesday 20-May-08Wednesday 21-May-08Thursday 22-May-08Friday 23-May-08Saturday 24-May-08Sunday 25-May-08Monday 26-May-08Tuesday 27-May-08Wednesday 28-May-08Thursday 29-May-08Friday 30-May-08Saturday 31-May-08Sunday 01-Jun-08Monday 02-Jun-08Tuesday 03-Jun-08
►Malcolm Ellis:Malcolm Ellis: 17Apr08 – 07May0817Apr08 – 07May08
►Tracker r/o issues:Tracker r/o issues: ME needed at FNALME needed at FNAL
►Cover arranged (ABl):Cover arranged (ABl): 08May08 – 03Jun08:08May08 – 03Jun08: KL + M.Apollonio + KL + M.Apollonio +
P.KyberdP.Kyberd
Plans & Aims for April + May
• Commissioning of all beam line magnets.• Running MICE in parasitic mode.• Detectors and DAQ.• Miscellaneous
M.Ellis
Beam Line MagnetsM.Ellis
Beam Line Magnets
• Magnet power supplies locked off and correct procedures (Method Statement + Risk Assessment to get Authorisation To Work) need to be followed to work on or with the magnets
• Water supply has been reduced from 100 L/min to 60 L/min, magnets operated with an acceptable temperature rise.
M.Ellis
Spensley, Glover
Spensley, Govans,Long
Decay Solenoid• Achieved the major milestone of achieving liquid
Helium in the solenoid for the first time.• No major problems with the refrigeration plant or
the magnet.• LiHe filled to 5% of full
M.Ellis
Detectors and DAQ
• CKOV in place.• TOF due in mid May (?)• Tracker due in mid June.• Online monitoring software is ready.• First version of G4MICE unpacking code for
the DATE format has been written.• First version of online database design has
been produced. Work continues.
M.Ellis
Software
Gate Valve
• Gate valve has been opened.
• Target operation authorised by ISIS, who release key to MICE for data taking.
• First step towards parasitic operation...
M.Ellis
Miscellaneous• First web-cam installed.• Three more planned to be installed, hopefully
by CM21.• Shielding wall construction has begun.
M.Ellis
Web Cam• http://www.mice.iit.edu/mico/webcams/
08May08:08May08:► Hall prepared for Hall prepared for
removal of asbestos tiles removal of asbestos tiles w/e of 10/11Mayw/e of 10/11May
► Q7—9 prepared for testQ7—9 prepared for test► South magnetic-shield South magnetic-shield
wall support almost wall support almost completecomplete
09May08:09May08:► Q7—9 TestsQ7—9 Tests► Lower flow rates high 60 l/minLower flow rates high 60 l/min► Outside temperature 25COutside temperature 25C► Humidity 55%Humidity 55%► Maximum output temperature 29CMaximum output temperature 29C► Five hour test.Five hour test.► Boring … no leaks, no hot spotsBoring … no leaks, no hot spots
► Oscillation of the input water Oscillation of the input water temperature with a period of an hour. 16-temperature with a period of an hour. 16-19C. Delta T~7C19C. Delta T~7C
► Hughes, Tilley, Jamdagni, KyberdHughes, Tilley, Jamdagni, Kyberd
Q7-Q9 Soak test (5.5 hours)
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
Time
Ret
urn
wat
er t
emp
erat
ure
(C
)
Q7
Q8
Q9
5 minute readings between 13:30 and 14:30
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
Time
Ret
urn
wat
er t
emp
erat
ure
(C
)
Q7
Q8
Q9
Q7 and Q8: temp difference degrees C
0
1
2
3
4
5
6
7
8
9
5 5.5 6 6.5 7 7.5 8 8.5 9 9.5 10 10.5 11 More
Temp. Difference degrees C
Fre
qu
ency
Q7
Q8
MOM: P.Kyberd
12May08:12May08:► Tracker cosmic test:Tracker cosmic test:
Space in R8 clearedSpace in R8 cleared Trigger/defining counters Trigger/defining counters
set-upset-up► Trigger rate ~10 HzTrigger rate ~10 Hz
► CMS finally vacates CMS finally vacates the MICE Hallthe MICE Hall
Sakamoto, MacWatersSakamoto, MacWaters
13May08:13May08:► Beam Counters:Beam Counters:
Set 6 gates/spillSet 6 gates/spill Check/debug EPICS Check/debug EPICS
client/server softwareclient/server software
► Target preparation:Target preparation: Re-load stepper motor Re-load stepper motor
drive software to allow drive software to allow target operation target operation 13May0813May08
Leaver, Walaron,Leaver, Walaron,Dobbs, MacWatersDobbs, MacWaters
Charnley, OatesCharnley, Oates
14May08:14May08:►Linde refrigerator:Linde refrigerator:
Compressor Compressor removed!removed!
Spensley, Courthold,Spensley, Courthold,Charnley, DL colleaguesCharnley, DL colleagues
14May08:14May08:► Target team Target team ((P.Smith, P.Hodgson, C.MacWatersP.Smith, P.Hodgson, C.MacWaters))::
Re-commissioned target driveRe-commissioned target drive Commissioned programmable delay unitCommissioned programmable delay unit Issue:Issue:
► ISIS will serve TS1 and TS2 after next 10-day runISIS will serve TS1 and TS2 after next 10-day run► Implies: Implies:
20% of machine cycles will be sent to TS220% of machine cycles will be sent to TS2► Pattern: 4 pulses to TS1 – 1 pulse to TS2Pattern: 4 pulses to TS1 – 1 pulse to TS2
Implicaiton for MICE:Implicaiton for MICE:► Need to re-commissioning timingNeed to re-commissioning timing
Target ready (including stepper motor)Target ready (including stepper motor)► Electrical authorising officer system introduced:Electrical authorising officer system introduced:
MOMs to be trained to be ‘authorised persons’ by M. GloverMOMs to be trained to be ‘authorised persons’ by M. Glover Electrical Authorisation to Work to be issued by Hall Manager Electrical Authorisation to Work to be issued by Hall Manager
or MOMor MOM Includes operation of magnet power suppliesIncludes operation of magnet power supplies Successfully put in place and executedSuccessfully put in place and executed
► D1 and D2 powered for parasitic running testD1 and D2 powered for parasitic running test Parasitic running test aborted because of ISIS RF problemsParasitic running test aborted because of ISIS RF problems
15May08: parasitic running15May08: parasitic running► ISIS set up to deliver protons to TS1:ISIS set up to deliver protons to TS1:
Neutron user runNeutron user run► Dean Adams ISIS physicist on shiftDean Adams ISIS physicist on shift
► 480 MeV/c positive particles:480 MeV/c positive particles: D1 400 A, D2 170 AD1 400 A, D2 170 A DAQ running: JSG and VVDAQ running: JSG and VV
► Set target dip-depth and actuation delay to deliver Set target dip-depth and actuation delay to deliver beam loss close to extractionbeam loss close to extraction
GVA 1 GVA 2
Dt = t R - t 0
Binary Decimal (t 0 = 5.2 ms) GVA1 GVA2 100 Hz clock
110100 5.2 0.0 2348 825 9730110100 5.2 0.0 2339 823 10004110110 5.4 0.2 2040 728 10012111001 5.7 0.5 1589 636 10006111110 6.2 1.0 1123 473 10014
1000011 6.7 1.5 803 446 100111001000 7.2 2.0 546 342 98211001101 7.7 2.5 460 343 99951010010 8.2 3.0
Background 365 285 10005ISIS trip: beam loss at injection
Particle rates versus target actuation delay
CountsTarget actuation delay (ms)
Raw delay (t R )
D. Adams, M. Apollonio, A. Dobbs, P. Hodgson, C. MacWaters, J. Leaver, K. Long, H. Sakamoto, P. Smith, K. Tilley, J.S. Grauhlich, V. Verguilov, K. Walaron, D. Wright
Parasitic running Parasitic running demonstrateddemonstrated
► Stable Stable running for > running for > 3 hrs3 hrs
► As delay As delay increases, increases, rate rate approaches approaches backgroundbackground
► ISIS trip due ISIS trip due to beam loss to beam loss at injection at injection when delay when delay set to 3 msset to 3 ms reproduciblereproducible
16May08: target: scan dip and 16May08: target: scan dip and delaydelay
►MICE shift in Machine Physics period:MICE shift in Machine Physics period: Goals:Goals:
►Commission Q1 – Q3Commission Q1 – Q3 Not possible, too little time!Not possible, too little time!
Scan target dip depth and actuation delay:Scan target dip depth and actuation delay:►D1 400 A, D2 170 AD1 400 A, D2 170 A►Successfully measured particle rates in GVA1 and Successfully measured particle rates in GVA1 and
GVA2 and beam loss over a grid of dip and delay GVA2 and beam loss over a grid of dip and delay valuesvalues
Details at CM21!Details at CM21!
MOM: M.Apollonio
19May08: quad 19May08: quad commissioningcommissioning
►Commission Q1 – Q3 and Q4 – Q6Commission Q1 – Q3 and Q4 – Q6 Apollonio, Dobbs, Hughes, Long, Sakamoto, TilleyApollonio, Dobbs, Hughes, Long, Sakamoto, Tilley
Magnet (Q1-3) Temperature
10
12
1416
18
20
22
2426
28
30
07: 12 09: 36 12: 00 14: 24 16: 48
Ti me
Temp
erat
ure
(℃)
Q1 I NQ1 OUTQ2 I NQ2 OUTQ3 OUT
Magnet (Q4-6) Temperature
10
12
1416
18
20
22
2426
28
30
09: 36 12: 00 14: 24 16: 48
Ti me
Temp
arat
ure
(℃)
Q4 I NQ4 OUTQ5 I NQ5 OUTQ6 I NQ6 OUT
Trip due to magnet-water flow: corrected, test continued
19May08: MCLR – the way nature 19May08: MCLR – the way nature intended?intended?
20May0820May08► Target:Target:
Frame was lowered by between 8 and 9 mm;Frame was lowered by between 8 and 9 mm; Measurement of voltage excursion on target actuation Measurement of voltage excursion on target actuation
attempted:attempted:► No noticeable spike, inconclusive because measurement was No noticeable spike, inconclusive because measurement was
at power-electronics rackat power-electronics rack► Re-measure with target in Sheffield and again in R76 ();Re-measure with target in Sheffield and again in R76 ();
LN2 bottle in vault replaced;LN2 bottle in vault replaced; Permanent LN2 pipe route planned; Permanent LN2 pipe route planned;
► To be agreed with ISIS (Thomason) and implemented by To be agreed with ISIS (Thomason) and implemented by Spensley;Spensley;
► Solenoid:Solenoid: Polarity check performed -- wiring certified OK;Polarity check performed -- wiring certified OK;
► Downstream beam line:Downstream beam line: Work began on changing D2 from the temporary water Work began on changing D2 from the temporary water
supply to the permanent supplysupply to the permanent supply► Tracker:Tracker:
Discriminator threshold measurement performed on Discriminator threshold measurement performed on trigger counters for tracker test in R8.trigger counters for tracker test in R8.
Govans, Spensley, BrianGovans, Spensley, Brian
Booth, Charnley, McCarron, MullacraneBooth, Charnley, McCarron, Mullacrane
Long, SpensleyLong, Spensley
Courthold, Hills, TilleyCourthold, Hills, Tilley
Sakamoto, MacWatersSakamoto, MacWaters
Lowering of target:Lowering of target:
► Target mechanism lowered by addition of shims:Target mechanism lowered by addition of shims: Gain in depth 8 Gain in depth 8 ± 0.5 mm± 0.5 mm
► Water pipes ‘tidied’ to remove risk of snagging on Water pipes ‘tidied’ to remove risk of snagging on edge of target support frameedge of target support frame
► Colder water solution found:Colder water solution found: Chiller in ‘catacombs’, will be installed in August shutdown Chiller in ‘catacombs’, will be installed in August shutdown
with new targetwith new target
Photos and data fromE.McCarron
20May08: tracker trigger counter 20May08: tracker trigger counter setupsetup
►Rate vs HV and Rate vs HV and threshold:threshold:
Sakamoto, MacWatersSakamoto, MacWatersD2
D1
D1
D2
Coincidence Rate at dz=0cm
9
11
13
15
17
- 45 - 35 - 25 - 15
Threshold (mV)
Rat
e (H
z) - 2100 & - 2100- 2100 & - 2050- 2100 & - 2000
Coincidence Rate at dz=200cm
0
0.1
0.2
0.3
0.4
- 45 - 35 - 25 - 15
Threshold (mV)
Rat
e (H
z)
- 2100 & - 2000
Underinvestigation
Low statistics?
21May0821May08► Downstream beam line:Downstream beam line:
Parts for D2 water supply producedParts for D2 water supply produced► Will fit 22May08Will fit 22May08
Implies string test could take place 23May08 eveningImplies string test could take place 23May08 evening
Preparation for installation of temporary Preparation for installation of temporary removable beam stop:removable beam stop:
Spensley, Brian
Eamon, Mike
21May0821May08► Preparations for tracker mock-up in Hall:Preparations for tracker mock-up in Hall:
Goal: to confirm cable runs, cable lengths, Goal: to confirm cable runs, cable lengths, positioning of compressors and flexible high-positioning of compressors and flexible high-pressure hoses, etc.pressure hoses, etc.
Walaron,MacWaters,
Hare
Magnet commissioning Magnet commissioning status:status:
► To do:To do: Remote control of Q1 – Q3Remote control of Q1 – Q3 String test:String test:
► Run all conventional magnets togetherRun all conventional magnets together Possible: Friday, 23May08 eveningPossible: Friday, 23May08 evening Fall back: Bank Holiday Monday, 26May08Fall back: Bank Holiday Monday, 26May08
Polarity check OKsuperconducting solenoid
Q9Q9
Q8Q8
Q7Q7
Q6Q6
Q5Q5
Q4Q4
D2D2
D1D1
Q3Q3
Q2Q2
Q1Q1
commissionecommissionedd
Remote Remote controlcontrol
Soak Soak testtest
Polarity Polarity checkcheck
PS PS currentcurrent
Magnet Magnet coolingcooling
PSPS
coolingcoolingMagnetMagnet
completed
not completed
to be done
Shifts in machine run-up:Shifts in machine run-up:► Assumption:Assumption:
Having demonstrated parasitic running, we Having demonstrated parasitic running, we should use Machine Physics shifts to:should use Machine Physics shifts to:
► Re-define (increase) beam-loss limit;Re-define (increase) beam-loss limit;► Perform studies that require accessPerform studies that require access
Note: ‘routine optics’ measurements should be Note: ‘routine optics’ measurements should be done during the user rundone during the user run
► Goals:Goals: Measure particle rates with Q1 – Q3 and try to Measure particle rates with Q1 – Q3 and try to
increase flux by increasing target dipincrease flux by increasing target dip► Frame has been lowered by 8 – 9 mm Frame has been lowered by 8 – 9 mm
Ensure BM1&2 and BC2 are workingEnsure BM1&2 and BC2 are working► Implies testing with source during shutdownImplies testing with source during shutdown
Radiation survey in MICE Hall:Radiation survey in MICE Hall:► Conditions agreed in discussion with P.WrightConditions agreed in discussion with P.Wright
► Worry:Worry: Will ToF0/1 be available?Will ToF0/1 be available?
Layout: preparation for step ILayout: preparation for step I
GVA1, BM1 GVA2, BM2
CKovA,B
‘GVA3’BC2
Preparations for next period:Preparations for next period:
►Seeking material for ‘GVA3’Seeking material for ‘GVA3’ Could be built if scintillator could be found Could be built if scintillator could be found
using a ‘second hand’ PMTusing a ‘second hand’ PMT Have BC1Have BC1
►But this has 2 dead channelsBut this has 2 dead channels
►Consider stand that could be erected Consider stand that could be erected between shield wall and Q7 to support between shield wall and Q7 to support TOF0TOF0
Shifts in machine run-up:Shifts in machine run-up:► Shift 1:Shift 1:
Establish new operating point:Establish new operating point:► Particle rate vs beam loss with magnets onParticle rate vs beam loss with magnets on► BM&BC testsBM&BC tests► Proton absorberProton absorber
► Shift 2:Shift 2: Radiation surveys:Radiation surveys:
► Magnets OFF, ISIS 50 pps, target dippingMagnets OFF, ISIS 50 pps, target dipping► Magnets ON, ISIS 50 pps, target dippingMagnets ON, ISIS 50 pps, target dipping► Mis-steered ISIS beam, Q1-3, D1, decay solenoid on, D2 and Mis-steered ISIS beam, Q1-3, D1, decay solenoid on, D2 and
Q4-6 off, the goal to measure shine on the north shielding wallQ4-6 off, the goal to measure shine on the north shielding wall Array of for mounting on north wall requiredArray of for mounting on north wall required
► In preparation (In preparation (Jamdagni, HareJamdagni, Hare))
► Shift 3 (if possible):Shift 3 (if possible): Initial optics studiesInitial optics studies
► Of course, now that parasitic running has been established, Of course, now that parasitic running has been established, optics studies can take place during user runoptics studies can take place during user run
Outstanding issues:Outstanding issues:► Beam line:Beam line:
Target:Target:► Documentation:Documentation:
In preparation: P.HodgsonIn preparation: P.Hodgson Conventional magnets:Conventional magnets:
► String test and remote control of Q1 – Q3String test and remote control of Q1 – Q3 Instrumentation:Instrumentation:
► Commission and test BM1, BM2, & BC2 with sourceCommission and test BM1, BM2, & BC2 with source► ‘‘GVA3’GVA3’
► Detectors for Step I:Detectors for Step I: ToF:ToF:
► ‘‘Fall-back’ stand for positioning ToF0 outside shieldingFall-back’ stand for positioning ToF0 outside shielding ToF/KL:ToF/KL:
► Cable installationCable installation► DAQ:DAQ:
Documentation:Documentation:► In preparation? Jean-Sebestien GraulichIn preparation? Jean-Sebestien Graulich
► G4MICE:G4MICE: Reconstruction of last week’s data … would be interesting Reconstruction of last week’s data … would be interesting
……