+ All Categories
Home > Documents > Monday, September 24, 2018 30% Design Community Meeting

Monday, September 24, 2018 30% Design Community Meeting

Date post: 06-Dec-2021
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
19
30% Design Community Meeting Please sign in on your mobile device: http//communitymeeting.ocps.net/ Monday, September 24, 2018 Site 83-E-SE-3
Transcript

30%DesignCommunityMeeting

Please sign in on your mobile device: http//communitymeeting.ocps.net/

Monday, September 24, 2018

Site 83-E-SE-3

Site83‐E‐SE‐3MeetingAgendaSeptember 24, 2018, 6:00PM

• Welcome – School Board Member, Daryl Flynn

• Introductions – Facilities Meeting Organizer                                     Lauren Roth

• Project Update                                                                                        Architect:  Rhodes+Brito Architects

• Questions and Answers• Adjournment

2

Last month, Facilities and Board Members Daryl Flynn and Pam Gould co-hosted a Live Town Hall meeting explaining the process for planning new schools.

To view answers to frequently asked questions such as “HowdoesOCPSplanschools?”and “HowdoesOCPSdecidewhichschoolsgofirst?”visit: https://bit.ly/2OLS4Rn

For the Powerpoint presentation that accompanies the video, please visit: https://bit.ly/2zn2zVT

FacilitiesLiveTownHall

3

4

Rezoning ProcessSchool Board Policy JC

https://www.ocps.net/sb/Superintendent%20Documents/JC%20School%20Attendance%20Areas%20(12‐13‐16).pdf

Step 1 ‐ Superintendent commences rezoningStep 2 ‐ Calendar (Timeline) developedStep 3 ‐ Calendar shared Step 4 ‐ Research, data collection and meetings with 

internal stakeholders Step 5 ‐ Community Meeting(s)Step 6 ‐ Rule Development WorkshopStep 7 ‐ Public HearingStep 8 ‐ Storage of materials

Planned Facility:

NEW Campus on vacant site to Meet District  Standards for  Elementary Schools: • Prototypical Core Spaces

Enhanced Learning Environment: • Latest Technology  • Planned Site Circulation• Safety  • Community Asset

5Aerial Map

ORLANDO INTERNATIONAL AIRPORT

SR 528

Semoran

Blvd

Golde

nrod

 Rd

Project SiteSite 83‐E‐SE‐2

McCoy ES

Planned Facility:

NEW Campus on vacant site to Meet District  Standards for  Elementary Schools: • Prototypical Core Spaces

Enhanced Learning Environment: • Latest Technology  • Planned Site Circulation• Safety  • Community Asset

6Aerial Map

Semoran

Blvd

Golde

nrod

 Rd

Project SiteSite 83‐E‐SE‐2

Lee Vista Blvd

Planned Facility:

NEW Campus on vacant site to Meet District  Standards for  Elementary Schools: • Prototypical Core Spaces

Enhanced Learning Environment: • Latest Technology  • Planned Site Circulation• Safety  • Community Asset

7Aerial Map

Golde

nrod

 Rd

Project SiteSite 83‐E‐SE‐2

Lee Vista Blvd

Market Place Dr

Site Plan 8

Planned Facility:

Site• 18 Acres• Future Road Extension• Separate Bus and 

Parent Drives• Queuing for 166 Cars• 140 Parking Spaces

Sustainability

Site:•Low Impact Design (LID) stormwater design•Native/low water plants – reduce water consumption

Building:•10% more energy efficient than ASHRAE 90.1 standard•High Efficiency Chillers (8% energy reduction)•Light colored roof to reduce heat gain and improves energy performance•Energy Star rated equipment•Water saving toilets, faucets, and fixtures•All general classrooms have daylighting•Over 75% of ALL  spaces have daylighting•Thermal efficient windows/glazing•Fully automated building controls system 10% more energy 11

Site 20‐E‐SW‐4 ES Relief

Example ‐ Classroom 12

Site 20‐E‐SW‐4 ES Relief

Example ‐ Technology 13

Planned Facility: Technology : Campus

The technology package will include:

• Student and teacher computers

• Interactive Flat Panel• White boards• Skills labs (Computer & 

Science)• Wireless Access• Audio Enhancement

Site 20‐E‐SW‐4 ES Relief

Example – Media Center 14

Planned Facility:Media Center

The Media Center will include:

• Genius bar• Library tables for an 

entire class• Story‐telling area• CCTV studio• Audio Enhancement 

Example – Multi‐Purpose Room

Planned Facility: Cafeteria

The Cafeteria will include:

• Kitchen• Two Serving Lines• Teacher Dining• Elevated Stage• Extended Day Office• Restrooms

15

Site 20‐E‐SW‐4 ES Relief

Example – Music Room

Planned Facility: Specialty Classrooms

• Art Classroom with kiln• Science Classroom• Music Classroom

16

Site 20‐E‐SW‐4 ES Relief

Example – Administration / Lobby

Planned Facility: Administration

The administrative  area includes:

• Single point of entry      during school hours

• Lobby • Administrative offices,   workroom & storage

• Large conference  room

• Clinic• Teacher planning

17

Site 20‐E‐SW‐4 ES Relief

Example – Play Equipment 18

Planned Facility: Physical Education

Physical Education will include:• PE Office and storage• Covered play canopy• Basketball Courts• Tot lot play structure• Youth lot play structure• Playfields

Site 20‐E‐SW‐4 ES Relief

Example – Main Entry

Planned Facility: Site Circulation

• On‐site car stacking• On‐site parking• Bus loop• Covered walkways• Safe pedestrian paths• Bike racks

19

Site 20‐E‐SW‐4 ES Relief

Schedule 20

Design & Construction Schedule

20202018Nov

GMP

Completed Design

Building Construction

Move‐in Date

Jan

2019

Mar May Apr

2020

JunAprFebDec Jul Jun JulMayAug

2019

Questions&Answers