Unit : Integrated Civil Engineering Design Project
Task : 01
Student ID : 0000504585 ENR No. :
Candidate Name : K.K Channa PriyadevaDate of Submission : 21.02.2016
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 2/61
CITY AND GUILD LEVEL 5 DIPLOMA IN CIVIL ENGINEERING
DESIGN OF STURUCTURAL ELEMENTS
(9209-522)
TASK ASSIGNMENT 01
DRAFT PROJECT PROPOSAL
BASED ON
TRAFFIC FREE COLOMBO CITY WITH PUBLIC MONORAIL NETWORK
LECTURED BY : ENG S.A.Y.B JAYASINGHE
NAME : K.K CHANNA PRIYADEVA
STUDENT ID : 504585
DATE OF PERFORMANCE: 07/02/2016
DATE OF SUBMISSION : 21/02/2016
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 3/61
TABLE OF CONTENT
TABLE OF CONTENT 3 - 4
LIST OF FIGURES 5
LIST OF TABLES 6
CHAPTER 01 – IDENTIFICATION OF PROBLEMS
1.1 Project Study Areas 7
1.2 Problems And Needs 7
1.3 Problem Statements 7 - 8
CHAPTER 02 – LITERATURE REVIEW
2.1 Previous Project Descriptions 9 - 16
2.2 Supportive Information 17
CHAPTER 03 - PROJECT IDEAS
3.1 Alternative Design Ideas 18 – 19
3.1.1 Viability of design ideas 20 - 24
3.2 Project Ideas 25 – 27
3.2 Case Studies 28 - 35
CHAPTER 04- OUTLINE DESCRIPTION OF PROJECT
4.1 Project Statements 36
4.2 Project Title 36
4.3 Aims 36
4.4 Objectives 37
4.5 Project Scope 37
4.6 Methodology 37
4.7 Outcomes 38
4.8 Validation 38
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 4/61
CHAPTER 05 – PLANNING THE PROJECT
5.1 Activities in Project 38 - 40
5.2 Gantt Chart 41- 48
5.3 Roles in the Project 49 – 50
5.3.1 Important roles in the Project 50 - 52
CHAPTER 06 - PROJECT SPECIFICATIONS
6.1 Constraints in Project 53
6.2 Specifications 54
6.3 Related principle to project specifications 55
6.4 Examples of project constraints 56- 58
REFERENCES 60- 62
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 5/61
LIST OF FIGURES
Figure 1.1 Mumbai monorail network Page 09
Figure 1.2 New Jersey ferry service Page 10
Figure 1.3 Auckland highway Page 11
Figure 1.4 Delhi forestation programme Page 12Figure 1.5 Rooftop herbal garden in Tokyo Page 13
Figure 1.6 pneumatic waste collection system Page 14
Figure 3.1 Average travel time In Colombo Page 28
Figure 3.2 Annual average of PM 10 at
Colombo fort ambient air qualitymonitoring station
Page 29
Figure 3.3 Monthly mean sulfur dioxideconcentration at Colombo fort- Dec
2003- 2007
Page 29
Figure 3.4 Survey results of purity andcleanliness in Colombo
Page 30
Figure 3.5 Survey data of pollution ofColombo city
Page 31
Figure 3.6 Monthly mean of one hour average
of nitrogen dioxide concentrationsat Colombo fort
Page 31
Figure 3.7 Garbage recycling efficiency inSweden
Page 33
Figure 3.8 Survey results of purity and
cleanliness of Colombo
Page 34
Figure 6.1 Applying latex coating in metal Page 54
Figure 6.2 Monorail car construction Page 55
Figure 6.3 Rotary piling rig Page 56
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 6/61
LIST OF TABLES
Table 3.1 - Traffic index in Colombo city - Page 27
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 7/61
TASK SUBMISSION 01 IDENTIFICATION OF PROBLEMS
CHAPTER 01 – IDENTIFICATION OF PROBLEMS
1.1 PROJECT STUDY AREA
Study area
Option 01
Monorail networking, highway and transportation, Hydrology, water transportation
Option 02
Town and country planning, landscaping engineering, agriculture, biology
Option 03
Irrigation engineering, hydrology, geo technological engineering, town and country planning
1.2 PROBLEMS AND NEEDS
1. Colombo district have huge amount of traffic during the starting of office works, school conclusion and
end of office work which have direct impact on the environment and productivity in the city. People who
travel in and out from Colombo on those hours need faster efficient and smooth way to travel to their
destinations
2. Colombo city is one of the major air and water polluted city in Asia causing threat to public health, presence of harming substance is the main reason to the issue. To mitigate air and water pollution level cit
needs a more tree plantations and efficient waste disposal system.
3. Colombo city is prone to flooding even in an average rainfall resulting the day to day life of the public
and creates huge economic loss to the country. It affects the daily routine of residents, motorists and publi
alike. City needs an efficient drainage system.
1.3 PROBLEM STATEMENTS
1. Traffic concentration during peak hours causing impact on the air quality where 55% of hazardous air
emission in Colombo emits by automotive and huge traffic concentration is causing law productivity
and resulting huge economic lost to the country. Residents, occupancies and motorists need traffic fre
Colombo city with efficient, comfortable, ecofriendly public transportation system which leads to
reduce to waste of time, energy, reduce vehicular emissions, prevent accidents and gain high
productivity from the Colombo city.
2. Air pollution both indoor and outdoor and water pollution in Colombo city is increased into a vital
level which may cause variety of health effects. Many of the toxic substances of the atmosphere in
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 8/61
TASK SUBMISSION 01 IDENTIFICATION OF PROBLEMS
3. Colombo reaches beyond the world health organization recommended levels and they warned about th
severe health outcomes to the population. To avoid those health outcomes to residents and occupants
city needs more plantation cover, indoor gardening system and efficient waste disposal system.
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 9/61
TASK SUBMISSION 01 LITERATURE REVIEW
CHAPTER 02 – LITRETURE REVIEW
2.1 PREVIOUS PROJECT DESCRIPTIONS
OPTION NO 01
REFERENCE PREVIOUS PROJECT NO 1
PROJECT NAME: -
Mumbai monorail project
COUNTRY: - India
Figure 1.1- Mumbai monorail
Source: - (google images)
PROJECT DESCRIPTION:-
Mumbai, commercial capital of India made a 20km long monorail network with 18 stations which provide
services for average of 125000 passengers per day to counter the traffic in the city.
REFERENCE: - http://www.monorails.org/tMspages/Mumbai1.html
REFERENCE PREVIOUS PROJECT NO 2
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 10/61
TASK SUBMISSION 01 LITERATURE REVIEW
PROJECT NAME: -
Ferry service in New Jersey
COUNTRY: - United States of America
Figure 1.2- New Jersey ferry service
Source: - (google images)
PROJECT DESCRIPTION:-
In 1986 ferry service is started in Hudson River to reduce travel time of the people and mitigate traffic in
New Jersey and able to perform 65000 passenger trips per year
REFERENCE PREVIOUS PROJECT NO 3
PROJECT NAME: -
Construction of high occupancy vehicle lanes in Auckland highway
COUNTRY: - New Zealand
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 11/61
TASK SUBMISSION 01 LITERATURE REVIEW
Figure 1.3: Auckland highway
Source: - (google images)
PROJECT DESCRIPTION:-
Separate high speed vehicle lanes were built in Auckland highway for motorists which carry two or more
passengers which leads to encourage carpooling and travel with less amount of vehicles hence mitigate th
traffic in Auckland highway
REFERENCE: - https://en.wikipedia.org/wiki/High-occupancy_vehicle_lane
OPTION 02
REFERENCE PREVIOUS PROJECT NO 1
PROJECT NAME: -
Plantation in non – forest area in New Delhi
COUNTRY:-
India
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 12/61
TASK SUBMISSION 01 LITERATURE REVIEW
Figure 1.4 – Delhi forestation programme
Source: - Google images
PROJECT DESCRIPTION:-
Indian government decide to improve air quality of the Delhi city by plantation on non – forest area
growing plantation cover form 6.6% to 20.6%
REFERENCE:-
http://www.ndtv.com/delhi-news/20-8-per-cent-green-cover-in-delhi-due-to-plantation-high-court-
1209889
REFERENCE PREVIOUS PROJECT NO 2
PROJECT NAME: -
Herbal garden project in Tokyo national nature and science museum
COUNTRY : -
Japan
PROJECT DESCRIPTION:-
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 13/61
TASK SUBMISSION 01 LITERATURE REVIEW
As a symbol of encouraging people to rooftop gardening in Tokyo, national museum of nature and science
complete a project of herbal garden in its roof top
Figure 1.5- rooftop herbal garden
Source: -
https://en.wikipedia.org/wiki/File:Herb_garden_of_National_Museum_of_Nature_and_Science_Tokyo_01.
pg
REFERENCE:-
https://en.wikipedia.org/wiki/File:Herb_garden_of_National_Museum_of_Nature_and_Science_Tokyo_0
.jpg
REFERENCE PREVIOUS PROJECT NO 3
PROJECT NAME: -
Automated vacuum waste collection system
COUNTRY : -
South Korea
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 14/61
TASK SUBMISSION 01 LITERATURE REVIEW
Figure 1.6 – pneumatic waste collection system
Source: - google images
PROJECT DESCRIPTION:-
City of songdo has automated vacuum waste collection system which runs by 7 personal and it
automatically sorted recycled, buried or burn to use as a fuel.
REFERENCE: - http://www.theatlantic.com/international/archive/2014/09/songdo-south-korea-the-city-
of-the-future/380849/
OPTION 03
Reference previous projects 01
Project name: -
Flood prevention Program city of Edmonton
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 15/61
TASK SUBMISSION 01 LITERATURE REVIEW
Country: -
Canada
Project description:-
Severe rainstorms in 2004 cause flooding caused more than 4000 homes, streets and roads in Edmonton
city and extensively damaged private and public property. Therefore local drainage companies develop
flood prevention strategies and took initiative strategies by finding causes for floods, identify and reduce
the flood risks and work with public to find viable solutions. They educate the public in the city to how to
reduce flood risk and help homeowners identify the deficit in their home drainage system and improve
them also they improve the neighborhood sewers and storm water system to support flood prevention.
Reference: - http://www.edmonton.ca/city_government/utilities/flood-prevention-program.aspx
Reference previous projects 02
Project name: -
North Main Street Flood Control Project
Country : -
United States
Project Description:-
North Main Street of the Wheaton city in USA is prone to floods during heavy rainfall. The city of
Wheaton and Wheaton park district have work together to find solutions for this. City plans alternative
route to North Main Street with a bridge over Winfield creek and widen and gain more depth the creek
channel near the main street to allow more storm water to flow.
And they broaden the capacity of the lagoon by lowering the height of the barrier that maintain the waterlevel in the lagoon. And they make sure ongoing developments in the city will not result a flood in private
properties or the city
Reference: - https://www.wheaton.il.us/northmain/
Reference previous projects 03
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 16/61
TASK SUBMISSION 01 LITERATURE REVIEW
Project name: -
Markham’s Flood Control Program
Country : -
Canada
Project Description:-
Town has identified capacity limitation of their drainage system excel the risk of their risk of flooding an
they identif ied it’s would require significant upgrade. It is long term broad initiative to improve storm
water drainage capacity and reduce flooding of streets and private properties. Main objective is to upgrade
the city in to non-flooding threat city under extreme climate and weather changes to help the daily routineof the public and save private properties.
Reference: -
https://www.markham.ca/wps/portal/Markham/MunicipalGovernment/AboutMunicipalGovernment/Majo
CityProjects/StormwaterMgmt
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 17/61
TASK SUBMISSION 01 LITERATURE REVIEW
2.2 SUPPORTIVE INFORMATION
OPTION 01 –
Previous project no 01 -
Traffic survey information, monorail networking feasibility studies, road construction materials,
Previous project no 02 -
Traffic survey data in New Jersey, town and country planning, irrigation in New Jersey
Previous projects no 03 -
Traffic survey data in Auckland, Highway transportation
OPTION 02 –
Previous project no 01 -
Surveys on atmosphere in Mumbai, plants suitable to lower temperature, weather data in Mumba
Previous project no 02 -
Appropriate heat and light for plantations, weather patterns in Tokyo, Roof top plantation
Previous project no 03 -
Plumbing engineering, waste surveys in songdo city, pneumatic technology
OPTION 03 –
Previous project no 01 -
Edmonton city infrastructure, steps to take mitigate flood risk, cost estimation and funding for city
drainage system, ongoing and future project in the city
Previous project no 02 -importance of wet lands to mitigate flood risk, advantage of wide and depth drainage system, cit
infrastructure , ongoing and future project in the city
Previous project no 03 -
Importance of high capacity drainage system, city infrastructure
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 18/61
TASK SUBMISSION 01 PLANNING OF PROJECT
CHAPTER 03 – PROJECT IDEAS
3.1 ALTERNATIVE DESIGN IDEAS
OPTION 01
ALTERNATIVE DESIGN IDEA NO 1:-
Colombo city possess a canal drainage system which gone through all over Colombo city and some are
expanding beyond Colombo districts. Monorail network which connecting main cities in Colombo along
the canal is suitable because it doesn’t need any optional land acquisition. It is ecofriendly, efficient and
can carry high capacity of people
ALTERNATIVE DESIGN IDEA NO 2:-
Colombo is a coastal city and possess many lakes canal throughout the city. Indian Ocean and certain
canals can be used as a means of transportation of people during traffic peak hours through ferry or boat
service.
ALTERNATIVE DESIGN IDEA NO 3:-
Upgrade the road system by providing separate lanes for different category of vehicles and separate high
speed lanes alongside the main road and improve alternative roads alongside main roads. Allow vehicles
with more passengers in high-speed lanes.
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 19/61
TASK SUBMISSION 01 PLANNING OF PROJECT
OPTION NO 2
ALTERNATIVE DESIGN IDEA NO 1:-
Implant trees along the banks of canals, lakes and other water ways in the city is an effective way to
increase the plantation in the city. Watering of plants can be done by the water in canals through plumbin
system after undergoing a purification.
ALTERNATIVE DESIGN IDEA NO 2:-
Improve indoor air quality with green building concepts including indoor gardening, courtyards and roof
top plantation. Gardening methods can be followed to achieve maximum plantation in small space and
enhance interior beauty
ALTERNATIVE DESIGN IDEA NO 3:-
Provide better waste disposal system and maintain water and air quality. Pneumatic automated waste
collection system is a better solution to the waste disposal because it runs underground, maintaining
aesthetic and space restriction in the city. It is also better solution for segregating the waste
OPTION NO 3
ALTERNATIVE DESIGN IDEA NO 1:-
Increasing the capacity of drain system by increasing depth and width of the drain lines is a faster way todrain the flood waters. Also installment of high capacity culvert is a essential
ALTERNATIVE DESIGN IDEA NO 2:-
When developing wet and marshy lands it is suitable to use pile foundation in construction and wetland
shouldn’t be landfill.
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 20/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 20 | P a g e
3.1.1 VIABILITY OF DESING IDEAS
Viability of the design idea no 01
Design Idea: -
Construct monorail railway network to mitigate traffic in Colombo city
Brief Explanation: -
The existing transportation system is not efficient enough to fulfill the public transportation needs
of the public in peak hours of office times. Therefore monorail system is an essential project to
mitigate traffic in the Colombo city. Idea to build monorail system along canal system in
Colombo city is can be a realistic aim considering projects feasibility to land acquisition,
construction feasibility, site feasibility, cost and proposed network routes.
Results: - Accepted
Reason to Reject: - N/A
Viability of the design idea no 02
Design Idea: -
Provide ferry and boat service (water taxi) to travel through Colombo district in peak hours
Brief Explanation: -
Provide water taxi service with boats and ferries through canal, waterways and Indian Ocean to
counter the traffic in Colombo city in peak hours
Results: - Rejected
Reason to Reject: -
Considering the environmental impacts (water pollution, Air pollution and noise pollution) ,
lesser average speed in travelling, not practical to extend routes, risk in travelling water lead to
nonrealistic project objectives and goals
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 21/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 21 | P a g e
Viability of the design idea no 03
Design Idea: -
Upgrade the roads system by Provide separate lanes for different category of vehicles and
separate high speed lane alongside the main road and improve alternative roads alongside main
roads
Brief Explanation: -
The existing Main roads in Colombo is with two lanes throughout, it is compulsory to provide 4
lanes to different categories of vehicles. But land acquisition is difficult because existingconstruction is too close to the ground. Therefore it is sensible to provide separate lanes in certain
high traffic area where there is high traffic density and suitable land, And also inclusion of high
speed alternative lanes alongside the main roads and facilitate alternative roads is realistic to
achieve
Results: -
Rejected
Reason to reject:-
Considering population density and building developments in Colombo city it is hard to acquire
land to construct new roads and upgrade the roads
Viability of the design idea no 04
Design Idea: -
Implant trees along the banks of canals, lakes and other water ways in the
city
Brief Explanation:
Plantation of trees along the banks of the canal with plumbing system and water purification
plant is difficult considering seasonal floods which leads to overflowing the
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 22/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 22 | P a g e
Drainages, cost and maintenance difficulty water purification and plumbing system is beyond
the reach of realistic objectives.
Results: -
Accepted
Reason to Reject: -
N/A
Viability of the design idea no 05
Design Idea: -
Improve indoor air quality with green building concepts including indoor gardening, courtyards
and roof top plantation
Brief Explanation: Existing housing system is not encouraged to indoor plantation. It can be
modified to proceed indoor plantation and receive good indoor air quality with few other good
outcomes
Results: -
Accepted
Reason to reject:-
N/A
Viability of the design idea no 06
Design Idea: -
Provide better waste disposal system and maintain water and air quality to maintain comfort andwellbeing of the citizen and prevent bio diversity in the city
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 23/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 23 | P a g e
Brief Explanation:
Automated vacuum waste collection system is a possibility considering its underground
plumbing, efficiency, aesthetic aspects, cost and improvement in hygiene standards.
Results: -
Accepted
Reason to reject:-
N/A
Viability of the design idea no 07
Design Idea: -
Upgrade the drainage system in Colombo
Brief Explanation:
Replacing current drain tunnels with more broad and wide tunnels is efficient way to improvedrainage
Results: -
Rejected
Reasons for reject:-
Existing drain system possess a considerable capacity. And main reasons for the flooding in the
city are illegal disposal of waste is blocking the drainage system and illegal development in wet
and marshy lands. Therefore drainage should be achieve through better waste disposal system and
keeping wet and marshy land unpolluted.
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 24/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 24 | P a g e
Viability of the design idea no 08
Design Idea: -
When developing wet marshy lands foundations of the constructions should be on piles and earth
filling should be avoided
Brief Explanation:
For some developments wet lands soil condition is not suitable therefore in highly important
projects soil condition some areas in wet land should be improved by earth filling with minimal
impact to the nature and drainage
Results: -
Rejected
Reason to Reject: -
10% of wet and marshy lands which originally in Colombo is already earth filled and government
is about to bring an amendment to prohibiting development of wet and marshy lands.
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 25/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 25 | P a g e
3.2 PROJECT IDEAS
Project Idea No 01
Design Idea: -
Alternative design idea no 01
Project idea :-
introducing monorail railway network for the city covering all the major towns in Colombo
district and provide easy access to the all the Long distance major roads (Galle Road, Southern
expressway, Colombo – Katunayaka Highway, Colombo- Kandy road ) starting from Colombo
district.
Condition of problem statement: -
Not revised
Problem statement:-
Residents, occupancies and motorists in Colombo city needs minimum traffic concentration to
reduce time and energy waste, reduce emission of hydro carbon gases, reduce accidents and
increase productivity
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 26/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 26 | P a g e
Project Idea No 02
Combined Design Idea: -
Alternative design idea no 04 &
no 05
Project idea : -
Improve the quality of indoor outdoor air by indoor plantation and forestation in banks of lakes
Condition of problem statement: -
Not revised
Problem statement:-
Residents, occupancies and animals in Colombo need quality air to breathe because it is the one
of the vital part for the wellbeing and comfort of living things
Project Idea No 03
Design Idea: -
Alternative design idea no 06
Project idea : -
Provide efficient and hygienic waste disposal system through automated underground pneumatic
waste collection system
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 27/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 27 | P a g e
Condition of problem statement: -
Not revised
Problem statement: -
Illegal disposal of waste is resulting adverse effect to the livelihood of the people. Creating
adverse health effects, effect harmfully to the quality of air ground water, blocking drainage
system and effect badly to the aesthetic appearance of the city
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 28/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 28 |
P
3.3 CASE STUDIES
Case Study 01 (For Project Idea 01)
Colombo city is a city with high concentration of buildings and residences. Almost all themajor government offices, privet sector head offices, commercial buildings, grounds,
recreational areas are located in Colombo which separate in to 13 administrative divisions for
administrative purposes.
Huge traffic concentration in Colombo city results vital consequences to human lives and
economy of the country. For Traffic free Colombo city with productive economy and healthy
comfortable life style it is essential to eradicate huge traffic from the roads of the Colombo.
Colombo – Katunayaka expressway, southern highway, Galle road and Railways are great
asset to reduce the traffic in the city because they are facilitate to provide quality, capacitive
and speedy transportation. Develop these existing main roads, develop and link other roadsto these main roads and provide link to these main roads through alternative transportation
method is the way to mitigate the traffic density in the Colombo district.
Table 3.1 – traffic index in Colombo
Traffic index 234.79
Time index ( in minutes ) 52.88
Time Exp. index 8534.93
Inefficiency index 250.86
CO2 Emission Index 5430.25
Source :- (www.numbeo.com)
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 29/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 29 |
P
Figure 3.1 – Average travel time In Colombo
Source :- (www.numbeo.com)
Especially in office and school starting times and concluding times there are huge trafficconcentration in the city.
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 30/61
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 31/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 31 |
P
Figure 3.3
Monthly mean sulfur dioxide concentration at Colombo fort- Dec 2003- 2007
Source: - (central environment authority)
Figure 3.4 - Survey results of purity and cleanliness in ColomboSource :- (www.Numbeo.com)
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 32/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 32 |
P
Figure 3.5
Survey data of pollution of Colombo city
Source: - (www. Numbeo.com)
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 33/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 33 |
P
Figure 3.6
Monthly mean of one hour average of nitrogen dioxide concentrations at Colombo fort (June
2003)
Source: (central environment authority)
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 34/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 34 |
P
CASE STUDY 03
Colombo city suffers a garbage disposal problem raising concerns over health and wellbeing
of the citizens and animals, resulting land, water and air pollution. Main reason to these
adverse effects are not majorly the volume of garbage but the inefficient collection, disposaland recycling methods. Some countries have high efficient garbage recycle methodology.
Figure 3.7
Garbage recycling efficiency in Sweden
Source: - (google images)
According to the statics provided by Colombo municipal council more than 80 cases have
filed in courts and more than 2000 warnings are issued for residents by government
institutions. These illegal disposal and government garbage dumping grounds creates fear that
they creates mosquito breeding grounds and increase the risk of dengue and other diseases.
Also some authorities received multiple complains from people that some garbage collections
in some areas are not attended by municipal council and some people passing by cannot
simply bear the smell.
I visited few places in Colombo to gather information about garbage collecting and disposal.
As I went to the Kalubowila hospital , Dehiwala one sanitary worker D.S Weerasingha
showed us the rotting garbage bin which uncollected for more than two weeks he says “
Garbage collecting crew doesn’t perform their duty properly , they just come and collect
nearby bins and go away , this is a severe hygiene problem to the patients and neighbors “
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 35/61
TASK SUBMISSION 01 PROJECT IDEAS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 35 |
P
Then I visited one of the garbage dumping ground neighborhood, kolonnawa. R. Sumana
who lived over 20 years here mother of two child says that children frequently ill due to
polluted environment and there are few animal carcasses frequently found in area where dogs,
cats fall ill after consuming garbage’s.
Figure 3.8- Survey results of purity and cleanliness of Colombo
Source: (www. Numbeo.com)
Existing Garbage collecting, dumping and recycling method is not giving even a mere solution for the
garbage problem of the city
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 36/61
TASK SUBMISSION 01 OUTLINE DESCRIPTION OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 36 |
P
CHAPTER 04 - OUTLINE DESCRIPTION OF THE PROJCET
4.1 FORMULATE A PROJECT IDEA
Accepted Project Ideas: -
Project Idea 01
Rejected Project Ideas: -
Project Idea 03 and Project Idea 02
Reasons To Reject: -
Lack of impact to the problem statement, Lack of attitude of People, Lack of
technology and skilled officers for handling automated waste collection unit, lack ofapplicability to domestic houses
Combination of Project Ideas: -
Not possible
Final Project Idea: -
Mitigate traffic and vehicular emissions in Colombo by upgrading the Public
transportation system with monorail public railway network
Project Title: -
Traffic free Colombo city with public monorail network
4.2 PROBLEM STATEMENT:-
Residents, occupancies and motorists in Colombo city needs minimum traffic
concentration to reduce time and energy waste, reduce emission of hydro carbon
gases, reduce accidents and increase productivity
4.3 PROJECT TITLE:-
Traffic free Colombo city with public monorail network
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 37/61
TASK SUBMISSION 01 OUTLINE DESCRIPTION OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 37 |
P
4.4 AIMS
1.
To Provide comfortable public transportation service with reduced road
accidents, less noise pollution and travel any town/city in the district within
maximum time of one hour
2. To Provide efficient transport methods to reach highways, Long distance
roads (southern and Colombo – Katunayaka expressway, Galle road, Kandy
road, Negambo Road) from the core of the Colombo city.
3. To Brings PM10 and PM 2.5 levels and other air composition in atmosphere
in Colombo up to world health Organization standard levels
4.5 OBJECTIVES
1. Reduce vehicle waiting time therefore reduce usage of fuels
2. Introducing low Sulphur diesel fuel
3. Provide comfortable efficient high-speed public transportation system where
people no longer wants to use their own vehicle to reach work place
4. Reduce toxic industrial emissions
5. Encourage electric- fuel hybrid vehicles
6. Save sanctuaries forest cover in the city.
4.6 SCOPE
The main aim of this project is provide comfortable, high speed and
environment friendly transportation system to asset people who travel in, out
and within Colombo district limits and bring the air quality of Colombo up to
world health organizational standard level by reducing vehicular toxic
emission Less traffic will lead to less travel time, with low Sulphur emissionsfuels with hybrid motors it is less vehicular emission of toxic in the city.
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 38/61
TASK SUBMISSION 01 OUTLINE DESCRIPTION OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 38 |
P
4.7 METHODOLOGY
Methodology to construct monorail system
• Feasibility study and environmental impact reports
• Develop stopping stations
• Link other travelling means to resume travelling
• Construct vehicle parking spaces
4.8 OUTCOME
City with less traffic density
Fast comfortable public transportation network City with less pollution
Increase of productivity and economy of the city
4.9 VALIDATION
Lack of efficient public transportation network is a prominent need in
Colombo city during office starts and conclusion times. Huge traffic jam
during these hours results lot of negative outcome. But monorail networkwhich connected to main roads from Colombo to outstations are providing
efficient solution to peoples need of public transport and it will definitely
help to mitigate the traffic in the city.
05-PLANNING OF PROJECT
5.1 – ACTIVITIES IN PROJECT
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 39/61
TASK SUBMISSION 01 PLANNING OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 39 |
P
# Activity Description Start Date End Date Duration (Day
1 Identification Of EngineeringProblems
01.09.2015 10.09.2015 8
2 Investigation Of related PreviousProjects
11.09.2015 15.10.2015 25
3
Formulating Alternative Design
Ideas 16.10.2015 15.11.2015 22
4 Development Of Project Ideas 16.11.2015 27.11.2015 10
5
Preparation of project idea 28.11.2015 01.12.2015 3
6 Preparation Of Case Studies 02.12.2015 10.12.2015 7
7 Writing Outline Description OfProject
11.12.2015 18.12.2015 6
8Identification Of Project Activities& roles
20.12.2015 24.12.2015 5
mobilization 26.02.2016 02.03.2016 4
Setting preliminaries 04.03.2016 16.03.2016 9
Site clearance 17.03.2016 09.06.2016 61
Fabrication of columns and beams 28.03.2016 03.06.2016 50
Setting out 04.06.2016 10.06.2016 6
excavation 11.06.2016 25.08.2016 55
Construction of stations,maintenance facilities and controlcenters
28.06.2016 09.01.2017 140
Construction of foundation 20.07.2017 11.10.2017 60
CONCEPT
ION
DEFINI
TION
P
LANNING
(
)
IMPLEMENT
ATION
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 40/61
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 41/61
TASK SUBMISSION 01 PLANNING OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 41 | P a g e
CHAPTER 05- PLANNING OF PROJECT
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 42/61
TASK SUBMISSION 01 PLANNING OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 42 | P a g e
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 43/61
TASK SUBMISSION 01 PLANNING OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 43 | P a g e
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 44/61
TASK SUBMISSION 01 PLANNING OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 44 | P a g e
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 45/61
TASK SUBMISSION 01 PLANNING OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 45 | P a g e
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 46/61
TASK SUBMISSION 01 PLANNING OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 46 | P a g e
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 47/61
TASK SUBMISSION 01 PLANNING OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 47 | P a g e
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 48/61
TASK SUBMISSION 01 PLANNING OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 48 | P a g e
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 49/61
TASK SUBMISSION 01 PLANNING OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 49 | P a g
5.3 ROLES IN PROJECT
Activity Description Responsible Role
Perform feasibility studies and siteinvestigation,
undertake complex calculations produce detailed designs and drawings
manage budget and resources schedule materials prepare bids for tendering
Civil Engineer
Analyze structural components
calculate forces, pressure, stress andstrains
suggest materials regarding strength anddurability
liaison with other professionals to
change the design complying the aesthetic advise on structural integrity, make
drawings, models using computer aidedsoftware,
serve expert knowledge on structures to
solve problems
Structural Engineer
Advise on blocking the drainage and flow
them through alternate drainage
Advise on soil erosion, embankment
Predict future behavior on drain waterafter the monorail system
Prevent future blocking in drainages
Irrigation Engineer
Design suitable pneumatic system forvarious commodity of garbage’s
develop , evaluate designs provide solutions for machinery
malfunction
liaison with other professionals to provideeffective service
Mechanical engineer
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 50/61
TASK SUBMISSION 01 PLANNING OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 50 | P a g
IMPORTANT ROLES TO THE PROJECT
ROLE- NO 1- CIVIL ENGINEER
Civil engineer involves in design, development and construction of the project mainly. He make sure the
maintaining the time, cost and quality of the project.
In the pre-construction stage
He performs the site feasibility study with site investigations with other professional
provide suitable electrical application formonorail project
study technical drawings Liaoning withother professionals
provide solution electrical malfunctions inthe projects
design and conduct tests
Electrical engineer
Perform feasibility studies
Prepare boq. contracts, budgets
provide advises forecast of cost
control cost writing reports prepare final accounts
Quantity surveyor
Liaising with construction professional before work starts
Develop schedule to progress of the project,
Storage and deliver machineries and
materials, Oversee the health and safety
implications in multiple projects
Plan smooth work flows aiding
construction management software’s andavoid future problems before they occur
Project manager
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 51/61
TASK SUBMISSION 01 PLANNING OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 51 | P a g
Prepare drawings and specification comply with the structural and aesthetic appearance of th
constructions
asses special risk and undertake them
supervise tendering process
During construction stage
Offer civil engineering solution at sites
Supervise work of junior staff
Communicating and Liasioning with other construction professionals
Review and approve project drawings
Schedule materials for buying
Correct project defiance’s
Make sure smooth run of project
ROLE- NO 2- Project Manager
Project manager is the professional who has the overall responsibility to planning, executing, monitoring and
controlling the project to successful completion
During pre-construction stage
Plan and define project scope
Develop working schedule
Allocate and manage resource
Time and cost estimation
Documentation
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 52/61
TASK SUBMISSION 01 PLANNING OF PROJECT
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 52 | P a g
During construction stage
Monitoring progress
Risk analysis
Prepare reports
Quality assurance
Lead the team to a successful project completion
ROLE- NO 3- structural engineer
Structural engineer is the designer of the construction structure to withstand forces imposed by nature
and occupancies. They prevent structures to deflected, excessively vibrate or collapse make sure the
safety of the occupancies
During Pre-construction stage
Calculate forces, pressures and stress impose on the structure
Analyze strength of materials Work with geotechnical engineers to analyses the bearing capacity of the soil
Cooperate with designers to produce safe design
During construction stage
Examine construction erection and advise how to improve the integrity
Coordinate with contractors to make sure the sound erection of building
Offer knowledge of forces on the structure to other professional
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 53/61
TASK SUBMISSION 01 PROJECT SPECIFICATIONS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 53 | P a g
CHAPTER 06- PROJECT SPECIFICATION
6.1 PROJECT CONSTRAINTS
1. Environmental constraints - Site clearance, mobilization, dredging, piling , laying lines, canal blocking
Above activities are results air and noise pollution, demolition of trees, buildings, excavation of ground
which brings effects to the environments. Colombo is coastal area therefore steel parts in monorails are
prone to rust. Dredging and piling emit high frequency vibrations which affects neighborhood buildings
2.
Economic constraints - installing advanced technology for monorail system, providing electrical powe
to monorails
Monorail network is yet to establish in Sri Lanka. Therefore all the technology and skillful officers shoul
be lend from foreign companies which led to greater cost. Also main energy source to monorail is
electricity
3. Technical constraints - installing technology
Sri Lankan officers and workers are not familiar with monorail technology and advanced technology whic
apply in control centers and station and trains are not available in Sri Lanka.
4.
Social constraints - dredging, installing tracks
When dredging for foundations will emit high noises which affect to neighborhood and installing the
tracks will sometimes interrupt with roads, bridges and traffic in the city.
5.
Legal constraints - building monorail tracks and installations
Land acquisition will be a problem and it will take some time to move the people who resides in these lan
legally or illegally and acquire the ownership for the land
6. Physical constraints - , building tracks for monorail,
Colombo is a city with high population density, so there are lot of legal/ illegal constructions, building
and infrastructure which built along the intended project areas.
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 54/61
TASK SUBMISSION 01 PROJECT SPECIFICATIONS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 54 | P a g e
6.2 PROJECT SPECIFICATIONS TO OVERCOME CONSTRAINTS
To avoid rusting of steel part of monorail network
For steel in monorail network: “The Home Depot, 6589 Alyssum color “Vinyl, acrylic or
styrene polymer combination latex paint coatings, apply 3 coating within gap of 20 hours
minimum for each coating
to avoid excessive weight of monorail and therefore need of electricity
Kevlar k119, High tensile strength at low weight. Material for construction of monorail car body. High tensile strength at low weight.
To avoid higher vibration when piling
Piling machinery: “Ep 160 kw rotary piling rig motor power, 1110 r/min vibration frequency
, maximum hole diameter 2000mm, piling speed 1.5km/h “Hydraulic or diesel drill with
built-in energy measurement efficiency 95%
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 55/61
TASK SUBMISSION 01 PROJECT SPECIFICATIONS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 55 | P a g e
6.3 RELATED PRINCIPLES TO PROJECT SPECIFICATIONS
Constraints in steel parts in monorail network
Monorail tracks is installed along the banks in canals in Colombo which also a coastal
city. High concentration of moisture, salt will result steel piles to corrode and generate
rust. Vinyl, acrylic or styrene polymer combination latex coatings will prevent the steel
from corroding and generating rust. Coating creates a rust proofing barrier between the
surface and the atmosphere.
Using Kevlar material to construction of monorail cars
Lightweight monorail car means power requirement is less and results smaller engines,
low power batteries, smaller fuel tanks are required
Environment constraint which occur when piling
Dredging for piling is emitting high vibration which effects to the environment and
stability of the neighborhood buildings. : Hydraulic or diesel drill with built-in energy
measurement efficiency of 95% is much more efficient, less noisy and emits less
vibrations therefore environment constraint is less with it.
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 56/61
TASK SUBMISSION 01 PROJECT SPECIFICATIONS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 56 | P a g e
6.4 EXAMPLES OF PROJECT CONSTRAINTS
1. Using Latex and Acrylic paints to cover steel parts in monorail tracks
Rust resistance
Water proof Good adhesion
Resistance to chemicals
Monorail network should be maintain to prevent from rusting and keep the aesthetic
aspects in the city. Latex and Acrylic paints are stain protected But this paint offers
good rust barrier, wash ability therefore it is easy to maintain, and it is resistance for
chemicals, water and better adhesion will maintain the aesthetic of the system.
Figure 6.1- applying latex coating in metal
Source: (google images)
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 57/61
TASK SUBMISSION 01 PROJECT SPECIFICATIONS
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 57 | P a g e
2. Using Kevlar 119 material for monorail car construction
When construction of monorail car is undergoing it should be done with Kevlar 119material where it is a light weight material with higher tensile strength and many more
advantages. When lightweight monorail cars are used in the network energy requirement
is less, can get higher speed easily and put s less stress on the tracks
Figure 6.2 - monorail car construction
Sources: (google images)
3. Using Ep rotary piling rig as piling machinery
Ep 160Kw rotary piling rig is energy efficient piling machinery which emits less noise and
transmit less vibrations to the neighborhood. Also higher operating speed will finish the
piling works quickly
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 58/61
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 59/61
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 59 | P a g e
REFERENCES
1.
Air pollution and health in Sri Lanka: a review of epidemiologic studies | BMC Public Health |Full Text. 2016. Air pollution and health in Sri Lanka: a review of epidemiologic studies | BMC
Public Health | Full Text. [ONLINE] Available
at: http://bmcpublichealth.biomedcentral.com/articles/10.1186/1471-2458-10-300 [Accessed 14
January 2016].
2. Chennai Monorail Corridor 2 at Vandalur to Velachery is expected | Asvini Foundations.
2016. Chennai Monorail Corridor 2 at Vandalur to Velachery is expected | Asvini Foundations.
[ONLINE] Available at:http://www.asvini.com/blog/chennai-monorail-corridor-2-at-vandalur-to-
velachery-is-expected/[Accessed 07January 2016]
3. City of Markham - Markham Flood Control Program. 2016. City of Markham - Markham Flood
Control Program. [ONLINE] Available at:
4.
Drilling rig - Wikipedia, the free encyclopedia. 2016. Drilling rig - Wikipedia, the free
encyclopedia. [ONLINE] Available
at: https://en.wikipedia.org/wiki/Drilling_rig#Auger_drilling[Accessed 30 January 2016].
5. Floods in sri lanka. 2016. Floods in sri lanka. [ONLINE] Available
at:http://www.slideshare.net/Guruge/floods-in-sri-lanka [Accessed 16 January 2016]
6. Flood Prevention Program:: City of Edmonton. 2016. Flood Prevention Program:: City of
Edmonton. [ONLINE] Available at: http://www.edmonton.ca/city_government/utilities/flood-
prevention-program.aspx[Accessed 08 January 2016]
7. Forest Park (Portland, Oregon) - Wikipedia, the free encyclopedia. 2016. Forest Park (Portland,
Oregon) - Wikipedia, the free encyclopedia. [ONLINE] Available
at:https://en.wikipedia.org/wiki/Forest_Park_(Portland,_Oregon) [Accessed 08 January 2016]
8. Helping Colombo Hold Back the Next Flood. 2016. Helping Colombo Hold Back the Next Flood.
[ONLINE] Available at: http://www.worldbank.org/en/news/feature/2014/07/02/helping-
colombo-hold-back-next-flood[Accessed 09 January 2016]
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 60/61
ADVANCE TECHNICIAN DIPLOMA IN CIVIL ENGINEERING 60 | P a g e
9. How many more floods before something’s done?. 2016. How many more floods before
something’s done?. [ONLINE] Available
at: http://www.sundaytimes.lk/101121/Plus/plus_02.html[Accessed 07 January 2016]
10.
How to Design a Successful Indoor Garden: 13 Steps. 2016. How to Design a Successful IndoorGarden: 13 Steps. [ONLINE] Available at: http://www.wikihow.com/Design-a-Successful-
Indoor-Garden[Accessed 09 January 2016].
11. Irrigation Engineer / Job / Degrees to Careers / the University of Newcastle, Australia.
2016. Irrigation Engineer / Job / Degrees to Careers / the University of Newcastle, Australia.
[ONLINE] Available at:https://www.newcastle.edu.au/degrees-to-
careers/job/?id=3901#jopt=tabsummary[Accessed 22 January 2016]
12. Istanbul is building a 47km monorail network to deal with its crippling traffic congestion |
CityMetric. 2016. Istanbul is building a 47km monorail network to deal with its crippling traffic
congestion | CityMetric. [ONLINE] Available at: http://www.citymetric.com/transport/istanbul-
building-47km-monorail-network-deal-its-crippling-traffic-congestion-700[Accessed 05 January
2016]
13.
Jokowi breaks ground marking start of work in monorail project - - ANTARA News.
2016. Jokowi breaks ground marking start of work in monorail project - - ANTARA News.
[ONLINE] Available at:http://www.antaranews.com/en/news/91137/jokowi-breaks-ground-
marking-start-of-work-in-monorail-project-[Accessed 06 January 2016]
14. Mechanical engineer: Job description | Prospects.ac.uk. 2016. Mechanical engineer: Job
description | Prospects.ac.uk. [ONLINE] Availableat:http://www.prospects.ac.uk/mechanical_engineer_job_description.htm [Accessed 22 January
2016
15. NYC DOT - HOV Lanes. 2016. NYC DOT - HOV Lanes. [ONLINE] Available
at:http://www.nyc.gov/html/dot/html/motorist/carpool.shtml [Accessed 07 January 2016].
16. Pollution in Colombo. 2016. Pollution in Colombo. [ONLINE] Available
at:http://www.numbeo.com/pollution/city_result.jsp?country=Sri+Lanka&city=Colombo
[Accessed 15 January 2016
8/20/2019 monorail project for colombo
http://slidepdf.com/reader/full/monorail-project-for-colombo 61/61
17. Quantity surveyor: job description | TARGET jobs. 2016. Quantity surveyor: job description |
TARGETjobs. [ONLINE] Available at: https://targetjobs.co.uk/careers-advice/job-
descriptions/278255-quantity-surveyor-job-description. [Accessed 22 January 2016]
18.
SCOPE 6 - Colombo is drowning | SCOPE. 2016. SCOPE 6 - Colombo is drowning | SCOPE.[ONLINE] Available at: http://scope.cowi.com/content/scope-6-colombo-
drowning#.VplgFOaff2M[Accessed 14 January 2016]
19. Structural engineer: Job description | Prospects.ac.uk. 2016. Structural engineer: Job description |
Prospects.ac.uk. [ONLINE] Available
at:http://www.prospects.ac.uk/structural_engineer_job_description.htm [Accessed 22 January
2016
20. The future of waste collection? Underground automated waste conveying systems « Recycling «
Waste Management World. 2016. The future of waste collection? Underground automated waste
conveying systems « Recycling « Waste Management World. [ONLINE] Availableat: http://waste-management-world.com/a/the-future-of-waste-collection-underground-automated-
waste-conveying-systems[Accessed 09 January 2016]
21. Traffic in Colombo. 2016. Traffic in Colombo. [ONLINE] Available
at:http://www.numbeo.com/traffic/city_result.jsp?country=Sri+Lanka&city=Colombo[Accessed
16 January 2016
22. Trees and Air Quality. 2016. Trees and Air Quality. [ONLINE] Available
at:http://www.arb.ca.gov/research/ecosys/tree-aq/tree-aq.htm[Accessed 07 January 2016]
23.
Vegetable Roof Garden - Gallery | Garden Design. 2016. Vegetable Roof Garden - Gallery |
Garden Design. [O NLINE] Available at: http://www.gardendesign.com/pictures/vegetable-roof-
garden_473/#7551[Accessed 08 January 2016].
24.
What is latex and acrylic paint? 2016. What is latex and acrylic paint?. [ONLINE] Available
at:http://www.dundean.com/tips_what_is_latex_paint.shtml[Accessed 30 January 2016].