MONTHLY PROGRESS For details contact: [email protected] INSTITUTE OF RURAL MANAGEMENT Volume: 21 Issue: 02/14 February: Highlights of the Month Pictorial Review Statistical Overview Graphical Analysis REPORT ² ² ² ² 2014
Transcript

MONTHLY PROGRESS

For details contact: [email protected] OF RURAL MANAGEMENTVolume: 21 Issue: 02/14 February:

Highlights of the Month

Pictorial Review

Statistical Overview

Graphical Analysis

REPORT

²²²²

2014

HIG

HL

IGH

TS

Livel ihood Enhancement and

Protection LEP – KPK

The duration of the project is from

March 2013 to June 2014 with total of

510 target beneficiaries. Around 66

participants trained in the month of

February; rounding to a total of 489

(96% of total) participants trained to

date.

The planning for the month of March

includes the training of 50 men at

Azakhel office and 50 women at field

training centers.

Life Skills Training - BRAC

Institute of Rural Management (IRM)

has signed a life skills training project in

February 2014 with BRAC. The Project

area covers district Lasbela. The

activities of project 'Life Skills Training

– BRAC' are started in the month of

February 2014. A total of 1,217

participants of district Lasbela are

trained in Life Skills Training.

Around 30 training events on Business

Management Training are planned for the

month of March 2014.

Nukari ya Karobar – PPAF

The Nukari ya Karobar project, funded

by PPAF, was started in the month of

February 2014 with 200 total target

b e n e f i c i a r i e s . T h e p r o j e c t ’ s

achievements for the month of February

includes the training of 46 participants of

district Bahawalpur.

Credit Appraisal & Recovery

Technique – PPAF

The Credit Appraisal & Recovery

Technique project, funded by PPAF, was

initiated in the month of February 2014

with total 200 target beneficiaries. The

project area covers KP, Punjab and Sindh.

The project's achievements for the month

of February includes the training of 19

participants on Credit Appraisal &

Recovery Techniques.

The planning for the month of March

includes six training events on Credit

Appraisal & Recovery Technique.

Punjab Skills Development Fund -

PSDF

Punjab Skills Development Foundation

(PSDF) funded a project to IRM which is

in initial stage. A total of 500 women of

district Bahawalpur will be trained as of th30 June 2014. The project achievements

in the month of February progressed to the

installation of UPS/Generator on centers,

delivery of consumables on centers,

submission of Training Inception Report

to PSDF and preparation of 4 month

training schedule/time table (literacy &

voca t iona l ) accord ing to Tevta

curriculum.

The planning for the month of March

includes the submission of trainees

profiles to PSDF, payment of stipend to

trainees, submission of Monthly Progress

Report to PSDF and regular visits of PSDF

team to centers.

Youth Economic Empowerment

Project

As part of the project deliverables, life

skills training and business management

HIG

HL

IGH

TS

a total of 1,745 participants trained to

date. The project was started in January

2013 with a total target of 5,600 youth

that would be trained till December 2016.

Next month's planning includes the

training of 150 participants.

Basic Tailoring - Save The Children

This project was started in the month of

January 2014. Around 199 women IDPs

from Bara Khyber Agency, have

successfully been completed their

training in Basic tailoring trade in the

month of February 2014. The project area

covers peripheries of district Peshawar.

L i v e l i h o o d E n h a n c e m e n t a n d

Protection LEP – Badin

Livelihood Enhancement and Protection

project was started in October 2013 with

total of 2,400 target beneficiaries of Badin

and Mir Pur Khans. Around 407

participants were trained in different

vocational trades during the month of

February 2014, rounding to a total of 1,168

(49% of total) participants trained to date.

Livelihood Restoration Protection and

S u s t a i n a b l e E m p o w e r m e n t o f

Vulnerable Peasant Communities in

Sindh – ILO

ILO funded a project to IRM that was

started in the month of January 2014. The

project's target of 60 participants has

successfully been achieved, of them 8 were

enrolled in Motorcycle Repairing, 7 were

enrolled in Peter Engine Repairing, 33

were enrolled in Dress Designing and 12

were enrolled in Machine Embroidery.

FATA-DA Entrepreneurship Training

Around 150 participants were trained

during the month of February; rounding to

skills training was provided to 34 young

participants, MoU with local enterprises

and employers was signed, meeting with

Employer was conducted providing

input to TEVT institutions in designing

competency and prevailing technology

based module and awareness sessions

were conducted as an ongoing activity in

the month of February 2014.

Moreover, other activities of YEEP

Chakwal includes the Meeting with Plan

and its partners regarding organizing

Family Health Mela in Chakwal, Project

coordination meeting with NRSP- YEEP

staff, Coordination meeting with MFI's

i.e. NRSP & Akhuwat and Monitoring

visit to vocational institutes along with

DMO Plan.

Planning for the month of March 2014

includes women friendly workplace

session with employers, meetings with

Employers and TVETs, capacity

building of selected TVET, and financial

support and provision of toolkits to the

trained youth.

S# Name of the project Project Client

Section

Project Duration Total Training Target

Target of Feb 2013

Achieved in Feb 2013

Achieved in Feb (%Age)

Achieved As of Feb

2013

Achieved As of Feb

(%Age) From To

CTP

1 YEEP PLAN International

CTP Aug 2012

Nov 2014

280 34 34 100% 290 103%

2 Life Skills Training BRAC CTP Feb 2014

Apr 2014

1,200 1,200 1,217 101% 1,217 101%

3 Training on Managing Nukari ya Karobar Center

PPAF CTP Feb 2014

Mar 2014

200 50 46 92% 46 23%

4 Credit Appraisal & Recovery Technique

PPAF CTP Feb 2014

Apr 2014

200 20 19 95% 19 10%

Sub Total

1,880 1,304 1,316 101% 1,572 84%

IRM Sindh Team

5 Vocational – LEP Badin

NRSP/PPAF IRM

Sindh

July

2013

Jun

2014 2,400 400 407 101% 1,168 49%

6 ILO Project ILSO IRM

Sindh

Jan

2014

Mar

2014 60 60 60 100% 60 100%

7 SCOPE (Vocational) SCOPE IRM

Sindh

Jan

2014

Feb

2014 12 12 12 100% 12 100%

Sub Total 2,472 472 479 101% 1,240 50%

S# Name of the project Project Client

Section Project Duration Total

Training Target

Target of Feb 2013

Achieved in Feb 2013

Achieved in Feb (%Age)

Achieved As of Feb

2013

AchievedAs of Feb

(%Age) From To

VTEC Azakhel

8 Entrepreneurship Training Project

FATA DA VTEC

Azakhel

Jan

2013

Dec

2016 5,600 150 150 100% 1,745 31%

9 Livelihood Enhancement and Protection LEP-KPK

PPAF-NRSP

CTP Mar 2013

Jan 2014

510 66 66 100% 489 96%

10 Basic Tailoring Save the

Children

VTEC

Azakhel

Jan

2014

Feb

2014 199 199 199 100% 199 100%

Sub Total 6,309 415 415 100% 2,433 39%

VTEC Rawalpindi

11 IRD-FATA (Vocational)

IRD VTEC Aug 2013

Feb 2014

280 40 35 58% 245 75%

12 Behbood and S&D (Vocational)

Behbood, S&D

VTEC Dec 2013

Jan 2014

5 5 5 100% 5 100%

13 Vocational – Islamic Relief

IRP VTEC Sep 2013

Dec 2013

50 25 25 100% 50 100%

Sub Total 335 70 65 72% 300 90%

MDP

14 M&E tools for Missing Children Strategy Implementation

UNICEF PEI-COMNeT

ICE Jan

2014 Mar 2014

1,400 1,400 1,393 99% 1,393 99%

Grand Total of Trained Pax 12,396 3,661 3,668 100% 6,938 56%

Community vs Staff

STPCTP

CTP 2,275

STP 1,393

Total 3,668

62%

38%

0.0% 20.0% 40.0% 60.0% 80.0% 100.0%

S&D

Behbood

Scope

Islamic Relief

Plan International

IRD -FATA

ILO Project

PPAF

LEP - KFW

FATA-DA

Save The Children

NRSP-LEP

BRAC

UNICEF PEI-COMNeT

0.1%

0.1%

0.3%

0.7%

0.9%

1.0%

1.6%

1.8%

1.8%

4.1%

5.4%

11.1%

33.2%

38.0%

Major Clients

Client Pax

S&D 2

Behbood 3

Scope 12

Islamic Relief 25

Plan International 34

IRD-FATA 35

ILO Project 60

PPAF 65

LEP-KFW 66

FATA-DA 150

Save The Children 199

NRSP-LEP 407

BRAC 1217

UNICEF PEI-COMNeT 1393

Total 3668

0.0% 20.0% 40.0% 60.0% 80.0% 100.0%

Bricks Work

Computer Course

Generator Repairing

Motor Winding

Beautician

Peter Engine Repairing

Plumbing & Pipe Fitting

Motorcycle Repairing

Heavy Machinary

Rilli Making

Paranda Making

Entrepreneurship

Adda/Aplic/Arc Work & Ebroidery

Tailoring & Dress Designing

0.9%

1.0%

1.5%

1.7%

2.0%

2.1%

2.7%

3.8%

4.5%

7.3%

7.5%

16.4%

21.9%

26.7%

Favorite Trades of the Month

Trades Pax

Tailoring & Dress Designing 244

Adda/Aplic/Arc Work &

Ebroidery 200

Entrepreneurship 150

Paranda Making 69

Rilli Making 67

Heavy Machinary 41

Motorcycle Repairing 35

Plumbing & Pipe Fitting 25

Peter Engine Repairing 19

Beautician 18

Motor Winding 16

Generator Repairing 14

Computer Course 9

Bricks Work 8

Section-wise

CTP Section VTEC RawalpindiVTEC Azakhel IRM Sindh

Pax

CTP 1,316

IRM Sindh 479

VTEC Azakhel 415

VTEC Rawalpindi 65

Total 3,668

Section

MDP

MDP 1,393

11%

13%

36%

2%

38%

6, St# 56, F-6/4 Islamabad, Pakistan. Email: [email protected]

Phone: +92-51-2822752, 2822792 Fax: +92-51-2823335

One of Asia’s Leading Capacity Development Institutes

www.facebook.com/IRM.Pakistan

www.linkedin.com/company/999766?trk=tyah

www.twitter.com/irm_islamabad

www.youtube.com/IRMpk


Recommended