Monthly Progress Report No. 22Covering Project Activities During
October 2014
Direktur Jenderal Bina MargaInspektoratJenderal, KementrianPUDirektur Transportasi - BappenasDirektur PengelolaanKas Negara(PKN), KementrianKeuanganDirektur Bina Program,DitJen BinaMargaDirektur BinaTeknik, DitJen BinaMargaDirektur Bina PelaksanaanWilayah I, DJBMBiro Perencanaan& KLN, KementrianPUKasubdit KawasanStrategisdan Andalan, KementrianDalamNegeri
.10. Kasubdit Pembiayaandan KerjasarnaLuar Negeri,Dit. Bipran,DJBM11. KasubditWilayah I B, Direktorat Bina PelaksanaWilayah I, DJBM12. KasubditWilayah I C, DirektoratBina PelaksanaWilayah I, DJBM13. KasubditWilayah I 0, DirektoratBina PelaksanaWilayah I, DJBM14. Kepala SNVT PembinaanAdministrasidan PelaksanaanPengendalianPHLN15. PT. Perentiana Djaja16. Yongma EngineeringCo, Ltd17. PT. Epadascon Permata EngineeringConsultant18. FilePT. PERENTJANAOJAJAin subconsultancy with • Yongina Engineering Co. Ltd and i1PT. Epadascon Permata Engineering Consultant
CTC Office: JI. CiniruVl1 No. 25, Kebavoran Baru, Jakarta Selatan, :2:Phone /Fax: (021) 7229823
Should you have any comment or additional information that need to be incorporated in the Report, pleasefeel free to get in touch with us.
This Report is reproduced in twenty (20) copies for distributionto all concemedauthorities.
In compliance with the Terms of Reference of our ConsultancyContract, we submit herewith the MonthlyProgress Report No.22covering the monthof October2014.
Dear Sir,
....~
Submission of October 2014 Monthly Progress Report No.22; WINRIPLoan IBRD No.8043-10
Subject
Attention: Ir. Agusta ErsadaSinulingga I MTOfficer In ChargePMUWINRIP
Directorate Generalof Highways, MPWJI. Pafirnura20 KebayoranBaruJakarta SelatanIndonesia
Jakarta, November14,2014Our Ref.No . : 03_02/CT NO/M-10.2014
MINISTRY OF PUBLIC WORKSDIRECTORATE GENERAL OF HIGHWAYS
DIRECTORATE OF PLANNINGCore Team Consultant for
Western Indonesia National Roads Improvement Project (WINRIP)IBRDLoan No. 8043-10
---~.--....
Monthly Progress Report No. 22Covering Project Activities During
October 2014
Direktur Jenderal Bina MargaInspektoratJenderal, KementrianPUDirektur Transportasi - BappenasDirektur PengelolaanKas Negara(PKN), KementrianKeuanganDirektur Bina Program,DitJen BinaMargaDirektur BinaTeknik, DitJen BinaMargaDirektur Bina PelaksanaanWilayah I, DJBMBiro Perencanaan& KLN, KementrianPUKasubdit KawasanStrategisdan Andalan, KementrianDalamNegeri
.10. Kasubdit Pembiayaandan KerjasarnaLuar Negeri,Dit. Bipran,DJBM11. KasubditWilayah I B, Direktorat Bina PelaksanaWilayah I, DJBM12. KasubditWilayah I C, DirektoratBina PelaksanaWilayah I, DJBM13. KasubditWilayah I 0, DirektoratBina PelaksanaWilayah I, DJBM14. Kepala SNVT PembinaanAdministrasidan PelaksanaanPengendalianPHLN15. PT. Perentiana Djaja16. Yongma EngineeringCo, Ltd17. PT. Epadascon Permata EngineeringConsultant18. FilePT. PERENTJANAOJAJAin subconsultancy with • Yongina Engineering Co. Ltd and i1PT. Epadascon Permata Engineering Consultant
CTC Office: JI. CiniruVl1 No. 25, Kebavoran Baru, Jakarta Selatan, :2:Phone /Fax: (021) 7229823
Should you have any comment or additional information that need to be incorporated in the Report, pleasefeel free to get in touch with us.
This Report is reproduced in twenty (20) copies for distributionto all concemedauthorities.
In compliance with the Terms of Reference of our ConsultancyContract, we submit herewith the MonthlyProgress Report No.22covering the monthof October2014.
Dear Sir,
....~
Submission of October 2014 Monthly Progress Report No.22; WINRIPLoan IBRD No.8043-10
Subject
Attention: Ir. Agusta ErsadaSinulingga I MTOfficer In ChargePMUWINRIP
Directorate Generalof Highways, MPWJI. Pafirnura20 KebayoranBaruJakarta SelatanIndonesia
Jakarta, November14,2014Our Ref.No . : 03_02/CT NO/M-10.2014
MINISTRY OF PUBLIC WORKSDIRECTORATE GENERAL OF HIGHWAYS
DIRECTORATE OF PLANNINGCore Team Consultant for
Western Indonesia National Roads Improvement Project (WINRIP)IBRDLoan No. 8043-10
---~.--....
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Table of Contents
1 EXECUTIVE SUMMARY .................................................................................................................1
1.1 Current Implementation Situation.......................................................................................................... 1
1.2 Disbursement............................................................................................................................................. 2
1.3 Visit.............................................................................................................................................................. 3
1.4 Procurement................................................................................................................................................ 3
1.5 Consolidated Update of the Progress of the Project .............................................................................. 6
2 PROJECT DESCRIPTION ...............................................................................................................8
2.1 Background................................................................................................................................................ 8
2.2 Project Development................................................................................................................................ 8
2.3 Project Objective ....................................................................................................................................... 13
3 CONSULTANCY SERVICES .............................................................................................................14
3.1 CTC Consultants ....................................................................................................................................... 14
3.1.1 Scope of Services.................................................................................................... 14
3.1.2 CTC Manning ........................................................................................................ 15
3.1.3 CTC Contract ........................................................................................................ 17
3.2 DSC Consultants...................................................................................................................................... 18
3.3 Technical Assistance for Capacity Building for Disaster Risks Reduction......................................... 18
4 CIVIL WORKS..............................................................................................................................19
4.1 Detailed Design Preparation.................................................................................................................... 19
4.2 Procurements........................................................................................................................................... 20
4.3 Civil Works Implementation.................................................................................................................. 21
4.4 Civil Works Progress................................................................................................................................ 22
4.5 Quality Assurance................................................................................................................................... 24
4.6 Environmental and Social Considerations ........................................................................................... 25
4.7 Anti Corruption Issues............................................................................................................................. 38
4.7.1 Anti‐Corruption Action Plan (ACAP) ...................................................................... 38
4.7.2 Community Representative Observers (CRO) ....................................................... 38
4.7.3 Publication / Disclosure ......................................................................................... 39
4.7.4 Complaints Handling Mechanism (CHS) ................................................................ 40
4.7.5 Third Party Monitoring (TPM) ............................................................................... 41
4.8 Road Safety Audit .................................................................................................................................. 41
5 FINANCIAL & MANAGEMENT INFORMATION SYSTEMS................................................................43
5.1 Draw‐Downs and Future Costs............................................................................................................... 43
5.2 Disbursement........................................................................................................................................... 43
5.3. Management Information System ....................................................................................................... 43
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
6 PROJECT PERFORMANCE............................................................................................................46
6.1 World Bank and GOI Compliance......................................................................................................... 46
6.1.1 World Bank Missions ........................................................................................... 46
6.1.2 Agreed Key Actions and Mission Plans During Recent World Bank Visit ............. 46
6.1.3 Performance Indicators ........................................................................................ 49
6.2 Implementation Support Components................................................................................................ 49
6.2.1 Core Team Consultant (CTC) ................................................................................. 49
6.2.2 Design and Supervision Consultant (DSC) ......................................................... 50
6.2.3 Road Sector Institutional Development ............................................................ 50
6.4 Anti‐Corruption Issues............................................................................................................................ 52
6.4.1 Anti-Corruption Action Plan (ACAP) ..................................................................... 52
6.4.2 Community Representative Observers (CRO) ...................................................... 53
6.4.3 Third Party Monitoring (TPM)............................................................................... 53
6.4.4 Complaint Handling System (CHS) ........................................................................ 55
6.4.5. Publication / Disclosures ...................................................................................... 55
6.4.6. Action Plan for Next Months ............................................................................... 56
6.5 Road Safety Audit ................................................................................................................................... 56
6.6 Environmental and Social Impact Issues.............................................................................................. 58
6.6.1 Package No.01: Krui – Biha ................................................................................. 58
6.6.2 Package No.02: Padang Sawah – Simpang Empat ............................................ 58
6.6.3 Package No.03: Manggopoh – Padang Sawah .................................................. 58
6.6.4 Package No.04: Ipuh – Bantal............................................................................. 58
6.6.5 Package No.05: Sp. Rampa – Poriaha ................................................................ 59
6.6.6 Package No.06: Psr.Pedati – Kerkap .................................................................. 59
6.6.7 Package No.07: Indrapura – Tapan .................................................................... 59
6.6.8 Package No.08: Bts Kota Pariaman – Manggopoh ........................................... 59
6.6.9 Package No.09: Rantau Tijang – Kota Agung .................................................... 59
6.6.10 Package No.10: Sp. Empat – Air Balam.............................................................. 60
6.6.11 Package No.11: Bantal - Mukomuko.................................................................. 60
6.6.12 Package No12: Kambang – Indrapura................................................................ 60
6.6.13 Package No.13: Sp. Rukis – Tj. Kemuning .......................................................... 60
6.6.14 Package No.14: Painan – Kambang .................................................................... 60
6.6.15 Package No.15: Sibolga – Bts. Tapsel................................................................. 61
6.6.16 Package No.16: Sebelat – Ipuh ........................................................................... 61
6.6.17 Package No.17: SP. Gunung Kemala – Pg. Tampak .......................................... 61
6.6.18 Package No.18: Mukomuko – Bts. Sumbar ....................................................... 61
6.6.19 Package No.19: Lais - Bintunan .......................................................................... 61
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
6.6.20 Package No.20: Lubuk Alung – Sicincin.............................................................. 62
6.6.21 Package No.21: Lubuk Alung – Kuraitaji ............................................................ 62
6.7 Management Information System.......................................................................................................... 62
6.8 Quality Assurance...................................................................................................................................... 70
6.9 Project Risks and Mitigation Measures .................................................................................................. 70
6.9.1 Risks Related to Delays ....................................................................................... 70
6.9.2 Financial Risks ...................................................................................................... 70
6.9.3 Risks Related to Quality ...................................................................................... 70
7 ISSUES and RECOMMENDATIONS...............................................................................................72
7.1 Current Situation .................................................................................................................................... 72
7.2 Actions Required..................................................................................................................................... 72
8 CORRESPONDENCES...................................................................................................................73
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
ABBREVIATIONS AND ACRONYMS
ACAP : Anti Corruption Action PlanAER : Application Evaluation ReportAIP : Australian Indonesia PartnershipAMDAL : Environmental Management (Analisis Mengenai Dampak
Lingkungan)ANDAS : Analisis Dampak SosialAWPs : Annual Work ProgramsBalai : Regional Office for National Roads ImplementationBAPPENAS : Badan Perencanaan Pembangunan Nasional (National
Development Planning Agency of GOI)Bappedalda : Regional Environmental Impact AgenciesBBPJN : Balai Besar Pelaksanaan Jalan Nasional (Regional Office for
National Roads Implementation)BER : Bid Evaluation Report
BLH : Badan Lingkungan Hidup
BPK : Badan Pemeriksaan Keuangan (Audit Board of the Government
of Indonesia)
CAD : Computer Aided Design
CHS : Complaint Handling System
CTC : Core Team Consultant
CHU : Complaint Handling Unit
CRO : Community Representative Observer ( = WPM)
DIA : Directorate of Implementing Affairs
DOP : Directorate of Planning
DGH : Directorate General of Highways
DMS : Document Management System
DTA : Directorate of Technical Affairs
DMS : Document Management System
DSC : Design and Supervision Consultants
EA : Executing Agency
EINRIP : Eastern Indonesian National Roads Improvement Project
EIRTP-1 : Eastern Indonesia Regional Transport Project First Project
ESAMP : Environmental and Social Assessment Plan
ESS : Environmental and Social Safeguards
FMIS : Financial Management Information System
FIDIC : Federation Internationale des Ingenieur Conseils
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
FMIS : Financial Management Information System
GIS : Geographic Information System
GOI : Government of Indonesia
IA : Implementation Agency
IBRD : International Bank for Reconstruction and Development
IFR : Internal Financial Report
IRMS : Integrated Road Management System
Kabupaten : Regency
KPIs : Key Performance Indicators
KPPN : Kantor Pelayanan Perbendaharaan Negara (Indonesian: State
Treasury Service Office)
LAN : Local Area Network
LARAP : Land Acquisition and Resettlement (Rencana Tindak Pengadaan
Tanah dan Pemukiman Kembali)
MIS : Management Information System
MOF : Ministry of Finance
MPW : Ministry of Public Work
MPRs : Monthly Progress Reports
P2JN : Perencanaan Pengawasan Jalan dan Jembatan Nasional
PDF : Portable Document Format
PMU : Project Management Unit
PAPs : Project Affected Peoples
PMM : Project Management Manual
PMU : Project Management Unit (WINRIP)
POKJA : Bina Marga Project Managers and Procurement Committes
PPC : Project Preparation Consultants
PP3 : Pemantau Pihak ke 3
PPK : Sub Project Manager
PPR : Project Progress Report
QPRs : Quarterly Progress Reports
RKL/RPL : Rencana Pengelolaan/Pemantauan Lingkungan
RS : Road Safety
Satker : Satuan Kerja (Work Unit for Road Project Implementation)
SPPL : Surat Pernyataan Pengelolaan Lingkungan
SRIP : Strategic Road Infrastructure Project
TA : Technical Assistance
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
TOR : Terms of Reference
UKL/UPL : Upaya Pengelolaan Lingkungan / Upaya Pemantauan Lingkungan
(Site Specific Environmental and Monitoring Plan)
WINRIP : Western Indonesia Roads Improvement Project
WB : World Bank
WP : Work Program
WPs : Works Programs
WPM : Wakil Pengamat dari Masyarakat (or Community Representative
Observer / CRO )
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
APPENDICESAppendix A : Overall Loan Progress
Appendix B : Highway Design Progress
Appendix C : Financial Progress
Appendix D : Quality Assurance Progress
Appendix E : Environmental and Social Progress
Appendix F : Procurement Plan and Progress
Appendix G : WINRIP Website Progress
Appendix H : ACAP Training/Dissemination Progress
Appendix I : Performance Indicator
Appendix J : Correspondences
ANNEXES
Annex P-1 : Package No. 1
Annex P-2 : Package No. 2
Annex P-3 : Package No. 3
Annex P-4 : Package No. 4
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 1
1 EXECUTIVE SUMMARY
1.1 Current Implementation SituationCivil Works
Implementation of the WINRIP Project is scheduled to be implemented into three (3) Annual WorkPrograms (AWP’s).
AWP-1 original implementation is scheduled to begin with the pre-construction activities(procurement) in mid 2011 and the actual work implementation to start in mid 2012.
AWP-2 consist of three (3) implementation stages. The 1st stage is the preparation of TenderDocuments (construction drawings, bid documents, special specs and other related documents) byDesign Supervision Consultant (DSC), 2nd stage is the procurement and the 3rd stage is the actualimplementation of the works. AWP-2 is originally scheduled to start in mid 2013 and to beimplemented at the beginning of Year 2014.
AWP-3 implementation stages are of the same sequence with that of AWP-2. The only difference isthat AWP-3 is originally schedule to take-off beginning the 1st month of the Year 2013 and to beimplemented in the 1st month of the Year 2015.
But to due some unavoidable circumstances, the original schedules incurred delays. Actualimplementation status are shown below.
AWP No. ofPackages
Implementation Statusas of October 31, 2014
AWP-1 4 4 Nos. Under construction
AWP-2 9
1 No. Bid Evaluation Report (BER) under final evaluation andfinalization.
2 Nos. Bids were submitted and opened. Bid Evaluation Report(BER) were finalized and forwarded to World Bank forrequest of No Objection Letter (NOL).
1 No. Bid preparation (Post Qualification) NCB.4 Nos. DED on-going revision by BALAI II prior to submission
to World Bank for NOL.1 No. Replacement road, still to be finalized.
AWP-3 8
1 No. World Bank issued NOL on the Bid EvaluationReport with concurrence to award the Contract tothe lowest bidder. Letter of Acceptance to thelowest bidder was issued by PPK.
2 Nos. Bid preparation (Post Qualification)ICB and NCB.4 Nos. Detailed Engineering Design (DED) on-going.1 Nos. Replacement roads, still to be finalized.
TOTAL 21
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 2
1.2 Disbursement
Loan Allocation and Percent (%) Disbursement To Date
1.454.35 4.35
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
Month
% C
ompl
ete
Actual Expenditure USD6.99 mil (2.80 %)
WINRIP ACTUAL PROGRESS UP TO OCTOBER 2014 AND FORECAST UP TO DECEMBER 2017
ACTUAL October 2014
Forecast October 2014Forecast Expenditure USD
116.00 mil (46.40%)
Deviation = 43.60%
The total disbursement from the loan to the end of October 2014 was USD 6,991,757.97equivalent to approximately 2.80% of the loan funds. The following table summarizes the individualdisbursements as calculated by CTC but retaining the total disbursement from Client Connectionat the end of October 2014. Appendix A shows the Overall Loan Progress Status.
Category DescriptionLoan Restructuring
Amount US$Disbursement
This PeriodPrevious
DisbursementTotals Disbursed toEnd October in US$
% Disbursed
1Part 1 Betterment andCapacity Expansion of
National Roads.220,400,000.00 310,453.52 4,446,969.05 4,757,422.97 2.16
2Part 2
Implementation Support16,000,000.00 133,841.61 1,848,059.18 1,981,900.79 12.39
3Part 3
Road Sector InstitutionalDevelopment
1,000,000.00 0,00 0 0 0
4Part 4
Contingency for DisasterRisk Response
0 0 0 0
Unallocated 12,600,000.00 0,00 0 0 0LN 8043 DA-
A252,434.61 252,434.61 0
Original LoanAmount
250,000,000.00 444,295.13 6,547,462.84 6,991,757.97 2.80
The amount disbursed during this month of October 2014 are “Statement of Work Accomplished”for Package No.1 Contractor covering the Monthly Certificate Nos. 5, 6 and 7 amounting toUSD 133,901.61, and for Package No.3 Contractor for Monthly Certificate Nos.5 and 6 with anamount of USD 176,551.91 and CTC consultancy fee of USD 133,841.61.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 3
1.3 VisitNo World Bank Implementation Review mission and site visit during the month.
1.4 Procurement
As of this reporting month of October 2014, two (2) sub-projects were bidded and BidEvaluation Reports (BER) were forwarded to World Bank requesting the issuance of NoObjection Letter (NOL) and concurrence to award the Contract to the responsive lowest bidder.While one (1) sub-project which was bidded in the middle part of September 2014, BidEvaluation Report (BER) is still to be finalized for submission to the World Bank. These three (3)sub-projects are programmed and clustered under AWP-2.
Under AWP-3, World Bank issued No Objection Letter (NOL) on the Bid Evaluation Report (BER)and concurrence to award the Contract for one (1) sub-project to the lowest responsive bidder.Letter of Acceptance to the lowest bidder was issued by PPK.
The current status of Contract Packages which are under procurement stage are as follows :
1. Package 17 (Sp. Gunung Kemala – Pugung Tampak) AWP-3.
During the period (October 2014), the Bid Evaluation Report (BER) and recommendationby DGH to award the Contract to the lowest responsive bidder, PT. Jaya KonstruksiManggala Pratama was forwarded to the World Bank for request of concurrence andissuance of No Objection Letter (NOL).
After World Bank’s final review of the submitted documents and DGH’srecommendation to award the Contract in the amount of Rp. 199,551,233,999(corrected amount) to the lowest responsive bidder, Bank issued on October 14, 2014their concurrence and No Objection Letter (NOL).
As the month was about to end, a Letter of Acceptance to the winning bidder was issuedby PPK with instruction to the winning Contractor to submit within 28 days thePerformance Security and an irrevocable line of credit of 6.0 million US dollars from areputable bank.
2. Package 11 (Bantal – Mukomuko) AWP-2
As mentioned in previous Monthly Report of September 2014, there were three (3)applicant bidders who were issued Invitation to Bid by the Procurement Committee(POKJA) Bengkulu. The three (3) bidders submitted their respective bid on October 3,2014 and bids were opened as schedule on the same day.
Following are the three (3) pre-qualified applicant bidders with their respective bid priceas read-out by the Procurement Committee Chairman during the bid opening :
a. PT. Waskita Karya (Persero), Tbk : Rp. 231,050,000,000
b. PT. Hutama Karya (Persero)-
PT. Daya Mulya Turangga, J.O : Rp. 228.899.000.000
c. PT. Yasa Patria Perkasa : Rp. 235.023.800.000
The lowest canvassed bid was submitted by a joint venture of PT. Hutama Karya(Persero)/PT. Daya Mulya Turangga with an amount of Rp. 228,899,000,000 or 0,99%below the Owner’s Estimate (OE) of Rp. 231,182,517,000
During this reporting period, the Bid Evaluation Report (BER) was finalized by the
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 4
Procurement Committee with recommendation to award the Contract to the lowestbidder, PT. Hutama Karya (Persero) / PT. Daya Mulya Turangga Joint Operation for acorrected contract price of Rp. 228,899,717,000.
After final review by CTC of the Bid Evaluation Report (BER), CTC officially endorsed thedocuments to PMU, recommending the award of Contract to the lowest responsivebidder with the corrected contract amount of Rp. 228,899,717,000 with bid validity toremain valid until January 31, 2015.
It is expected that the DGH Director of Planning will forward on the 1st week ofNovember 2014 to the World Bank the documents and contract award recommendationfor Bank’s final review and issuance of No Objection Letter (NOL)
3. Package 13 (Sp. Rukis – Tj. Kemuning) AWP-2
As mentioned in previous Monthly Report of September 2014, there were three (3)applicant bidders who were issued Invitation to Bid by the Procurement Committee(POKJA) Bengkulu. The three (3) bidders submitted their respective bid on October 3,2014 and bids were opened as schedule on the same day.
Following are the three (3) pre-qualified applicant bidders with their respective bid priceas read-out by the Procurement Committee Chairman during the bid opening :
a. PT. Waskita Karya (Persero), Tbk : Rp. 292,700,000,000
b. PT. Hutama Karya (Persero)-
PT. Conblock Infratechno, J.O : Rp. 314,791,000,000
c. Hala Co. – PT. Daya Mulya Turangga J.V : Rp. 301,706,925,300
The lowest canvassed bid was submitted by PT. Waskita Karya (Persero) with an amountof Rp. 292,700,000,000 or 1,52% below the Owner’s Estimate (OE) ofRp.297,209,388,000
During this reporting period, the Bid Evaluation Report (BER) was finalized by theProcurement Committee with recommendation to award the Contract to the lowestbidder, PT. Waskita Karya (Persero) for a contract price of Rp. 292,700,000,000.
After final review by CTC of the Bid Evaluation Report (BER), CTC officially endorsed thedocuments to PMU, recommending the award of Contract to the lowest responsivebidder with contract amount of Rp. 292,700,000,000 with bid validity to remain validuntil January 31, 2015.
It is expected that the DGH Director of Planning will forward on the 1st week ofNovember 2014 to the World Bank the documents and contract award recommendationfor Bank’s final review and issuance of No Objection Letter (NOL)
4. Packages 5 (Simpang Rampa – Poriaha) AWP-2
There were 14 (fourteen) contractor applicants (13 single company and 1 (one) jointventure operation) who submitted their prequalification documents. Three (3)contractor applicants failed to prequalify due to failure to satisfy the qualificationcriteria. Likewise, the 11 (Eleven) contractors who passed the qualification criteria wereissued an Invitation To Bid to submit their respective tenders for the execution of theWorks.
Ten (10) out of the eleven (11) pre-qualified applicant – bidders who were issuedInvitation Bid met the deadline for submission of bids at 10:00 am on September 22,
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 5
2014 in Medan and opening of bids followed immediately at 10:15 am.
The lone prequalified bidder who failed to submit bid for unknown reason was PT.Nindya Karya (Persero).
The lowest canvassed bid was submitted by PT. Nusa Konstruksi Enjiniring, Tbk with anamount of Rp. 107,321,260,000 or 26.40% below the approved Owner’s Estimate ofRp.145,815,316,000. while the highest bid was quoted by PT. Yasa Patria Perkasa in theamount of Rp. 151,361,000,000 or 3,80% above the approved Owner’s Estimate.
Following are the ten (10) prequalified applicant – bidders who submitted their bidswith their respective bid prices as read-out during bid opening are as follows :
a. PT. Adhi Karya (Persero), Tbk (Indonesia) : Rp. 113,325,400,000
b. PT. Bangun Cipta Kontraktor (Indonesia) : Rp. 127,588,401,500
c. PT. Brantas Abipraya (Persero) (Indonesia) : Rp. 115,098,070,721
d. PT. Hutama Karya (Persero) –PT. Seneca Indonesia JO (Indonesia) : Rp. 139,890,000,000
e. PT. Multi Structure (Indonesia) : Rp. 123,067,753,000
f. PT. Nusa Konstruksi Enjiniring, Tbk (Indonesia) : Rp. 107,321,260,000
g. PT. Pembangunan Perumahan (Persero (Indonesia) : Rp. 108,270,000,000
h. PT. Waskita Karya (Persero, Tbk (Indonesia) : Rp. 111,625,800,000
i. PT. WIdya Sapta Colas (Indonesia) : Rp. 127,716,417,000
j. PT. Yasa Patria Perkasa (Indonesia) : Rp. 151,361,000,000
There was slight delay in the preparation and finalization of the Bid Evaluation Report(BER) due to some more time were needed to address and resolve some outstandingissues.
Bid Evaluation Report (BER) is under preparation and expected to be finalized forsubmission to DGH on before the 2nd week of November 2014.
Procurement of Other Contract Packages
The present status of other Contract Packages which are about to be put on tender are asfollow :
1. Package No. 6 (Pasar Pedati – Kerkap)
This sub-project is under implementation schedule AWP-2. The project roadline islocated in the Province of Bengkulu having an approximate length of 20.90 .
The Contract Package is ready to be procured thru the National Competitive Bidding(NCB) as an agreement between MPW and World Bank concerning three (3) issues onModel Bidding Document for Procurement of Works were settled.
During this period, the bidding documents intended to be used on this Contract Packageare under finalization by incorporating all the agreements reached during the recentlyconcluded meeting.
It is expected that bid for this NCB project can be invited by DGH anytime this comingmonth of November 2014.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 6
2. Package No.19 (Lais – Bintunan)
This sub-project is under implementation schedule AWP-3. The project roadline islocated in the Province of Bengkulu having an approximate length of 10.80 kilometers.
The Contract Package is ready to be procured thru the National Competitive Bidding(NCB) as an agreement between MPW and World Bank concerning three (3) issues onModel Bidding Document for Procurement of Works were settled.
During this period, the bidding documents intended to be used on this Contract Packageare under finalization by incorporating all the agreements reached during the recentlyconcluded meeting.
It is expected that bid for this NCB project can be invited by DGH anytime this comingmonth of November 2014.
3. Package No. 15 (Sibolga – Batas Tapsel)
This sub-project is included in the implementation schedule AWP-3. The project road is36 kilometer long and located in the Province of Sumatera Utara.
The Bank agreed on DGH to pilot the use of MPW’s full e-procurement system, using theWorld Bank ICB Standard Bidding Documents (SBD) for procurement of works afterincorporating in the ICB bidding documents for this package the changes required foruse e-procurement system.
It is expected that DGH can invite bids within this coming month of November 2014.
Procurement of Three (3) Consultancy Packages Under Category 3 of the Loan Agreement,Part 3 : Road Sector Institutional Development
1. Technical Assistance for Capacity Building for Disaster Risk Reduction
“Request for Expression of Interest” and “Terms of Reference’ had been finalized basedon previous comments from the World Bank.
The documents are expected for resubmission to World Bank for final review andissuance of No Objection Letter.
2. Technical Assistance for Capacity Building for Environmental Management
Consultant still to be procured.
3. Technical Assistance for Capacity Building for Road Safety
Consultant still to be procured.
1.5 Consolidated Update of the Progress of the Project
Other brief updates of the pre-construction activities of this reporting month are shown in Table 1.1.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 7
DEDTechnical
DesignReview
Road SafetyAudit
Status Doc Requirement Status Doc Requirement StatusBudget
AllocationStatus
Est'd.Start
Duration(Months)
1 Krui - Bha Completed Completed Completed SPPL & AMDAL(No.1 & 17)
SPPL OK P2JN 2010 &AMDAL Subdit TLKJOK 2012 . WB NOL
issues on 20 Nov 2013
1).LARAP2). LARAP Mon
Report
1).NOL WB 4 Jan 132.NOL WB
Satker PJNProv
98% Completed Jan-14 21.00 A
Padang Saw ah - Sp. Ampat
Including Air Gadang Bridge
3 Manggopoh - Padang Saw ah Completed Completed Completed SPPLOK P2JN 2010.(No
need NOL WB forSPPL/UKL&UPL)
1).LARAP2). LARAP Mon
Report
1).NOL WB 13 Dec 122).Pending compensationpayment for the remaining
3 PAP
APBD Provinsi 99% Completed Jan-14 24.00 A
4 Ipuh - Bantal Completed Completed Completed SPPL & UKL&UPL
SPPL OK P2JN 2010 &UKL/UPL
OK, 31 Oct. 2014recommended by BLH
1).LARAP2). LARAP Mon
Report
1).NOL WB 10 Dec 122). 15 New PAP not yet
paid
Satker PJNProvinsi
96% Completed Jan-14 24.00 A
5 Sp. Rampa - Poriaha Completed Completed Completed UKL/UPLOK Balai 1 2011. (No
need NOL WB forSPPL/UKL&UPL)
1).SLARAP2). LARAP Mon
Report
1).Nol WB 10 Dec 122).Relocation 1 kiosk
affected project w ill bedone paralel construction
Satker PJNProvinsi
Not Applicable.No Land
Acquisition
Bids opened onSept. 22, 2014
Des-14 18.00 C
6 Ps. Pedati - Kerkap Completed Completed Completed UKL/UPLOK TLKJ 2011. NOLWB issued on 20 Nov
2013
1).SLARAP2). LARAP Mon
Report
1).NOL WB 20 Nov 20132). Target of a Mon Report
on Dec 2014
Satker PJNPropinsi
Comp paymentin process Not Yet Started Dec-14 15.00 D
7 Indrapura - Tapan Completed Completed Completed AMDALOK TLKJ , 20 Feb 2014.
NOL WB issues on 8Aug 2014
1).SLARAP2). LARAP Mon
Report
1).NOL WB 10 Oct 20142). Target of a Mon Report
on 2015
APBD Provinsi2015
Socializationprocess
Not Yet Started Jan-15 21.00 B
8 Bts. Kota Pariaman - Manggopoh Completed Completed Completed AMDALOK TLKJ 2013 . NOL
WB issued on 14 April2014
1).LARAP2). LARAP Mon
Report
1).NOL WB 12 Aug 20142). Target of a Mon Report
on 2015APBD Propinsi Socialization
processNot Yet Started Feb-15 24.00 B
9Rantau Tijang - Kota Agung bechanged w ith Bengkunat - Biha
UKL/UPLOK TLKJ 2011. NOLWB issued on 20 Nov
2013
Social and Envsafeguardsscreening
Being prepared byConsultant recuirement
(Balai 3)
Satker PJNProvinsi Not Yet Started Jun-15 21.00 I
10 Sp. Empat - Sp. Air Balam Completed Completed Completed AMDALOK TLKJ 2013 . NOL
WB issued on 14 April2014
1).LARAP2). LARAP Mon
Report
1).NOL WB 12 Aug 20142). Target of a Mon Report
on 2015APBD Provinsi
Socializationprocess Not Yet Started Feb-14 24.00 B
11 Bantal - Mukomuko Completed Completed Completed AMDALOK TLKJ 2014. NOL WBissues on 8 Aug 2014
1).LARAP2). LARAP Mon
Report
1).Nol WB: 20 Nov 20132).Target a MR in Dec
2014
Satker PJNProvinsi
35 from 209PAP alreadypaid (17%)
On Going Dec-14 24.00 E
12 Kambang - Indrapura Completed Completed Completed AMDAL OK TLKJ 2014 .NOL WBissues on 8 Aug 2014
1).LARAP2). LARAP Mon
Report
1).NOL WB 10 Oct 20142). Target of a MR on
2015APBD Provinsi Socialization
processNot Yet Started Feb-15 24.00 B
13 Sp. Rukis - Tj.Kemuning Completed Completed Completed UKL/UPLOK P2JN 2011. (No
need NOL WB forSPPL/UKL&UPL)
1).LARAP2). LARAP Mon
Report
1).NOL WB:20 Nov 20132).Target a MR in Mar
2015
Satker PJNProvinsi
Socializationprocess
On Going Dec-14 24.00 E
14 Painan - Kambang On Going AMDALOK TLKJ 2014 .NOL WBissues on 8 Aug 2014 SLARAP
Finalization of LARAP docby CTC APBD Provinsi Staking Out Not Yet Started Mar-15 21.00 H
15 Sibolga - Bts.Tap Sel Completed Completed Completed UKL/UPLOK Balai 1 2011. (No
need NOL WB forSPPL/UKL&UPL)
1).LARAP2). LARAP Mon
Report
1).NOL WB: 5Feb 20142).Target a MR on Dec
2014 - Mar 2015
Satker PJNProvinsi
Affected assetappraisalprocess
Not Yet Started Feb-15 30.00 D
Seblat - Ipuh including
Air Lalang & Air Guntung Bridge
18Mukomuko - Bts.Sumbar be changed
w ith Sibolga - SorkamUKL/UPL
OK TLKJ 2011. (Noneed NOL WB forSPPL/UKL&UPL)
Social and Envsafeguardsscreening
Being prepared byConsultant recuirement
(Balai 2)
Satker PJNProvinsi
Not Yet Started May -15 18.00 I
19 Lais - Bintuan Completed Completed Completed UKL/UPLOK TLKJ 2011.(Noneed NOL WB forSPPL/UKL&UPL)
1).LARAP2). LARAP Mon
Report
1).Nol WB: 20 Nov 20132).Target a MR in Dec
2014
Satker PJNProvinsi
Comp paymentin process Not Yet Started Dec-14 10.00 D
20 Lubuk Alung - Sicincin On Going UKL/UPLOK TLKJ 2011.(Noneed NOL WB forSPPL/UKL&UPL)
SLARAPFinalization of LARAP doc
by CTC APBD Provinsi Staking Out Not Yet Started Feb-15 18.00 H
21 Lubuk Alung - Kurajati On Going UKL/UPLOK TLKJ 2011. (No
need NOL WB forSPPL/UKL&UPL)
SLARAPFinalization of LARAP doc
by CTC APBD Provinsi Staking Out Not Yet Started Feb-15 18.00 H
Remarks :A On going Construction = 3 Packages in 1 study AMDAL (West Sumatera Prov ince)B Design rev ision by Balai II (Padang)
C Finalizing Bid Ev aluation Report by POKJA = 2 Packages in 1 study AMDAL (Bengkulu Prov ince)D For inv itation to bidE For Bank issuance of NOL to aw ard the ContractF Design f inalization by DSCG For Contract signing w ith the w inning bidderH Detailed design by DSC on-goingI Proposed to be replaced
Completed
21.00Mar-15Not Yet StartedComp paymentin process
Satker PJNProvinsi
Satker PJNProvinsi
OK TLKJ 2014 . NOLWB issues on 8 Aug
2014Completed AMDAL
Completed AMDAL (No.1&17)
1).NOL WB: 20 Nov 20142).Target a MR on Dec
2014
1).LARAP2). LARAP Mon
Report
G
F
AWP-3
Hire appraisalprocess
Bids opened onAugust. 15, 2014
Oct-14 24.00OK TLKJ 2011. NOLWB issued on 20 Nov
2013
1).LARAP2). LARAP Mon
Report
1).NOL WB: 16 Sep 20142).Target a MR on Mar
2015
16 On Going Completed
17 Sp.Gunung Kemala - Pg.Tampak Completed
AWP-2
Remarks
ContractImplementation Plan
Loan Package Name
2 Completed Completed CompletedSPPL&UKL/ UPL
Bridge
OK P2JN 2010 (Noneed NOL WB forSPPL/UKL&UPL)
Environmental Social Land Acquisition
24.00 A
Group Pack.No.
ProcurementStatus
AWP-1
1).LARAP2). LARAP Mon
Report
1).NOL WB 13 Dec 122).Pending Compensationfor the remaining 21 PAP
and 24 new PAP
APBD Provinsi 80% Completed Jan-14
Consolidated Project Status As Of End October 2014
Table 1.1
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 8
2 PROJECT DESCRIPTION
2.1 Background
The Government of Indonesia wishes to continue strengthening of the National Road system inIndonesia while the Eastern Indonesia National Roads Improvement Project (EINRIP which is assistedby AusAID through the Australian Indonesia Partnership or AIP), is providing support program ofNational road and bridge improvement works in Eastern Indonesia. The Western Indonesia NationalRoad Improvement Project (WINRIP) will provide similar support for National road and bridge in theSumatera region of Indonesia. The focus of WINRIP will be roads administered directly by theNational Government, including those currently classified as Provincial, Kabupaten (District) or non-status roads which are in process of being reclassified as National roads. In addition, provision will bemade for major bridge repair works, rehabilitation, duplication and replacement as necessary tocomplement road betterment works.
2.2 Project Development
The loan effectiveness date for the WINRIP is 12 March 2012 and key project data is shown in thefollowing detail.
Key Project Data WINRIP Loan No. 8043-ID
Project Cost US$350 million
Original Loan Amount US$250 million
Revised Loan Amount N/A
Board Approval Date 26 May 2011
Loan Signing Date 14 December 2011
Effectiveness Date 12 March 2012
Disbursement (as of 31 December 2013) US$ 2.2 million (0.88%)
Original Closing Date 31 December 2017
Environmental Category B-Partial Assessment
The IBRD loan amount is US$250 million. The Project is intended to finance a part of the DGHinvestment program for national roads with a particular focus on the Western corridor of Sumatera.The corridor is one of the three main corridors in Sumatera and connects the city of Padang (with apopulation of around one million) to major towns along the west coast (Bukittinggi, Sibolga andBengkulu). It also connects through connector roads on the West coast to Medan in the northeastand to Pekanbaru in the centre of the island. The project has four components:
Project Component 1: Betterment and Capacity Expansion of National Roads
According to the Loan Agreement, this component will cover three work programs of bettermentand capacity expansion of approximately 715.6 km including replacement of 194 meters of bridges.This civil works program will be executed in three Annual Work Programs(AWP), as summarized inTable 2.1. The table shows the IBRD assisted scope and costs of civil works at estimated current
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 9
(year of implementation) prices, excluding taxes.
Table 2.1 Proposed Physical Works by DGH Program
Type of WorksAWP-1 AWP-2 AWP-3
Km USDMillion
Km USDMillion
Km USDMillion
Road Betterment - - 53.10 22.77 - -
Capacity Expansion 137.10 79.70 314.60 127.67 207.60 74.58
Bridge works 0.100 1.94 - - 0.08 2.06
TOTAL(excluding tax @ current prices)
137.20 81.64 367.70 150.45 207.68 76.65
The batches of projects are termed Annual Work Programs (AWPs) in line with terminology used inother Bina Marga projects. They are not in fact “annual” programs as such but rather a series ofmulti-year programs, each commencing in consecutive years. Hence, hereinafter it will call as justWork Programs (WPs). It is expected that implementation of the first Works Program (WP-1) willcommence in the third quarter of 2013 and be completed by third quarter or late 2015. The secondWork Program (WP-2) is expected to commence in early 2014 and be completed by late 2015 ormiddle 2016. The third Work Program (WP-3) is expected to commence in early 2015 and becompleted by mid-2017. The loan will be closed on December 2017.
Table 2.2 presents details of the First Works Program (WP-1). The four packages in this group shouldhave been free from any land acquisition issues, but in fact two packages (Krui – Biha andManggopoh – Padang Sawah) had land issues which were solved by the DGH properly. Thus, thereare no foreseeable impediments to implementation.
Table2.2 IBRD Assisted WINRIP Civil Work WP-1
No Province LinkNo.
LinkName
Clas
s
Road
Typ
e
Road Works Bridge Works Total Cost
From
To Leng
th
Trea
tmen
t
Cost
(201
0)
No
Leng
th
Cost
(201
0)
2010
Pric
es
Equi
vale
nt
Km Km Km Rp mill m Rp mill Rp mill US$ mill
1 Lampung 053.0 Krui –Biha K1 IU 221.5 246.5 25.0 Bett’nt
to 7 m. 148,668 148,668 16.52
2 WestSumatera 047.2
PadangSawa –SimpangEmpat
K1 IU 0.0 40.9 40.9 Bett’ntto 7 m. 189,810 189,810 21.09
2a WestSumatera 34.1 AirGadan
gBridge K1 IU NewBridge 1 100 17.580 17,580 1.95
3 WestSumatera 047.1
Manggopoh –PadangSawah
K1 IU 102.2 134.2 32.0 Bett’ntto 7 m. 152,435 152,435 16.94
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 10
No Province LinkNo.
LinkName
Clas
s
Road
Typ
e
Road Works Bridge Works Total Cost
From
To Leng
th
Trea
tmen
t
Cost
(201
0)
No
Leng
th
Cost
(201
0)
2010
Pric
es
Equi
vale
nt
Km Km Km Rp mill m Rp mill Rp mill US$ mill
4 Bengkulu 015.3 Ipuh -Bantal K1 IU 0.0 49.7 49.7 Bett’nt
to 7 m. 226,275 226,275 25.14
It should be noted that all road sub-projects have been subject to economic appraisal and haveestimated Economic Internal Rates of Return (EIRR) in excess of 15%. These were selected forinclusion and are subject to completion of environmental and social screening, to confirm that thereis no land acquisition or resettlement requirements remain outstanding.
Final Engineering Designs, Engineer’s Estimates and bidding documents have been completed for allprojects proposed for WP-1.
Sub-projects to be included in WP-2 and WP-3 have also been determined as listed in Table 2.3. FinalEngineering Designs and Engineer’s Estimates for all WP-2 and WP-3 proposed works requirepreparation or finalization. In the cases of some projects, preliminary Engineering Designs wereprepared during Project preparation which will require review and possible amendment by theDesign and Supervision Consultant prior to procurement.
The costs presented in Table 2.3 are planning estimates only, and the overall scope and contents ofWP-2 and WP-3 may need to be revised as when revised costs and budgets are determined.
Table2.3: IBRD Loan WINRIP Civil Work WP-2 and WP-3
NO. SUBPROJECT LINK NO. AND NAME LENGTH(KM)
ENGINEER’SESTIMATE(RP. MILL)
WIDTH(M)
IMPLEMENTATION PLAN
START DURATION(MONTHS)
WP-2
5. Sumut : Link No. 015.xx,Sp. Rampa – Poriaha 9.7 152,870 6.0 Aug 2014 18
6. Bengkulu : Link No. 010.0,Ps. Pedati – Kerkap 20.88 92,127 7.0 June 2014 15
7. Sumbar : Link No. 019.0,Indrapura – Tapan 19.5 207,010 7.0 August 2014 21
8. Sumbar : Link No. 024.0,Bts. Pariaman – Manggopoh 46.8 401,567 7.0 Sep 2014 24
9. Lampung : Link No. 026.1,Rantau Tijing - Kota Agung 42.0 149,831 7.0 Jan 2015 21
10. Sumbar : Link No. 034.1,Sp. Empat - Sp. Air Balam 61.7 546,065 7.0 Sep 2014 24
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 11
NO. SUBPROJECT LINK NO. AND NAME LENGTH(KM)
ENGINEER’SESTIMATE(RP. MILL)
WIDTH(M)
IMPLEMENTATION PLAN
START DURATION(MONTHS)
11. Bengkulu : Link No. 015.2,Bantal – Mukomuko 50.1 246,500 6.0 August 2014 24
12. Sumbar : Link No. 017.2,Kambang – Indrapura 55.2 498,619 7.0 Sep 2014 24
13. Bengkulu : Link No. 006.1,Simpang Rukis - Tanjung Kemuning 56.3 316,305 7.0 August 2014 24
WP-3
14. Sumbar : Link No. 017.1,Painan – Kambang 31.5 118,993 7.0 Jan 2015 21
15. Sumut : Link No. 016.0,Sibolga - Bts. TapSel 36.0 353,956 7.0 August 2014 30
16.
Bengkulu : Link No. 009.4,Seblat – Ipuh, including Air Galang andAirGuntung Bridges
34.50.052 110,237 6.0 Jan 2015 21
17. Lampung : Link No. 061.1,Sp. Gunung Kemala - Pugung Tampak
36.8 255,269 6.0 August 2014 24
18. Bengkulu : Link No. 015.3,Mukomuko - Bts. Sumbar 25.8 69,233 6.0 May 2014 18
19. Bengkulu : Link No. 009.1,Lais – Bintuan 10.8 35,886 7.0 June 2014 10
20. Sumbar : Link No. 002.0,Lubuk Alung – Sicincin 14.6 54,557 7.0 Jan 2015 18
21. Sumbar : Link No. 027.0Lubuk Alung – Kuraitaji 16.8 65,788 7.0 Jan 2015 18
Project Component 2: Implementation Support
This component provides consulting services to support project management and implementationso as to ensure implementation efficiency and overall quality of the works. It also includes funds fora small amount of training of DGH staff and for incremental operating costs for the project. This willprovide support to the MPW for the implementation of the civil works, including: (a) provision ofCore Team Consultants (CTC), Design and Supervision Consultants (DSC) and road safety audits; (b)Project management support and technical audits. This is directly related to the implementation ofthe civil works and covers consulting services for design and supervision of the civil works inComponent 1; management support and technical audits to help improve the quality of constructionand support to governance improvements during procurement and implementation; and a series ofsystematic road safety audits of road designs for all project roads in Component 1. This is to ensurecompliance with road safety standards and regulations, identify road hazards and undertakeremedial treatments for safety improvements.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 12
Project Management Core Team Consultants (CTC)
The CTC will provide support to the PMU and DGH in the management of the Project, based inJakarta. Their tasks include financial and progress monitoring and reporting, informationmanagement and dissemination, quality assurance and performance review for the Design andSupervision Consultants, implementation and monitoring of the anti-corruption action plan, supportfor project monitoring and evaluation, and support for implementation of a training program tosupport project management and implementation. The CTC contract No. 06-20/CTC/TA/LN/8043/1112 was signed on 5 November 2012 by both DGH and a Joint Venture of PT.PerentjanaDjaja, Yongma Engineering Co,Ltd, and PT. Epadascon Permata Engineering Consultant.
Design and Supervision Consultants (DSC)
A Design and Supervision Consultant (DSC) will be responsible for design of WP-2 and WP-3 civilworks and supervision of all civil works. They will have the role of ‘Engineer’ under a FIDIC-typecontract. The tasks include the preparation and maintenance of a quality assurance plan, validationand updating of designs, supervision of all civil works, environmental and social monitoring andmanagement, and support for financial and progress monitoring and reporting. The DSC will also beresponsible for quality assurance of materials and workmanship, certifying whether or notcontractors have achieved the required results, as well as documentation and reporting based onthe financial management plan. They will prepare a Quality Assurance system covering allsubprojects, and continuously monitor the effectiveness of their supervision procedures. The teamwill be contracted and managed by DGH through the Bina Marga Regional Office (Balai II), and willbe based in Padang, West Sumatera.
Project Component 3: Road Sector Institutional Development
This component will provide technical assistance and support to strengthen disaster risk mitigationin the road sector, including capacity building support for the new environment/risk mitigation androad safety unit of DGH to conduct disaster risk assessments and planning, risk mapping of land-slides, coastal erosion, earthquake and floods, and analysis of alternative designs for road segmentsthat pass through critical environmental assets and vulnerable areas. The procurement forconsultants under this component has not yet been started. Preparation for the procurement wouldbe coordinated soon by the PMU WINRIP, the CTC and the DGH.
Project Component 4: Contingency for Disaster Risk Response
This special component will provide preparedness and rapid response to disaster, emergency and/orcatastrophic events as needed. This provisional zero dollar component will be added under thisproject to allow for rapid reallocation of loan proceeds from other components under streamlinedprocurement and disbursement procedures.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 13
2.3 Project Objective
The main objective of the program will be to increase the effective use of selected sections ofNational roads along the Western Sumatera Corridor by reducing road user costs, throughimproving the National road network especially in 4 (four) Provinces of Sumatera (North Sumatera,West Sumatera, Bengkulu and Lampung) and, where desirable, raise the road standard to that set bythe Directorate General of Highways. This will contribute significantly to ensuring that the Nationalroad network in the region provides acceptable standards of service and accessibility, and is capableof supporting local and regional economic development.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 14
3 CONSULTANCY SERVICES
3.1 CTC Consultants
3.1.1 Scope of Services
The CTC contract services originally were structured in its different project management elements.
Inception Phase
A key activity during the inception phase will be to establish lines of communication with PMU-WINRIP and DSC’s Team Leader as well as with all Provincial Project Managers (Satkers) wherethe first works are to be constructed under WP-1.
Project Management and Support to PMU, including acting DSC until the DSC is established
The Terms of reference identify a number of sub-items to be performed by CTC. The key factorthat will ensure success is that the CTC must work pro-actively and alongside PMU counterpartsand with DSC team in a professional manner based on mutual respect and trust.
Preparation of Work Programs
The tendering process for WP 1 sub-projects began as soon as procurement committees havebeen formed and received appropriate training in the procurement procedures required. Theindicative work programs and cost estimates identified for WP-2 and WP-3 are subject toverification, and are likely to change following more detailed investigations. Further preparationfor WP-2 and WP-3 will be managed by the PMU supported by the CTC.
Financial Monitoring
It will be the role of the CTC to first assess the level of understanding of the financialmanagement, monitoring and reporting procedures by the finance staff at the provincial andcentral level and subsequently devise an appropriate training program and assist the PMU intraining delivery.
Project Progress and Performance Monitoring
CTC will monitor the loan project progress and prepare the report in monthly basis. In themeantime, GOI and the World Bank have agreed on a set of Key Performance Indicators (KPIs) tomeasure the project’s performance in achieving its stated development objectives. CTC willtherefore first concentrate on the establishment of precise definitions, calculation methods anddata collection procedures to monitor the KPIs.
Support for the Implementation of the ACAP
The CTC will assist PMU be responsible for ensuring the ACAP is properly implemented and forrevising the Project Management Manual on an annual basis to incorporate necessary
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 15
improvements to processes and procedure.
ESAMP and LARAP Implementation Monitoring
CTC will closely work with BLH and DSC and will monitor and report the action of theEnvironmental Management Plan on a periodical basis and/or as required.
Training to Support Project Implementation
CTC is responsible for preparation and management of all training program required underWINRIP.
Reporting
CTC is responsible for all reports required under the contract agreement with standardize forms,charts and tables.
3.1.2 CTC Manning
CTC professional staffs involved in the project as of end of October 2014 are listed in Table 3.1.
Senior Highway Engineer (International) have completed his allocated man-month in the originalcontract and Amendment No. 1 and demobilized on March 2014. Likewise, the Senior Road SafetyEngineer (International) have also completed his man-month under Amendment No. 1 andtemporarily demobilized on March 2014, however, he will be remobilized for two (2) months periodunder Amendment No. 2 during the post construction phase to conduct final Road Safety Audits.
During this reporting month, the Team Leader took a vacation leave from October 11-28, 2014 tosecure extension of work visa from the Indonesian Embassy in Manila, Philippines.
In order to have continuity and not disrupt the operations of the Core Team Consultants, the Co-Team Leader was given full authority by the Team Leader to assume and discharged the duties andtask in conjunction with CTC’s Terms of Reference.
With no mobilization and demobilization of staff this month, the composition of the CTC professionalstaffs to date remain the same as during the previous month.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 16
Table 3.1
40.00 - - Mahbub ur Rahman - - - - A
- 35.25 - Per Weiss Pedersen Apr-13 Mar-14 10.50 - B
- - 23.00 C.T. Arenas Apr-14 - 6.31 16.69Senior Highway
Engineer 8.00 12.50 14.00 Moon, Sung Hyung Mar-13 Mar-14 14.00 0.00 C
Senior RoadSafety Audit 6.00 11.00 13.00 Cho, Woo Sung Jun-13 Mar-14 11.00 2.00 D
18.00 - - Wasim ur Rahman - - - - A
- 16.00 16.00 Sanjeev KumarAgarwal Jan-14 - 9.20 6.80
40.00 9.67 9.67 Besar Awiat Bowo Nov-12 Sep-13 9.67 - B
- 30.33 6.67 Agus Setiawan Sep-13 Mar-14 6.67 - B
- - 23.36 Julius J. Sohilait Apr-14 - 7.00 16.36
36.00 7.37 7.37 Whiliyanto Nov-12 Jun-13 7.37 - B
- 28.40 28.40 Lebiyartono Jul-13 - 15.97 12.43Quality Assurance
Engineer 30.00 30.00 30.00 Uray Abdul Manaf Jul-13 - 15.97 13.03
36.00 12.33 12.33 Uus Martawijaya Nov-12 Nov-13 12.33 - B
- 22.40 22.40 YD Tarwanto Oct-13 - 12.97 9.43Environmental
Specialist 30.00 30.00 30.00 Leti Hermawati Dec-12 - 22.43 7.57
35.00 - 11.33 M. Sutopo Nov-12 Oct-13 11.33 - B - 26.00 26.00 Witono Sep-13 - 13.93 12.07
12.00 - - Darmansiri - - - - A - 12.00 12.00 Muhdi - - - - A - - 12.00 Mardiansyah Jul-14 4.00 8.00
12.00 - 4.10 Rudi Rungkat Nov-12 Mar-13 4.10 - B
- 24.00 24.00 M. Edhi Fachri Mar-13 - 19.17 4.83
30 - - Agung Lukito - - - - A
- 25.00 25.00 Sony Thamrin May-13 - 17.97 7.03Community
DevelopmentOfficer
36.00 36.00 36.00 Yakobus Jan-13 - 21.90 14.10
Road Safety AuditEngineer 25.00 25.00 19.00 Aditya Moraza Alwi Jun-14 - 5.00 14.00
Bridge Engineer 5.00 5.00 5.00 Harimurti Suprihantoro Apr-13 Aug-13 5.00 0.00 C
Training Specialist 12.00 12.00 12.00 Roedjitarjo Jan-14 - 7.90 4.10
RemarksA - Not able to mobilizied due to poor health or personal reasonsB - Resigned due to personal reasons or poor healthC - Task assigment completedD - Remaining man - month for post audit
Demob-ilized
Man - MonthUsed as of endof October 2014
Man - MonthRemaining RemarksOriginal
ContractAmendment
No.1Amendment
No. 2
Highway Engineer
POSITION
Man - Months Duration
Name Mobilized
Team Leader
SeniorProcurement
Specialist
Assistant TeamLeader
FinancialManagement
Specialist
Social ImpactSpecialist
ProcurementSpecialist-2
ManagementInformationSpecialist
ProcurementSpecialist-1
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 17
3.1.3 CTC Contract
The CTC contract for “Western Indonesia National Roads Improvement Project” (Contract No.06-20/CTC/TA/LN/8043/1112) was signed on 05 November 2012. The contract is between theGovernment of Indonesia represented by Directorate General of Highways in the Ministry of PublicWorks and PT. Perentjana Djaja in joint venture with Yongma Engineering Co.Ltd. and PT. EpadasconPermata Engineering Consultant.
The Notice To Proceed was issued by letter dated 6 November 2012 from the PPK, and the officialstarting date of the contract was set at 6 November 2012.
Likewise, Amendment No. 1 to the original contract was signed on 25 October 2013 to cover allrequirements of the CTC are summarized below.
Replacement of the Senior Procurement Specialist Extending the assignment of the Senior Highway Engineer. Extending the assignment of the Senior Road Safety Audit Engineer. Extending the assignment of the Procurement Specialist 2 and replacement of the
Procurement Specialist 1. Adding the new position of Bridge Engineer. Adding the new position of Training Specialist, and Adding the new position of Road Safety Engineer.
Amendment No. 2 is still to be officially approved. Proposed amendment to the Original Contractand Amendment No. 1 are additional man-months for professional and technical staff forinternational and local, replacement of foreign and local consultants and modification to variousreimbursables to match with the actual requirements. Presented in Table 3.2 is the current statusof CTC contract.
Table 3.2
Description USD IDR
Original Contract 1,276,700 21,415,400,000
10% VAT 127,670 2,141,540,000
Total Original Contract 1,404,370 23,556,940,000
Amendment No.1 1,315,925 22,426,175,000
10% VAT 131,592 2,242,617,500
Total Amendment No. 1 1,447,517 24,668,792,500
Variance Against Original Contract +3,07% +4,72%
Amendment No. 2 * 1,371,925 *22,458,676,500
10% VAT *137,192 *2,245,867,650
Total Amendment No. 2 *1,509,117 *24,704,544,150
Variance Against Original Contract *+7,46% *+4,87%
* Tentative until Amendment No. 2 is officially approved
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 18
3.2 DSC Consultants
A Design and Supervision Consultant (DSC) will be responsible for design of WP-2 and WP-3 civilworks and supervision of all civil works. They will have the role of ‘Engineer’ under a FIDIC-typecontract. The tasks include the preparation and maintenance of a quality assurance plan, validationand updating of designs, supervision of all civil works, environmental and social monitoring andmanagement, and support for financial and progress monitoring and reporting. The DSC will also beresponsible for quality assurance of materials and workmanship, certifying whether or notcontractors have achieved the required results, as well as documentation and reporting based onthe financial management plan. They will prepare a Quality Assurance system covering allsubprojects, and continuously monitor the effectiveness of their supervision procedures. The teamwill be contracted and managed by DGH through the Bina Marga Regional Office (Balai II), and willbe based in Padang, West Sumatera.
DSC has been established in Balai II Padang following the contract signing on 11 June 2013 betweenBalai II and Renardet SA in joint venture with PT. Cipta Strada, PT. Daya Creasi Mitrayasa, PT.Seecons and PT. Yodya Karya. The Notice To Proceed was issued by the Balai II on 19 June 2013.
Shown in Table 3.3 is the present status of the Design Supervision Consultant (DSC) contract.
Table 3.3
Description USD IDR
Original Contract 820,600 51,818,705,000
VAT 10% (GOI Portion) 82,060 5,181,870,500
Total 920,660 57,000,575,500
3.3 Technical Assistance for Capacity Building for Disaster Risks Reduction
Draft Finals of “Request for Expression of Interest“ and “Terms of Reference” had been finalizedby Teknik Lingkungan dan Keselamatan Jalan (TLKJ) based on previous comments from theWorld Bank.
The Draft Final copies are expected for resubmission to the World Bank for final review andissuance of No Objection Letter (NOL)
3.4 Technical Assistance for Capacity Building for Environmental Management
Consultant still to be procured
3.5 Technical Assistance for Capacity Building for Road Safety
Consultant still to be procured
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 19
4 CIVIL WORKS
4.1 Detailed Design Preparation
Final Engineering Designs, Engineer’s Estimates and bidding documents have been completed for allprojects proposed for WP-1.
WP-2 (nine subprojects) and WP-3 (eight subprojects) will be designed by DSC and the constructionsupervision of all the works programs will be performed by the same DSC team. In parallel with theinstruction to speed up the process, detailed engineering design (DED) of some subprojects of WP-2and WP-3 were prepared and completed by respective P2JN. The CTC has been instructed by DGH toreview the DED of seven packages completed by the P2JNs (package 5, 6, 11, 13, 15, 17 and 19).
To date, detailed engineering design for fifteen (15) sub-projects has been completed, four (4) areunder preparation and detailed design works of two (2) sub-projects are still pending due to proposalto replace the two (2) originally listed packages.
As previously reported in previous Monthly Progress Report, detailed engineering design drawingsaccompained by corresponding Engineer’s Estimate for the four (4) sub-projects were approved byBALAI II (Padang) and were forwarded to PMU for final checking and review.
However due to the considerable cost estimate in implementing the design the Director ofImplementation Affairs of Region I instructed BALAI II (Padang) Project Manager thru Internal Memo(Nota Dinas) No.130/ND/BL2014 to prepare design revisions.
The detailed engineering design drawings for the four (4) sub-project that are under revision by BALAIII are follows :
1. Package 7 : Indrapura – Tapan
2. Package 8 : Bts. Pariaman – Manggopoh
3. Package 10 : Sp. Empat – Sp. Air Balam
4. Package 12 : Kambang – Indrapura
To date, the four (4) DED drawing are still to be resubmitted for final review prior to submission toWorld Bank for request of No Objection Letter (NOL).
With regards to the other two (2) design drawings for Package 20 (Lubuk Alung – Sicincin) and Package21 (Lubuk Alung – Sincincin) wherein result of CTC’s technical review, comments andrecommendations were transmitted to DSC for incorporation in the preparation of final designdrawings, to date, DSC have not yet returned the corrected drawings for final review.
As mentioned earlier, there is a proposal to delete two (2) originally listed packages forimplementation under AWP-2 and AWP-3 due to the two (2) listed sub-projects were recentlyrehabilitated with newly laid asphalt concrete overlay on the existing travelledway.
The sub-projects that are originally listed for implementation in the WINRIP Program and proposed tobe replaced are are Package No. 9 (Rantau Tijang – Kota Agung) and Package No. 18 (Mukomuko –Bts. Sumbar) both located in Lampung and Bengkulu, respectively.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 20
The candidate roadlinks that are considered and proposed as repalcements are Biha – Bengkunat (LinkNo. 028) and Sibolga – Sorkam (Link No. 043) both located in Lampung and North Sumatera,respectively. One (1) of the two (2) proposed road sections which is Biha – Bengkunat is alreadyincluded in “List of Proposed Links For Feasibility Studies”on Report from the Technical Assistance ofProject Preparation for WINRIP but updating of economic evaluation still to be conducted. While theother proposed roadlink (Sibolga – Sorkam) which is not included in the original “List of Proposed LinkFor Feasibility Studies” needs economic evaluation to determine whether it is feasible for furtherimplementation.
A “Technical Analysis Report For Verification of Replacement Road” was prepared by the CTC’sCo– Team, Highway Engineer and Road Safety Audit Engineer from data and informations gatheredduring the reconnaissance and preliminary surveys and was formally submitted to PMU.
Based on the final review by PMU of the “Technical Analysis Report For Verification of ReplacementRoad, the Directorate of Planning endorsed the proposal to World Bank for the Bank’s confirmationand issuance of No Objection Letter (NOL).
In principle, the World Bank thru letter ref. no.WINRIP/187 on October 2, 2014 interpose conditionalNo Objection to the proposal by DGH to replace the original road sub-projects by two (2) new roadlinks as follows :
(a) the two (2) replacements will be subjected to evaluation of technical and economic point ofview by the World Bank and subsequently to restructure the project with loan agreement tochange the road section.
(b) DGH to confirm the willingness to fully or partially finance the civil works with ABPN budget incase World Bank’s technical and economic evaluation are not satisfactory and / or the loanclosing date is not extended.
Progress of Technical Design Review and Road Safety Audit are shown in Appendix B.
4.2 Procurements
Procurement shall be conducted under the Bank’s Procurement Procedures as mentioned in the LoanAgreement. The International Competitive Bidding (ICB) based on the Bank letter Ref. WINRIP/136 willapply to the packages with the construction estimated cost more than US$ 25 Million to comply with thenew Bank’s threshold for ICB. According to the GOI regulation, a prequalification shall be applied for thepackages with the construction estimated cost more than IDR 10 Billion. Review from previousprocurement process, the World Bank in the Aide Memoire requested to GOI, for next 4 ICB subprojectsqualification still used Pre-Qualification and for remaining sub-project must be process with PostQualification. As well as for all NCB the World Bank also requested to follow Post Qualification inprocurement process.
All subprojects for WP-1 have been started with prequalification since 30 December 2011 for ICB multiplecontract. This was an advanced procurement action agreed by both DGH and the World Bank prior to theCTC establishment. All AWP-1 sub-projects had signed the contract. The last 2 sub-projects, Package 02: Pd.Sawah – Simpang Empat and Package 03: Manggopoh – Padang Sawah, signed the contract on December
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 21
6, 2013 and NOL for disbursement for all 4 packages had been issued by the World Bank on December 10,2013.
As of the reporting month (October 2014), a more detailed current updates are fully described inSub-Chapter 1.4 Procurement on Page 3 of this Report and consolidated project status in a tabulatedformat shown in Table 1.1 on page 7 of this Report.
Under Category 3 of Loan Agreement there are three (3) consultancy packages namely ;
1. Capacity Building For Disaster Risks Reduction
2. Capacity Building For Environmental Management
3. Capacity Building For Road Safety
Consultants for the three (3) consultancy packages are still to be procured. A more detailed updates can befound in Sub-Chapter 1.4 Procurement on Page 6 of this Report.
Draft Terms of References for the three packages are in the process of finalization.
The WINRIP updated Procurement Plan is attached as Appendix F.
4.3 Civil Works Implementation
All 4 contract packages under AWP-1 are currently under construction by different contractors.Commencement of works for all the 4 packages commenced on the 2nd week of January 2014. Table4.1 shows the details for each contract packages.
Table 4.1
ProgramContractPackage
#Contractor Name of Road Province Contract
Signed
Noticeto
Proceed
ContractTime
CompletionDate
AWP-1
1Jaya KonstruksiManggalaPratama Tbk
Biha - Krui Lampung Nov 25,2013
Jan 8,2014 640 CD Oct 9, 2015
2
Jaya KonstruksiManggalaPratama Tbk
Padang Sawah– Sp. Empatincluding AirGadang
WestSumatera
Dec 6,2013
Jan 6,2014 730 CD Jan 5, 2016
3Jaya KonstruksiManggalaPratama Tbk
Manggopoh –Padang Sawah
WestSumatera
Dec 6,2013
Jan 6,2014 730 CD Jan 5, 2016
4PT. Waskita Karyaand PT. MulyaTurangga (JO)
Ipuh - Bantal Bengkulu Nov 14,2013
Jan 10,2014 730 CD Jan 9, 2016
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 22
4.4 Civil Works ProgressAll the 4 Contractors substantially completed their mobilization and construction of Base Camps inall packages have been completed. Other activities done during this month were repair andrestoration of deteriorated existing pavements, roadway excavation, embankment formation,spreading of granular pavement for roadway widening, asphalt paving structural works, constructionof stone masonry side ditches, stockpiling of raw material, production of crush aggregates and otherminor works. Progress status of the four (4) on-going civil work contracts as of this reporting periodare shown in Table 4.2.
Table 4.2
ProgramContractPackage
#Contractor Name of Road
Target ProgressSchedule Ending
October 2014
Actual ProgressAccomplished Slippage Time Elapsed
AWP-1
1Jaya KonstruksiManggala PratamaTbk
Biha - Krui 46.36% 11.28% - 35.08% 46.25%
2
Jaya KonstruksiManggala PratamaTbk
Padang Sawah– Sp.Empatincl.Air GadangBrd
33.56% 25.61% - 7.95% 40.82%
3Jaya KonstruksiManggala PratamaTbk
Manggopoh –Padang Sawah 30.10% 14.45% - 15.65% 40.82%
4PT. Waskita Karyaand PT. MulyaTurangga (JO)
Ipuh - Bantal 24.22% 5.35% - 18.88% 40.27%
At the end of this reporting month of October 2014, all the four (4) contract packages did notachieved any significant accomplishments to catch up with the schedule and were still laggingfarther behind schedule. The situation remains the same as in previous month as three (3) of thecontract packages continue to follow a downward trend of delayed schedules, while the other one(1) Package No.2 which showed signs of improvement to catch up with the schedule the previousmonth, is also leading to a downward trend of delayed works.
With time elapsed of more than 40% and approaching the halfway mark of the contract time foreach of the four (4) contract packages, the Contractors will have hard time to deliver the Works onthe target dates of completion, unless a realistic action plans or “Catch-up Schedules” will bestrictly implemented.
Package No. 1 : Biha – KruiAt the end of this month, there was no substantial work accomplished to reduce previous monthslippage of -30.39%, instead the behind works further slipped to – 35.08%.
The major work items which brought down the slippage to highly alarming situation are thedrainage works (20.14%) and granular and asphalt pavements (19.47%) which accounted for a totalof 39.61% cummulative target schedule for the end of this month. In contrast, the Contractor was
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 23
able to accomplished only 1.60% total for the three (3) major work items.
The overall situation of this contract package is so critical with respect to timely completion takinginto consideration the short remaining contract time to complete the big amount of remainingworks.
The balance of remaining works which is equivalent to 88.72% and still to be completed by theContractor within the remaining 53.75% of the contract period or 344 calendar days can still beattained provided a realistic action plan will be implemented by the Contractor.
As agreed in the 2nd Show Cause Meeting, Test Case covering 2 week (September 28, 2014 –October 6, 2014) to attain a minimum of 2.53% progress was executed by the Contractor.However, the Test Case did not produced good results as the Contractor was unable to producedthe agreed targeted progress.
To achieved successful completion of the Project, all issues and major problems which arehampering the progress of the works shall be resolved thru a 3rd Show Cause to be participated in byhigh level management of the DGH, Contractor and concerned authorities.A more detailed status of this Package is presented in ANNEX P-I Executive Summary Report.
Package No. 2 : Padang Sawah – Sp. Empat (Including Air Gadang Bridge)During the month, the delayed works slightly slipped down from previous month slippage of -5.33%to -7.95%.
The Contruction of Air Gadang Bridge which is yet to be started and breakdown of the AsphaltMixing Plant were the two (2) factors which caused the schedule to slipped down.
To date, the delayed works is still on the manageable level and not yet of much concern.ANNEX P-2 Executive Summary Report present a more detailed status of the Contract Package.
Package No. 3 : Manggopoh – Padang SawahThe current slippage which further slipped down from -9.10% the previous month to -15.65% thismonth is now in critical stage and is much of concern.
The main reason for the minimal progress was the delayed works on the asphalt pavement itemwhich accounted for almost 56% of the entire contract as the calibrations of AMP and theWeigh-bridge were not yet issued calibration certificates.
Due to urgency to start the actual paving works to attain a modest progress the calibrationcertificates shall be issued. In addition, Show Cause Meeting shall be scheduled as soon as possiblein order to address and resolve all issues that are presently hampering the progress of the works.
A more detailed status of the project progress are shown in ANNEX P-3 “Executive SummaryReport”.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 24
Package No. 4 : Ipuh – BantalThe current status of this contract package is similar with that of Package No. 1 wherein thenegative slippage of -16.35% incurred last month further slipped down to -18.88% as of end of thisreporting month.
The actual progress of only 5.35% since the project started ten (10) months ago is of much concernthan the slippage. Simply looking at the percentage of work accomplished, it seems that the projectis not moving forward.
As mentioned in the previous Monthly Report in September 2014, Show Cause meeting was held inBengkulu with main agenda to address all current problems and issues that are hampering theprogress of the works.
A Test Case of 30 days period was agreed in the meeting to target minimum 8.75% work progresswhich was executed by the Contractor, However, the Test Case resulted with no success as only1.62% of progress was attained.
As only 60% of the contract time is remaining with 94.65% of the Works still to be completed, aShow Cause Meeting shall be scheduled immediately preferably a high level meeting to be held inDGH Central Office and to be attended by higher level managements of DGH, Contractor and otherconcerned authorities.
Shown in ANNEX P-4 “Executive Summary Report” are the current problem and actions to be takento attain substantial progress in order to catch-up with the schedule.
For contract packages under AWP-2 and AWP-3 which have a combined total of 17 Packages, a briefsummary of the actual activities and status as of this reporting period are presented in Table 1.1,page 7 of this Report.
4.5 Quality AssuranceThe DSC will be responsible for quality assurance of materials and workmanship, certifying whetheror not contractors have achieved the required results, as well as documentation and reporting basedon the financial management plan. They will prepare a Quality Assurance system covering allsubprojects, and continuously monitor the effectiveness of their supervision procedures.
During the month of October 2014, the CTC’s Quality Assurance Engineer conducted site inspectionand quality assurance audits on two (2) on-going construction packages.
The following were the results and findings during the field visits :
Packages 2 : Padang Sawah – Simpang Empat
a) Very minimal accomplished work were attained due to insufficient manpower and no signof activities on location where there are no obstruction and/or cleared areas
b) Excavated material are stockpiled on the road shoulders and not disposed of properly.
c) Completed stone masonry retaining walls to restrain embankment material for roadway
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 25
widening are left open. No sign activity for embankment formation works behind theretaining walls.
d) Asphalt paving for AC-Base in trial section has been done. Actual paving works canproceed upon issuance of approval letter to use the Asphalt Mixing Plant by the Engineeror PM of BALAI.
e) Warning signs on locations with work activities were not in placed.
f) No work activity on the bridge site of Air Gadang Bridge.
g) Routine maintenance of existing road shoulders and travelledways were not beingimplemented.
Packages 3 : Manggopoh – Padang Sawah
a) Very minimal accomplished works were attained due to insufficient manpower and nosign of activities on location where there are no obstruction and/or cleared areas
b) Excavated material are stockpiled on the road shoulders and not disposed of properly.
c) Oversize material for Aggregate B and segregations were observed
d) Asphalt paving for AC-Base in trial section has been done. Actual paving works canproceed upon issuance of approval letter to use the Asphalt Mixing Plant by the Engineeror PM of BALAI.
e) Warning signs on locations with work activities were not in placed.
f) Routine maintenance of existing road shoulders and travelledways were not beingimplemented.
4.6 Environmental and Social Considerations
4.6.1 Current Overall Situation
A project category is assigned to each package as either Category A, B or C depending on the likelydegree of influence on environmental issues with a brief explanation as follows:
Category A project is one which will have a significant negative impact on the environment and mayhave an influence on areas outside the actual project area. A project classified as such requires anAMDAL (ANDAL, RKL/RPL) study.
Category B project is one which affects the people or the environment to some extent but with asmaller impact than a Category A. The required environmental analysis is a UKL/UPL study only.
Category C project has minimal effect on the people or environment and an environmental analysisis not required. SPPL are used to handle any minor problem which may arise.
All the twenty one (21) packages require environmental impact investigations. There are a total offourty one (41) studies required, twenty (20) for environmental impact investigations and twenty
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 26
one (21) for social studies.
The twenty (20) environmental studies need the approval of the Environmental Agency (BLH) withfive (5) of the studies (AMDAL/EIA) to be approved by World Bank (WB).
While the twenty one (21) social studies (SLARAP and LARAP) require the approval of World Bankprior to implementation.
As of end of this reporting period (October 2014), twenty (20) environmental impact studies hasbeen approved by BLH, while all of the five (5) studies that requires World Bank approval, Bankalready issued No Objection Letter (NOL).
For the social studies , twelve (12) of the twenty one (21) studies were already given No ObjectionLetter from the World Bank (WB).
Details of sub-projects that require environmental and social safeguards and progress are shown inAppendix E.
Presented below in a tabulated format is the current status of the environmental and social studies.
WorksProgram
No ofPackages
No of Investigations Approval by Remarks
BLH World Bank
AWP-1 4 11
AMDAL x 1UKL&UPL x 2SPPL x 4Full LARAP x 4 1 (AMDAL) 1
UKL&UPL4 (SPPL)
1 EIA, NOLIssued by WB
4Full LARAP
Approved – NOL issuedby WB (LARAP andAMDAL paket 1&17),except for SPPL.UKL-UPL for PackageNo.4 processing ofenvironmental permitwas recommended byBLH Kab. Muko-muko
AWP-2 9 17
AMDAL Study x 4UKL&UPL x 4Simple LARAP x 1Full LARAP x 8
4 UKL&UPL4 AMDAL
1 SimpleLARAP;
3 Full LARAP4 EIA, NOL
Issued by WB
1 (one) Study AMDALfor three packages.Packages No.7, 12 and14 /packages on AWP2&AWP3.
1 (one) Study AMDALfor two packages.Packages No.11 & 16./packages on AWP2&AWP3.
AWP-3 8 13
Full LARAP x 4Simple LARAP x 4AMDAL Study x 1=Paket No.1 AWP 1UKL/UPL x 5
AMDAL OK =paket No.1&
17 AWP15 UKL&UPL
EIA same withPackage 11 SimpleLARAP;
3 Full LARAP
Approved – NOL issuedby WB include AMDALexcept for UKL/UPL
Total 21 41 Env=20,Soc=21 20 12
Note: UKL & UPL do not need a NOL from WB, and SPPL not necessary to submit to the WB.
Appendix E shows the Progress of Environmental Safeguard Studies.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 27
4.6.2 Environmental and Social Issues
This section outlines the activities of the Social Impact Specialist and the Environmental Specialistduring October 2014.
4.6.2.1 Environmental Issues
The CTC’s Environmentalist conducted review on RKKPL that were submitted by Contractor.Comments were transmitted to the Contractor for finalization of the RKKPL. The Environmental andMonitoring Plan (RKPPL) is now ready for signature by PPK and Contractor.
CTC requested DSC to issue instruction thru CTC’s letter of October 3, 2014 to Contractor of PackageNo.1 to incorporate CTC’s comments and the Package No.4 Contractor to compile the RKPPLdocuments and submit to PMU.
1. Monitoring of Environmental Aspects During Construction
CTC provided monitoring forms to DSC for use in monitoring of environmental and social impacts.These forms are to be used every month by the DSC Environmental Specialist.
CTC’s environmental staffs actively advises DSC on environmental monitoring, but DSC have notdirectly carried out monitoring or to implement the Environmental and Social Analysis ManagementPlan for WINRIP.
To date, only the DSC’s Site Engineer of Package 1 have regularly submitting the monthlyenvironmental mitigation reports. Site Engineers of Packages 2,3 and 4 have never submitted anyreport.
CTC issued letter to DSC on July 23, 2014 requiring DSC to submit the Reports at each end of themonth.
Environmental Monitoring Report for the month of October 2014 have not yet been submitted byDSC to CTC.
2. Design Integration, Road Safety Aspects and Monitoring of Environmental Studies
Task 5.8.0 of CTC-2 TOR (Implement the Environmental and Social Analysis ManagementPlan/ESAMP) and paragraf 10.9 of the PMM requires ensuring that environmental managementaspects of contracts have been implemented in accordance with AMDAL, UKL&UPL, SPPL studies andenvironmental issues will be integrated in the design and to prepare environmental mitigation onconstruction stage for contractor (Contractor Program for Executing Environmental ManagementPlan CPEMP/RKPPL). Therefore CTC will proposed that staff visit the site of projects subject tostudies or issues, and ensure that the plans are being implemented. A schedule for these visits arescheduled as the need arises.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 28
During the period (October 2014), the CTC’s Environmental Specialist conducted verification surveyon Package No.5 (Sp. Rampa – Poriaha) and Package No.15 (Sibolga – Batas Tapsel) and confirmedthat the recommendations in the UKL and UPL were integrated in the design.
4.6.2.2 Social Issues
1. Monitoring Report of the LARAPPackage No. 1 : Krui – BihaProvince : Lampung
A. Previous Status :
LARAP documents approved by World Bank on January 4, 2013
Monitoring Report approved by World Bank on April 18, 2013
B. Pending Issues, Concern and Actions
a) Existing mosque is partially traversed due widening of the existing travelled way.
b) Due to resistance to partially demolished and rebuild the mosque, a new action planis proposed, where the road alignment centerline will be shifted to the other side.
c) Land acquisition is required on the other side of the road centerline alignment if thenew action plan push through.
C. Update during this reporting month of October 2014
a) On-going construction
b) No Update this period
2. Monitoring Report of the LARAPPackage No. 2 : Padang Sawah – Sp. EmpatProvince : Sumatera Barat
A. Previous Status :
LARAP documents approved by World Bank on January 13, 2013
Monitoring Report approved by World Bank on July 19, 2013
Additional LARAP documents approved by World Bank on July 21, 2014
B. Pending Issues, Concern and Actions
a) Remaining twenty one (21) affected persons and twenty four (24) new PAPare notyet compensated by the Local Government. Five (5) of the twenty one (21) affectedpersons are residing along the proposed bridge site of Air Gadang Bridge.
b) Documents for compensation payments are being processed by the LocalGovernment.
c) Monitoring Report concerning the payments to the remaining affected persons still tobe prepared for submission to World Bank.
C. Update during this reporting month of October 2014
a) On-going construction
b) Compensation payments for fourty five (45) PAP are still being resolved and underpreparation by the local government.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 29
3. Monitoring Report of the LARAPPackage No. 3 : Manggopoh – Padang SawahProvince : Sumatera Barat
A. Previous Status :
LARAP documents approved by World Bank on January 4, 2013
Monitoring Report approved by World Bank on April 18, 2013
CTC received proof of compensation payments for five (5) of the affected persons out ofthe remaining fifteen (15) persons and Monitoring Report was submitted to World Bankon February 28, 2014.
CTC received proof of compensation payment for 8 of the affected persons out of the 10remaining persons and 67 from 68 new PAP and Monitoring Report submitted to WorldBank on June 19, 2014.
B. Pending Issues, Concerns and Actions
a) Documents for compensation payments for three (3) remaining identified PAP arebeing processed by the Local Government.
b) Monitoring Report concerning compensation payments to the three (3) identifiedPAP still to be prepared for submission to World Bank.
C. Update during this reporting month of October 2014
a) On-going construction
b) Processing of documents for the 3 remaining affected persons are under preparationby the Local Government.
c) Monitoring Report for the 3 remaining affected persons is under preparation forsubmission to World Bank.
4. Monitoring Report of the LARAPPackage No. 4 : Ipuh – BantalProvince : Bengkulu
A. Previous Status :
LARAP documents approved by World Bank on December 10, 2012
CTC received proof of payments for 157 affected persons out of the 227 Project AffectedPersons.
Monitoring Report was submitted by PMU to World Bank on December 24, 2013
World Bank transmitted their comments on the Monitoring Report to PMU on January 6,2014.
For the remaining 70 affected persons, Local Government settled their compensationpayments in January 2014 and February 2014.
Monitoring Report for the compensation of the remaining 70 affected persons wassubmitted by PMU to the World Bank on February 28, 2014.
World Bank sent letter to PMU on March 5, 2014 informing that the Bank have no furthercomment on the Monitoring Report.
B. Pending Issues, Concern and Actions
a) There are an additional 5 to 15 PAP still to be compensated.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 30
C. Update during this reporting month of October2014
a) On-going construction.
b) Compensation payments for the 5 to 15 PAP are under process.
5. Monitoring Report of the LARAPPackage No. 5 : Sp. Rampa – PoriahaProvince : Sumatera Utara
A. Previous Status :
Comments on LARAP documents by World Bank were transmitted to PMU on September16, 2013
On September 23, 2013 World Bank wrote letter to Director of Implementation Affairsthru Satker/PPK to revise the LARAP documents in line with their comments.
CTC in consultation with PMU prepared the revised LARAP documents and resubmitted iton November 6, 2013.
World Bank accepted the revised LARAP documents on November 12, 2013.
On November 18, 2013 the Director of Planning issued a letter to the Director ofImplementation Affairs Region 1, that the LARAP documents can now be implemented inthe acquisition of Right of Ways and removal of construction obstructions.
B. Pending Issues, Concern and Actions
a) PMU/CTC is awaiting the LARAP implementation Report from SATKER
b) Relocation of 1 kiosk still to done.
C. Update during this reporting month of October 2014
a) No update this month.
6. Monitoring Report of the LARAPPackage No. 6 : Pasar Pedati - KerkapProvince : Bengkulu
A. Previous Status :
September 30, 2013, CTC received the LARAP documents from BBPJN III Palembang.
After CTC’s review, PMU forwarded the documents to World Bank on November 13, 2013requesting for No Objection Letter (NOL).
Bank conducted their review and their comments were relayed to PMU thru letter onNovember 20, 2013.
On November 27, 2013, the World Bank sent letter to the Director of Planning to requestthe Director of Implementation Affairs thru Satker/PPK to revise the LARAP documents byincorporating their comments.
PMU resubmitted to the World Bank on January 9, 2014 the revised LARAP documents andwas resubmitted again on May 21, 2014 due to some minor corrections.
B. Pending Issues, Concern and Actions
a) LARAP’s implementation still to be implemented by SATKER.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 31
b) Head of Satker in Bengkulu informed PMU thru letter that LARAP implementationregarding land acquisition will be completed by the end of August 2014.
C. Update during this reporting month of October 2014
a) Compensation payments under process.
7. Monitoring Report of the LARAPPackage No. 7 : Indrapura - TapanProvince : Sumatera Barat
A. Previous Status :
CTC received the Draft Final LARAP documents from Balai II/P2JN on January 2014
After CTC’s review of the documents, comments were transmitted in the form of a MEMODINAS to Balai II thru the Directorate of Implementation in Region I.
CTC received the corrected/revised LARAP documents from BALAI II/P2JN on June 2014.
B. Pending Issues, Concern and Actions
a) LARAP Implementation Report to be prepared and submitted to PMU/CTC forreview.
b) No allocated budget in 2014 for payment of land acquisition.
C. Update during this reporting month of October 2014
a) LARAP documents approved by World Bank on October 14, 2014.
b) Implementation cost of LARAP will be included by Local Government in the 2015budget.
8. Monitoring Report of the LARAPPackage No. 8 : Bts. Pariaman - ManggopohProvince : Sumatera Barat
A. Previous Status :
CTC received the Draft Final LARAP documents from Balai II Padang on August 1, 2013
CTC reviewed the documents with comments transmitted to PMU on September 9, 2013and PMU forwarded to P2JN/Local Consultants the CTC’s comments requesting thedocuments for revision in line with CTC’s comments.
Revised LARAP documents from P2JN Consultant resubmitted in June 2014.
CTC received the corrected/revised LARAP documents from BALAI II/P2JN on June 2014.
LARAP documents submitted to World Bank on August 7, 2014.
LARAP documents approved by World Bank on August 12, 2014.
B. Pending Issues, Concern and Actions
a) Monitoring Report of LARAP implementation still to be prepared for submission andreview by the World Bank.
C. Update during this reporting month of October 2014
a) Implementation cost of LARAP will be included by the Local Government in the 2015budget.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 32
9. Monitoring Report of the LARAPPackage No. 9 : Rantau Tijang – Kota AgungProvince : Lampung
A. Previous Status :
LARAP documents are still to be prepared.
B. Pending Issues, Concern and Actions
a) Still no issues and concerns.
C. Update during this reporting month of October 2014
a) Nothing to report this period.
10. Monitoring Report of the LARAPPackage No. 10 : Sp. Empat – Sp. Air BalamProvince : Sumatera Barat
A. Previous Status :
CTC received the Draft Final LARAP documents from Balai II Padang on August 1, 2013
CTC reviewed the documents with comments transmitted to PMU on September 9, 2013and PMU forwarded to P2JN/Local Consultants the CTC’s comments requesting thedocuments for revision in line with CTC’s comments
Revised LARAP documents from P2JN Consultant resubmitted in June 2014.
CTC received the corrected/revised LARAP documents from BALAI II/P2JN on June 2014.
LARAP documents submitted to World Bank on August 7, 2014.
LARAP documents approved by World Bank on August 12, 2014.
B. Pending Issues, Concern and Actions
a) Monitoring Report of LARAP implementation still to be prepared for submission andreview by the World Bank.
C. Update during this reporting month of October 2014
a) Implementation cost of LARAP will be included by the Local Government in the 2015budget.
11. Monitoring Report of the LARAPPackage No. 11 : Bantal - MukomukoProvince : Bengkulu
A. Previous Status :
September 30, 2013, CTC received the LARAP documents from BBPJN III Palembang.
After CTC’s review, PMU forwarded the documents to World Bank on November 13, 2013requesting for No Objection Letter (NOL).
Bank conducted their review and their comments were relayed to PMU thru letter onNovember 20, 2013.
On November 27, 2013, the World Bank sent letter to the Director of Planning to requestthe Director of Implementation Affairs thru Satker/PPK to revise the LARAP documents byincorporating their comments.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 33
PMU resubmitted to the World Bank on January 9, 2014 the revised LARAP documents andwas resubmitted again on May 21, 2014 due to some minor corrections.
World Bank issued on May 30, 2014 a No Objection Letter (NOL) on the revised LARAPdocuments for implementation.
B. Pending Issues, Concern and Actions
a) Monitoring Reports of the LARAP’s implementation have to be prepared andsubmitted for review and for submission to World Bank.
b) Head of Satker in Bengkulu informed PMU thru letter that LARAP implementationregarding land acquisition will be completed by the end of August 2014
C. Update during this reporting month of October 2014
a) LARAP is under implementation by the Local Government.
12. Monitoring Report of the LARAPPackage No. 12 : Kambang - IndrapuraProvince : Sumatera Barat
A. Previous Status :
CTC received the Draft Final LARAP documents from Balai II Padang on August 1, 2013
CTC reviewed the documents with comments transmitted to PMU on September 9, 2013and PMU forwarded to P2JN/Local Consultants the CTC’s comments requesting thedocuments for revision in line with CTC’s comments
Revised LARAP documents from P2JN Consultant resubmitted in June 2014.
CTC received the corrected/revised LARAP documents from BALAI II/P2JN on June 2014.
B. Pending Issues, Concern and Actionsa) LARAP implementation Report to be prepared and submitted to PMU/CTC for
review.b) No allocated budget to pay land acquisition in the 2014 budget of the Local
Government.
C. Update during this reporting month of October 2014
a) LARAP documents has been approved by to World Bank with the issuance of NoObjection Letter (NOL) on October 14, 2014.
b) Implementation cost of LARAP will be included by the Local Government in the 2015budget.
13. Monitoring Report of the LARAPPackage No. 13 : Sp. Rukis – Tj. KemuningProvince : Bengkulu
A. Previous Status :
September 30, 2013, CTC received the LARAP documents from BBPJN III Palembang.
After CTC’s review, PMU forwarded the documents to World Bank on November 13, 2013requesting for No Objection Letter (NOL).
Bank conducted their review and their comments were relayed to PMU thru letter onNovember 20, 2013.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 34
On November 27, 2013, the World Bank sent letter to the Director of Planning to requestthe Director of Implementation Affairs thru Satker/PPK to revise the LARAP documents byincorporating their comments.
PMU resubmitted to the World Bank on January 9, 2014 the revised LARAP documents andwas resubmitted again on May 21, 2014 due to some minor corrections.
World Bank issued on May 30, 2014 a No Objection Letter (NOL) on the revised LARAPdocuments for implementation.
B. Pending Issues, Concern and Actions
a) Monitoring Reports of the LARAP’s implementation have to be prepared andsubmitted for review and for submission to World Bank.
b) Head of Satker in Bengkulu informed PMU thru letter that LARAP implementationregarding land acquisition will be completed by the end of August 2014
C. Update during this reporting month of October 2014a) LARAP Implementation is on-going.
14. Monitoring Report of the LARAPPackage No. 14 : Painan - KambangProvince : Sumatera Barat
A. Previous Status :
CTC received the Draft Final LARAP documents from Balai II/P2JN on January 2014.
After CTC’s review of the documents, comments were transmitted in the form of a MEMODINAS to Balai II thru the Directorate of Implementation in Region I.
Revised LARAP documents from P2JN Consultant resubmitted in June 2014.
B. Pending Issues, Concern and Actions
a) Revised LARAP documents still to be submitted to World Bank for NOL.
C. Update during this reporting month of October 2014
a) LARAP documents for submission to World Bank by November 2014.
15. Monitoring Report of the LARAPPackage No. 15 : Sibolga – Bts. TapselProvince : Sumatera Utara
A. Previous Status :
CTC received the Draft Final LARAP documents on September 30,2013 from Balai.
PMU submitted the documents to World Bank on October 28, 2013 requesting furtherreview and acceptance.
On October 28, 2013, World Bank returned to PMU the documents with comments to beconsidered in finalizing the documents for resubmission.
On October 31, 2013, PMU requested the Director of Implementation Affairs thruSatker/PPK to address the World Bank comments
Revised LARAP documents was resubmitted to World Bank on January 30, 2014
World Bank approved the LARAP documents on February 6, 2014 for implementation in
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 35
acquiring Road Right of Ways and removal of obstruction.
PPK/Satker and the Local Government started the preparation stage of land acquisition
B. Pending Issues, Concern and Actions
a) LARAP implementation under preparation stage by SATKER/PPK.
b) Appraisal result still to be finalized prior to negotiation with the land owners andsubsequent payments of the PAP.
C. Update during this reporting month of October 2014
a) Appraisal result for two (2) out of the six (6) sub-districts affected by the roadimprovement are ready. .
16. Monitoring Report of the LARAPPackage No.16 : Seblat - IpuhProvince : Bengkulu
A. Previous Status :
September 30, 2013, CTC received the LARAP documents from BBPJN III Palembang.
After CTC’s review, PMU forwarded the documents to World Bank on November 13, 2013requesting for No Objection Letter (NOL).
Bank conducted their review and their comments were relayed to PMU thru letter onNovember 20, 2013.
On November 27, 2013, the World Bank sent letter to the Director of Planning to requestthe Director of Implementation Affairs thru Satker/PPK to revise the LARAP documents byincorporating their comments.
PMU resubmitted to the World Bank on January 9, 2014 the revised LARAP documents andwas resubmitted again on May 21, 2014 due to some minor corrections.
World Bank issued on May 30,2014 a No Objection Letter (NOL) on the revised LARAPdocuments for implementation.
B. Pending Issues, Concern and Actions
a) Monitoring Reports of the LARAP’s implementation have to be prepared andsubmitted for review and for submission to World Bank.
b) LARAP documents for this Package No.16 covers only land acquisition for the roadlink. If there are land acquisition for the bridge site, a separate LARAP documentsneed to be prepared.
c) Head of Satker in Bengkulu informed PMU thru letter that LARAP implementationregarding land acquisition will be completed by the end of August 2014
C. Update during this reporting month of October2014a) LARAP Implementation is underway.
17. Monitoring Report of the LARAPPackage No.17 : Sp. Gunung Kemala – Pg. TampakProvince : Lampung
A. Previous Status :
Comments on LARAP documents by the World Bank was forwarded to PMU on September
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 36
16, 2013
World Bank issued letter on September 23, 2013 to the Director of Implementation AffairsRegion I thru Satker/PPK to incorporate their comments on the LARAP documents.
CTC revised the LARAP documents taking into consideration all the Bank’s comments andPMU resubmitted the documents to the World Bank on November 6, 2013
World Bank approved the corrected documents on November 12, 2013
Director of Planning issued letter on November 18, 2013 to the Director ofImplementation Affairs to inform that World Bank had already approved the LARAPdocuments for implementation by the land acquisition committee.
B. Pending Issues, Concern and Actions
a) LARAP implementation report is not yet submitted to PMU/CTC.
b) Hiring of Appraisal committee is on-hold due to no available budget in the year 2014budget.
C. Update during this reporting month of October 2014
a) Inventory of affected assets (buildings, houses, plant and other obstructions) is on-going.
18. Monitoring Report of the LARAPPackage No.18 : Mukomuko – Bts. SumbarProvince : Bengkulu
A. Previous Status :
LARAP documents are still to be prepared
B. Pending Issues, Concern and Actions
a) Still no issues and concerns
C. Update during this reporting month of October 2014
a) Still no update during this period.
19. Monitoring Report of the LARAPPackage No.19 : Lais - BintunanProvince : Bengkulu
A. Previous Status :
September 30, 2013, CTC received the LARAP documents from BBPJN III Palembang.
After CTC’s review, PMU forwarded the documents to World Bank on November 13, 2013requesting for No Objection Letter (NOL).
Bank conducted their review and their comments were relayed to PMU thru letter onNovember 20, 2013.
On November 27, 2013, the World Bank sent letter to the Director of Planning to requestthe Director of Implementation Affairs thru Satker/PPK to revise the LARAP documents byincorporating their comments.
PMU resubmitted to the World Bank on January 9, 2014 the revised LARAP documents andwas resubmitted again on May 21, 2014 due to some minor corrections.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 37
World Bank issued on May 30, 2014 No Objection Letter (NOL) on the revised LARAPdocuments for implementation
B. Pending Issues, Concern and Actions
a) Monitoring Reports of the LARAP’s implementation have to be prepared andsubmitted for review and for submission to World Bank.
b) Head of Satker in Bengkulu informed PMU thru letter that LARAP implementationregarding land acquisition will be completed by the end of August 2014.
C. Update during this reporting month of October2014a) LARAP Implementation is on-going.
20. Monitoring Report of the LARAPPackage No. 20 : Lubuk Alung - SicincinProvince : Sumatera Barat
A. Previous Status :
CTC received the Draft Final LARAP documents from Balai II/P2JN on January 2014
After CTC’s review of the documents, comments were transmitted in the form of a MEMODINAS to Balai II thru the Directorate of Implementation in Region I.
CTC received the revised LARAP documents from BALAI II/P2JN on August 2014.
B. Pending Issues, Concern and Actions
a) Revised LARAP documents under final review by CTC/PMU prior to submission toWorld Bank on November 2014.
C. Update during this reporting month of October 2014
a) Review and finalization of LARAP document by CTC.
21. Monitoring Report of the LARAPPackage No. 21 : Lubuk Alung - KuratajiProvince : Sumatera Barat
A. Previous Status :
CTC received the Draft Final LARAP documents from Balai II/P2JN on January 2014
After CTC’s review of the documents, comments were transmitted in the form of a MEMODINAS to Balai II thru the Directorate of Implementation in Region I.
CTC received the revised LARAP documents from BALAI II/P2JN on August 2014.
B. Pending Issues, Concern and Actions
a) Revised LARAP documents under for final review by CTC/PMU prior to submission toWorld Bank on November 2014.
C. Update during this reporting month of October 2014
a) Review and finalization of LARAP documents by CTC.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 38
4.7 Anti Corruption Issues
4.7.1 Anti‐Corruption Action Plan (ACAP)
ACAP for WINRIP was developed from the previous SRIP experiences. Basically, it has the same maincomponents of involving the Community Representative Observers (CRO) in the bid opening andThird Party Monitoring (TPM) during the construction supervision although modification was madeon the selection process of the CROs for SRIP. Within this plan there are four main pillars asindicated separately below
a) Community Representative Observers (CRO)b) Publication / Disclosurec) Complaints Handling System (CHS)d) Third Party Monitoring (TPM)
4.7.2 Community Representative Observers (CRO)
The Community Representative Observers, who are required to observe the actual bid opening,were appointed for WP-1 group. All of the CROs were university staff, selected in accordance withthe World Bank suggestion to request assistance from local universities.
CRO is the independent observer who is not related directly or indirectly to the Contractors,Consultants, and Suppliers or not be part of the WINRIP’s management, and not a member of anypolitical party.
CROs selection procedures:
a. Review the criteria and qualifications of candidates for the CRO.b. Director of Planning, DGH/ as Chairman of the Project Management Unit, delegated of the
authority to the selection of the CRO to the Head of National Roads Implementation Agency(BBPJN) / Head of Procurement Services Unit (Unit Layanan Pengadaan - ULP), hereinafterreferred to as Head of Balai.
c. Head of Balai to invite CRO candidates from the local universities or colleges.d. Selection of CRO to be facilitated by Balai (BBPJN) / Procurement Services Unit (Unit Layanan
Pengadaan - ULP).e. Elected CRO and substitute CRO must attend one day training to be conducted by the PMU / CTC
WINRIP.f. Head of Balai to report the result of CRO selection by attaching the Minutes of Election Meeting
and send an approval application letter of the CRO to Director of Planning DGH as the Chairmanof PMU.
g. Based on the report and a written request from the Head of Balai, the Director of Planning DGHas the Chairman of PMU must sign a Letter of Agreement and the Decree of the Establishment ofCROs.
The duties and obligations of CRO are:
a. CRO must be present in any procurement activity (Pre-Bid Meeting, Site Visit, Bids Submissionand Opening of Bids, and Announcement of Bids Winner) by invitation of the ProcurementCommittee, and are required to sign the attendance list
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 39
b. If the elected CRO is unable to attend on procurement activities, a Substitute CRO shall beappointed to attend these activities.
c. In discharging of duties the Substitute CRO have the same responsibilities as elected CRO.d. The CRO / Substitute CRO, after attending the Procurement activities, required to make a report
of his/her activities and submit them to the PMU and copy furnished to the related Head ofBalai.
CRO as the representative of the community is to be independent observers and in performing theirduties voluntarily and not demanding benefits of their works.
In the performance of its duties, the CROs receive transportation cost from their home / office to thelocation of procurement meeting, and also he / she also receives per diem or Out Station Allowance(OSA) and hotel accommodation if necessary to stay. CROs also get additional charged for theirreporting costs. The financing standards adjusted to the General Cost Standard (Standar BiayaUmum) issued by the Ministry of Finance.
The CRO’s financing charged to the Contract for Consulting Services for Technical Assistance for CoreTeam Consultants (CTC) No: 06-20/CTC/TA/LN/8043/1112, dated 5 November 2012.
4.7.3 Publication / Disclosure
The second task under ACAP is publication of related ACAP documents for public disclosure witheasy access to the general public and this is mainly manifest in the ACAP segment of the WINRIPwebsite. This ACAP section has been being designed to attain the best possible transparency of theproject.
Ministry of Public Work (MPW) will provide necessary information in the Project ImplementationPlan (PIP), Project Management Manual (PMM) on its website, and in the bidding documents, suchas contact point for complaint (mail and e-mail address, phone, fax, text message). The contact willalso include the Bank’s Fraud and Corruption Hotline. MPW will hold Annual Accountability Meetingsto enhance accountability and project information sharing with civil society. The PMM will provideguidelines on disclosure of information related to the project. MPW official website will displaycritical information on WINRIP to enhance both internal and external monitoring of the project:
Work Plan and Procurement Plan.
Quarterly newsletter containing information on the list of contracts, implementation progress,projects related activities, number, types and status of complaints in each location. Thenewsletter will also be made available to civil society in hard copy and through electronic mailingsystem.
Mid-Term Review Report, promptly after completion of the mid-term review implementationsupport is carried out in accordance with the loan agreement;
All final audit reports (financial or otherwise, including qualified audit reports) prepared inaccordance with the loan agreement and all formal responses of the government in relation to
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 40
such reports. The publication should be done within one month after the report is accepted asfinal.
Contracts awarded with information on general scope of work (with location), value, andsummary information of the awarded firms/ contractors. The practice in other projectsdemonstrates that disclosure of contracts awarded will help in reducing fraudulent practices
Ministry of Public Works (PU) maintains a website: http://www.pu.go.id/, with a link to'eproc.pu.go.id' for information on semi e-procurement or e-procurement. PMU WINRIP supportedby CTC will develop his own website: http://www.winrip-ibrd.com, and with it all the informationand data about WINRIP be inputted or uploaded on this site.
In the application of one of the components of ACAP, the public disclosure and transparency, it isnecessary to spread information and increase the capacity of all stakeholders involved in theimplementation of this WINRIP project, through a variety of relevant training. The trainings havebeen expressed in the ToR of CTC WINRIP and described in the Project Implementation Plan (PIP).
One of the major risks to effective project implementation and management derives from thelikelihood that project management staff does not have adequate training in or experience of themanagement of large-scale projects.
4.7.4 Complaints Handling Mechanism (CHS)
The ACAP as adopted by the Ministry of Public Works for WINRIP states on the subject of“Complaints Handling System”. The Community Development Specialist and the ManagementInformation Specialist will play a crucial role in the set-up of the Complaints Handling System (CHS)within PMU, in cooperation with the PMU officer(s) in charge of the Complaints Handling Unit (CHU).
CHS essentially has four main components as follows:
Data Entry.
All complaints were expected to be submitted through the WINRIP website but in fact, todate, most complaints have been received by letter, either directly or indirectly, although afew were sent by fax or email. However, to attain the best possible transparency of theproject, complaints submitted manually through letter, facsimile, telephone, e‐ mail or visit tothe Public Works regional offices will be entered in the WINRIP website by the CHS team ofCTC. The possibility of using the ‘short message service’ (SMS) from a cell phone forcomplaints was considered and it was decided that all SMS messages, although not treated asformal complaints, will be recorded as additional information.
Complaint Registration.
Every submitted complaint is registered and stored into the CHS database, categorized, andsent to the correlated expert for future consultation in order to formulate a response.
Complaint Assessment.
The CHS Team assesses the urgency and complexity of all complaints. Simple complaints are
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 41
followed by the formulation of a response for PMU’s approval before uploading the formalresponse into the WINRIP website. Complex complaints are followed by a thoroughinvestigation.
Field Investigation and Analysis.
In the case of an investigation being required, the CHS team will make field visits and takenecessary action such as discussion with related institutions (Satker, Dinas, SupervisionConsultant, etc); invite the complainer; interview the contractor; etc. Findings will be used foranalysis to formulate a conclusion, solution, next action and any further decision.
4.7.5 Third Party Monitoring (TPM)
All WINRIP packages are designed to have external parties involved in conducting an independentassessment of the project throughout construction. Project information is accessible through theWINRIP website (under construction), project information booth which is normally maintained in thePPK/Satker/Dinas office or, project announcement (billboard) at each site. ACAP requires a thirdparty, from outside the project, to independently monitor the progress of construction work of eachlink and these personnel are provided by universities nearby each package.
It was decided that the best method of recruitment for TPM was through the universities closest toeach package and PMU mailed invitations asking them to express their interest in formingindependent monitoring teams of Third Party Monitors. This concept is based on the fact thatUniversities/Technical Faculties have the engineers available for recruitment and Universities coulduse this opportunity to be involved in public service. It is hoped that this concept will be moreeffective and more efficient in getting legitimate, competent, independent Third Party Monitoring(TPM).
The duties of a TPM included:
a) Report to the PPK for his intended package and obtain copies of all drawings and contractdocumentation.
b) Make at least three (3) separate visits to site, with each visit up to four (4) days long, andascertain that the works are being carried out in compliance with the drawings anddocumentation.
c) Prepare and submit a report for the PMU following each visit with their last report post PHO.
4.8 Road Safety Audit
Since the Senior Road Safety Audit Engineer has been mobilized on 1st May 2013, technicaldesign review which is AWP2 and AWP-3 sub-projects in aspect of road safety has beenimplemented. After completing of technical design review, the report of RSA which is to identifythe road safety weaknesses in design during the design and actual construction and makerecommendations for realistic improvements, has been made in response to recommendation ofthe links for betterment and their implementation under Annual Works Programs(AWP-2,3),through site visiting, review of prepared drawing & report, had an official meeting with stakeholder
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 42
which is for Full design review and technical advisory. The CTC technical design team(highway &road safety audit) shall compile all the road safety recommendations in the Road Safety AuditReports which shall be part of the technical reports. The RSA report has to be disseminating inparticular to the audited packages.
The details of Civil Work in aspect of road safety audit are mentioned in “Chapter 4.1 DetailedDesign Preparation” combined with highway part for the Design Stage.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 43
5 FINANCIAL & MANAGEMENT INFORMATION SYSTEMS
5.1 Draw‐Downs and Future Costs
Details of the disbursements already made from the loan are listed in the following sub‐section.
5.2 Disbursement
The total disbursement from the loan to the end of October 2014 was USD 6,991,757.97equivalent to approximately 2.80% of the loan funds.
The total expenditure to date measured in the term of the World Bank commitment, notincluding the Special Account advance, is shown in Appendix C. The following tablesummarizes the individual disbursements as calculated by CTC but retaining the totaldisbursement from Client Connection at the end of October 2014.
Category DescriptionLoan Restructuring
Amount USDTotals Disbursed toEnd October in USD
% Disbursed
1Part 1 Betterment andCapacity Expansion of
National Roads.220,400,000.00 4,757,422.97 2.16
2Part 2
Implementation Support16,000,000.00 1,981,900.79 12.39
3Part 3
Road Sector InstitutionalDevelopment
1,000,000.00 0 0
4Part 4
Contingency for DisasterRisk Response
0 0 0
Unallocated 12,600,000.00 0 0
LN 8043 DA-A
252,434.61 0
Original LoanAmount
250,000,000.00 6,991,757.97 2.80
5.3. Management Information System
5.3.1. General OverviewThe Management Information System tasks include the following below:
1) Information Systema. Develop and manage a File Storage as database system to store soft copy
documents into the server.b. Establish a Document Management System (DMS) to provide:
Letter Database System, used to record all information of incoming andoutgoing letter.
Document Library System, used to record all information of hard copydocuments then store it into library shelves.
c. Create and maintain a WINRIP official website.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 44
d. Develop and update a Geographic Information System (GIS) of spatial and roadsinformation that overlay into Google Maps.
e. Develop and manage a Financial Management Information System (FMIS), theweb based application to monitoring the financial report and the physicalprogress report.
f. Provide a Complaint Handling System (CHS), used and support the ACAPactivities to accommodate complaints from the public.
2) Data Collection and Document Uploada. Collecting data and updating list of data catalog every month.b. Uploading documents into a file storage server.
3) Technical and Computer Troubleshootinga. Setting up and manage cable network of local area network and internet
connection.b. Setting up and manage hardware problem of the computer, printer, copier and
phone.c. Software installation and cleaning up of computer virus.
5.3.2. Database
Incoming andOutgoing Data Administrator Saved
Stored
Inputted
File StorageServer
Shelves
DatabaseApplication
Soft File
Hard Copy
DataInformation
Typical Workflow ofDatabase Management
A typical workflow in management of incoming and outgoing data is divided into 3 typesof data handling, below:
1. Hardcopy, the document is stored in a rack.2. Soft files, saved in the File Storage Server.3. Data information, inputted in database applications.
For further handling that needs to be made an integrated database management systemso that all data can be stored properly. The database system has been prepared tostore all of WINRIP project information in a systematic, easily traceable, maintainable,and manageable format as outlined below with the following systems:
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 45
a. File Storage Server, used to stored all files of reports and other documents. Pleasecheck the URL address http://storage.winrip-ibrd.com.
b. Letter Database System, used to record all information of incoming and outgoingletter.
c. Document Library System, used to record all information of hard copy documentsthen store it into library shelves.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 46
6 PROJECT PERFORMANCE
6.1 World Bank and GOI Compliance
6.1.1 World Bank Missions
No World Bank implementation mission this period.
6.1.2 Agreed Key Actions and Mission Plans During Recent World Bank Visit
A list of the key actions monitored during the period are listed below.
No. Action By Whom Status and Target dates
1 Project reviews DGH andBank October 2014
2 TOR for Capacity Enhancement onDisaster Risk Mitigation
PMU andCTC /
Draft Final for “Request for Expression of Internal’(RE01) has been finalized based previouscomments from World Bank.
Draft Final for “Terms of Reference” (TOR) hasbeen finalized based on previous comments fromWorld Bank.
The Draft Finals to be submitted to World Bank byNovember 2014.
3 Complete and send to the BankUKL & UPL for package 4 CTC
Recommendation of UKL & UPL of Ipuh-BantalCompleted on October 30, 2014.
CTC submitted informally to the WB therecommendation of UKL & UPL.
The environmental permit of UKL/UPL Package 4will be submitted to Bank on end of November2014.
4Submit LARAP documents forpackages 7, 8, 10 and 12 for Bankreview
DGH 8, 10 - NOL given on August 12, 2014. 7, 12 submitted on September 29.
5 Submit to the Bank the LARAPmonitoring report for package 2 PMU Will be submitted in Dec. 2014.
6Submit to the Bank the LARAPmonitoring reports for packages6, 11 and 19
PMU Will be submitted in Dec. 2014.
7Submit to the Bank the LARAPmonitoring report for packages 13and 15
PMU Will be submitted in April 2015.
8 Submit to the Bank the LARAP forpackages 14, 20 and 21 PMU Will be submitted in Nov – Dec 2014.
9 Submit to the Bank the LARAPmonitoring report for package 17 PMU Will be submitted on April 2015.
10Finalize NCB standard biddingdocument (SBD) for full e-procurement
MPW(Bintek,PMU,Pusdata, andBapekon)and Bank
The issues concerning the use of NationalCompetitive Bidding (NCB) Bid Documents forProcurement of works were settled after anagreement was reached between MPW andWorld Bank. The Documents are underfinalization based on the minutes of agreement,Bids for scheduled NCB sub-project can be invitedon the middle part of November 2014.
Bank agreed on DGH to pilot the use of MPW’sfull e-procurement system, using the World BankICB Standard Bidding Documents (SBD) forprocurement of works after incorporating in theICB documents the changes required for use of e-procurement system, Bids can be invited on themiddle part of November 2014.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 47
No. Action By Whom Status and Target dates
11 Bidding of Package 17 PMU
Bid opening took place on August 15, 2014. Sixbidders submitted their bids.Bid Evaluation Report (BER) submitted toWorld Bank on October 2014
12 Bidding of package 5 PMU
Bid Opening Record forwarded to Bank onSeptember 23, 2014.
Bid Evaluation Report for submission to Bank’sby the 2nd week of Nov. 2014.
13 Bidding of packages 11 and 13 PMU The Bid Evaluation Reports (BER) will be
submitted to the Bank by the 1st week ofNovember 2014
14Submit the bidding document ofpackage 15 (ICB) to the Bank forNOL
PMU 1st of November 2014
15 The auditing report of the 2012and 2013 financial statements
PMU andBank
The PMU needs to report back to the Bank onhow they have implemented therecommendations of the auditors by the end ofNovember.
16Submit to the Bank the revisedPMM, including the webapplication
PMU
The revised PMM, including the supplementwith the procedures to activate component 4of the loan agreement, will be submitted onDecember 17, 2014.
17Finalize ToR for technical andfinancial audit and submitproposal to DFAT for funding
DGH (teamleader forEINRIP) andBank
The Bank will finalize the TOR in the end ofOctober 2014.
DGH and EINRIP will meet in the beginning ofOctober to discuss the details regarding theaudit of the four ongoing packages throughtheir TFAC consultants.
18
Make sure that adequate budgetsfor LARAP implementation areallocated in 2015 for packages allpackages, especially packages 14,16, 20, 21, 12 and 7
DGH
DGH will checked to Local Government of WestSumatera and Balai III for #16 and for all otherpackage for which they do not have yet thisinformation and report back to the Bank is endof Nov 2014 in Padang.
19 LARAPs for packages #2 PadangSawah – Simpang Empat DGH
NOL for additional LARAP issued on Submittedto Bank on July 21, 2014.
On August 18, 204 Bank sent a reminder to thePMU to complete the LARAP implementationprocess and submit documentary evidence.
The TL of DSC reported a change of design ofthe slope protection. Bank will follow up on theimpact on LARAP in a meeting planned for mid-November.
20 LARAPs for packages #3Manggopoh - Padang Sawah PMU
On August 18, 2014 the Bank sent a reminderletter to PMU to complete LARAPimplementation process and submitdocumentary evidence. Bank will follow up onthe impact on LARAP in a meeting planned formid-November.
21
Engineering design andreview/approval of slopeprotection design completion andthe nomination of the chiefinspector for package 4
DSC The PMU will send to the Bank a copy of these
designs for information by the end ofNovember.
22 PMU to submit draft DED and EEof package # 7, 8, 10, and 12 PMU
Bina Marga decided to redesign these fourpackages based on 2011 standard.
The PMU will send to WB the revised designsand OE on November 17, 2014.
23PMU to submit draft DED and EEof package # 14, 16, 20, and 21
PMU The PMU will send draft DED and OE to WB onNovember 30, 2014.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 48
No. Action By Whom Status and Target dates
24 DSC additional staffs PMU andDSC
The TL of DSC informed the Bank team thatDSC is finalizing the contract addendum #1 foradditional staff, asking for one highwayinspector, one surveyor, and one laboratorytechnician for each work package and, for thecentral office, one highway engineer, onebridge engineer, one quality engineer, onesocial and environmental specialist, and oneQAT operator.
To expedite the process, the Bank teamsuggested that PMU and DSC to submit arequest letter for some staffs who are urgentlyneeded (e.g. bridge engineer package #2,supervision engineer, and environmentalspecialist), rather than waiting for thecomplete addendum.
DSC will submit the request to the PMU by theend of November 2014.
25 Submission of IFR PMU The PMU will submit the IFR for the period Julyto September by November 15.
26 Approving of field engineering forpackage 1 to 4 DSC/DGH Month of November.
27Submission of environmentalmanagement plan for packages 2and 3
CTC/DGH By November 20.
28Submission of environmentalmanagement plan for packages 1and 4
CTC/DGH By November 28.
29
Status reports to be sent to theenvironmental agency, whichapproved the environmentaldocuments.
CTC/DGH Submission of status reports at regular
intervals as per local law. Please copy the Bankon the submission of these reports. Done.
30
Replacement packages forpackage No. 9 Rantau Tijang –Kota Agung and package No. 18Mukomuko – Batas Sumbar (Biha– Bengkunat and Sibolga –Sorkam)
CTC/DGH
If DGH wants to try to include them in thisproject, design works need to startimmediately since no new bidding processescan be started after March 31, 2015 (otherwiseworks implementation will go beyond theclosing date). However, before starting thedesign works under the project, DGH needs toconfirm that they will finance the works withABPN budget in case the technical andeconomic evaluation is not satisfactory or thebidding for civil works cannot start 31beforeMarch 31, 2015. In addition, DGH needs toprovide the Bank with the technical andeconomic evaluation for the new sections bythe end of November at the latest (the Bank isavailable to meet at your convenience todiscuss the scope of this evaluation).
31
Meeting to review the status ofwork package readiness, includingLARAP implementation andrespective budgets, andpreparation of time schedule forpackages to be ready to bid byMarch 31, 2015
PMU andWB
Bank and PMU to meet in the third week ofOctober. Meeting was held on October 7 and10, 2014.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 49
6.1.3 Performance Indicators
GOI and the World Bank have agreed on a set of Key Performance Indicators (KPIs) to measure theproject’s performance in achieving its stated development objectives. These KPIs are provided in theWorld Bank’s Project Appraisal Document (PAD), together with baseline data and targets.
The annual targets for KPIs that are indicated in the Project Appraisal Document are based on theinitial Project Implementation Schedule as shown in Appendix I.
The CTC is concentrating on the establishment of precise definitions, calculation methods and datacollection procedures to monitor the KPIs.
6.2 Implementation Support Components
6.2.1 Core Team Consultant (CTC)
The CTC is responsible to provide support to the PMU and DGH in the management of the Project,based in Jakarta. The CTC tasks include financial and progress monitoring and reporting, informationmanagement and dissemination, quality assurance and performance review for the Design andSupervision Consultants (DSC), implementation and monitoring of the anti-corruption action plan,support for project monitoring and evaluation, and support for implementation of a trainingprogram to support project management and implementation.
The CTC contract No. 06-20/CTC/TA/LN/8043/1112 was signed on 5 November 2012 by both DGHand a Joint Venture of PT. Perentjana Djaja, Yongma Engineering Co.Ltd., and PT. EpadasconPermata Engineering Consultant.
The main CTC activities during October 2014 are as follows:
Continue assistance to PMU as and when required. Prepare and submit Monthly Progress Report for October 2014 Finalization of International Competitive Bidding full e-proc documents for Package No.15
(Sibolga – Batas Tapsel) Finalization of National Competitive Bidding full e-proc documents for Package 6 (Ps. Pedati –
Kerkap) and Package No. 19 (Lais – Bitunan) Monitoring LARAP implementation at Padang Pariaman Package # 10 Monitoring of implementation of environmental mitigation measures Monitoring of financial status and disbursements Conducted technical design review of DED safety audit Prepared issued letters to PMU and DSC Attended Bid submission and opening for Package No.11 (Bantal – Mukomuko) and Package 13
(Sp. Rukis – Tj. Kemuning) Assisted Procurement Committe (POKJA) in preparing Bid Evaluation Reports (BER) Environmental & Social Safe Guard screening for package “Serkam – Sibolga” North Sumatera
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 50
Field Inspection Package No.2 and Package No.3 Attended revised timeline meeting for WINRIP with World Bank Attended meeting with TFAC Selection of Civil Society Oversight (CSO) for Package No.5 Assisted Project Implementation Unit (PIU) of West Sumatera in Preparing Financial Report Road Safety Field review of Package No.2 and Package No.3 in West Sumatera Province Finishing PMM and transfer PMM to PMU for the next process of approval
6.2.2 Design and Supervision Consultant (DSC)
The Design and Supervision Consultant (DSC) will be responsible for design of WP 2 and WP 3 civilworks and supervision of all civil works. They will have the role of ‘Engineer’ under a FIDIC-typecontract. The tasks include the preparation and maintenance of a quality assurance plan, validationand updating of designs, supervision of all civil works, environmental and social monitoring andmanagement, and support for financial and progress monitoring and reporting.
The DSC will also be responsible for quality assurance of materials and workmanship, certifyingwhether or not contractors have achieved the required results, as well as documentation andreporting based on the financial management plan. They will prepare a Quality Assurance systemcovering all subprojects, and continuously monitor the effectiveness of their supervision procedures.The team will be contracted and managed by DGH through the Bina Marga Regional Office (Balai II),and will be based in Padang, West Sumatera.
DSC contract was negotiated in Balai Besar Pelaksanaan Jalan Nasional II (Balai-II) of DGH. Thenegotiation result and draft contract have been sent to WB on 25 March 2013 for review andapproval. The Bank issued no objection letter on the negotiation results and draft contract withletter dated 19 April 2013.
6.2.3 Road Sector Institutional Development
This component consists of technical assistance for capacity building for the new environment/riskmitigation and road safety unit to enhance its capacity for disaster risk assessment and planning, riskmapping of land-slides, coastal erosion, earthquake and floods, analysis of alternative road designsfor road segments passing through critical environmental assets and vulnerable areas.
It is planned so far that there will be three (3) consultant services for: Capacity Building of Disaster Risks Reduction Capacity Building for Environmental Management Capacity Building for Road Safety
Draft of the respective Terms of Reference has been being finalized by the Sub-Directorate ofEnvironment and Road Safety outlining the proposed scope activities for the component.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 51
During preparation of this Report, the procurement for consultants under this component has notyet been started. Preparation for the procurement would be coordinated by the PMU, the DGHProcurement Team and the CTC.
6.3 TRAINING TO SUPPORT PROJECT IMPLEMENTATION
The work during this reporting month is actually inseparable continuation of what wereprepared and done during previous month (September 2014) summarized below:
Continuing to assist PMU in the actions of perfecting the PMM document to be readyfor further socialization/dissemination.
Preparation and Carrying out the Financial Management and Reporting training earlyin November 2014 (prospective participants, venue, training materials,correspondences, etc.) ..
The work during this reporting month was actually the continuation of a couple of days worksin the beginning of the intermittent period, and the work of the last week of October 2014. Itshould be noted that based on the Amendment No. 2 to Contract No. 06-20/CTC/TA/LN/8043/1112, the period from 16th September 2014 until 31st October 2014 (46days) has been the intermittent period of the Training Specialist and the Assistant TrainingSpecialist, and the Training Specialist has planned to make use of part of the intermittentperiod to go on the pilgrimage to Mecca. Both training staffs have then been intermitting for35 days (instead of 46 days), from 21ST September to 25th October 2014, and have back towork the last week of October 2014 (27th - 31st October 2014). The work during the last weekof this reporting month was then focused on the following activities:
6.3.1 Updating the Project Management Manual (PMM)
Continuing to assist the actions of perfecting some chapters of PMM a couple ofdays in the beginning of the intermittent period before actually go to Mecca, basedon some additional suggestions from the respective PMU Officials and resourcepersons, that still be required for the document to be ready for approval and furthersocialization/dissemination. Apparently, especially chapter 7 of the PMM: ContractImplementation, still requires some actions of perfecting, completing, finishing aswell as refinement of thought and euphemism.. Some discussions are still going tobe needed.
A copy of the Project Management Manual (PMM) was submitted to the PMU onOctober 21, 20`14, after all the inputs, comments and suggestions were incorporatedin the proposed revised Manual.
6.3.2 Annual Training Program
Preparation of Financial Management & Reporting (esp. IFR) training for 4 packagesof AWP-1 has been continued and planned to be delivered in November 2014. Thisincluding:
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 52
Identification of the prospective participants of the IFR training;
Identification and selection of the venue;
Preparation of training materials and methods to be used.
Analyzing, calculating the provisional sum allocated for training in theAmendment no. 1 and no. 2, possibility of spending it, revision required, etc.
6.3.3 Activities Plan for next month (November 2014)
Continuing to assist PMU in the actions of perfecting the PMM document to beready for further socialization/dissemination.
Preparation and Carrying out the Financial Management and Reporting (IFR)training in November 2014 (prospective participants, venue, training materials,correspondences, etc.) .
Preparation of other training programs (procurement training, environmental andsocial training, implementation of PMM training) urgently needed in line with thephysical progress of the project.
6.4 Anti‐Corruption Issues
6.4.1 Anti-Corruption Action Plan (ACAP)
The main duties of the Community Development Officer are implementation of Anti-CorruptionMeasures and Monitoring their Effectiveness. Provide assistance as required with the establishmentof anti-corruption measures necessary to support the project and monitor and report theireffectiveness based on the Anti-Corruption Action Plan (ACAP) agreed between the World Bank andthe DGH.
The following tasks particularly need to establish procedures to be undertaken:
Selection of Community Representative Observers (CROs) of civil society groups to attend theprocurements process on key procurement steps including pre-bid meeting and site visit, bidssubmission and bids opening, and the announcement of the bid winner. These CROs will beinvited from local universities or other selected independent institutions and will sign theattendance list for the procurement/selection process.
Establishment of a Third Party Monitoring (TPM) mechanism, whereby the media and civilsociety groups can become involved in monitoring the progress of the project. This mechanismwill include regular sharing of information with the media.
Establishment and Management of a Complaints Handling Mechanism (CHM), which includesmaintaining project complaint log and filing to monitor status of follow-up of each complaint.This mechanism will include provision for follow up investigations of substantial complaints bythe Inspectorate General of Ministry of Public Works or third party audit to ensureindependence and reliability of the system. The CTC assignment concerns the monitoring of theaspects of Anti-Corruption Action Plan (ACAP) implementation and where required to act pro-active in resolving issues when such matter arises. The Community Development Specialist has
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 53
a major role in monitoring performance and assists PMU in the set-up and follow-through of theComplaints Handling Unit (CHU) for the ACAP related incidents
Enhanced Disclosure Provisions and Transparency, Ministry of Public Work (MPW) will providenecessary information in the Project Implementation Plan (PIP), Project Management Manual(PMM) on their website and in the bidding documents, such as contact point for complaint (mailand e-mail address, phone, fax, text message). The contact will also include the Bank’s Fraud andCorruption Hotline. MPW will hold Annual Accountability Meetings to enhance accountabilityand project information sharing with civil society. The PMM will provide guidelines on disclosureof information related to the project. MPW official website will display critical information onWINRIP to enhance both internal and external monitoring of the project
6.4.2 Community Representative Observers (CRO)
The Anti-Corruption Action Plan (ACAP) activities on Community Representative Observers (CROs),was adjusted and supported the progress of procurement activities.
The activity on the Community Representative Observers (CROs) during October 2014 was asfollows:
On the 3rd of October 2014 there were two CROs who have attended the Bid-opening meeting,namely:
Ms. Hesti Aulia Sari, ST, CRO for Package 11: Bantal - Mukomuko, meet the invitation ofthe Procurement Committee (Pokja of Procurement Unit/Unit Layanan Pengadaan BBPJNIII, PIU/Satker PJN Region I Bengkulu Province).
Ms. Hot Maria Angelina, ST, CRO for Package 13: Simpang Rukis - Tanjung Kemuningattended Bid-Opening meeting on the invitation by the Procurement Committee (Pokja ofProcurement Unit/Unit Layanan Pengadaan BBPJN III, PIU/Satker PJN Region II BengkuluProvince).
The result of observation on above Bid-Opening meeting has not been reported because still waitingfor the announcement of the Bid winner.
The activities progress of Community Representative Observers (CROs) from January 2013 untilOctober 2014, are shown in Appendix H1.
6.4.3 Third Party Monitoring (TPM)
The Third Party Monitoring, activities during October 2014 was focus on the preparation for theselecting process of TPM for four packages under AWP-2 & AWP-3 (packages 05, 11, 13, and 17).
The preparation activities on TPM selection process that has been done for October 2014 were asfollow:
1. Sending the Coordination Letter from Director of Planning, Directorate General of Highways tothe Head of BBPJN Region I Medan, No. HL.0202/Bp-11/2808/2014 dated October 7, 2014,about Selection of the Third Party Monitoring (TPM) for package 05 (Simpang Rampa – Poriaha,and package 15 (Sibolga – Tapanuli Selatan border) in North Sumatera.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 54
2. Sending the Information Letter about participation of Third Party Monitoring (TPM) on WINRIP,from Director of Planning, Directorate General of Highways to the Universities:
Letter No. HM.0602/Bp-11/2779/2014 dated October 3, 2014, to Universitas Lampung(UNILA) about information on the selection of Third Party Monitoring (TPM) for package 17(Simpang Gunung Kemala – Pugung Tampak) in Lampung Province.
Letter No. HM.0602/Bp-11/2780/2014 dated October 3, 2014, to Universitas Sumatera Utara(USU) about information on the selection of Third Party Monitoring (TPM) for package 05(Simpang Rampa – Poriaha) in North Sumatera Province.
Letter No. HM.0602/Bp-11/2835/2014 dated October 20, 2014, to Universitas Bengkulu(UNIB) about information on the selection of Third Party Monitoring (TPM) for package 11(Bantal – Mukomuko) and package 13 (Simpang Rukis - Tanjung Kemuning) in BengkuluProvince.
3. Sending the Letter from the Officer in Charge of PMU WINRIP to Satker/PIU PJN Region II ofNorth Sumatera Province No. UM.0206/BLI/WINRIP/046, dated October 3, 2014 on theparticipation of Third Party Monitoring about preparation of selection the TPM for package 05((Simpang Rampa – Poriaha) in North Sumatera Province.
4. Carry out Socialization and explaination of TPM Selection for package 05: Simpang Rampa –Poriaha, and has been conducted on Thursday, October 16, 2014, in Satker/PIU PJN Region IINorth Sumatera, Jl. Busi Dalam No. 7 Medan.
The meeting was attended by TPM candidates from State University of Sumatera Utara/Universitas Sumatera Utara (USU), elements of Satker PJN Region II North Sumatera Province,elements of PPK 12 Sibolga Cs (Package 05: Simpang Rampa – Poriaha), and CommunityDevelopment Officer of CTC WINRIP.
Some comments from this meeting were:
TPM Candidates from Universitas Sumatera Utara (USU) stated that the TPM objectivesrelatively high but the support facilities to achieve these goals is inadequate, such astransport costs (mileage more than 10 hours by road), there is no honor in recognition of theprofessionalism of members of the TPM, other than it must prepare accountability reportsand operating expenses.
TPM Candidates asked for an explanation from the the PMU of the problems submittedabove.
Need to find an alternative College / University which has a Civil Engineering program,which close to the project site
5. The Employment Agreement or Memorandum of Understanding between TPM (packages 01,02, 03, and 04) with the CTC WINRIP (PT. Perentjana Djaja) ready to be signed, still waitingCovering Letter from Officer in Charge of PMU.
The Progress of Third Party Monitoring (TPM) Activities from April 2013 up to October 2014 and theworks plan is shown in Appendix H2.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 55
6.4.4 Complaint Handling System (CHS)
The Community Development Officer with collaboration with MIS Specialist has developed asoftware application of Complaint Handling System (CHS) in integrated to website of WINRIPhttp://www.winrip-ibrd.com.
In the implementation of Complaint Handling System (CHS) essentially there are four maincomponents as follows:
Data Entry. Complaint Registration. Complaint Assessment. Field Clarification and Analysis. Problem Solving and taking the Decision
The final draft of Complaint Handling System (the framework of the complaint procedures on theweb site of WINRIP and provided ACAP inputting data in the web site) has ready to be operated.
However these applications still continue to be refined by considering input from various parties.
The CHS team has been monitored and noted the public complaints via SiPP website and WINRIPwebsite, but until now have no complaint about the WINRIP programs.
The CHS Activities is shown in Appendix H3.
6.4.5. Publication / Disclosures
Publication and disclosure is an attempt to increase transparency of information to the public, sothe public can easily access to information about the project WINRIP. Some components ofpublication and disclosures are as follows: a) announcing the information about the project throughdissemination activities and provision the leaflets, b) installation of the project information boards,c) the provision of space / project information booth, d) providing important information that canonly be accessed by public with submitted an officially applications to the authorities, and e) theprovision of information in the website which can be accessed via the internet.
Information provision / dissemination about the Public Disclosures and Transparencies has beendone by the preparatory training of TPM for Packages 01, 02, 03 and 04, and will be done by theWINRIP regular training like: Project Management Manual (PMM), Procurement Training, InterimFinancial Report (IFR) and other relevant trainings. Another way is to inputting the information/dataor to upload the articles into the website of WINRIP.
The publication of project information that stated above are the responsibility of PPK, like provisionleaflets, project information boards, project information booth, and publication of CTC website aswell as application of Complaint Handling System.
Until now there were no information if the PPK has done publication media or provided informationas mentioned above, because there were never been implemented monitoring of it. Until now stillhave no information if the PPK has to be provided or to do this publication.
Methods of delivery of disclosure of information to the public including procedures for submissionof complaints from the public or from all relevant stakeholders, still needs to be discussed betweenthe PMU, PIUs / PPK, and CTC to get a deal together.
The Community Development Team has sent the CRO’s activities Reports and Third Party
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 56
Monitoring (TPM) activities Reports to Information Management Team to be uploaded to thewebsite of WINRIP.
The Works Activities for Publication / Disclosure is shown in Appendix H4.
6.4.6. Action Plan for Next Months
The Activities plan for future months (November of 2014), in order of priority are as follows:
1. Ensure that the Employment Agreement or Memorandum of Understanding between TPM(packages 01, 02, 03, and 04) with the CTC WINRIP (PT. Perentjana Djaja) can be signed inNovember 2014.
2. Inputting or upload the data, documents and reports of ACAP into the website.
3. Prepare selection of the Third Party Monitoring (TPM) Selection for packages 17, 05, 11, and 13.
4. Prepare selection of the Community Representative Observers (CRO) for packages 06 (PasarPedati – Kerkap), 19 (Lais – Bintunan), and 15 (Sibolga – Batas Tapsel)
6.5 Road Safety Audit
6.5.1 Activities During This Month (October 2014)The activities during this month was to prepare report of review on the the Road Safety Engineeringand Monitoring, the implementation of Traffic Management Safety for Manggopoh – Padang Sawah(Package #3) and Padang Sawah – Simpang 4 (Package #2) construction stage. The activities includedsite visit to collect data which has been conducted 8 - 10 october 2014.
The aim of road safety engineering review is to find out the possibility to improve road safety byreviewing the design and by on site observation to reveal probable additional improvement as a wayto minimize accident and to provide a more safer road to the users.
The purpose of monitoring the implementation of traffic management safety is to find out whetherthe Contractor consistently running the traffic management safety plan that has been made.Summary activities during this month, i.e:
1. 8 – 10 October 2014, site visit to : (i) Manggopoh – Padang Sawah (Package #3); (ii) PadangSawah – Simpang 4 (Package #2)
2. Preparation reports : (i) Review Road Safety Engineering, (ii) Monitoring the Implementation ofTraffic Management Safety.
6.5.2 Current Status of the Project for Technical Field as of October 2014.
The Details of Progress of Technical Design Review with respect to road safety audit and Monitoringof Traffic Management Safety as of the end of October 2014 are shown in table below and isincluded as Appendix B.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 57
Technical Design Review & Road Safety Audit Report Status
Group PackNo. Name of Sub-project
Technical Design Review & Road Safety Audit Road SafetyAudit Report
by BINTEK
Submitted toPMUPost
-ReviewSite
VisitingFull
-ReviewTechnical
Report
AWP-2
5 Sp.Rampa – Poriaha(Link No.015.xx) completed completed completed completed -
Final Technical Report isresubmittedon 17th September 2013
6 PS.Pedati - Kerkap(Link No.010.0)
completed completed completed completed -Final Technical Report issubmittedon 17th September 2013
7 Indrapura – Tapan(Link No.019.0)
-(By DSC)
-(By DSC
-(By DSC
TechnicalAdvisory
Reviewed andprepared by
SubDirectorate of
EA& RS
1)Final Technical Advisory issubmitted on 5th February 20132)Final RSA Report is submittedon May 2014
8Bts.Pariaman –
Manggopoh(Link No.024.0)
-(By DSC
-(By DSC
-(By DSC
TechnicalAdvisory
Reviewed andprepared by
SubDirectorate of
EA& RS
1)Final Technical Advisory issubmitted on 5th February 20132)Final RSA Report is submittedon May 2014
9Rantau Tijang – Kota
Agung(Link No.026.1)
(By DSC (By DSC (By DSC - - -
10Sp.Empat – Sp. Air
Balam(Link No.034.1)
-(By DSC
-(By DSC
-(By DSC
TechnicalAdvisory
Reviewed andprepared by
SubDirectorate of
EA& RS
1)Final Technical Advisory issubmitted on 5th February 20132)Final RSA Report is submittedon May 2014
11 Bantal - Mukomuko(Link No.015.2)
completed completed completed completed -Final Technical Report isresubmittedon 16th August 2013
12 Kambang – Indrapura(Link No.017.2)
-(By DSC
-(By DSC
-(By DSC
TechnicalAdvisory
Reviewed andprepared by
SubDirectorate of
EA& RS
Final Technical Advisory issubmitted on 5th February 20132)Final RSA Report is submittedon May 2014
13 SP.Rukis - TJ.Kemuning(Link No.006.0)
completed completed completed completed -Final Technical Report isresubmittedon 16th August 2013
AWP-3
14 Painan – Kambang(Link No.017.1) (By DSC (By DSC (By DSC Technical
Advisory-
Final Technical Advisory issubmitted on 28 May 2014
15 Sibolga – Bts TapSel(Link No.016.1)
completed completed completed completed -Final Technical Report issubmittedon 23th September 2013
16 Seblat – Ipuh(Link No.010.0)
-Completed
-Completed
-Completed
TechnicalAdvisory
-1)Final Technical Advisory issubmitted on 27th March 20142)RSA Report was submitted onSeptember 1st, 2014
17Sp.Gng Kemala–
Pg.Tampak(Link No.061.1)
PPC-TAWINRIP
PPC-TAWINRIP
PPC-TAWINRIP - - -
18Mukomuko –Bts.Sumbar
(Link No.015.3)(By DSC (By DSC (By DSC - - -
19 Lais - Bintuan(Link No.009.1) completed completed completed completed -
Final Technical Report issubmittedon 17th September 2013
20 Lubuk Alung – Sicincin(Link No.009.1) (By DSC (By DSC (By DSC Technical
Advisory-
Final Technical Advisory issubmitted on 23 May 2014
21 Lubuk Alung – Kuraitaji(Link No.009.1) (By DSC (By DSC (By DSC Technical
Advisory-
Final Technical Advisory issubmitted on 23 May 2014
AWP-1
2 Padang Sawah – Sp.Empat
Beingprepared
Beingprepared
- AWP-1 2 Padang Sawah – Sp. Empat
3 Manggopoh – PadangSawah
Beingprepared
Beingprepared
3 Manggopoh – Padang Sawah
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 58
6.6 Environmental and Social Impact Issues
6.6.1 Package No.01: Krui – BihaSocial Issues:
Existing mosque is partially traversed due widening of the existing travelledway. Due to resistance to partially demolished and rebuild the mosque, a new action plan is proposed,
where the road alignment centerline will be shifted to the other side. Land acquisition is required on the other side of the road centerline alignment if the new action
plan push through.Environmental Issues:
CTC have reviewed and gave comments on RKPPL that was submitted by the Contractor.Contractor still to resubmitt the revised RKPPL.
CTC to check if the DSC and Contractor implement the requirements and recommendations in theAMDAL on the site and incorporated in the design. CTC is waiting for the submission of AMDALdrawings recommendations from DSC/Contractors.
6.6.2 Package No.02: Padang Sawah – Simpang EmpatSocial Issues:
Remaining twenty one (21) affected persons are not yet compensated by the Local Government.Five (5) of the twenty one (21) affected persons are residing along the proposed bridge site of AirGadang Bridge. Twenty four (24) new affected persons included in the new LARAP are not yetcompleted by the Local Government.
Environmental Issues:
RKPPL under final processing by PPK and COntractor. CTC need to check the recommendation UKL&UPL (bridge) in the field for clearance of
environmental issues which have to be integrated in to the design.
6.6.3 Package No.03: Manggopoh – Padang SawahSocial Issues:
The three (3) remaining affected persons still to be compensated by the Local Government.Environmental Issues:
RKPPL under final processing by PPK and Contractor. CTC check the implementation of the SPPL in the field.
6.6.4 Package No.04: Ipuh – BantalSocial Issues:
Compensation for additional 5 – 15 Project Affect people still to be paid.Environmental Issues:
Environmental permit issued on October 30, 2014.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 59
6.6.5 Package No.05: Sp. Rampa – PoriahaSocial Issues:
Relocation of gasoline station affected by the road improvement have not yet been relocated. Relocation of 1 Kiosk still to be done.Environmental Issues:
CTC need to check the recommendations of UKL&UPL in the field for clearance of environmentalissues which will be integrated in to the design.
6.6.6 Package No.06: Psr.Pedati – KerkapSocial Issues:
Monitoring Reports of the LARAP’s implementation have to be prepared and submitted forreview and for submission to World Bank.
Environmental Issues:
CTC need to check the recommendations of UKL&UPL in the field for clearance of environmentalissues which will be integrated in to the design.
6.6.7 Package No.07: Indrapura – TapanSocial Issues:
Implementation cost of LARAP to be included by Local Government in 2015 budget.Environmental Issues:
CTC need to check the recommendation of AMDAL in the field for clearance of environmentalissues which will be integrated in to the design.
World Bank issued No Objection Letter (NOL) on August 8, 2014 for the AMDAL documents thatwere prepared by Subdit TLKJ/AMDAL local consultant hired by BALAI.
6.6.8 Package No.08: Bts Kota Pariaman – ManggopohSocial Issues:
Implementation cost of LARAP to be included by Local Government in 2015 budget.Environmental Issues:
CTC need to check the recommendations of AMDAL in the field for clearance of environmentalissues which will be integrated in to the design.
6.6.9 Package No.09: Rantau Tijang – Kota AgungSocial Issues:
Still no issues and concerns.Environmental Issues:
CTC need to check the recommendations of UKL&UPL in the field for clearance of environmentalissues which will be integrated in to the design.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 60
6.6.10 Package No.10: Sp. Empat – Air BalamSocial Issues:
Implementation cost of LARAP to be included by Local Government in 2015 budget.Environmental Issues:
CTC need to check the recommendations of AMDAL in the field for clearance of environmentalissues which will be integrated in to the design.
6.6.11 Package No.11: Bantal - MukomukoSocial Issues:
Monitoring Reports of the LARAP’s implementation have to be prepared and submitted forreview and for submission to World Bank.
Environmental Issues:
CTC need to check the recommendations of AMDAL in the field for clearance of environmentalissues which will be integrated in to the design.
6.6.12 Package No12: Kambang – IndrapuraSocial Issues:
Implementation cost of LARAP to be included by Local Government in 2015 budget.Environmental Issues:
CTC need tocheck the recommendations of AMDAL in the field for clearance of environmentalissues which integrated in to the design.
6.6.13 Package No.13: Sp. Rukis – Tj. KemuningSocial Issues:
Monitoring Reports of the LARAP’s implementation have to be prepared and submitted forreview and for submission to World Bank.
Environmental Issues:
CTC need to check the recommendations of UKL&UPL in the field for clearance of environmentalissues which will be integrated in to the design.
6.6.14 Package No.14: Painan – KambangSocial Issues:
Corrected LARAP documents still to be submitted to World Bank for NOL.Environmental Issues:
CTC need to check the recommendations of AMDAL in the field for clearance of environmentalissues which will be integrated in to the design.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 61
6.6.15 Package No.15: Sibolga – Bts. TapselSocial Issues:
LARAP implementation Monitoring Report from Satker/PPK still to be submitted to PMU/CTC forreview and for submission to World Bank.
Environmental Issues:
CTC need to check the recommendations of UKL&UPL in the field for clearance of environmentalissues which will be integrated in to the design.
6.6.16 Package No.16: Sebelat – IpuhSocial Issues:
Monitoring Reports of the LARAP’s implementation have to be prepared and submitted forreview and for submission to World Bank.
LARAP documents covers only the road link. If there are land acquisition for the bridge site,separate LARAP documents need to be prepared
Environmental Issues:
CTC need to check the recommendations of AMDAL in the field for clearance of environmentalissues which will be integrated in to the design.
6.6.17 Package No.17: SP. Gunung Kemala – Pg. TampakSocial Issues:
LARAP implementation report is not yet submitted by Satker 1 Lampung to PMU/CTC.Environmental Issues:
CTC need to check the recommendations of AMDAL & UKL&UPL in the field for clearance ofenvironmental issues which will be integrated in to the design.
6.6.18 Package No.18: Mukomuko – Bts. SumbarSocial Issues:
Still no issues and concernsEnvironmental Issues:
CTC need to check the recommendations of AMDAL in the field for clearance of environmentalissues which will be integrated in to the design.
6.6.19 Package No.19: Lais - BintunanSocial Issues:
Monitoring Reports of the LARAP’s implementation have to be prepared and submitted forreview and for submission to World Bank.
Environmental Issues:-
CTC need to check the recommendations of UKL&UPL in the field for clearance of environmentalissues which will be integrated in to the design.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 62
6.6.20 Package No.20: Lubuk Alung – SicincinSocial Issues:
Corrected LARAP documents still to be submitted for final review prior to submission to WorldBank.
Environmental Issues: CTC need to check the recommendations of UKL&UPL in the field for clearance of environmental
issues which will be integrated in to the design.
6.6.21 Package No.21: Lubuk Alung – Kuraitaji
Social Issues:
Corrected LARAP documents still to be submitted for final review prior to submission to WorldBank.
Environmental Issues:
CTC need to check the recommendations of UKL&UPL in the field for clearance of environmentalissues which will be integrated in to the design.
6.7. Management Information System
The WINRIP File Storage has been developed in May 2013. But after a year away, there aresome basic things that happen that cause it is not running optimally. These deficiencies are:
Messy folder structure, there is duplication of folders and files documents. Forexample, the CTC-WINRIP reports contained in the folder [Report] and also [CTC].Supposedly all of the data and document files of CTC-WINRIP only be in the rootfolder [CTC].
We've made a desktop-based of the letter applications, and has installed in one PC.But once that PC is infected by a virus computer and reinstalled, then theapplications are also disappear. So now we need to create a new, web-based andonline applications. So it does not need to do the install and can be accessed online.We call these applications is the Document Management System (DMS).
There is request from the PMU in order to re-structuring the root folder based onWINRIP components and physical work packages. So the user easier to find the dataand document files.
6.7.1 Rebuild The New File Storage Server
1) Background
Currently the WINRIP hosting server using a shared hosting on the ISPs (Internet ServiceProvider) company. The total capacity is 20 GB of shared hosting. Then its used for theWINRIP website, CHS applications, FMIS application and File Storage. All of them that has
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 63
spent capacity of the shared hosting. And until the end of Oktober 2014, the capacity of theshared hosting is about 5 GB.
So we created a new File Storage server with a larger storage capacity that about 2 TB (equalto 2,000 GB). This server is separate from the other websites and applications. And it buildon the external hard drive with bigger capacity.
Then we create a small file manager application to access the File Storage server through theinternet. Because previously we failed to build the cloud systems that use WD My Cloudframework. The WD My Cloud framework using Java Applet that blocked by all internetbrowser software. So the File Storage failed to open with the browser software.
2) Web Server on The WD My Book LiveThe first stage is to create a File Storage to create a web server in the WD external harddrive. Web server is useful to put the File Manager application so that it can be accessedthrough the Internet.
The steps to create a web server on the WD external hard drive is as follows:1. Create a domain name of localhost.2. Make settings of localhost.3. Reload the Apache.4. Running a web server.
3) Root Folder StructuresWe did change the File Storage folder structure. Especially in the root folder. A preview ofchanges in the root folder can be seen in the figure below.
In the old folder structure in the left image, the root folder sorted by the type of documentssuch as the Project Documents, Letters, Reports, etc. But there are duplicate folders use. Forexample, a report file created by the CTC placed in the folder [03_REPORT] and also[04_CTC]. This method is very inefficient.
Then we make changes to the new folder structure in the right image. The root folders aresorted based on the WINRIP components, namely:
Changed to
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 64
Component 1 abbreviated C1 is the root folder of Civil Works. Component 2 abbreviated C2 is divided into 3 sub-components:
o Sub-component 2.1 abbreviated C2.1 is the root folder of PMU.o Sub-component 2.2 abbreviated C2.2 is the root folder of CTC.o Sub-component 2.3 abbreviated C2.3 is the root folder of DSC.
Component 3 abbreviated C3 is the root folder of Road Safety Environment. Component 4 abbreviated C4 is the root folder of Disaster Management.
And all the data and files of documents placed in a sub-folder of each project component ofWINRIP. So there is no duplication of data and document files.
4) Installing The File Manager ApplicationThe next step is to install the File Manager application into a web server that is alreadyrunning. We use the eXtplorer framework as a web-based File Manager application.
To install the File Manager application is quite easy. All of the eXtplorer framework sourcecode just is copied into DocumentRoot of the web server. Then File Manager application isnow online and running well.
Log in page
Screenshot of The File Manager Application
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 65
5) Integration of File Storage with DMS ApplicationWe plan to combine and connect the File Storage with DMS application. A description of thelinked can be seen in the following chart:
All document files are saved in the File Storage. And information about the contents of thedocument is saved in the DMS application. And the path location of the document file will bestored in the database system of DMS applications. So between the File Storage and DMSapplications will be linked.
6.7.2 Re-developing of The Document Management System (DMS)1) Background
For further handling that needs to be made an integrated database management system sothat all data can be stored properly. The database system has been prepared to storeall of WINRIP project information in a systematic, easily traceable, maintainable, andmanageable format.
2) Objectives Saving the incoming and outgoing mail in a database system. Storing an information of document file into database system. Save soft files into the following folders automatically. Create a document management system that more effective and efficient.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 66
3) System Development Methodology
SYSTEMASSESSMENT
COM
PLAINT TYPE, STRU
CTURES AN
D SYSTEM
REQU
IREMEN
TS
SYSTEMANALYSIS
NEEDSANALYSIS
PROCESSANALYSIS
DATABASEANALYSIS
MODULEANALYSIS
SYSTEMDESIGN
INTERFACEDESIGN
FLOW CHARTDESIGN
DATABASEDESIGN
SYSTEMARCHITECTURE
COD
E PROG
RAMM
ING
AND
TESTING
SYSTEM
IMPLEM
ENTATIO
N
FINALIZATION
4) System AssessmentThe DMS is a web-based and online application. Then we need some of the following systemrequirements:
NO. SYSTEM REQUIREMENT
1 Storage server NAS (Network Attached Storage) system.
2 Storage capacity 2 TB
3 Operating system Linux
4 Web server Apache web server
5 Database MySQL
6 External IP Address The DynDNS
5) System Analysis1. Needs Analysis
NO. NEEDS RECOMMENDATION
1. Preparing The NAS (NetworkAttached Storage) system.
Need to setting up the WD MyBookLive as the NAS(Network Attached Storage) system.
2. Installing Web Server. Setting up the Apache web server into the NASsystem.
3. Installing Database Server. Setting up the MySQL server into the NAS system.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 67
NO. NEEDS RECOMMENDATION
4. External IP Address. Provides the DynDNS as an external IP address toaccess the DMS application via the internet.
2. Process AnalysisInformation system and processing documents are described through the followingscheme.
Explanation: The data sources are divided into 3 groups: Letters, Documents, and Soft
Files. From the three of data sources are then made 3 main modules in the DMS
application, namely:o Letter Moduleo Document Moduleo Upload File Module
Soft Files are saved in a following folder in the File Storage automatically.
3. Data Analysis
Table: surat
No. Column Type Extra
1 id_surat int(5) AUTO_INCREMENT
2 tipe_surat varchar(50)
3 tanggal_surat varchar(12)
4 tanggal_terima_surat varchar(12)
5 pengirim_surat vachar(100)
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 68
Table: surat
No. Column Type Extra
6 nomer_surat varchar(50)
7 perihal_surat varchar(255)
8 nama_file_surat varchar(100)
9 path_surat varchar(100)
Table: tipe_surat
No. Column Type Extra
1 incoming int(5)
2 outgoing int(5)
Table: dokumen
No. Column Type Extra
1 id_dokumen int(5) AUTO_INCREMENT
2 tipe_dokumen varchar(50)
3 kategori_dokumen varchar(50)
4 tanggal_dokumen varchar(12)
5 judul_dokumen varchar(12)
6 deskripsi_dokumen vachar(100)
7 pembuat_dokumen varchar(50)
8 nama_file_dokumen varchar(100)
9 path_dokumen varchar(100)
Table: tipe_dokumen
No. Column Type Extra
1 amendment int(5)
2 addendum int(5)
3 aide_memoire int(5)
4 analysis int(5)
5 ded int(5)
6 document int(5)
7 contract int(5)
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 69
Table: tipe_dokumen
No. Column Type Extra
8 mom int(5)
9 pad int(5)
10 photo int(5)
11 pip int(5)
12 pmm int(5)
13 report
14 video
Table: kategori_dokumen
No. Column Type Extra
1 environment int(5)
2 social int(5)
3 highway int(5)
4 rsa int(5)
5 procurement int(5)
6 qa int(5)
7 acap int(5)
8 mis int(5)
9 training int(5)
Table: pengguna
No. Column Type Extra
1 Id_pengguna int(5) AUTO_INCREMENT
2 nama_lengkap varchar(255)
3 username varchar(100)
4 password varchar(100)
5 level int(5)
6 email varchar(255)
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 70
4. Module AnalysisThere is 3 main module in the DMS application, namely:
Letter Module Document Module Upload File Module
6.8 Quality AssuranceAfter socialization PMM in Padang PMM bab.7 had been corrected by incorporating inputsnoted during the socialization. The Quality Assurance Engineer presented and discussed with theBINTEK, the finalized Chapter. As a result of discussion, BINTEK approved the Chapter.
In the MPR SE must be submit monthly reports of testing or quality control activities for any jobthat requires testing.
Quality Assurance Progress are shown in Appendix D
6.9 Project Risks and Mitigation Measures
6.9.1 Risks Related to Delays
Since the detailed engineering design (DED) is under responsibility of the Design andSupervision Consultant (DSC), delay on DSC establishment affected to the procurement ofAWP-2 and AWP-3 sub-projects. As discussed previously above, the DED of severalsubprojects of WP-2 and WP-3 were prepared and completed by respective P2JN. The CTChas then been instructed by DGH to review the DEDs of seven packages completed by theP2JNs (package 5, 6, 11, 13, 15, 17 and 19).
6.9.2 Financial Risks
The following factors will be monitored during implementation of the loan project. Loan Amount Actual Tender Prices Price Adjustment Currency Fluctuation Current Estimated Situation
No risk was detected until preparation of this report, however CTC prepared revised costestimates in anticipation of future cost claims to cover contract price escalations andvariation orders. A factor of 10% for both additional cost components is applied on theoriginal cost.
6.9.3 Risks Related to Quality
The quality of work is inherently tied to the competence of the Contractors and thediligence of the Supervision Teams. The competence or otherwise of contractors shall beconsidered at the time of bid evaluation and prior to the award of any contract.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 71
The quality of supervision however is influenced by the following factors:
Ensuring that supervision staff levels are fully manned with competent, honest,qualified and experienced personnel.
The provision of properly equipped laboratories with properly trained operatorsfor each package.
Package supervision comes under the responsibilities of the immediate supervision teamsand the relevant DSC but the Quality Assurance Engineer from CTC.
Until now, the performance have not been reported by the Quality Assurance Engineer fromCTC, because the quality assurance no information from DSC.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 72
7 ISSUES and RECOMMENDATIONS
7.1 Current Situation
The main issues during this month of October 2014 are as follows:a) The slow progress of procurement proceedings.b) Provisions for additional funds to cover claims for contract escalations and expected
variation orders.c) The official approval of the Revised Project Management Manual (PMM).d) The big negative slippage (behind schedule) of three (3) on-going construction sub-
projects.e) The design revision of four (4) detailed design drawings for the Packages Nos. 7, 8, 10
and 12 which are to be revised in accordance with Nota Dinas No.130/ND/BL/2014 datedSeptember 19, 2014.
f) Delayed land acquisition and compensation payments of Project Affected People (PAP) intwo (2) sub-projects. There are 2,564 affected people in Package 13(Sp. Rukis – Tj.Kemuning) and in Package 17 (Sp. Gunung Kemala – Pugung Tampak)1,885 persons are affected. These two (2) sub-projects have already been tendered.
g) Delayed action in processing the justification of the Field Engineering Survey result forthe four (4) on-going construction packages (Packages 1, 2, 3 and 4)
7.2 Actions Requireda) The main cause of the delay in procurement is attributed to the flow of communication
between POKJA, PMU, CTC and the World Bank in finalizing the procurementdocuments. To minimize or totally eliminate the delays in securing Bank’s concurrenceand issuance of No Objection Letter (NOL), special meeting shall be held regularly amongall concerned to discuss each comments and suggestions which are to be incorporated inany documents prior to formally submitting to the Bank.
b) As the budgets for the price escalation and expected variation orders were not includedin the original cost estimates, PMU shall discuss this matter with the higher authorities torequest fund allocation to cover the additional cost.
c) As there are now four (4) on-going civil works contract packages under construction andsooner another four (4) civil works contracts will be awarded, the Revised ProjectManagement Manual (PMM) shall be formally approved. Although the Revised PMM hasbeen already disseminated to all concerned parties, official approval is needed prior tofurnishing copy to the World Bank.
d) Three (3) of the four (4) on-going construction packages were on critical stage due to bignegative slippages. To be on schedule or reduce the negative slippage to a manageablelevel, Design Supervision Consultant (DSC) shall initiate and schedule a high level meetingto be attended by no other than the Contractor’s principal and other concernedauthorities.
The situation is too alarming due to the huge value of remaining works that are still to bedone with just only 50% of the contract time left.
Contractors shall be required to submit realistic action and workable plans and catch-upschedule to be implemented, if possible, on a two (2) shifts per day work schedule.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project 73
e) BALAI II (Padang) have to expedite the design revisions in order that the four (4) ContractPackages can proceed as soon as possible with the disrupted procurement of works.
f) Concerned authorities in the acquisition of the road right of way shall expedite theprocess with the intervention of DGH to accelerate the LARAP implementation.
g) DSC and Contractors shall constantly follow-up with the authorities concerned the earlyapproval of the Field Engineering.
8 CORRESPONDENCESDuring the period the CTC received and issued letters. Lists of letters received and issued areshown in Appendix J.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
ANNEXES
Annex P-1 : Package No. 1
Annex P-2 : Package No. 2
Annex P-3 : Package No. 3
Annex P-4 : Package No. 4
ANNEX P-1
MONTH :
Package No. Time Elapsed (Days) 229
Name Time Elapsed (%) 35.78%
Project Manager Scheduled Progress (%) 31.58 Contractor PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress (%) 5.98 Supervision Consultant Balance (%) -25.60 Commencement Date Progress This Month (%) 1.19 Take Over Date Time for Complation (Days) 640 Addendum-1 Status date Contract Amount Rp. Accumulative Rp. 10.46% Contract Amount Add-1 (+ PPN) *) Include advance payment
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month MonthI G e n e r a l 8.25 2.35 0.01 2.36 2.04II D r a i n a g e 34.19 0.22 0.13 0.35 14.65III Earthworks 3.95 0.84 0.41 1.25 2.72
IV Pavement Widening &Shoulders
1.47 - - - -
V Granular Pavement 9.22 0.53 0.41 0.94 7.09VI Asphalt Pavement 40.14 - - - 3.82VII S t r u c t u r e s 1.09 0.57 0.20 0.77 0.86
VIII Reinstatement &Minor Works
1.20 0.09 0.03 0.12 0.15
IX Day Work 0.14 - - - 0.05
X Routine MaintenanceWorks
0.36 0.18 0.01 0.19 0.20
TOTAL 100.00 4.79 1.20 5.99 31.58
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 220.22 0.87 1.69 5.62 11.11 18.06 24.50 31.58 38.99 46.36 53.25 60.68 67.46 74.81 80.69 83.98 87.62 91.27 93.71 96.16 98.75 100.000.10 0.58 0.79 1.59 2.93 3.71 4.79 5.98
(0.12) (0.29) (0.90) (4.03) (8.18) (14.35) (19.71) (25.60)
Scheduled Progress Original (%) Actual Progress (%) Balance (%)
Div Description
PHYSICAL PROGRESS MONITORING TABLE2014 2015 Year
Month The month of time for complation
- Late of Field Engineering Decision - DSC and Contractor to discuss with PPK regarding the finalization of the Field Engineering.
PHYSICAL WORK PROGRESS BY CATEGORY
134,909,211,000.00
DISBURSEMENT *)
14,106,688,650.003-Jul-14
- The Contractor has not started works as per the - The contractor have to started the main work approved schedule such as drainage works
RENARDET S.A JV - Insufficient manpower, equipment and financial - The contractor have to add manpower aspecialy
SUPARJONO, ST,MT
AMO
UN
T
8-Jan-14 resources to undertake the needed acceleration for drainage work9-Oct-15 of works.
EXECUTIVE SUMMARY REPORTAug-14
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
01
TIM
E August 25, 2014
BIHA - KRUI MAJOR PROBLEMS ACTION TO BE TAKEN
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PHYS
ICAL
PRO
GRES
(%)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE #01
Schedule
Actual
ANEXES EXECUTIVE SUMMARY REPORT edit 9 Sep 2014_50256C ExSum P-1
ANNEX P-2
MONTH :
Package No. Time Elapsed (Days) 231 Name Time Elapsed (%) 31.64% Project Manager Scheduled Progress (%) 20.63 Contractor PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress (%) 13.85 Supervision Consultant Balance (%) -6.78 Commencement Date Progress This Month (%) 4.17 Take Over Date Time for Complation (Days) 730 Addendum-1 Status date Contract Amount Rp. Accumulative Rp. 10.21% Contract Amount Add-1 (+ PPN) *) Include advance payment
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 10.46 1.59 2.15 3.74 4.89II D r a i n a g e 3.53 1.58 0.80 2.37 3.39III Earthworks 4.44 1.10 0.21 1.32 2.32
IV Pavement Widening &Shoulders
2.26 0.47 0.48 0.95 -
V Granular Pavement 10.49 0.29 0.34 0.63 3.53VI Asphalt Pavement 52.09 - - - 1.33VII S t r u c t u r e s 14.35 3.47 0.14 3.61 4.71
VIII Reinstatement & MinorWorks
1.65 0.88 0.04 0.92 0.10
IX Day Work 0.12 - - - 0.04
X Routine MaintenanceWorks
0.62 0.31 0.01 0.32 0.32
TOTAL 100.00 9.69 4.17 13.85 20.63
Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Schedl Progress Original (%) 0.45 0.90 2.20 3.45 7.17 13.58 17.48 20.63 27.88 33.56 38.81 44.72 50.52 56.13 62.58 69.25 73.65 79.35 82.91 85.94 90.59 93.85 97.89 100.00 Actual Progress (%) - 0.13 1.02 2.19 4.11 5.96 9.69 13.85 Balance (%) (0.45) (0.77) (1.17) (1.26) (3.07) (7.62) (7.80) (6.78)
2014 2015
- Late of Field Engineering Decision - DSC and Contractor to discuss with PPK
- Contractor has insufficient manpower and finan- - The contractor have to add manpower aspecialy cial resource to excecute the available works for drainage work - Delayed land acquisition of Air Gadang Bridge - DSC ask partial land acquisition plan to PPK approach - Delayed of additional land acquisition - PPK should coordinate with respective agency - Delayed relocation of existing electrical pole - PPK should give notification to the utility company
197,936,699,000.00 regarding the finalization of the Field Engineering.
August 25, 2014PADANG SAWAH-SIMPANG EMPAT MAJOR PROBLEMS ACTION TO BE TAKEN
EXECUTIVE SUMMARY REPORTAug-14
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
The month of time for complation
DISBURSEMENT *)14-Jul-14
20,211,284,785
02
TIM
EAM
OU
NT
RENARDET S.A JV6-Jan-145-Jan-16
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
PHYSICAL PROGRESS MONITORING TABLE
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
PHYS
ICAL
PRO
GRES
(%)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE #02
Schedule
Actual
ANEXES EXECUTIVE SUMMARY REPORT edit 9 Sep 2014_50256C ExSum P-2
ANNEX P-3
MONTH :
Package No. Time Elapsed (Days) 231
Name Time Elapsed (%) 31.64% Project Manager Scheduled Progress (%) 14.27 Contractor PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress (%) 7.01 Supervision Consultant Balance (%) -7.26 Commencement Date Progress This Month (%) 1.31 Take Over Date Time for Complation (Days) 730 Addendum-1 Status date - Delayed relocation of existing electrical pole - PPK should give notification to the utility company Contract Amount Rp. Accumulative Rp. 11.20% - Late of Field Engineering Decision - DSC and Contractor to discuss with PPK Contract Amount Add-1 (+ PPN) *) Include advance payment regarding the finalization of the Field Engineering.
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 10.21 1.35 0.01 1.36 3.40II D r a i n a g e 13.17 1.10 0.07 1.17 6.17III Earthworks 3.04 2.51 0.08 2.59 1.29
IV Pavement Widening &Shoulders
2.45 - - - -
V Granular Pavement 11.27 0.80 0.07 0.87 1.77VI Asphalt Pavement 55.81 - - - 0.50VII S t r u c t u r e s 0.80 0.36 0.14 0.50 0.57
VIII Reinstatement & MinorWorks
2.27 0.56 0.44 1.00 0.12
IX Day Work 0.22 0.03 0.00 0.03 0.07
X Routine MaintenanceWorks
0.76 0.38 0.01 0.39 0.38
TOTAL 100.00 7.08 0.83 7.91 14.27
Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Schedl Progress Original (%) 0.26 1.00 1.67 2.45 4.78 7.45 10.70 14.27 21.53 30.10 36.95 44.01 51.62 58.67 65.63 73.03 79.97 87.04 91.61 93.19 94.30 95.76 97.82 100.00 Actual Progress (%) 0.24 0.48 2.07 2.43 2.87 5.45 5.70 7.01 Balance (%) (0.02) (0.52) 0.40 (0.02) (1.91) (2.00) (5.00) (7.26)
PHYSICAL PROGRESS MONITORING TABLE
143,688,963,000.00
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
RENARDET S.A JV - Delayed decision of the design of concrete pile - DSC and Contractor has discussed with PPK regar-
DISBURSEMENT *)
6-Jan-14 retaining wall ding the finalization of the design and the5-Jan-16 method of construction of precast retaining wall.
cial resource to excecute the available works for drainage work
EXECUTIVE SUMMARY REPORTAug-14
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
2014 2015
30-Jun-1416,091,601,613.00
03
TIM
E August 25, 2014
MANGGOPOH - PADANG SAWAH MAJOR PROBLEMS ACTION TO BE TAKEN
- Delayed of additional land acquisition - PPK should coordinate with respective agency
AMO
UN
T - Contractor has insufficient manpower and finan- - The contractor have to add manpower aspecialy
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
PHYS
ICAL
PRO
GRES
(%)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE #03
Schedule
Actual
ANEXES EXECUTIVE SUMMARY REPORT edit 9 Sep 2014_50256C ExSum P-3
ANNEX P-4
MONTH :
Package No. Time Elapsed (Days) 227
Name Time Elapsed (%) 31.10%
Project Manager Scheduled Progress (%) 15.81 Contractor PT WASKITA KARYA - PT DAYA JO Actual Overall Progress (%) 1.45 Supervision Consultant Balance (%) -14.36 Commencement Date Progress This Month (%) 0.58 Take Over Date Time for Complation (Days) 730 Addendum-1 Status date Contract Amount Rp. Accumulative Rp. 9.30% Contract Amount Add-1 (+ PPN) *) Include advance payment
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 7.59 0.56 0.01 0.56 0.59II D r a i n a g e 12.26 - 0.03 0.03 4.68III Earthworks 3.58 0.03 - 0.03 0.77
IV Pavement Widening &Shoulders
3.39 - - - -
V Granular Pavement 18.07 0.21 0.56 0.77 4.92VI Asphalt Pavement 49.27 - - - 3.27VII S t r u c t u r e s 2.55 - - - 1.16
VIII Reinstatement & MinorWorks
2.95 0.06 - 0.06 0.30
IX Day Work 0.14 - - - 0.06
X Routine MaintenanceWorks
0.20 0.01 0.00 0.01 0.08
TOTAL 100.00 0.87 0.59 1.46 15.81
Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Schedl Progress Original (%) 0.11 0.32 0.75 1.14 6.57 10.29 12.85 15.81 21.72 25.43 32.76 40.88 47.93 55.61 63.45 70.19 77.04 81.55 84.79 90.84 94.62 97.05 98.80 100.00 Actual Progress (%) - 0.18 0.40 0.53 0.56 0.78 0.87 1.45 Balance (%) (0.11) (0.14) (0.35) (0.61) (6.01) (9.51) (11.98) (14.36)
PHYSICAL PROGRESS MONITORING TABLE
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
- Late of Field Engineering Decision - DSC and Contractor to discuss with PPK
186,936,750,000.00 regarding the finalization of the Field Engineering.
DISBURSEMENT *)23-May-14
17,385,117,750.00
- The contractor have to add manpower aspecialy10-Jan-14 resources to undertake the needed acceleration for drainage work9-Jan-16 of works.
EXECUTIVE SUMMARY REPORTAug-14
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
2014 2015
04
TIM
E August 25, 2014
IPUH - BANTAL MAJOR PROBLEMS ACTION TO BE TAKEN
AMO
UN
T - The Contractor has not started works as per the - The contractor have to started the main work approved schedule such as drainage works
RENARDET S.A JV - Insufficient manpower, equipment and financial
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
PHYS
ICAL
PRO
GRE
S (%
)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE #04
Schedule
Actual
ANEXES EXECUTIVE SUMMARY REPORT edit 9 Sep 2014_50256C ExSum P-4
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix A
Overall Loan Progress
31 October 2014 In USD
Estimated Contractor(s) or Total Est. BudgetStarting Completion Consultant(s) Man-Month WB + GOI Remarks
Date Date Name (Excl. the (PIP) Original Revised Physical Man-Month Physical Man-Month Physical Man-MonthSupp. Staff) (USD, Excl.VAT) (Excl. VAT) (Excl. VAT) ( % ) ( MM ) ( % ) ( MM ) ( % ) ( MM )
1 Betterment and Capacity 314,900,000.00 $57,821,551.95Expansion of NationalRoads
1.A AWP-1 ICB DGH 81,630,000.00 $57,821,551.95 On - Going Construction1.A1 Krui-Biha (PT. Jaya Konstruksi) $11,757,337.74 46.36% 11.28% -35.08%
1.A2 Pd. Sawah-Sp. Empat (PT.JayaKonstruksi) $17,250,183.32 33.56% 25.61% -7.95%
1.A3 Manggopoh-Pd. Sawah (PT. JayaKonstruksi) $12,522,493.13 30.10% 14.45% -15.65%
1.A4 Ipuh-Bantal (PT. Waskita Karya) $16,291,537.76 24.22% 5.35% -18.88%
1.B AWP-2 and AWP-3 ICB & NCB DGH 227,100,000.00 Under Tendering Period : 1 PackagesBid Preparation : 3 PackagesPre-qualification : 3 PackagesDED Road Safety Revision : 4 Packages
1.C Contingency - DGH 6,170,000.00 Detailed Engineering Design preparation : 6 Packages
2 Implementation Support 16,000,000.00
2.A Core Team Consultants (CTC) QCBS DGH 6-Nov-12 15-Feb-16 PT. Perentjana Djaja 556 5,000,000.00 $1,276,700.00 $1,315,925.00 38.301% 212.95 33.804% 187.95 -4.496% 25.00 Supporting PMU. Joint Venture with Rp21,415,400,000.00 Rp22,426,175.00 Yongma Engineering Co.Ltd. Or US$ equivalent total : (Amandement) PT. Epadascon Permata $3,512,681.91 $3,641,077.48
2.B Design & Superv. Consultants QCBS DGH 19-Jun-13 18-Nov-16 Renardet S.A. 1,068 10,000,000.00 $820,600.00 3.964% 42.33 3.402% 36.33 -0.562% -6.00 Design preparation (package #7, #8, #10 and #12). Joint Venture with Rp51,818,705,000.00 PT Cipta Strada Or US$ equivalent total : PT. Daya Creasi Mitrayasa $6,465,729.72 PT. Seecons PT. Yodya Karya
2.C Incremental Operating Cost Varies PMU 1,000,000.00Including Technical Audits
3 Road Sector Institutional 1,000,000.00Development
3.A Capacity Building for NCB DGH 350,000.00 Preparation of TOR.Disaster Risks Reduction
3.B Capacity Building for NCB DGH 350,000.00 Preparation of TOR.Environmental Management
3.C Capacity Building for NCB DGH 300,000.00 Preparation of TOR.Road Safety
4 Contingency for Disaster DGH -Risk Response
5 Unallocated DGH 18,100,000.00
Total 350,000,000.00 67,799,963.58 0.450 212.95 0.395% 187.95 -0.054% -25.00
Appendix - AOVERALL PROGRESS STATUS
Description
WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT (WINRIP)IBRD LOAN No. 8043-ID
Proc.MethodCategory
Planned Actual BalancePROGRESS
Respon-sibility
Contract Value/BudgetTotal ( WB + GOI )
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix B
Highway Design Progress
Appendix B. Technical Design Reviewing and Road Safety Audit Progresss (October 2014.),
Amendment 9.7 6 126,219 Date 01-Feb-13 08-May-1304-Apr-1301-May-1315-Jul-13
17-Sep-13
Amendment 20.9 7 83,752 Date 02-May-13 18-Jul-13 18-Sep-13 17-Sep-13
Amendment 19.5 7 184,714 Date 12-Aug-13 24-Oct-13 27-Sep-13
Amendment 46.8 7 161,963 Date 24-Jun-13 24-Oct-13 27-Sep-13
Amendment Date
Amendment 61.7 7 252,629 Date 24-Jun-13 24-Oct-13 27-Sep-13
Amendment 50.1 6 224,090 Date 18-Mar-13 18-Jul-13 18-Sep-13 18-Jul-13
Amendment 55.2 7 316,306 Date 12-Aug-13 24-Oct-13 27-Sep-13
Amendment 56.3 7 287,549 Date 18-Mar-13 18-Jul-13 18-Sep-13 18-Jul-13
Amendment Date
Amendment 36 7 353,956 Date 28-Mar-1308-May-1321-Aug-13
04-Apr-1301-May-13
23-Sep-13
Amendment Date
Amendment Date 26-May-13
Amendment Date
Amendment 10.8 7 32,623 Date 02-May-13 18-Jul-13 18-Sep-13 17-Sep-13
Amendment Date
Amendment Date
ApprovalBy DTA
Total Process(%)
RemarkStatus
ReceivedDatum
Post-Review Site Visting Full-ReviewGroup
PkgNo.
Name of Sub-project ECLLength
(km)Width
(m) RSAAudit
Presentation&Discussion
TechinicalReport
Submission
QualityAssurance
AWP-2
5Sp.Rampa – Poriaha
(Link No.015.xx)
Original 11.1 6
EstimatedCost /
Excl.VAT(mil. RP)
Technical Design Review Process for Design Stage
55,126 Process
7Indrapura – Tapan
(Link No.019.0)Original 19.5 7 96,921 Process
9Rantau Tijang – Kota Agung
(Link No.026.1)Original 42 7 149,831 Process
97%TechnicalReviewby CTC
6PS.Pedati - Kerkap
(Link No.010.0)Original 25 7 72,019 Process 95%
TechnicalReviewby CTC
95%TechnicalReviewby DSCProcessed by DSC
8Bts.Pariaman – Manggopoh
(Link No.024.0)Original 46.8 7 183,268 Process 95%
TechnicalReviewby DSCProcessed by DSC
157,820 Process 97%
Processed by DSC
10Sp.Empat – Sp. Air Balam
(Link No.034.1)Original 61.7 7 241,617 Process 95%
TechnicalReviewby DSCProcessed by DSC
13SP.Rukis - TJ.Kemuning
(Link No.006.0)Original 56.3 7 225,481.5 Process
TechnicalReviewby CTC
12Kambang – Indrapura
(Link No.017.2)Original 55.2 7 171,948 Process 95%
TechnicalReviewby DSC
97%TechnicalReviewby CTC
11Bantal - Mukomuko
(Link No.015.2)Original 50.1 6
AWP-3
14Painan – Kambang
(Link No.017.1)Original 31.5 7 118,993 Process
Processed by DSC
17Sp.Gng Kemala–Pg.Tampak
(Link No.061.1)Original 36.8 6 104,238 Process
16Seblat – Ipuh
(Link No.010.0)Original 34.5 6 110,237 Process
15Sibolga – Bts TapSel
(Link No.016.1)
Original 36 7 129,228 Process
97%TechnicalReviewby CTC
70%TechnicalReviewby DSC
100%TechnicalReviewby PPCProcessed by Project Preparation Consultant
18Mukomuko – Bts.Sumbar
(Link No.015.3)Original 25.8 6 69,223 Process
19Lais - Bintuan
(Link No.009.1)Original 11.6 7 37,558 Process 95%
TechnicalReviewby CTC
20Lubuk Alung – Sicincin
(Link No.009.1)Original 14.6 7 54,557 Process
Process21Lubuk Alung - Kuraitaji
(Link No. 027.0)Original 16.8 7 65,778
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix C
Financial Progress
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix C Financial Progress
The table below shows total expenditure to date measured in the terms of World BankCommitment.
DatePercentage
Completion oftime
WBExpenditureCommitment
Percentage ofAvailable
ExpenditureSource
31/03/2012 1.45% - - -30/04/2012 2.90% - - -31/05/2012 4.35% - - -30/06/2012 5.80% - - -31/07/2012 7.25% - - -30/08/2012 8.70% - - -30/09/2012 10.15% - - -31/10/2012 11.60% - - -30/11/2012 13.05% - - -31/12/2012 14.50% 800,000 0.32% Actual31/01/2013 15.95% 800,000 0.32% Actual28/02/2013 17.40% 800,000 0.32% Actual31/03/2013 18.85% 2,207,915 0.88% Actual30/04/2013 20.30% 2,207,915 0.88% Actual31/05/2013 21.75% 2,207,915 0.88% Actual30/06/2013 23.20% 2,207,915 0.88% Actual31/07/2013 24.65% 2,207,915 0.88% Actual31/08/2013 26.10% 2,207,915 0.88% Actual30/09/2013 27.55% 2,207,915 0.88% Actual31/10/2013 29.00% 2,207,915 0.88% Actual30/11/2013 30.45% 2,207,915 0.88% Actual31/12/2013 31.90% 2,207,915 0.88% Actual31/01/2014 33.35% 4,940,115 1.98% Actual28/02/2014 34.80% 4,940,115 1.98% Actual31/03/2014 36.25% 4,966,535 1.99% Actual30/04/2014 37.70% 4,966,535 1.99% Actual31/05/2013 39.15% 6,109,480 2.44% Actual30/06/2014 40.60% 6,263,610 2.51% Actual31/07/2014 42.05% 6,470,288 2.59% Actual31/08/2014 43.50% 6,470,288 2.59% Actual30/09/2014 44.95% 6,681,304 2.67% Actual31/10/2012 46.40% 6,991,757 2.80%30/11/2014 47.85%31/12/2014 49.30%31/01/2015 50.75%28/02/2015 52.20%31/03/2015 53.65%30/04/2015 55.10%
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
DatePercentage
Completion oftime
WBExpenditureCommitment
Percentage ofAvailable
ExpenditureSource
31/05/2015 56.55%30/06/2015 58.00%31/07/2015 59.45%31/08/2015 60.90%30/09/2015 62.35%31/10/2015 63.80%30/11/2015 65.25%31/12/2015 66.70%31/01/2016 68.15%28/02/2016 69.60%31/03/2016 71.05%30/04/2016 72.50%31/05/2016 73.95%30/06/2016 75.40%31/07/2016 76.85%31/08/2016 78.30%30/09/2016 79.75%31/10/2016 81.20%30/11/2016 82.65%31/12/2016 84.10%31/01/2017 85.55%28/02/2017 87.00%31/03/2017 88.45%30/04/2017 89.90%31/05/2017 91.35%30/06/2017 92.80%31/07/2017 94.25%31/08/2017 95.70%30/09/2017 97.15%31/10/2017 98.60%30/11/2017 99.05%31/12/2017 100.00%
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix D
Quality Assurance Progress
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix D: Quality Assurance Progress
October 2014
No Activities has been done Status/condition
Date of Finish/completed
1. Preperation MPR CTC Semptember 2014 01 – 02 October, 2014
2. Leave 03 October, 2014
3. Meeting for improvement PMM WINRIP. 06 October, 2014
4. Sick 08 – 09 October, 2014
5. Finalization improvement PMM (Div.7) 10 October, 2014
6. Preparation site visit to Padang 13 October, 2014
7. Improvement bibliography of PMM WINRIP 14 October, 2014
8. Preparation site visit and make request to Padang 15 October, 2014
9. Learn the status of 02 package and 03 package 16 – 17 October, 2014
10. Site visit to package 02 and package 03, Padang. 20 – 23 October, 2014
11. Make accountability reports of site visit to Padang. 24 October, 2014
12. Make draft site visit reports to package 02 and 03. 27 October, 2014
13 Internal meeting CTC 28 October, 2014
14 Make preparation MPRs CTC. 29 October, 2014
15 Make draft site visit reports to package 02 and 03. 30 – 31 October, 2014
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix E
Environmental Progress and Social Progress
Length Width
(Km) (m) Result CommentsBudget
Alocated,YearStatus BLH Approval Result Comments
BudgetAlocated,Year
Status
THE WB Approval(A=Studi LARAP ;
B=ImplementationLARAP
A. NOL LARAP 04 Jan2013 ;
ICB/Prior B. NOL ImplemetationLARAP 18 April 2013, Rev26 June 2013.
2 Padang Sawah - Sp Empat Sumatera Barat 40.9 7 Total PAP 430 . No Land affected . Aset affected:building 149 unit = 2.110 M2 ; Fence 2 unit = 341.8 M; Kiosks BBM: 25 unit; Plant: 873 rod ; Mosque: 2 unit
A. NOL LARAP 13 Jan 2013;
2a Including Air Gadang Bridge Sumatera Barat 100 m 7 Total PAP 15. Land affected 2,110 M2 ; Aset affected:building 6 unit = 410 M2 ; Plant 72 rod.
B. NOL ImplementationLARAP 19 July 2013
ICB/Prior A. NOL LARAP 04 Jan 2013
B. NOL ImplementationLARAP 18 April 2013, Rev26 June 2013.
A. NOL LARAP 10 Dec 2012
ICB/Prior B.NOL ImplementationLARAP 6 January 2014
NCB/Post A. NOL LARAP 16 Sept2013, and approvalrevision the report 12 Nov2013;
B= implemented paralelwith construction
A. NOL LARAP 20November 2013;
NCB/Post B: Monitoring Report onDec 2014 (target)
ICB/Prior NOL Larap: Oct 14, 2014
ICB/Prior A. NOL LARAP 12 Sep2014;B: Monitoring Report onDec 2014 (target)
ICB/Prior A. Target of NOL LARAP isMarch 2015;
ICB/Prior A. NOL LARAP 12 Sep2014;
B: Monitoring Report onDec 2014 (target)
ICB/Prior A. NOL LARAP 20November 2013;
B: Monitoring Report onDec 2014 (target)
ICB/Prior Larap: NOL Target: Oct2014
ICB/Prior A. NOL LARAP 20November 2013; B.-B: Monitoring Report onDesember 2014
ENVIRONMENTAL : The CTC has been advise the UKL&UPL consultantto decided poin sampling and format report. The consultant wasconducted sampling poin on 7 to 11 July 2014. CTC was prepareoutline,form RKPPL (by PMU letter to Kasatker/PMU letter on 7 April2014), the contractor not yet prepare the RKPPL then CTC wasconducted training of RKPPL to Staff of Balai, PPK,DSC, and contractoron 7 July 2014 , As per 31 Aug 2014, the contractor still not prepare theRKPPL. SOC: compensation payment is under process done
Ipuh- Bantal4 Bengkulu 42.4 7
ENVIROMENTAL: Draft integration of AMDAL/RKL recommendationhas been prepared by CTC and under discussion with contractor, DSCfor input those recommendation in to the design. The CTC was carriedout training of RKPPL to participants (PJN, PPK,DSC,Contractor,Pokja&Balai) on 5 to 6 June 2014: CTC letter to DSC concerning Review theRKPPL produced by the contractor on 20 Aug 2014. Now the RKPPLunder revision by the contractor. SOCIAL: (1) is still on progress. (2) isstill on progress.
Manggopoh - Padang Sawah3 Sumatera Barat 32 7 SPPL Air pollution, traffic congestion,market on street, soft soil andrivers
APBN (P2JN 2010) 100% YES Recommended2010. UKL&UPL noneed NOL from theWB.
LARAP Total PAP 1.338 . No Land affected . Aset affected:building 115 unit = 668,33 M2 ; Culvert 661,05 m ;concrete & foundations 1.421,60 M3 ; Soilembankment 5.564,21 M3; Plant 5.324 rod ; paddyfield and lemongrass & turmeric = 17.695 clumps ;Mesjid & Market
Rp. 1.147.700.000APBD Prov Sumbar,Dinas PU, 2012/2013
The remaining 2 from 3 PAP not yet paid by LocalGovernment. A monitoring report (3 PAP) will besubmitted to the WB when ready
ENV IRONMENTAL: Propose to site visit for integration of UKL&UPLrecommendation in to the design. The CTC was carried out training ofRKPPL to participants (PJN, PPK,DSC,Contractor,Pokja &Balai) on 17 to18 June 2014, Review CTC by email on 22 Aug 2014. Now the RKPPLunder revision by the contractor. SOC : (1) Compensation payment tothe remaining 3 PAP is under resolved by Local Government, and PMU/ CTC waiting the monitoring report from Satker II Padang.
LARAP Total PAP 2.805 in 21 Pekon. Land affected 28.763,12M2 ; Aset affected : building 882,13 M2 ; Fence2.445,41 M ; Plant 653 rod ; paddy field 25 plots ;Social & Pablic Facilities
Air pollution, traffic congestion,steep slopes, soft soil and riversand beach abrasion
APBN (P2JN 2010 &2011)
100% YES RecommendedSPPL 2010 and AMDAL2012 & NOL WB issuedon 20 Nov 2013. Note:environmentalmitigation will be moredetail on RKPPL
1 Krui - Bha Lampung 25 7
YES Recommended2012.UKL&UPL no needNOL from the WB.
LARAP
Remaining issues : (1) compensation for Total 21 PAP(5 on the Air Gadang Bridge and 16 on the link), and24 new PAP as Additional LARAP not yet paid by LG.(2) Certification process of the 5 PAP will be as soonas resolved.
LARAP Total PAP are change from 217 PAP becomes 227 PAP.227 PAP has received compensation from The LocalGovernment as : Aset affected : building house =238,5 M2; terace = 667,64 M2; Fence = 470,05 M ;pavement = 2,314,21 M2; Plant 58 rod.
Rp.286.743.000.APBN, Satker PJN I,Bengkulu, 2013
Additional 15 PAP due to design changing not yet paidby project
Relocation for one kiosk not yet be done
LARAP implementation will be resolved by APBDWest Sumatera 2015
LARAP is under preparation by Balai III Palembang.This package was changed to Bengkunat - Biha
RP. 8.237.443.000APBN Satker PJN I,Bengkulu, 2014
NOL LARAP.Compensation payment is under process
RP. 11.295.833.000APBN, Satker PJN IBengkulu, 2014
Inventory asset affected was ready, and now hireappraisal process
SPPL 100%andUKL&UPL20%
Geometric, traffic congestion,steep slopes, soft soil and riversand beach abrasion
APBN (P2JN 2010) SPPL 100%,UKL&UPLcontract(50%)
YES Recommended2010 for SPPL andUKL&UPL. Presentationof UKL&UPL on 27 Aug2014. in PJN/Balai III.Now under finalize bythe consultant..
100% YES Recommended2011. UKL&UPL no needNOL from the WB.
SimpleLARAP
1 PAP with aset affected : 1 kios BBM. Agree torelocate the kios. relocate to the beside her house.relocating costs be the responsibility of the project
ENVIRONMENTAL STATUS & PROGRESS FOR WINRIP, IBRD LOAN NO.8043-ID
Remedial Action
AWP - 1
No Loan Package Name Provinces
Procur
Approval Status by Environmental Agency (BLH)Environmental Screening Social Screening Approval Status by The World Bank
YES Recommended2010. UKL&UPL no needNOL from the WB.
ICB/PriorSPPL&UKL/UPL
Bridge
LARAP Rp.2.340.600.000APBD Prov Sumbar,Dinas PU, 2012
APBN (P2JN 2010) 100%
Rp. 5.172.349.955APBN, Satker PJN IILampung, 2011 - 2012
Remaining issues: (1) one plot due to the alignmentchanging not yet paid by project. (2) Certificationprocess of the PAP will be as soon as resolved by LG
SPPL &AMDAL
Appendix E : Progress of Environmental Safeguard Studies on WINRIPas per 31 Oct, 2014
one link,sensitive areas/resident,public,facilities, squater (no landacquisition), market,sopt soil andrivers
ENV IRONMENTAL: Propose to site visit for integration of UKL&UPLrecommendation in to the design. The CTC was carried out training ofRKPPL to participants (PJN, PPK,DSC,Contractor,Pokja &Balai) on 17 to18 June 2014, the RKPPL under preparation by contractor (PT. Jakon) toacomodate commentd from CTC, Review CTC by email on 22 Aug 2014.Now the RKPPL under revision by the contractor. SOCIAL: (1)PMU/CTC has been coordinate with PPK, and ask LG to pay ASAP (2)Will be conducted together with the physical work of the road project.
AWP - 25 Sp. Rampa - Poriaha Sumatera Utara 11.1 6 UKL&UPL slope stability, water quality, Run
off, bridges acces, continuedtraffic access & quarry problem
APBN (BBPJN I 2011)
APBN (TLKJ 2012) 100%
ENVIRONMENTAL : Propose to site visit on September 2014 for checkthe UKL&UPL recommendation will integrated in to the design. finding(CTC letter was submit to the PMU), Prepare outline,form RKPPL (byPMU letter to Kasatker/PMU letter on 7 April 2014). SOCIAL: Now,PMU/CTC still waiting a report from Head of Satker PJN II - NorthSumatera Province
6 Ps Pedati - Kerkap Bengkulu 25 7 UKL&UPL Comersial areas, trafficcongestion, market on the street,air pollution & noise,
APBN (TLKJ 2011) 100% YES Recommended2010. UKL&UPL no needNOL from the WB.
LARAP Total PAP 166 . Land affected = 3.925 M2. Asetaffected : building 47 unit = 1.169 M2 ; Fence 38 unit =
491 M ; Plant 271 rod ; electricity pole 10 unit
RP. 8.049.290.000APBN, Satker PJN I,
Bengkulu, 2014
NOL LARAP.Compensation payment is under process
ENVIRONMENTAL : Propose to site visit on September 2014 for checkthe UKL&UPL recommendation will integrated in to the design. finding(CTC letter was submit to the PMU), Prepare outline,form RKPPL (byPMU letter to Kasatker/PMU letter on 7 April 2014). SOCIAL: Now,PMU/CTC still waiting a report from Head of Satker PJN I - BengkuluProvince
Rp.53.000.000.APBN, Satker PJN II,
Sumut, 2014
Completed/YESEnvironmental permitson Feb 2014. & NOL WBissued on 8 Aug 2014
LARAP The CTC has received LARAP documents from PMUdated 22 January 2014. CTC has completed reviewingand need some clarification before the LARAP can befinalized.
APBD Prov Sumbar,Dinas PU,
100%
ENVIRONMENTAL; Propose to site visit on Sep 2014 for check theAMDAL recommendation will integrated in to the design. (CTC letterwas submit to the PMU), Prepare outline,form RKPPL (by PMU letterto Kasatker/PMU letter on 7 April 2014) . SOCIAL: Now, PMU/CTC stillwaiting a report from Head of Satker PJN II - West Sumatera Province
8 Bts. Kota Pariaman - Manggopoh Sumatera Barat 46.8 7 AMDAL Comersil areas, market, publicfacilities, Air pollution, trafficcongestion, market on street, softsoil and rivers
APBN (TLKJ 2011) 100% Completed/YESEnvironmental permitson July 2013. & NOL WBissued on 14 April 2014
LARAP APBD Prov Sumbar,Dinas PU,
LARAP implementation will be resolved by APBDWest Sumatera 2015
ENVIRONMENTAL: propose to site visit on Oct 2014,for check theAMDAL/RKL recommendation will integrated in to the design. (CTCletter was submit to the PMU) and Prepare outline,form RKPPL (byPMU letter to Kasatker/PMU letter on 7 April 2014). SOCIAL: PMU /CTC waiting a Monitoring report from Satker
7 Indrapura - Tapan (1 Doc Amdal) Sumatera Barat 19.5 7 AMDAL Sensitive forest areas, socialissues, slope stability, waterquality, waste management, airpollution, squater on ROW etc
ENVIRONMENTAL: Propose to site visit on Oct 2014 for check theUKL&UPL recommendation will integrated in to the design, Prepareoutline,form RKPPL (by PMU letter to Kasatker/PMU letter on 7 April2014):
10 Sp Empat - Sp Air Balam Sumatera Barat 61.7 7 AMDAL Sensitive forest areas, socialissues, slope stability, waterquality, waste managemnt, bridgeaccess road & quarry problem
APBN (TLKJ 2011) 100% Completed/YESEnvironmental permitsonJuly 2013. & NOL WBissued on 14 April 2014
LARAP APBD Prov Sumbar,Dinas PU,
LARAP implementation will be resolved by APBDWest Sumatera 2015
ENVIRONMENTAL;;Propose to site visit on Oct 2014 for check theAMDAL/RKL recommendation will integrated in to the design andPrepare outline,form RKPPL (by PMU letter to Kasatker/PMU letter on7 April 2014). SOCIAL: PMU / CTC waiting a Monitoring report fromSatker
9 Rantau Tijang - Kota Agung Lampung 42 7 UKL&UPL Sensitive areas, resident, airpollution, traffic congestion,steep slopes,soft soil and riversand beach abrasion
APBN (TLKJ 2011)
ENVIRONMENTAL :Propose to site visit on Oct 2014 for check theAMDAL/RKL recommendation will integrated in to the design andPrepare outline,form RKPPL (by PMU letter to Kasatker/PMU letter on7 April 2014). SOCIAL: PMU / CTC waiting a Monitoring report fromSatker.
12 Kambang - Indrapura (1 Doc Amdal) Sumatera Barat 55.2 6 AMDAL Resident, productive land,Catcment areas,rivers, slopestability, squater on the street,land acquisition.
APBN (TLKJ 2011) 100% Completed/YESEnvironmental permitson Feb 2014. & NOL WBissued on 8 Aug 2014
LARAP APBD Prov Sumbar,Dinas PU,
LARAP implementation will be resolved by APBDWest Sumatera 2015
ENVIRONMENTAL; Propose to site visit on Sep 2014 for check theAMDAL/RKLand Prepare outline,form RKPPL (by PMU letter toKasatker/PMU letter on 7 April 2014). SOCIAL: Waiting LARAP approvalfrom WB
11 Bantal - Mukomuko (1 Paket doc AMDAL) Bengkulu 50.1 6 AMDAL
100%
Completed/YESEnvironmental permitson April 2014. & NOLWB issued on 8 Aug2014
LARAP Total PAP 292 . Land affected = 8.875 M2. Asetaffected : building 99 unit = 1.605 M2 ; Fence 12 unit =219 M ; Plant 143 rod ; electricity pole 22 unit ;Telkom Pole 5 unit
Sensitive areas, social issues,market on the street, geometric,waste managemnt, continuedtraffic access, etc
APBN (TLKJ 2011) 100%
YES Recommended2011. UKL&UPL no needNOL from the WB.
LARAP Total PAP: 2,564 . Land affected = 88,852 M2. Asetaffected : building 111 unit = 2.196 M2 ; Fence 127unit = 1.575 M ; Plant 363 rod ; electricity pole 25 unit
ENVIRONMENTAL : Propose to site visit on Sep 2014 for check theUKL&UPL recommendation will integrated in to the design, Prepareenvironmental mitigation on construction stage for contractor (RKPPL).SOCIAL: PMU/CTC has been coordinate with PPK to speed up thecompletion of land acquisition prior to comencement of work.
13 Sp Rukis - Tj Kemuning Bengkulu 56.3 7 UKL/UPL one link,sensitive/ steepslopes,soft soil and rivers,squater on the street, resident,productive land.
APBN (P2JN 2011)
Length Width
(Km) (m) Result CommentsBudget
Alocated,YearStatus BLH Approval Result Comments
BudgetAlocated,Year
Status
THE WB Approval(A=Studi LARAP ;
B=ImplementationLARAP
Remedial ActionNo Loan Package Name Provinces
Procur
Approval Status by Environmental Agency (BLH)Environmental Screening Social Screening Approval Status by The World Bank
ICB/Prior Larap: Not Yet / target:Oct 2014
ICB/Prior A. NOL LARAP 28 October2013 and NOL revise 05Feb 2014;
B: Monitoring Report onDesember 2014
Seblat - Ipuh including (1 Amdal) 34.5 6 A. NOL LARAP 20November 2013;
Air Lalang & Air Guntung Bridge 64 m 6 B: Monitoring Report onDec 2014 (target)
A. NOL LARAP 16 Sept2013
B: Monitoring Report onDesember 2014 (target)
NCB/Post A. Target of NOL LARAP isMarch 2015;
NCB/Post A. NOL LARAP 20November 2013;B: Monitoring Report onDec 2014 (target)
NCB/Post Larap: Not Yet / Target:Nov 2014
Larap: Not Yet / Target:Nov 2014
NCB/Post
Total PAP 129 . Land affected = 4.124 M2. Asetaffected : building 40 unit = 533 M2 ; Fence 34 unit =384 M ; Plant 51 rod ; electricity pole 5 unit
RP. 4.477.591.000APBN Satker PJN I,Bengkulu, 2014
NOL LARAP.Compensation payment is under process
YES Recommended2011. UKL&UPL no needNOL from the WB.
LARAP
17 Lampung ICB/Prior YES Recommended2012. & NOL WB issuedon 20 Nov 2013
APBN (TLKJ 2011)
100%
16 Bengkulu ICB/Prior
AMDAL
100%AMDAL sensitive areas/steep slopes, softsoil and rivers and beach abrasion
AWP - 3
ENVIRONMENTAL: Propose to site visit on Sep 2014, for check theAMDAL/RKL recommendation will integrated in to the design andPrepare outline,form RKPPL (by PMU letter to Kasatker/PMU letter on7 April 2014): SOC: PMU/CTC is waiting report of implementation ofthe Larap from Head of Satker II Lampung Province.
14 Painan -Kambang (1 doc Amdal) Sumatera Barat 31.5 7 AMDAL Sensitive forest areas, socialissues, slope stability, waterquality, waste managemnt,continued traffic access & quarryproblem
APBN (TLKJ 2011) 100% Completed/YESEnvironmental permitson Feb 2014. & NOL WBissued on 8 Aug 2014
SimpleLARAP
The CTC has received LARAP documents from PMUdated 22 January 2014. CTC has completed reviewingand need some clarification before the LARAP can be
finalized.
APBD Prov Sumbar,Dinas PU,
Finalization of LARAP from CTC ENVIRONMENTAL; Propose to site visit on Sep 2014 for check theAMDAL/RKL recommendation will integrated in to the design andPrepare outline,form RKPPL (by PMU letter to Kasatker/PMU letter on7 April 2014):.Propose to site visit for finding environmental issues onfield. SOCIAL: LARAP will be submitted to WB on Nov 2014
15 Sibolga - Bts Tap Sel Sumatera Utara 36 7 UKL/UPL resident, commersil areas,geometric etc.
APBN (BBPJN I 2011) 100% Total PAP 1.448 . Land affected 1.531 plot = 45,831M2.Aset affected : building 340 unit = 3.399 M2 ; Fence 12unit = 1.563 M ; Plant 385 rod, Terrace=991,607 M2
APBN, Satker PJN II,Sumut, 2014
Satker is waiting an appraisal result priorcompensation payment
Environmental: Propose to site visit on Sep 2014 for check theUKL&UPL recommendation will integrated in to the design issues willintegrated to design, and Prepare outline,form RKPPL (by PMU letterto Kasatker/PMU letter on 7 April 2014):.SOCIAL: SOCIAL: Now, PMUwaiting Larap implementation report from Head of Satker NorthSumatera Province
Sp.Gunung Kemala - Pg. Tampak 36.8 6
ENVIRONMENTAL : Propose to site visit on Sep 2014 for check theAMDAL/RKL recommendation will integrated in to the design andPrepare outline,form RKPPL (by PMU letter to Kasatker/PMU letter on7 April 2014):.Propose to site visit for finding environmental issues onfield. SOCIAL: PMU/CTC has been coordinate with PPK to speed upthe completion of land acquisition prior to contract.
Completed/YESEnvironmental permitson April 2014. & NOLWB issued on 8 Aug2014
sensitive areas/resident, landacquisition, steep slopes,soft soiland rivers and beach abrasion
APBN (TLKJ 2011) LARAP Total PAP 1.885 . Land affected 1.926 plot = 194.278M2. Aset affected : building 440 unit = 4.557 M2 ; ;Plant 4.267 rod ;paddy field 48.602 clumps.
RP.57.414.485 .000APBN, Satker PJN IILampung, 2014
Hire appraisal process by project
SimpleLARAP
APBN, 2015 LARAP is under preparation by Balai III Palembang.This package was changed to Sibolga - Sorkam
ENVIRONMENTAL : Propose to site visit on Oct 2014 for check theUKL&UPL recommendation will integrated in to the design, Prepareoutline,form RKPPL (by PMU letter to Kasatker/PMU letter on 7 April2014):
19 Lais- Bintunan Bengkulu 11.6 7 UKL&UPL one link,sensitive/air pollution,traffic congestion, squater on thestreet, etc
APBN (TLKJ 2011) 100% YES Recommended2010. UKL&UPL no needNOL from the WB.
LARAP Total PAP 82 . Land affected 82 plot = 2.852 M2. Asetaffected : building 14 unit = 201 M2 ; Fence 60 unit =714 M ; Plant 20 rod ; electricity pole 8 unit
Rp.3.349.829.000APBN, Satker PJN IILampung, 2014
NOL LARAP.Compensation payment is under process
ENVIRONMENTAL : Propose to site visit on Oct 2014 for check theUKL&UPL recommendation will integrated in to the design and Prepareoutline,form RKPPL (by PMU letter to Kasatker/PMU letter on 7 April2014):. SOCIAL: PMU/CTC has been coordinate with PPK to speed upthe completion of land acquisition prior to contract.
18 Mukomuko - Bts. Sumbar Bengkulu 25.8 6 UKL&UPL
sensitive areas/resident, landacquisition, steep slopes,soft soiland rivers
APBN (TLKJ 2011) 100%
YES Recommended2010. UKL&UPL no needNOL from the WB.
LARAPone link,sensitive/steepslopes,soft soil and rivers
APBN (TLKJ 2011) 100%
YES Recommended2011. UKL&UPL no needNOL from the WB.
SimpleLARAP
The CTC has received LARAP documents from PMUdated 22 January 2014. CTC has completed reviewingand need some clarification before the LARAP can befinalized.
APBD Prov Sumbar,Dinas PU,
Finalization of LARAP from CTC ENVIRONMENTAL; Propose to site visit on Oct 2014 for check theUKL&UPL recommendation will integrated in to the design and Prepareoutline,form RKPPL (by PMU letter to Kasatker/PMU letter on 7 April2014). SOCIAL: LARAP will be submitted to WB on Nov 2014
21 Lubuk Alung -Kurataji Sumatera Barat 16.8 7 UKL&UPL one link,sensitive/steepslopes,soft soil and rivers
APBN (Balai II 2011) 100% YES Recommended2011. UKL&UPL no needNOL from the WB.
SimpleLARAP
The CTC has received LARAP documents from PMUdated 22 January 2014. CTC has completed reviewingand need some clarification before the LARAP can befinalized.
APBD Prov Sumbar,Dinas PU,
Finalization of LARAP from CTC ENVIRONMENTAL; Propose to site visit on Oct 2014 for check theUKL&UPL recommendation will integrated in to the design. Prepareoutline,form RKPPL (by PMU letter to Kasatker/PMU letter on 7 April2014). SOCIAL: LARAP will be submitted to WB on Nov 2014
20 Lubuk Alung - Sicincin Sumatera Barat 14.6 7 UKL&UPL
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix F
Procurement Plan & Progress
APPENDIX F1
Submission Notification
Sub - Project of ofIDR (x10⁶) Application Qualification Original Addendum
AWP - 1
1 10-17/01-WINRIP-WP1/CE/A/8043-ID/11-13 Krui - BihaLampung Province.
CapacityExpansion 163,534.85 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 PT. Jaya Konstruksi
Manggala Pratama, Tbk. 25-Nov-13 Civil Work ICB 134,909.21 70.00
2 39-06/02-WINRIP-WP1/CE/A/8043-ID/12-13Padang Sawah - Sp.Empat (incl.Air Gadang Bridge), WestSumatera Province.
CapacityExpansion 228,772.24 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 PT. Jaya Konstruksi
Manggala Pratama, Tbk. 06-Dec-13 Civil Work ICB 197,936.70 70.00
3 40-06/03-WINRIP-WP1/CE/A/8043-ID/12-13 Manggopoh - Padang Sawah,West Sumatera Province
CapacityExpansion 167,678.40 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 PT. Jaya Konstruksi
Manggala Pratama, Tbk. 06-Dec-13 Civil Work ICB 143,688.96 70.00
4 01-26/04-WINRIP-WP1/CE/A/8043-ID/11-13 Ipuh - Bantal, Bengkulu Province CapacityExpansion 247,105.24 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 PT. Waskita Karya - PT.
Daya Mulia Turangga, J.O. 14-Nov-13 Civil Work ICB 186,936.75 70.00
AWP - 2
5 Simpang Rampa - Poriaha, NorthSumatera Province.
CapacityExpansion 152,870.49 07-Nov-13 22-Jul-14 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 9-Jun-14 15-Jul-14 22-Jul-14 18-Jul-14 22-Jul-14 11-Aug-14 22-Sep-14 Civil Work ICB 70.00
6 Ps. Pedati - Kerkap, BengkuluProvince
CapacityExpansion 92,127.40 21-Nov-13 Civil Work NCB 70.00
7 Indrapura - Tapan, West SumateraProvince
CapacityExpansion 280,123.02 Civil Work NCB 70.00
8 Bts.Kota Pariaman - Manggopoh,West Sumatera Province
CapacityExpansion 603,016.70 Civil Work ICB 70.00
9
Rantau Tijang - Kota Agung,Lampung Province(proposed change to Biha -Bengkunat, Lampung Province)
CapacityExpansion 149,831.00 Civil Work NCB 70.00
10 Simpang Empat - Sp.Air Balam,West Sumatera Province
CapacityExpansion 819,755.25 Civil Work ICB 70.00
11
Bantal - Mukomuko, BengkuluProvince(proposed change to Sibolga -Sorkam, North Sumatera Province)
CapacityExpansion 246,499.55 07-Nov-13 06-Aug-14 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 16-Jun-14 25-Jun-14 11-Jul-14 21-Jul-14 6-Aug-14 22-Aug-14 3-Oct-14 4-Nov-14 Civil Work ICB 70.00
12 Kambang - Indrapura, WestSumatera Province
CapacityExpansion 773,942.44 Civil Work ICB 70.00
13 Sp Rukis - Tj Kemuning, BengkuluProvince.
CapacityExpansion 316,304.67 07-Nov-13 06-Aug-14 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 16-Jun-14 25-Jun-14 11-Jul-14 21-Jul-14 6-Aug-14 22-Aug-14 3-Oct-14 4-Nov-14 Civil Work ICB 70.00
AWP - 3
14 Painan - Kambang, WestSumatera Province
CapacityExpansion 118,993.00 Civil Work NCB 70.00
15 Sibolga - Batas Tapsel, NorthSumatera Province
CapacityExpansion 376,479.38 30-Dec-13 28-Feb-14 Civil Work ICB 70.00
16Seblat - Ipuh, (incl. Air Lalang & AirGuntung Bridge), BengkuluProvince
CapacityExpansion 110,237.00 Civil Work NCB 70.00
17 Sp.Gng Kemala - Pugung Tampak,Lampung Province
CapacityExpansion 255,269.25 30-Sep-13 10-Oct-13 30-Sep-13 10-Oct-13 11-Nov-13 30-Dec-13 28-Feb-14 13-Jun-14 25-Jun-14 19-Dec-14 7-Jan-14 4-Jul-14 15-Aug-14 10-Oct-14 14-Oct-14 Civil Work ICB 70.00
18 Mukomuko - Batas Sumbar,Bengkulu Province
CapacityExpansion 69,233.00 Civil Work NCB 70.00
19 Lais - Bintunan, BengkuluProvince
CapacityExpansion 35,886.28 21-Nov-13 Civil Work NCB 70.00
20 Lubuk Alung - Sicincin, WestSumatera Province Betterment 54,557.00 Civil Work NCB 70.00
21 Lubuk Alung - Kuraitaji, WestSumatera Province
CapacityExpansion 65,788.00 Civil Work NCB 70.00
World BankFinancingRatio (%)
ContractorContractSignature
DateContract No.
WB NOLDate
Bidding Document
WESTERN INDONESIA NATIONAL ROAD IMPROVEMENT PROJECTPROCUREMENT MANAGEMENT FOR CIVIL WORK
PackageNo. Type of Work
Estimated CostEE (Incl. VAT)
Design PQ Document Invitation forPre-
qualification
Evalt.QualificationReport Category
ContractProcurement Method
Contract Price (IDR 106)including Tax
Invitationfor Bids
Date
BidOpening
Date
Bid Evaluation Report
SubmissionDate NOL Date Submission
DateWB NOL
DateSubmissio
n DateSubmissio
n DateWB NOL
DateSubmission
Date WB NOL
APPENDIX F2
Procurement Plan of Implementation Support and Road Sector Institutional DevelopmentWestern Indonesia National Roads Improvement Project (WINRIP)Name of Executing Agency: Directorate General of Highways , Ministry of Public Works. STATUS October 31, 2014
Ref.No. Contract Description Project Cost (US$) Procurement
Method
Review byBank
(Prior/Post)Schedule
Preparationof DraftREOI
EOIadvertised
in MPWWebsite
SubmissionRFP to WB WB NOL to RFP
Opening ofFinancialProposal
FinalEvaluationReport
ContractSign
Service Startdate
Period(Month) Consultant Remarks
Allocated Contract Actual Submission WB NOL Submission WB NOL Submission Submission WB NOL
2 Implementation Support
Schedule 14-Nov-10 05-Dec-10 23-Jan-11 12-Feb-11 12-Mar-11 02-Apr-11 23-Apr-12 04-Jun-12 22-Jul-12 05-Aug-12 12-Aug-12 15-Sep-12 29-Sep-12 22-Oct-12 12-Nov-12
Actual 26-Nov-10 7-Jun-11 30-Jan-12 7-Mar-12 9-Dec-11 6-Mar-12 20-Mar-14 30-Apr-12 14-Jun-12 29-Jun-12 27-Aug-12 3-Sep-12 21-Sep-12 12-Oct-12 5-Nov-12 16-Nov-12 40
Schedule 11-Dec-11 08-Jan-12 27-Feb-12 26-Mar-12 07-May-12 28-May-12 08-Oct-12 22-Oct-12 05-Nov-12 12-Nov-12 19-Nov-12 26-Nov-12 01-Apr-13 18-Apr-13 02-May-13
Actual 26-Nov-10 7-Jun-11 4/2/2012 10-Aug-12 20-Jan-12 23-May-12 31-Aug-14 23-Oct-12 20-Dec-12 21-Feb-13 5-Mar-13 13-Mar-13 25-Mar-13 19-Apr-13 11-Jun-13 25-Jun-13 42
3 Road Sector Institutional Development (DGH)
Capacity Building for DGH Environment/Risk Mitigation and Road Safety Unit(developing roadmap, norm, standard, procedure,criteria for disaster risk management in road sector,risk analysis and standad implementation)Peningkatan Kapabilitas Penanggulangan Bencana,Ditjen Bina Marga. Schedule 10-Nov-14 17-Nov-14 01-Dec-14 15-Dec-14 02-Jan-15 16-Jan-15 23-Jan-15 06-Mar-15 05-Apr-15 19-Apr-15 03-May-15 10-May-15 24-May-15 07-Jun-15 21-Jun-15 05-Jul-15 18 26-Dec-16
Capacity Building for Disaster Risk Reduction in DGH Actual
Note: Part 3: The packages based on proposed by DTA (Sub-Dit. Of Environmental and Road Safety). TOR of packages had been submitted by DTA (Sub-Dit. Of Environmental and Road Safety) directly to Bank. Draft TOR had submitted to PMU by DTA.
Date ofReceipt ofProposals
Prior
Evaluation and Short List Technical EvaluationReport Negotiation & Draft Contract
Prior
Theissuance
RFP to theshortlisted
firms
aCore Team Consultant (Project Management,Technical Assistant, Enviromental & Social Aspectand Road safety Audit)
5,000,000 3,497,984 QCBS
bDesign and Supervision Consultant (DesignAWP-2 & 3 and Construction Supervision of CivilWorks Project)
10,000,000 6,070,722 QCBS
a. 1,000,000 QCBS Prior
1,000,000
PT. PerentjanaDjaja, YongmaEng. Co. Ltd
and PT.Epadascon
PermataRenardet S.A.,PT. Cipta
Strada, PT.Daya Creasi
Mitrayasa, PT.
T O T A L
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix G
WINRIP Website & Application Progress
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
APPENDIX GManagement Information System (MIS) Status on October, 2014
NO. TASK DESCRIPTION STATUS WORK PLAN1 File Storage The storage server to stored all of
soft files of reports and documents.The server has been completed inMay 2013.
Rebuild the new File Storage Serverwith the root folder that moreefficient and integrated with the DMSapplication.
2 DMS (DocumentManagement System)
The application to record allinformation of letter and documentfiles.
The application has been developedin June 2013.
Rebuild the new DMS applicationthat integrated with the File Storage.
3 Website The WINRIP official website. The website has been developed inAugust 2013.
4 WebGIS The spatial data and roadsinformation that overlay intoGoogle Maps.
The application has been developedin October 2013.
5 FMIS (FinancialManagement InformationSystem)
The application to monitoring afinancial and physical progressreport.
The programming modules that havebeen finished are as follows: Project Data Financial and Physical Progress Progress Summary History of Financial and Physical
Progress User
The programming modules that notyet finished are as follows: Consultant Services Reports
6 CHS (Complaint HandlingSystem)
The application to accommodatecomplaints from the public.
The application has been developedin January 2014.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix H
ACAP Training /Dissemination Progress
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix H ACAP Activity ProgressAppendix H1
Activities Progress of Community Representative Observers (CROs)from January 2013 – October 2014 and the Works Plan
No Subject of Activities Date of Finish/completed
1. Orientation and studied of WINRIP documents and Development of Works Plan January 2013
2 Prepared of Workshop of Procurement Document Evaluation. February 2013
3. Conducted Workshop of Procurement Document Evaluation for POKJA, Satker/PPK,Balai BBPJN and PMU.
Febr. 28, 2013 –March 01, 2013
4. Provided of Term of Reference (TOR) of the CRO's Selection and Guidelines for CRO’sSelection
March 1, 2013
5. Provided the Materials (Slide Presentation/Power-point) of General Explanationsabout WINRIP and the CRO’s selection and
March 8, 2013
6. Provided Training Materials for CROs. March 8, 2013
7. Sending an official letter No. Hm.0603/Bp-11/0175/2013, from the Director ofPlanning as Chairman of PMU to Head of BBPJN II & III, about the Selection ofCROs/WPM, + TOR and Guidelines Document
March 11, 2013
8 Preparation of Socialization on CROs selection in BBPJN II Padang for package 02Padang Sawah – Simpang Empat and package 03 Manggopoh - Padang Sawah, andSocialization on CROs selection in BBPJN III Palembang for package 01 Krui – Biha andpackage 04 Ipuh – Bantal.
March 31, 2013
9. Socialization on CROs selection in BBPJN II Padang for package 02 Padang Sawah –Simpang Empat and package 03 Manggopoh - Padang Sawah
April 9, 2013
10 Socialization on CROs selection in BBPJN III Palembang for package 01 Krui – Biha andpackage 04 Ipuh – Bantal.
April 11, 2013
11. Sent the Invitation letter from Head of BBPJN III to Rector of Universities /Head ofColleges in Palembang, about selection of the CROs for package 01. Krui – Biha (Prov.Lampung) and package 04. Ipuh – Bantal (Prov. Bengkulu).
May 17, 2013
12. Sent the Invitation letter from Head of BBPJN II to Rector of Universities /Head ofColleges in Padang, about selection of the CROs for package 02. Padang Sawah –Simpang Empat and package 03. Manggopoh - Padang Sawah (Prov. Sumatera Barat).
May 20, 2013
13. Selection of CROs for Packages Krui – Biha Province Lampung and Ipuh – BantalProvince Bengkulu, and training for selected CROs in BBPJN III Palembang
May 23, 2013
14. Selection of WPM/CROs for Packages Manggopoh – Padang Sawah and Padang Sawah– Simpang Empat, and training for selected CROs in BBPJN II Padang
May 27, 2013
15. Sending an official letter No. Hm.0603/Bp-11/0175/2013, from the Director ofPlanning as Chairman of PMU to Head of BBPJN II & III, about the Selection ofCROs/WPM, + TOR and Guidelines Document
May 28, 2013
16. Guiding the Balai Besar Pelaksanaan Jalan Nasional (Balai) II Padang to compose theApplication Letter for Approval of selected CROs for Package 03. Manggopoh – PadangSawah, package 02. Padang Sawah – Simpang Empat, and Balai III Palembang forPackage 01. Krui – Biha Province Lampung and Package 04. Ipuh – Bantal ProvinceBengkulu.
May 29, 2013
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
No Subject of Activities Date of Finish/completed
17. Compiling summary of the results of Selection the Community RepresentativeObservers (CROs)/ Wakil Pengamat dari Masyarakat (WPM) and the Training activitiesfor selected CROs for four Packages AWP-1
June 1 - 9, 2013
18. Assist PMU to prepare the Approval letter of selected CROs for four AWP-1 Packages,and prepare of the Decree on Establishment the CROs of AWP-1 WINRIP from Directorof Planning DGH, as the Chairman of PMU.
June 1 - 9, 2013
19. Monitor and observation the Pre-Bid Meeting and Site Visit activities of ProcurementProcess that held by the Procurement Committee, in BBPJN II and III, on 10 June 2013by CROs in implementing their tasks on the
June 10 - 16,2013
20. Evaluate of the CROs observation on Pre-Bid Meeting and Site Visit activities June 17 - 23,2013
21. Examine the report of CROs on the monitoring and observation of Pre-Bid Meetingand Site Visit at the packages of Annual Works Program - 1 (AWP-1) WINRIP.
Modify the template of monitoring the report of the CROs, to be more focused andmore systematically
June 24 - 30,2013
22. Monitor /Observe of Bids Submission and Bids Opening for four packages AWP-1 byCommunity Representative Observers (CROs) for Package 01, 02, 03, and 04
July 18, 2013
23. Monitoring and examined of the CRO’s Report on the monitoring and observation ofBid Submission and Bid Opening activities for four packages of Annual Works Program- 1 (AWP-1) WINRIP, which have been carried out on July 18, 2013
August, 2013
24 Preparation on the Socialization of CROs selection to the Procurement Committee(POKJA) of Sumatera Utara province, for package Simpang Rampa – Poriaha andpackage Sibolga – Batas Tapanuli Selatan
October 2013
25 Monitored /Observed of Procurement progress on Commencement of Bid Winnersfor four packages AWP-1 (Package 01, 02, 03, and 04) and informed to relatedCommunity Representative Observers (CROs).
November 2013
26 Carried out the dissemination of CROs selection to the Procurement Committee(POKJA) of Sumatera Utara province, for package Simpang Rampa – Poriaha. in Balai(BBPJN) I Medan and in Project Management (Satker) Office.
November 19 –20, 2013
27 Carried out the CROs selection for package 17: Simpang Gunung Kemala – PugungTampak in Lampung..
July 17, 2014
28 Carried out the CROs selection for package 05: Simpang Rampa – Poriaha in NorthSumatera province.
August 20, 2014
29 Carried out the CROs selection for package 11: Bantal – Mukomuko, and package 13:Simpang Rukis – Tanjung Kemuning in Bengkulu province.
Sept. 1, 2014
30 Ms. Hesti Aulia Sari, ST, CRO for Package 11: Bantal - Mukomuko, meet the invitationof the Procurement Committee (Pokja of Procurement Unit/Unit Layanan PengadaanBBPJN III, PIU/Satker PJN Region I Bengkulu Province).
Oct. 03, 2014
31 Ms. Hot Maria Angelina, ST, CRO for Package 13: Simpang Rukis - Tanjung Kemuningwas attended Bid-Opening meeting meet the invitation by the ProcurementCommittee (Pokja of Procurement Unit/Unit Layanan Pengadaan BBPJN III, PIU/SatkerPJN Region II Bengkulu Province).
Oct. 03, 2014
Works Plan for the next steps of CROs subject activities
No Subject of Activities Datelines Plan /Actual condition
1. Prepare selection of the Community Representative Observers (CRO) for packages 06(Pasar Pedati – Kerkap), 19 (Lais – Bintunan), and 15 (Sibolga – Batas Tapsel)
November 2014
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix H.2
The Progress of Third Party Monitoring (TPM) Activitiesfrom January 2013 – October 2014 and Works Plan for Next Steps
No Subject of Activities Target Completed
1. Preparation the initial draft of ToR of selection the TPM Dec, 2013 Dec, 2013
2. Providing the TPM selection guidelines. Dec, 2013 Dec, 2013
3. Providing the Training Materials for the TPM Dec, 2013 Dec, 2013
4.Preparing the official letter from the Director of Planning asChairman of PMU to Head of BBPJN II & III, about the Selection ofTPM.
Jan, 2014 Jan. 24, 2014
5. Preparing the official letter from the Director of Planning asChairman of PMU to Universities, about the Selection of TPM. Jan., 2014 Jan 29, 2014
Preparing the official letter from the Official in Charge/KetuaPelaksana Harian PMU to Satker/PPK, about the Selection of TPM Jan, 2014 Jan 13, 2014
5.Preparing the official letter from the Official in Charge/KetuaPelaksana Harian PMU to Universities and Satker/PPK, about theSocialization of TPM Selection for Package 01, 02, & 03
Feb. 2014 Feb. 07, 2014Feb. 13, 2014
6. Socialization of the TPM selection for package 01: Krui - Biha. Feb. 2014 Febr. 14, 2014
7. Socialization of the TPM selection for package 02: Padang Sawah –Simpang Empat and package 03: Manggopoh – Simpang Empat Feb. 2014 Febr. 18, 2014
8.Preparing the official letter from the Director of Planning asChairman of PMU to University of Bengkulu, about the Selection ofTPM for package 04: Ipuh - Bantal.
Jan, 2014 Febr. 19, 2014
9. Help the PMU on formulating the TPM Evaluation Team March 2014 Febr. 25, 2014
10. Implementation of selection of the TPM for four AWP-1 packages byTPM Evaluation Team March 2014 March 10, 2014
11. Delivery of the Preparatory Training for elected TPM for package 01:Krui – Biha in Lampung June 2014 June 5 - 6, 2014
12.Delivery of the Preparatory Training for elected TPM for package 02:Padang Sawah – Simpang Empat, and package 03: Mangopoh –Padang Sawah in West Sumatera
June 2014 June 17-18, 2014
13. Delivery of the Preparatory Training for elected TPM for package 04:Ipuh – Bantal in Bengkulu July 2014 July 7 – 8, 2014
14 Approval process of elected TPM July 2014 July 7 – 8, 2014
15Assist PMU to prepare the Decree on Establishment the TPM ofAWP-1 WINRIP from Director of Planning DGH, as the Chairman ofPMU.
August 2014 Sept. 1, 2014
16
Sending the Coordination Letter from Director of Planning,Directorate General of Highways to the Head of BBPJN Region IMedan, about Selection of the Third Party Monitoring (TPM) forpackage 05 (Simpang Rampa – Poriaha, and package 15 (Sibolga –Tapanuli Selatan border) in North Sumatera.
October 2014 Oct, 07, 2014
17
Sent the Information Letter about participation of Third PartyMonitoring (TPM) on WINRIP, from Director of Planning, DirectorateGeneral of Highways to the University of Lampung (UNILA) forpackage 17 (Simpang Gunung Kemala – Pugung Tampak) in LampungProvince.
October 2014 Oct, 03, 2014
18
Sent the Information Letter about participation of Third PartyMonitoring (TPM) on WINRIP, from Director of Planning, DirectorateGeneral of Highways to the University of Sumatera Utara (USU) forpackage 05 (Simpang Rampa – Poriaha) in North Sumatera Province
October 2014 Oct, 03, 2014
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
No Subject of Activities Target Completed
19
Sent the Information Letter about participation of Third PartyMonitoring (TPM) on WINRIP, from Director of Planning, DirectorateGeneral of Highways to the University of Bengkulu (UNIB) forpackage 11 (Bantal – Mukomuko) and package 13 (Simpang Rukis -Tanjung Kemuning) in Bengkulu Province.
October 2014 Oct, 20, 2014
20Ensure that the Employment Agreement or Memorandum ofUnderstanding between TPM (packages 01, 02, 03, and 04) with theCTC WINRIP (PT. Planners Djaja) can be signed in November 2014
October 2014 November 2014
21 Prepare selection of the Third Party Monitoring (TPM) Selection forpackages 17, 05, 11, and 13
November 2014 November 2014
Appendix H.3
Works Plan on Complaints Handling Mechanism System (CHS) Activities.
No Subject of Activities / Item of Tasks Completion Plan/Progress Condition
1Review of Minister Decree of Public Works No. 323/2005 concerning theprocedures of Handling input from communities on the environment of theMinistry of Public Works
April 18, 2013
2 Preparation of Complaints Register and the complaints address (developing of website of WINRIP) and provided ACAP to inputting data in the web site.
Completed on themiddle of Feb. 2014.
3 Preparation of Complaint Handling Procedure (already available on the websiteapplication http://www.winrip-ibrd.com) April 2014
4
The completion of the Initial investigation of a complaint Procedure, and theprocedure for the investigation of Complaints, as well as the conclusion ofinvestigation (already available on the website application http://www.winrip-ibrd.com)
April 2014
5 Monitored and noted the public complaints via SiPP website and WINRIP website,but until October 2014 have no complaint about the WINRIP programs October 2014
6 The establishment of the settlement Commission Handling the Complaint underthe Inspectorate General of the Ministry of Public Works (Executing Agency) Nov. - Dec. 2014
7Preparation of the device for Executing Agency such as: Proceduresannouncement of penalties, procedures for the annual Survey, Procedure AnnualIndependent Review, the process of Auctions
Nov. - Dec. 2014
8 The development of a code of conduct and actions for Implementing Institutions/Implementing Agency (Bidders, Suppliers, contractors and Consultants) Nov. - Dec. 2014
9 Support the PMU in the Management and Monitoring of the implementationpolicy in handling public complaints Nov. - Dec. 2014
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix H.4
Works Activities on Publication / Disclosure Activities
No Subject of Activities / Item of Tasks Completion Plan/Progress Condition
1 Conducted Workshop of Procurement Document Evaluation for POKJA,Satker/PPK, Balai BBPJN and PMU
February 28, 2013– March 01, 2013
2 Conducted Workshop of World Bank Guidelines of Procurement forWINRIP to the POKJA, Satker/PPK, Balai BBPJN and PMU
April 24 – 25, 2013
3 Review training materials on Project Management Manual (PMM),especially CHAPTER XI of the anti-Corruption Action Plan (ACAP)
First updating April 29, 2013
4 The second Review of training materials on Project Management Manual(PMM), Chapter I - XII
Second updating onDecember 18, 2013
5 The third Review of training materials on Project Management Manual(PMM), Chapter I - XII
third updating onApril, 2014
6. Preparing Method Transparency to the Public, and Improvement theprocedures to the Public Disclosure through information media (website).
Establishment of InformationSystem (MIS) was finish on
March 2014
7. The updating of Project Management Manual (PMM), Chapter 3, 9, 11, and13, has been held in Bogor June 2014
8 Delivery of the Preparatory Training for elected TPM for AWP-a packages:01, 02, and 03 June 2014
9 Delivery of the Preparatory Training for elected TPM for AWP-a packages:04
July 2014
10 The implementation of Dissemination/training of the PMM toStakeholders
September 10 - 11 2014
11Sent the CRO’s activities Repots and Third Party Monitoring (TPM)activities Reports to Information Management Team to be up load to thewebsite of WINRIP.
October 2014
12 Delivery of PMM Training for PPK, contractors and Supervision Consultants(DSC)
PMM for Project Executorsafter the Work Order to the
Contractors
13 Delivering the training programs will inline of project implementationprogress.
Depend on projectimplementation progress
14Monitoring of the implementation of the methods and proceduresdisclosure and transparency of information to the public in each packetsthat has begun construction
2014
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix I
Performance Indicator
Project Development Objective: The development objective is to increase the effective use of selected sections of national roads along the Western Sumatera Corridor by reducing
road user costs.
PDO Level Results Indicators*
Co
re Unit of Measure Baseline
(2010)
Cumulative Target Values** Frequency Data Source/
Methodology
Responsibility
for Data
Collection YR 1 YR 2 YR3 YR 4 YR5
Indicator One:
Average passenger travel times reduced by
at least 20% on project roads.
(i) For light vehicles with base year Speed
of 51 km/h
(ii) 46 km/h for large buses
(iii) 40 km/h heavy trucks
Km/h
0 % --- --- 5 % --- 20 % Mid-term
and ICR
Travel speed
survey
PMU/CTC
Indicator Two:
Average vehicle operating cost for a
typical car, bus and heavy truck reduced
by at least 5%, 8%, and 10% respectively,
on project roads
(i) For light vehicles with base year
Vehicle Operating Cost of $US0.19 per
veh-km
(ii) $US0.35 veh-km for large buses
(iii) $US0.65 veh-km for heavy trucks
$US/km
0 %
0%
0%
--- --- 3 %
5%
7%
--- 5 %
8%
10%
Mid-term
and ICR
Road condition
and travel speed
surveys. And
use of HDM-IV
VOC estimation
Model
PMU/CTC
Indicator Three:
Increase of AADT on project road sections
as per forecast
AADT PAD-Annex 7 AADT
Increases
as per
forecast
ICR
Traffic surveys
PMU/CTC
INTERMEDIATE RESULTS
Intermediate Result (Component One): Betterment and Capacity Expansion of National Roads
Intermediate Result indicator One:
Number of kilometers of improved
national roads in the project region as
planned.
km
0 km 50
km
100
km
300
km
500
km
715 km Semi-
Annually
Reports from
PMU
PMU/CTC
Intermediate Result indicator Two:
Number of meters of improved bridges
meter
0 m 0 m 100
m
130
m
160
m
194 m Semi-
Annually
Reports from
PMU
PMU/CTC
Appendix I : WINRIP Performance Indicators
PDO Level Results Indicators*
Co
re Unit of Measure Baseline
(2010)
Cumulative Target Values** Frequency Data Source/
Methodology
Responsibility
for Data
Collection YR 1 YR 2 YR3 YR 4 YR5
Intermediate Result (Component Two): Implementation Support
Intermediate Result indicator One:
Satisfactory completion of technical audits
for all road projects of component 1
0 %
20 %
40 %
60 %
80 %
100 %
Semi-
Annually
Reports from
PMU
PMU/CTC
Intermediate Result indicator Two:
Satisfactory completion of road safety
audits for all road projects of component 1
0 %
20 %
40 %
60 %
80 %
100 %
Semi-
Annually
Reports from
PMU
PMU/CTC
Intermediate Result (Component Three): Road Sector Institutional Development
Intermediate Result indicator One:
% of Environment unit staff trained and
capacitated to mitigate disaster risk related
to road network
0%
20 %
40 %
50%
75%
100%
Semi-
Annually
Reports from
PMU and Bank
Supervision
PMU/CTC
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix J
Correspondence
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix J Correspondence
INCOMING LETTER
Correspondence
Date From To ActivityOctober 01, 2014 Kepala BBPJN III
PalembangCTC Undangan Acara Rapat Pleno
Kegiatan Pengadaan Tanah danPemukiman Kembali/LandAcquisition and ResettlementAction Plan (LARAP) Ruas JalanRantau Tijang – Kota Agung
October 01, 2014 Sub-DirektoratPKLN
PMU dan BadanTerkait
Permintaan Hasil Pemantauandan Evaluasi KinerjaPelaksanaan Kegiatan yangdibiayai dari Pinjaman LuarNegeri dan/atau Hibah TriwulanIII (July – Septembet) TA 2014
October 02, 2014 Director ofPlanning:Ir. Harris H.Batubara, M.Eng.Sc
Task Team LeadeWINRIP/SeniorTransport Specialist:Mrs. Elizabeth Goller
Submission of Final BiddingDocument for Package No.11:Bantal-Mukomuko and PackageNo.13: Sp.Rukis-Tj.Kemuning inBengkulu Province; WINRIP
October 02, 2014 Kepala BBPJN IIIPalembang
CTC Undangan Sosialisasi/RembugWarga diKecamatan Kota AgungTentang Pengadaan TanahDalam Rangka Pelebaran JalanNasional Ruas Jalan RantauTijang-Kota Agung
October 02, 2014 Direktur BinaPelaksanaanWilayah I:Ir. Wijaya Seta, M.T
Kepala BBPJN IIMedanKepala BBPJN IIIPalembang
Penyampaian Rencana AuditTFAC Pada Paket Krui-Biha(Lampung), Paket PadangSawah-Simpang Empat(Sumbar), dan PaketManggopoh-Padang Sawah(Sumbar)
October 02, 2014 Kepala BBPJN IIIPalembang
Direktur BinaProgram:Ir. Harris H. Batubara,M.Eng.Sc
Permohonan Surat Keputusan(SK) Pembentukan WPM untukPaket No.17: Sp. Gn. Kemala-Pg.Tampak; WINRIP
October 02, 2014 Kepala BBPJN IIIPalembang
Direktur BinaProgram:Ir. Harris H. Batubara,M.Eng.Sc
Permohonan Surat Keputusan(SK) Pembentukan WPM untukPaket No.11: Bantal-Mukomuko, dan Paket No.13:Sp.Rukis-Tj.Kemuning; WINRIP
October 03, 2014 Kasubdit SistemPengendalianWilayah I/PMU OIC:Ir. Agusta E.
Kasatker PJN WilayahII Provinsi SumateraUtara
Persiapan Pemilihan PemantauPihak Ketiga/Third PartyMonitoring Rencana Tindak AntiKorupsi/Anti Corruption Action
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Date From To ActivitySinulingga, M.T Plan (ACAP) WINRIP
October 03, 2014 Site EngineerPackage No.01:Syafri Hedianto
CTC Monthly Progress Report No.09covering for September 2014
October 03, 2014 Site EngineerPackage No.01:Syafri Hedianto
CTC Quarterly Progress ReportNo.03 covering for July, August,September 2014
October 03, 2014 ProcurementSpecialist 2:M. Edhi Fachri
CTC Progress WINRIP as perSeptember 30, 2014
October 03, 2014 DSC CTC Update Status and Target DatesDuring the Meeting by WorldBank in Jakarta on Sept 30, 2014
October 06, 2014 POKJA Paket No.11:Bantal-Mukomuko
CTC Minutes of Bid Opening forPackage No.11: Bantal-Mukomuko
October 06, 2014 POKJA Paket No.13:Sp.Rukis-Tj.Kemuning
CTC Minutes of Bid Opening forPackage No. 13: Sp.Rukis-Tj.Kemuning
October 06, 2014 Site EngineerPackage No.04:Tjantje Hallatu
CTC Monthly Project Report (MPR)No.09 covering for September2014
October 06, 2014 Site EngineerPackage No.04:Tjantje Hallatu
CTC Quarterly Project Report (QPR)No.03 July, August, September2014
October 06, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
CTC Surat Keputusan (SK) untukPaket No.05: Sp.Rampa-Poriaha; WINRIP
October 06, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
Bapak RektorUniversitas Lampung
Pemantau Pihak Ketiga atauThird Party Monitoring (TPM)Paket No.17: Sp.Gn.Kemala –Pg. Tampak WINRIP
October 07, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
Direktur BinaPelaksanaan WilayahI:Ir. Wijaya Seta, M.T
Usulan Penggantian Ruas Jalan;WINRIP
October 08, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
CTC Surat Keputusan WakilPengamat Masyarakat untukPaket No.17: Sp. Gn. Kemala –Pg. Tampak; WINRIP
October 08, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
CTC Surat Keputusan WakilPengamat Masyarakat untukPaket No.11: Bantal –Mukomuko; WINRIP
October 08, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
CTC Surat Keputusan WakilPengamat Masyarakat untukPaket No.13: Sp.Rukis – Tj.Kemuning; WINRIP
October 10, 2014 Direktur Bina Kepala BBPJN I Pemilihan Pemantau Pihak
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Date From To ActivityProgram:Ir. Harris H.Batubara, M.Eng.Sc
Medan Ketiga/Third Party Monitoring(TPM) Pelaksanaan KomponenRencana Tindak AntiKorupsi/ACAP WINRIP
October 10, 2014 Direktur BinaPelaksanaanWilayah I:Ir. Wijaya Seta, M.T
Kepala BBPJN IMedanKepala BBPJN IIPadang
Penyampaian UsulanPenggantian Ruas Jalan Biha-Bengkunat (Lampung) danSibolga-Sorkam (SumateraUtara)
October 13, 2014 Dekan FakultasUniversitasSumatera Utara
Direktur BinaProgram:Ir. Harris H. Batubara,M.Eng.Sc
Pemantau Pihak Ketiga atauThird Party Monitoring Paket05; WINRIP Loan IBRD 8043 ID
October 13, 2014 Director ofPlanning:Ir. Harris H.Batubara, M.Eng.Sc
Task Team LeadeWINRIP/SeniorTransport Specialist:Mrs. Elizabeth Goller
Submission of Bid EvaluationReport (BER) amdRecommendation for AwardContract of Package No.17:Sp.Gn.Kemala – Pg. Tampak inLampung Province; WINRIP
October 13, 2014 Director ofPlanning:Ir. Harris H.Batubara, M.Eng.Sc
Task Team LeaderWINRIP/SeniorTransport Specialist:Mrs. Elizabeth Goller
Status of Objection from PT.Multi Structure – PT. ModernWidya Technical JO to theResult of Pra-QualificationProcess for Package No.11:Bantal-Mukomuko, and PackageNo.13: Sp.Rukis – Tj. Kemuning;WINRIP
October 14, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
Kepala BBPJN IIIPalembang
Pemilihan Pemantau PihakKetiga/Third Party Monitoring(TPM) Pelaksanaan RencanaTindak Anti Korupsi Anti-Corruption Action Plan; WINRIP
October 15, 2014 Site Engineer Paket03:Ir. Sudjarwo
CTC Monthly Progress Report (MPR)untuk Bulan September 2014
October 16, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
Direktur BinaPelaksanaan WilayahI:Ir. Wijaya Seta, M.T
Implementasi LARAP PaketNo.02: Padang Sawah – Sp.Empat termasuk Jembatan AirGadang, dan Paket 03:Manggopoh – Pd. Sawah;WINRIP
October 20, 2014 Director General forConstructionDevelopmentAgency, Ministry ofPublic Works
World Bank Indonesia; WINRIP Loan IBRD8043 ID Model BiddingDocument for Procurement ofWorks under NationalCompetitive Bidding (NCB) usingMPW’s Full E-ProcurementSystem.
October 20, 2014 Site EngineerPackage No.02:
CTC Monthly Progress Report (MPR)June 2014
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Date From To ActivityStefanus Editya,M.T
October 20, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)July 2014
October 20, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)August 2014
October 20, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)September 2014
October 20, 2014 Direktur BinaPelaksanaanWilayah I:Ir. Wijaya Seta, M.T
Kepala BBPJN IIPadang
Implementasi LARAP PaketNo.02: Padang Sawah – Sp.Empat termasuk Jembatan AirGadang, dan Paket 03:Manggopoh – Pd. Sawah;(Sumbar) WINRIP
October 20, 2014 Menteri PekerjaanUmum
Ketua POKJAPengadaan Barangdan Jasa WINRIPProvinsi Lampung
Penetapan PemenangPelelangan Pekerjaan WINRIPNomor Paket 17: Sp.Gn.Kemala– Pg. Tampak, SNVT PJNWilayah II Provinsi LampungSumber Dana IBRD Loan 8043ID
October 21, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
Direktur BinaPelaksanaan WilayahI:Ir. Wijaya Seta, M.T
Penyampaian Surat Bank DUniaTerhadap Dokumen LARAPPaket No.07: Indrapura – tapan,dan Paket No.12: Kambang –Indrapura di Provinsi SumateraBarat; WINRIP Loan IBRD 8043ID
October 21, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)May 2014
October 21, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
Rektor UniversitasBengkulu
Pemantau Pihak Ketiga atauThird Party Monitoring (TPM)untuk Paket No.11: Bantal-Mukomuko, dan Paket No.13:Sp.Rukis-Tj.Kemuning; WINRIP
October 22, 2014 DirekturPerencanaan danPengembanganPendanaanPembangunan
Direktur BinaProgram, DirekturBina PelaksanaanWilayah I
Rapat Koordinasi Pemantauandan Evaluasi KinerjaPelaksanaan Kegiatan yangdibiayai Pinjaman dan HibahLuar Negeri Triwulan III Tahun2014
October 22, 2014 World Bank Director General for Indonesia; Western Indonesia
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Date From To ActivityConstructionDevelopment Agency,MPW
Roads Improvement Project(WINRIP) (Loan No.8043 ID)Model Bidding Document forProcurement of Works underNational Competitive Bidding(NCB) using MPW’s Full E-Procurement System
October 23, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
Direktur BinaPelaksanaan WilayahI:Ir. Wijaya Seta, M.T
Sanggahan dari PT. MultiStructure – PT. Modern WidyaTechnical, JO terhadap HasilPrakualifikasi Paket 11: Bantal –Mukomuko dan Paket 13: Sp.Rukis – Tj. Kemuning di ProvinsiBengkulu; WINRIP
October 23, 2014 Site Engineer Paket03
GS Paket 03: PT. JayaKonstruksi Manggala
Kelayakan Produksi AMP
October 24, 2014 Direktur BinaPelaksanaanWilayah I:Ir. Wijaya Seta, M.T
Kepala BBPJN IIPadang
Penyampaian Surat Bank DuniaTerhadap LARAP untuk PaketNo.07: Indrapura – Tapan, danPaket 12: Kambang – IndrapuraProvinsi Sumatera Barat;WINRIP
October 24, 2014 Task Team LeaderWINRIP/SeniorTransportSpecialist:Mrs. ElizabethGoller
Director of Planning:Ir. Harris H. Batubara,M.Eng.Sc
Indonesia; Western IndonesiaRoads Improvement Project(WINRIP) (Loan No.8043 ID)Serious Delays in theImplementation of LARAP forPackage No.13 and 17.
October 28, 2014 Site Engineer Paket03
Lab. TechnicianPackage No.03
Surat Peringatan Pertama/SP. I(Disiplin Kerja)
October 28, 2014 Site Engineer Paket03
GS Paket 03 Pemasangan Rambu Lalu LintasLokasi Pekerjaan
October 29, 2014 Task Team LeaderWINRIP/SeniorTransportSpecialist:Mrs. ElizabethGoller
Director of Planning:Ir. Harris H. Batubara,M.Eng.Sc
No Objection to Award for thePackage No.17: Sp.Gn.Kemala –Pg. Tampak, Lampung Province,International CompetitiveBidding – BER for PackageNo.01: Krui – Biha
October 30, 2014 Site Engineer Paket03
GS Paket 03 Pekerjaan Patching
October 31, 2014 SE Paket 04 CTC Quantity Record dan ExecutiveSummary Oktober 2014
October 31, 2014 PMU ProjectOfficer:Dwisman WIjaya,M.T
CTC Indonesia; Western IndonesiaRoads Improvement Project(WINRIP) (Loan No.8043 ID)Model Bidding Document forProcurement of Works underNational Competitive Bidding(NCB) using MPW’s Full E-Procurement System
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Report Submission
Date From To ActivityOctober 02, 2014 Director of
Planning:Ir. Harris H.Batubara, M.Eng.Sc
Task Team LeadeWINRIP/SeniorTransport Specialist:Mrs. Elizabeth Goller
Submission of Final BiddingDocument for Package No.11:Bantal-Mukomuko and PackageNo.13: Sp.Rukis-Tj.Kemuning inBengkulu Province; WINRIP
October 03, 2014 Site EngineerPackage No.01:Syafri Hedianto
CTC Monthly Progress Report No.09covering for September 2014
October 03, 2014 Site EngineerPackage No.01:Syafri Hedianto
CTC Quarterly Progress ReportNo.03 covering for July, August,September 2014
October 03, 2014 Site EngineerPackage No.01:Syafri Hedianto
CTC Monthly Progress Report No.09covering for September 2014
October 03, 2014 Site EngineerPackage No.01:Syafri Hedianto
CTC Quarterly Progress ReportNo.03 covering for July, August,September 2014
October 06, 2014 Site EngineerPackage No.04:Tjantje Hallatu
CTC Monthly Project Report (MPR)No.09 covering for September2014
October 06, 2014 Site EngineerPackage No.04:Tjantje Hallatu
CTC Quarterly Project Report (QPR)No.03 July, August, September2014
October 20, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)June 2014
October 20, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)July 2014
October 20, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)August 2014
October 20, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)September 2014
Meeting
Date From To ActivityOctober 01, 2014 Kepala BBPJN III
PalembangCTC Undangan Acara Rapat Pleno
Kegiatan Pengadaan Tanah dan
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Date From To ActivityPemukiman Kembali/LandAcquisition and ResettlementAction Plan (LARAP) Ruas JalanRantau Tijang – Kota Agung
October 02, 2014 Kepala BBPJN IIIPalembang
CTC Undangan Sosialisasi/RembugWarga diKecamatan Kota AgungTentang Pengadaan TanahDalam Rangka Pelebaran JalanNasional Ruas Jalan RantauTijang-Kota Agung
October 22, 2014 DirekturPerencanaan danPengembanganPendanaanPembangunan
Direktur BinaProgram, DirekturBina PelaksanaanWilayah I
Rapat Koordinasi Pemantauandan Evaluasi KinerjaPelaksanaan Kegiatan yangdibiayai Pinjaman dan HibahLuar Negeri Triwulan III Tahun2014
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Outgoing Letter
Correspondence
Date To From ActivityOctober 01,
2014Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Submission Report of Anti-Corruption Action Plan (ACAP)WINRIP
October 03,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Establishment Decree of CRO’sfor Package No.17: Sp. Gn.Kemala – Pg. Tampak; WINRIP
October 03,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Establishment Decree of CRO’sfor Package No.11: Bantal –Mukomuko; WINRIP
October 03,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Establishment Decree of CRO’sfor Package No.13: Sp. Rukis – Tj.Kemuning; WINRIP
October 03,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Request to prepare theEnvironmental and MonitoringPlan (RKPPL) WINRIP
October 06,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Evaluation of Show CauseMeeting (SCM) II in Balai forPackage No.01: Krui-Biha, andSCM Level I for Package No.04:Ipuh – Bantal; WINRIP
October 07,2014
CTC Co. TL:Julius J. Sohilait
CTC Team Leader:Cesar T. Arenas
Authorization as Team Leader
October 08,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Submission Report of Anti-Corruption Action Plan (ACAP)WINRIP
October 10, Kasubdit Sistem CTC Team Leader: Renewal and/or Extension of
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
2014 PengendalianWilayah I/PMUOIC:
Ir. Agusta E.Sinulingga, M.T
Cesar T. Arenas Work Visa
October 16,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Co. Team Leader:Julius J. Sohilait
LARAP Implementation forPackage No.2 Padang Sawah –Simpang Empat, include AirGadang Bridge, and PackageNo.3 Manggopoh – PadangSawah; WINRIP Loan IBRD No.8043-ID
October 21,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Co. Team Leader:Julius J. Sohilait
Submission of First RevisedProject Management Manual(PMM) in Bahasa Indonesia;WINRIP Loan IBRD 8043 ID
October 30,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:
Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Review of Bid Evaluation Reportfor Package 11: Bantal –Mukomuko ; WINRIP
October 30,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:
Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Review of Bid Evaluation Reportfor Package 13: Sp.Rukis – Tj.Kemuning ; WINRIP
Report Submission
Date From To ActivityOctober 01,
2014Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Submission Report of Anti-Corruption Action Plan (ACAP)WINRIP
October 08,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Submission Report of Anti-Corruption Action Plan (ACAP)WINRIP
October 21,2014
Kasubdit SistemPengendalianWilayah I/PMU
CTC Co. Team Leader:Julius J. Sohilait
Submission of First RevisedProject Management Manual(PMM) in Bahasa Indonesia;
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Date From To ActivityOIC:Ir. Agusta E.Sinulingga, M.T
WINRIP Loan IBRD 8043 ID
Meeting
Date From To Activity- - - -
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
ANNEXES
Annex P-1 : Package No. 1
Annex P-2 : Package No. 2
Annex P-3 : Package No. 3
Annex P-4 : Package No. 4
ANNEX P-1
MONTH :
Package No. Time Elapsed (Days) 229
Name Time Elapsed (%) 35.78%
Project Manager Scheduled Progress (%) 31.58 Contractor PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress (%) 5.98 Supervision Consultant Balance (%) -25.60 Commencement Date Progress This Month (%) 1.19 Take Over Date Time for Complation (Days) 640 Addendum-1 Status date Contract Amount Rp. Accumulative Rp. 10.46% Contract Amount Add-1 (+ PPN) *) Include advance payment
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month MonthI G e n e r a l 8.25 2.35 0.01 2.36 2.04II D r a i n a g e 34.19 0.22 0.13 0.35 14.65III Earthworks 3.95 0.84 0.41 1.25 2.72
IV Pavement Widening &Shoulders
1.47 - - - -
V Granular Pavement 9.22 0.53 0.41 0.94 7.09VI Asphalt Pavement 40.14 - - - 3.82VII S t r u c t u r e s 1.09 0.57 0.20 0.77 0.86
VIII Reinstatement &Minor Works
1.20 0.09 0.03 0.12 0.15
IX Day Work 0.14 - - - 0.05
X Routine MaintenanceWorks
0.36 0.18 0.01 0.19 0.20
TOTAL 100.00 4.79 1.20 5.99 31.58
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 220.22 0.87 1.69 5.62 11.11 18.06 24.50 31.58 38.99 46.36 53.25 60.68 67.46 74.81 80.69 83.98 87.62 91.27 93.71 96.16 98.75 100.000.10 0.58 0.79 1.59 2.93 3.71 4.79 5.98
(0.12) (0.29) (0.90) (4.03) (8.18) (14.35) (19.71) (25.60)
Scheduled Progress Original (%) Actual Progress (%) Balance (%)
Div Description
PHYSICAL PROGRESS MONITORING TABLE2014 2015 Year
Month The month of time for complation
- Late of Field Engineering Decision - DSC and Contractor to discuss with PPK regarding the finalization of the Field Engineering.
PHYSICAL WORK PROGRESS BY CATEGORY
134,909,211,000.00
DISBURSEMENT *)
14,106,688,650.003-Jul-14
- The Contractor has not started works as per the - The contractor have to started the main work approved schedule such as drainage works
RENARDET S.A JV - Insufficient manpower, equipment and financial - The contractor have to add manpower aspecialy
SUPARJONO, ST,MT
AMO
UN
T
8-Jan-14 resources to undertake the needed acceleration for drainage work9-Oct-15 of works.
EXECUTIVE SUMMARY REPORTAug-14
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
01
TIM
E August 25, 2014
BIHA - KRUI MAJOR PROBLEMS ACTION TO BE TAKEN
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
PHYS
ICAL
PRO
GRES
(%)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE #01
Schedule
Actual
ANEXES EXECUTIVE SUMMARY REPORT edit 9 Sep 2014_50256C ExSum P-1
ANNEX P-2
MONTH :
Package No. Time Elapsed (Days) 231 Name Time Elapsed (%) 31.64% Project Manager Scheduled Progress (%) 20.63 Contractor PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress (%) 13.85 Supervision Consultant Balance (%) -6.78 Commencement Date Progress This Month (%) 4.17 Take Over Date Time for Complation (Days) 730 Addendum-1 Status date Contract Amount Rp. Accumulative Rp. 10.21% Contract Amount Add-1 (+ PPN) *) Include advance payment
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 10.46 1.59 2.15 3.74 4.89II D r a i n a g e 3.53 1.58 0.80 2.37 3.39III Earthworks 4.44 1.10 0.21 1.32 2.32
IV Pavement Widening &Shoulders
2.26 0.47 0.48 0.95 -
V Granular Pavement 10.49 0.29 0.34 0.63 3.53VI Asphalt Pavement 52.09 - - - 1.33VII S t r u c t u r e s 14.35 3.47 0.14 3.61 4.71
VIII Reinstatement & MinorWorks
1.65 0.88 0.04 0.92 0.10
IX Day Work 0.12 - - - 0.04
X Routine MaintenanceWorks
0.62 0.31 0.01 0.32 0.32
TOTAL 100.00 9.69 4.17 13.85 20.63
Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Schedl Progress Original (%) 0.45 0.90 2.20 3.45 7.17 13.58 17.48 20.63 27.88 33.56 38.81 44.72 50.52 56.13 62.58 69.25 73.65 79.35 82.91 85.94 90.59 93.85 97.89 100.00 Actual Progress (%) - 0.13 1.02 2.19 4.11 5.96 9.69 13.85 Balance (%) (0.45) (0.77) (1.17) (1.26) (3.07) (7.62) (7.80) (6.78)
2014 2015
- Late of Field Engineering Decision - DSC and Contractor to discuss with PPK
- Contractor has insufficient manpower and finan- - The contractor have to add manpower aspecialy cial resource to excecute the available works for drainage work - Delayed land acquisition of Air Gadang Bridge - DSC ask partial land acquisition plan to PPK approach - Delayed of additional land acquisition - PPK should coordinate with respective agency - Delayed relocation of existing electrical pole - PPK should give notification to the utility company
197,936,699,000.00 regarding the finalization of the Field Engineering.
August 25, 2014PADANG SAWAH-SIMPANG EMPAT MAJOR PROBLEMS ACTION TO BE TAKEN
EXECUTIVE SUMMARY REPORTAug-14
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
The month of time for complation
DISBURSEMENT *)14-Jul-14
20,211,284,785
02
TIM
EAM
OU
NT
RENARDET S.A JV6-Jan-145-Jan-16
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
PHYSICAL PROGRESS MONITORING TABLE
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
PHYS
ICAL
PRO
GRES
(%)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE #02
Schedule
Actual
ANEXES EXECUTIVE SUMMARY REPORT edit 9 Sep 2014_50256C ExSum P-2
ANNEX P-3
MONTH :
Package No. Time Elapsed (Days) 231
Name Time Elapsed (%) 31.64% Project Manager Scheduled Progress (%) 14.27 Contractor PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress (%) 7.01 Supervision Consultant Balance (%) -7.26 Commencement Date Progress This Month (%) 1.31 Take Over Date Time for Complation (Days) 730 Addendum-1 Status date - Delayed relocation of existing electrical pole - PPK should give notification to the utility company Contract Amount Rp. Accumulative Rp. 11.20% - Late of Field Engineering Decision - DSC and Contractor to discuss with PPK Contract Amount Add-1 (+ PPN) *) Include advance payment regarding the finalization of the Field Engineering.
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 10.21 1.35 0.01 1.36 3.40II D r a i n a g e 13.17 1.10 0.07 1.17 6.17III Earthworks 3.04 2.51 0.08 2.59 1.29
IV Pavement Widening &Shoulders
2.45 - - - -
V Granular Pavement 11.27 0.80 0.07 0.87 1.77VI Asphalt Pavement 55.81 - - - 0.50VII S t r u c t u r e s 0.80 0.36 0.14 0.50 0.57
VIII Reinstatement & MinorWorks
2.27 0.56 0.44 1.00 0.12
IX Day Work 0.22 0.03 0.00 0.03 0.07
X Routine MaintenanceWorks
0.76 0.38 0.01 0.39 0.38
TOTAL 100.00 7.08 0.83 7.91 14.27
Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Schedl Progress Original (%) 0.26 1.00 1.67 2.45 4.78 7.45 10.70 14.27 21.53 30.10 36.95 44.01 51.62 58.67 65.63 73.03 79.97 87.04 91.61 93.19 94.30 95.76 97.82 100.00 Actual Progress (%) 0.24 0.48 2.07 2.43 2.87 5.45 5.70 7.01 Balance (%) (0.02) (0.52) 0.40 (0.02) (1.91) (2.00) (5.00) (7.26)
PHYSICAL PROGRESS MONITORING TABLE
143,688,963,000.00
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
RENARDET S.A JV - Delayed decision of the design of concrete pile - DSC and Contractor has discussed with PPK regar-
DISBURSEMENT *)
6-Jan-14 retaining wall ding the finalization of the design and the5-Jan-16 method of construction of precast retaining wall.
cial resource to excecute the available works for drainage work
EXECUTIVE SUMMARY REPORTAug-14
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
2014 2015
30-Jun-1416,091,601,613.00
03
TIM
E August 25, 2014
MANGGOPOH - PADANG SAWAH MAJOR PROBLEMS ACTION TO BE TAKEN
- Delayed of additional land acquisition - PPK should coordinate with respective agency
AMO
UN
T - Contractor has insufficient manpower and finan- - The contractor have to add manpower aspecialy
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
PHYS
ICAL
PRO
GRES
(%)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE #03
Schedule
Actual
ANEXES EXECUTIVE SUMMARY REPORT edit 9 Sep 2014_50256C ExSum P-3
ANNEX P-4
MONTH :
Package No. Time Elapsed (Days) 227
Name Time Elapsed (%) 31.10%
Project Manager Scheduled Progress (%) 15.81 Contractor PT WASKITA KARYA - PT DAYA JO Actual Overall Progress (%) 1.45 Supervision Consultant Balance (%) -14.36 Commencement Date Progress This Month (%) 0.58 Take Over Date Time for Complation (Days) 730 Addendum-1 Status date Contract Amount Rp. Accumulative Rp. 9.30% Contract Amount Add-1 (+ PPN) *) Include advance payment
Comp Accum Actual Accum AccumTotal Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 7.59 0.56 0.01 0.56 0.59II D r a i n a g e 12.26 - 0.03 0.03 4.68III Earthworks 3.58 0.03 - 0.03 0.77
IV Pavement Widening &Shoulders
3.39 - - - -
V Granular Pavement 18.07 0.21 0.56 0.77 4.92VI Asphalt Pavement 49.27 - - - 3.27VII S t r u c t u r e s 2.55 - - - 1.16
VIII Reinstatement & MinorWorks
2.95 0.06 - 0.06 0.30
IX Day Work 0.14 - - - 0.06
X Routine MaintenanceWorks
0.20 0.01 0.00 0.01 0.08
TOTAL 100.00 0.87 0.59 1.46 15.81
Year Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Schedl Progress Original (%) 0.11 0.32 0.75 1.14 6.57 10.29 12.85 15.81 21.72 25.43 32.76 40.88 47.93 55.61 63.45 70.19 77.04 81.55 84.79 90.84 94.62 97.05 98.80 100.00 Actual Progress (%) - 0.18 0.40 0.53 0.56 0.78 0.87 1.45 Balance (%) (0.11) (0.14) (0.35) (0.61) (6.01) (9.51) (11.98) (14.36)
PHYSICAL PROGRESS MONITORING TABLE
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
- Late of Field Engineering Decision - DSC and Contractor to discuss with PPK
186,936,750,000.00 regarding the finalization of the Field Engineering.
DISBURSEMENT *)23-May-14
17,385,117,750.00
- The contractor have to add manpower aspecialy10-Jan-14 resources to undertake the needed acceleration for drainage work9-Jan-16 of works.
EXECUTIVE SUMMARY REPORTAug-14
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
2014 2015
04
TIM
E August 25, 2014
IPUH - BANTAL MAJOR PROBLEMS ACTION TO BE TAKEN
AMO
UN
T - The Contractor has not started works as per the - The contractor have to started the main work approved schedule such as drainage works
RENARDET S.A JV - Insufficient manpower, equipment and financial
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
PHYS
ICAL
PRO
GRE
S (%
)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULEPACKAGE #04
Schedule
Actual
ANEXES EXECUTIVE SUMMARY REPORT edit 9 Sep 2014_50256C ExSum P-4
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix A
Overall Loan Progress
31 October 2014 In USD
Estimated Contractor(s) or Total Est. BudgetStarting Completion Consultant(s) Man-Month WB + GOI Remarks
Date Date Name (Excl. the (PIP) Original Revised Physical Man-Month Physical Man-Month Physical Man-MonthSupp. Staff) (USD, Excl.VAT) (Excl. VAT) (Excl. VAT) ( % ) ( MM ) ( % ) ( MM ) ( % ) ( MM )
1 Betterment and Capacity 314,900,000.00 $57,821,551.95Expansion of NationalRoads
1.A AWP-1 ICB DGH 81,630,000.00 $57,821,551.95 On - Going Construction1.A1 Krui-Biha (PT. Jaya Konstruksi) $11,757,337.74 46.36% 11.28% -35.08%
1.A2 Pd. Sawah-Sp. Empat (PT.JayaKonstruksi) $17,250,183.32 33.56% 25.61% -7.95%
1.A3 Manggopoh-Pd. Sawah (PT. JayaKonstruksi) $12,522,493.13 30.10% 14.45% -15.65%
1.A4 Ipuh-Bantal (PT. Waskita Karya) $16,291,537.76 24.22% 5.35% -18.88%
1.B AWP-2 and AWP-3 ICB & NCB DGH 227,100,000.00 Under Tendering Period : 1 PackagesBid Preparation : 3 PackagesPre-qualification : 3 PackagesDED Road Safety Revision : 4 Packages
1.C Contingency - DGH 6,170,000.00 Detailed Engineering Design preparation : 6 Packages
2 Implementation Support 16,000,000.00
2.A Core Team Consultants (CTC) QCBS DGH 6-Nov-12 15-Feb-16 PT. Perentjana Djaja 556 5,000,000.00 $1,276,700.00 $1,315,925.00 38.301% 212.95 33.804% 187.95 -4.496% 25.00 Supporting PMU. Joint Venture with Rp21,415,400,000.00 Rp22,426,175.00 Yongma Engineering Co.Ltd. Or US$ equivalent total : (Amandement) PT. Epadascon Permata $3,512,681.91 $3,641,077.48
2.B Design & Superv. Consultants QCBS DGH 19-Jun-13 18-Nov-16 Renardet S.A. 1,068 10,000,000.00 $820,600.00 3.964% 42.33 3.402% 36.33 -0.562% -6.00 Design preparation (package #7, #8, #10 and #12). Joint Venture with Rp51,818,705,000.00 PT Cipta Strada Or US$ equivalent total : PT. Daya Creasi Mitrayasa $6,465,729.72 PT. Seecons PT. Yodya Karya
2.C Incremental Operating Cost Varies PMU 1,000,000.00Including Technical Audits
3 Road Sector Institutional 1,000,000.00Development
3.A Capacity Building for NCB DGH 350,000.00 Preparation of TOR.Disaster Risks Reduction
3.B Capacity Building for NCB DGH 350,000.00 Preparation of TOR.Environmental Management
3.C Capacity Building for NCB DGH 300,000.00 Preparation of TOR.Road Safety
4 Contingency for Disaster DGH -Risk Response
5 Unallocated DGH 18,100,000.00
Total 350,000,000.00 67,799,963.58 0.450 212.95 0.395% 187.95 -0.054% -25.00
Appendix - AOVERALL PROGRESS STATUS
Description
WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT (WINRIP)IBRD LOAN No. 8043-ID
Proc.MethodCategory
Planned Actual BalancePROGRESS
Respon-sibility
Contract Value/BudgetTotal ( WB + GOI )
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix B
Highway Design Progress
Appendix B. Technical Design Reviewing and Road Safety Audit Progresss (October 2014.),
Amendment 9.7 6 126,219 Date 01-Feb-13 08-May-1304-Apr-1301-May-1315-Jul-13
17-Sep-13
Amendment 20.9 7 83,752 Date 02-May-13 18-Jul-13 18-Sep-13 17-Sep-13
Amendment 19.5 7 184,714 Date 12-Aug-13 24-Oct-13 27-Sep-13
Amendment 46.8 7 161,963 Date 24-Jun-13 24-Oct-13 27-Sep-13
Amendment Date
Amendment 61.7 7 252,629 Date 24-Jun-13 24-Oct-13 27-Sep-13
Amendment 50.1 6 224,090 Date 18-Mar-13 18-Jul-13 18-Sep-13 18-Jul-13
Amendment 55.2 7 316,306 Date 12-Aug-13 24-Oct-13 27-Sep-13
Amendment 56.3 7 287,549 Date 18-Mar-13 18-Jul-13 18-Sep-13 18-Jul-13
Amendment Date
Amendment 36 7 353,956 Date 28-Mar-1308-May-1321-Aug-13
04-Apr-1301-May-13
23-Sep-13
Amendment Date
Amendment Date 26-May-13
Amendment Date
Amendment 10.8 7 32,623 Date 02-May-13 18-Jul-13 18-Sep-13 17-Sep-13
Amendment Date
Amendment Date
ApprovalBy DTA
Total Process(%)
RemarkStatus
ReceivedDatum
Post-Review Site Visting Full-ReviewGroup
PkgNo.
Name of Sub-project ECLLength
(km)Width
(m) RSAAudit
Presentation&Discussion
TechinicalReport
Submission
QualityAssurance
AWP-2
5Sp.Rampa – Poriaha
(Link No.015.xx)
Original 11.1 6
EstimatedCost /
Excl.VAT(mil. RP)
Technical Design Review Process for Design Stage
55,126 Process
7Indrapura – Tapan
(Link No.019.0)Original 19.5 7 96,921 Process
9Rantau Tijang – Kota Agung
(Link No.026.1)Original 42 7 149,831 Process
97%TechnicalReviewby CTC
6PS.Pedati - Kerkap
(Link No.010.0)Original 25 7 72,019 Process 95%
TechnicalReviewby CTC
95%TechnicalReviewby DSCProcessed by DSC
8Bts.Pariaman – Manggopoh
(Link No.024.0)Original 46.8 7 183,268 Process 95%
TechnicalReviewby DSCProcessed by DSC
157,820 Process 97%
Processed by DSC
10Sp.Empat – Sp. Air Balam
(Link No.034.1)Original 61.7 7 241,617 Process 95%
TechnicalReviewby DSCProcessed by DSC
13SP.Rukis - TJ.Kemuning
(Link No.006.0)Original 56.3 7 225,481.5 Process
TechnicalReviewby CTC
12Kambang – Indrapura
(Link No.017.2)Original 55.2 7 171,948 Process 95%
TechnicalReviewby DSC
97%TechnicalReviewby CTC
11Bantal - Mukomuko
(Link No.015.2)Original 50.1 6
AWP-3
14Painan – Kambang
(Link No.017.1)Original 31.5 7 118,993 Process
Processed by DSC
17Sp.Gng Kemala–Pg.Tampak
(Link No.061.1)Original 36.8 6 104,238 Process
16Seblat – Ipuh
(Link No.010.0)Original 34.5 6 110,237 Process
15Sibolga – Bts TapSel
(Link No.016.1)
Original 36 7 129,228 Process
97%TechnicalReviewby CTC
70%TechnicalReviewby DSC
100%TechnicalReviewby PPCProcessed by Project Preparation Consultant
18Mukomuko – Bts.Sumbar
(Link No.015.3)Original 25.8 6 69,223 Process
19Lais - Bintuan
(Link No.009.1)Original 11.6 7 37,558 Process 95%
TechnicalReviewby CTC
20Lubuk Alung – Sicincin
(Link No.009.1)Original 14.6 7 54,557 Process
Process21Lubuk Alung - Kuraitaji
(Link No. 027.0)Original 16.8 7 65,778
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix C
Financial Progress
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix C Financial Progress
The table below shows total expenditure to date measured in the terms of World BankCommitment.
DatePercentage
Completion oftime
WBExpenditureCommitment
Percentage ofAvailable
ExpenditureSource
31/03/2012 1.45% - - -30/04/2012 2.90% - - -31/05/2012 4.35% - - -30/06/2012 5.80% - - -31/07/2012 7.25% - - -30/08/2012 8.70% - - -30/09/2012 10.15% - - -31/10/2012 11.60% - - -30/11/2012 13.05% - - -31/12/2012 14.50% 800,000 0.32% Actual31/01/2013 15.95% 800,000 0.32% Actual28/02/2013 17.40% 800,000 0.32% Actual31/03/2013 18.85% 2,207,915 0.88% Actual30/04/2013 20.30% 2,207,915 0.88% Actual31/05/2013 21.75% 2,207,915 0.88% Actual30/06/2013 23.20% 2,207,915 0.88% Actual31/07/2013 24.65% 2,207,915 0.88% Actual31/08/2013 26.10% 2,207,915 0.88% Actual30/09/2013 27.55% 2,207,915 0.88% Actual31/10/2013 29.00% 2,207,915 0.88% Actual30/11/2013 30.45% 2,207,915 0.88% Actual31/12/2013 31.90% 2,207,915 0.88% Actual31/01/2014 33.35% 4,940,115 1.98% Actual28/02/2014 34.80% 4,940,115 1.98% Actual31/03/2014 36.25% 4,966,535 1.99% Actual30/04/2014 37.70% 4,966,535 1.99% Actual31/05/2013 39.15% 6,109,480 2.44% Actual30/06/2014 40.60% 6,263,610 2.51% Actual31/07/2014 42.05% 6,470,288 2.59% Actual31/08/2014 43.50% 6,470,288 2.59% Actual30/09/2014 44.95% 6,681,304 2.67% Actual31/10/2012 46.40% 6,991,757 2.80%30/11/2014 47.85%31/12/2014 49.30%31/01/2015 50.75%28/02/2015 52.20%31/03/2015 53.65%30/04/2015 55.10%
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
DatePercentage
Completion oftime
WBExpenditureCommitment
Percentage ofAvailable
ExpenditureSource
31/05/2015 56.55%30/06/2015 58.00%31/07/2015 59.45%31/08/2015 60.90%30/09/2015 62.35%31/10/2015 63.80%30/11/2015 65.25%31/12/2015 66.70%31/01/2016 68.15%28/02/2016 69.60%31/03/2016 71.05%30/04/2016 72.50%31/05/2016 73.95%30/06/2016 75.40%31/07/2016 76.85%31/08/2016 78.30%30/09/2016 79.75%31/10/2016 81.20%30/11/2016 82.65%31/12/2016 84.10%31/01/2017 85.55%28/02/2017 87.00%31/03/2017 88.45%30/04/2017 89.90%31/05/2017 91.35%30/06/2017 92.80%31/07/2017 94.25%31/08/2017 95.70%30/09/2017 97.15%31/10/2017 98.60%30/11/2017 99.05%31/12/2017 100.00%
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix D
Quality Assurance Progress
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix D: Quality Assurance Progress
October 2014
No Activities has been done Status/condition
Date of Finish/completed
1. Preperation MPR CTC Semptember 2014 01 – 02 October, 2014
2. Leave 03 October, 2014
3. Meeting for improvement PMM WINRIP. 06 October, 2014
4. Sick 08 – 09 October, 2014
5. Finalization improvement PMM (Div.7) 10 October, 2014
6. Preparation site visit to Padang 13 October, 2014
7. Improvement bibliography of PMM WINRIP 14 October, 2014
8. Preparation site visit and make request to Padang 15 October, 2014
9. Learn the status of 02 package and 03 package 16 – 17 October, 2014
10. Site visit to package 02 and package 03, Padang. 20 – 23 October, 2014
11. Make accountability reports of site visit to Padang. 24 October, 2014
12. Make draft site visit reports to package 02 and 03. 27 October, 2014
13 Internal meeting CTC 28 October, 2014
14 Make preparation MPRs CTC. 29 October, 2014
15 Make draft site visit reports to package 02 and 03. 30 – 31 October, 2014
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix E
Environmental Progress and Social Progress
Length Width
(Km) (m) Result CommentsBudget
Alocated,YearStatus BLH Approval Result Comments
BudgetAlocated,Year
Status
THE WB Approval(A=Studi LARAP ;
B=ImplementationLARAP
A. NOL LARAP 04 Jan2013 ;
ICB/Prior B. NOL ImplemetationLARAP 18 April 2013, Rev26 June 2013.
2 Padang Sawah - Sp Empat Sumatera Barat 40.9 7 Total PAP 430 . No Land affected . Aset affected:building 149 unit = 2.110 M2 ; Fence 2 unit = 341.8 M; Kiosks BBM: 25 unit; Plant: 873 rod ; Mosque: 2 unit
A. NOL LARAP 13 Jan 2013;
2a Including Air Gadang Bridge Sumatera Barat 100 m 7 Total PAP 15. Land affected 2,110 M2 ; Aset affected:building 6 unit = 410 M2 ; Plant 72 rod.
B. NOL ImplementationLARAP 19 July 2013
ICB/Prior A. NOL LARAP 04 Jan 2013
B. NOL ImplementationLARAP 18 April 2013, Rev26 June 2013.
A. NOL LARAP 10 Dec 2012
ICB/Prior B.NOL ImplementationLARAP 6 January 2014
NCB/Post A. NOL LARAP 16 Sept2013, and approvalrevision the report 12 Nov2013;
B= implemented paralelwith construction
A. NOL LARAP 20November 2013;
NCB/Post B: Monitoring Report onDec 2014 (target)
ICB/Prior NOL Larap: Oct 14, 2014
ICB/Prior A. NOL LARAP 12 Sep2014;B: Monitoring Report onDec 2014 (target)
ICB/Prior A. Target of NOL LARAP isMarch 2015;
ICB/Prior A. NOL LARAP 12 Sep2014;
B: Monitoring Report onDec 2014 (target)
ICB/Prior A. NOL LARAP 20November 2013;
B: Monitoring Report onDec 2014 (target)
ICB/Prior Larap: NOL Target: Oct2014
ICB/Prior A. NOL LARAP 20November 2013; B.-B: Monitoring Report onDesember 2014
ENVIRONMENTAL : The CTC has been advise the UKL&UPL consultantto decided poin sampling and format report. The consultant wasconducted sampling poin on 7 to 11 July 2014. CTC was prepareoutline,form RKPPL (by PMU letter to Kasatker/PMU letter on 7 April2014), the contractor not yet prepare the RKPPL then CTC wasconducted training of RKPPL to Staff of Balai, PPK,DSC, and contractoron 7 July 2014 , As per 31 Aug 2014, the contractor still not prepare theRKPPL. SOC: compensation payment is under process done
Ipuh- Bantal4 Bengkulu 42.4 7
ENVIROMENTAL: Draft integration of AMDAL/RKL recommendationhas been prepared by CTC and under discussion with contractor, DSCfor input those recommendation in to the design. The CTC was carriedout training of RKPPL to participants (PJN, PPK,DSC,Contractor,Pokja&Balai) on 5 to 6 June 2014: CTC letter to DSC concerning Review theRKPPL produced by the contractor on 20 Aug 2014. Now the RKPPLunder revision by the contractor. SOCIAL: (1) is still on progress. (2) isstill on progress.
Manggopoh - Padang Sawah3 Sumatera Barat 32 7 SPPL Air pollution, traffic congestion,market on street, soft soil andrivers
APBN (P2JN 2010) 100% YES Recommended2010. UKL&UPL noneed NOL from theWB.
LARAP Total PAP 1.338 . No Land affected . Aset affected:building 115 unit = 668,33 M2 ; Culvert 661,05 m ;concrete & foundations 1.421,60 M3 ; Soilembankment 5.564,21 M3; Plant 5.324 rod ; paddyfield and lemongrass & turmeric = 17.695 clumps ;Mesjid & Market
Rp. 1.147.700.000APBD Prov Sumbar,Dinas PU, 2012/2013
The remaining 2 from 3 PAP not yet paid by LocalGovernment. A monitoring report (3 PAP) will besubmitted to the WB when ready
ENV IRONMENTAL: Propose to site visit for integration of UKL&UPLrecommendation in to the design. The CTC was carried out training ofRKPPL to participants (PJN, PPK,DSC,Contractor,Pokja &Balai) on 17 to18 June 2014, Review CTC by email on 22 Aug 2014. Now the RKPPLunder revision by the contractor. SOC : (1) Compensation payment tothe remaining 3 PAP is under resolved by Local Government, and PMU/ CTC waiting the monitoring report from Satker II Padang.
LARAP Total PAP 2.805 in 21 Pekon. Land affected 28.763,12M2 ; Aset affected : building 882,13 M2 ; Fence2.445,41 M ; Plant 653 rod ; paddy field 25 plots ;Social & Pablic Facilities
Air pollution, traffic congestion,steep slopes, soft soil and riversand beach abrasion
APBN (P2JN 2010 &2011)
100% YES RecommendedSPPL 2010 and AMDAL2012 & NOL WB issuedon 20 Nov 2013. Note:environmentalmitigation will be moredetail on RKPPL
1 Krui - Bha Lampung 25 7
YES Recommended2012.UKL&UPL no needNOL from the WB.
LARAP
Remaining issues : (1) compensation for Total 21 PAP(5 on the Air Gadang Bridge and 16 on the link), and24 new PAP as Additional LARAP not yet paid by LG.(2) Certification process of the 5 PAP will be as soonas resolved.
LARAP Total PAP are change from 217 PAP becomes 227 PAP.227 PAP has received compensation from The LocalGovernment as : Aset affected : building house =238,5 M2; terace = 667,64 M2; Fence = 470,05 M ;pavement = 2,314,21 M2; Plant 58 rod.
Rp.286.743.000.APBN, Satker PJN I,Bengkulu, 2013
Additional 15 PAP due to design changing not yet paidby project
Relocation for one kiosk not yet be done
LARAP implementation will be resolved by APBDWest Sumatera 2015
LARAP is under preparation by Balai III Palembang.This package was changed to Bengkunat - Biha
RP. 8.237.443.000APBN Satker PJN I,Bengkulu, 2014
NOL LARAP.Compensation payment is under process
RP. 11.295.833.000APBN, Satker PJN IBengkulu, 2014
Inventory asset affected was ready, and now hireappraisal process
SPPL 100%andUKL&UPL20%
Geometric, traffic congestion,steep slopes, soft soil and riversand beach abrasion
APBN (P2JN 2010) SPPL 100%,UKL&UPLcontract(50%)
YES Recommended2010 for SPPL andUKL&UPL. Presentationof UKL&UPL on 27 Aug2014. in PJN/Balai III.Now under finalize bythe consultant..
100% YES Recommended2011. UKL&UPL no needNOL from the WB.
SimpleLARAP
1 PAP with aset affected : 1 kios BBM. Agree torelocate the kios. relocate to the beside her house.relocating costs be the responsibility of the project
ENVIRONMENTAL STATUS & PROGRESS FOR WINRIP, IBRD LOAN NO.8043-ID
Remedial Action
AWP - 1
No Loan Package Name Provinces
Procur
Approval Status by Environmental Agency (BLH)Environmental Screening Social Screening Approval Status by The World Bank
YES Recommended2010. UKL&UPL no needNOL from the WB.
ICB/PriorSPPL&UKL/UPL
Bridge
LARAP Rp.2.340.600.000APBD Prov Sumbar,Dinas PU, 2012
APBN (P2JN 2010) 100%
Rp. 5.172.349.955APBN, Satker PJN IILampung, 2011 - 2012
Remaining issues: (1) one plot due to the alignmentchanging not yet paid by project. (2) Certificationprocess of the PAP will be as soon as resolved by LG
SPPL &AMDAL
Appendix E : Progress of Environmental Safeguard Studies on WINRIPas per 31 Oct, 2014
one link,sensitive areas/resident,public,facilities, squater (no landacquisition), market,sopt soil andrivers
ENV IRONMENTAL: Propose to site visit for integration of UKL&UPLrecommendation in to the design. The CTC was carried out training ofRKPPL to participants (PJN, PPK,DSC,Contractor,Pokja &Balai) on 17 to18 June 2014, the RKPPL under preparation by contractor (PT. Jakon) toacomodate commentd from CTC, Review CTC by email on 22 Aug 2014.Now the RKPPL under revision by the contractor. SOCIAL: (1)PMU/CTC has been coordinate with PPK, and ask LG to pay ASAP (2)Will be conducted together with the physical work of the road project.
AWP - 25 Sp. Rampa - Poriaha Sumatera Utara 11.1 6 UKL&UPL slope stability, water quality, Run
off, bridges acces, continuedtraffic access & quarry problem
APBN (BBPJN I 2011)
APBN (TLKJ 2012) 100%
ENVIRONMENTAL : Propose to site visit on September 2014 for checkthe UKL&UPL recommendation will integrated in to the design. finding(CTC letter was submit to the PMU), Prepare outline,form RKPPL (byPMU letter to Kasatker/PMU letter on 7 April 2014). SOCIAL: Now,PMU/CTC still waiting a report from Head of Satker PJN II - NorthSumatera Province
6 Ps Pedati - Kerkap Bengkulu 25 7 UKL&UPL Comersial areas, trafficcongestion, market on the street,air pollution & noise,
APBN (TLKJ 2011) 100% YES Recommended2010. UKL&UPL no needNOL from the WB.
LARAP Total PAP 166 . Land affected = 3.925 M2. Asetaffected : building 47 unit = 1.169 M2 ; Fence 38 unit =
491 M ; Plant 271 rod ; electricity pole 10 unit
RP. 8.049.290.000APBN, Satker PJN I,
Bengkulu, 2014
NOL LARAP.Compensation payment is under process
ENVIRONMENTAL : Propose to site visit on September 2014 for checkthe UKL&UPL recommendation will integrated in to the design. finding(CTC letter was submit to the PMU), Prepare outline,form RKPPL (byPMU letter to Kasatker/PMU letter on 7 April 2014). SOCIAL: Now,PMU/CTC still waiting a report from Head of Satker PJN I - BengkuluProvince
Rp.53.000.000.APBN, Satker PJN II,
Sumut, 2014
Completed/YESEnvironmental permitson Feb 2014. & NOL WBissued on 8 Aug 2014
LARAP The CTC has received LARAP documents from PMUdated 22 January 2014. CTC has completed reviewingand need some clarification before the LARAP can befinalized.
APBD Prov Sumbar,Dinas PU,
100%
ENVIRONMENTAL; Propose to site visit on Sep 2014 for check theAMDAL recommendation will integrated in to the design. (CTC letterwas submit to the PMU), Prepare outline,form RKPPL (by PMU letterto Kasatker/PMU letter on 7 April 2014) . SOCIAL: Now, PMU/CTC stillwaiting a report from Head of Satker PJN II - West Sumatera Province
8 Bts. Kota Pariaman - Manggopoh Sumatera Barat 46.8 7 AMDAL Comersil areas, market, publicfacilities, Air pollution, trafficcongestion, market on street, softsoil and rivers
APBN (TLKJ 2011) 100% Completed/YESEnvironmental permitson July 2013. & NOL WBissued on 14 April 2014
LARAP APBD Prov Sumbar,Dinas PU,
LARAP implementation will be resolved by APBDWest Sumatera 2015
ENVIRONMENTAL: propose to site visit on Oct 2014,for check theAMDAL/RKL recommendation will integrated in to the design. (CTCletter was submit to the PMU) and Prepare outline,form RKPPL (byPMU letter to Kasatker/PMU letter on 7 April 2014). SOCIAL: PMU /CTC waiting a Monitoring report from Satker
7 Indrapura - Tapan (1 Doc Amdal) Sumatera Barat 19.5 7 AMDAL Sensitive forest areas, socialissues, slope stability, waterquality, waste management, airpollution, squater on ROW etc
ENVIRONMENTAL: Propose to site visit on Oct 2014 for check theUKL&UPL recommendation will integrated in to the design, Prepareoutline,form RKPPL (by PMU letter to Kasatker/PMU letter on 7 April2014):
10 Sp Empat - Sp Air Balam Sumatera Barat 61.7 7 AMDAL Sensitive forest areas, socialissues, slope stability, waterquality, waste managemnt, bridgeaccess road & quarry problem
APBN (TLKJ 2011) 100% Completed/YESEnvironmental permitsonJuly 2013. & NOL WBissued on 14 April 2014
LARAP APBD Prov Sumbar,Dinas PU,
LARAP implementation will be resolved by APBDWest Sumatera 2015
ENVIRONMENTAL;;Propose to site visit on Oct 2014 for check theAMDAL/RKL recommendation will integrated in to the design andPrepare outline,form RKPPL (by PMU letter to Kasatker/PMU letter on7 April 2014). SOCIAL: PMU / CTC waiting a Monitoring report fromSatker
9 Rantau Tijang - Kota Agung Lampung 42 7 UKL&UPL Sensitive areas, resident, airpollution, traffic congestion,steep slopes,soft soil and riversand beach abrasion
APBN (TLKJ 2011)
ENVIRONMENTAL :Propose to site visit on Oct 2014 for check theAMDAL/RKL recommendation will integrated in to the design andPrepare outline,form RKPPL (by PMU letter to Kasatker/PMU letter on7 April 2014). SOCIAL: PMU / CTC waiting a Monitoring report fromSatker.
12 Kambang - Indrapura (1 Doc Amdal) Sumatera Barat 55.2 6 AMDAL Resident, productive land,Catcment areas,rivers, slopestability, squater on the street,land acquisition.
APBN (TLKJ 2011) 100% Completed/YESEnvironmental permitson Feb 2014. & NOL WBissued on 8 Aug 2014
LARAP APBD Prov Sumbar,Dinas PU,
LARAP implementation will be resolved by APBDWest Sumatera 2015
ENVIRONMENTAL; Propose to site visit on Sep 2014 for check theAMDAL/RKLand Prepare outline,form RKPPL (by PMU letter toKasatker/PMU letter on 7 April 2014). SOCIAL: Waiting LARAP approvalfrom WB
11 Bantal - Mukomuko (1 Paket doc AMDAL) Bengkulu 50.1 6 AMDAL
100%
Completed/YESEnvironmental permitson April 2014. & NOLWB issued on 8 Aug2014
LARAP Total PAP 292 . Land affected = 8.875 M2. Asetaffected : building 99 unit = 1.605 M2 ; Fence 12 unit =219 M ; Plant 143 rod ; electricity pole 22 unit ;Telkom Pole 5 unit
Sensitive areas, social issues,market on the street, geometric,waste managemnt, continuedtraffic access, etc
APBN (TLKJ 2011) 100%
YES Recommended2011. UKL&UPL no needNOL from the WB.
LARAP Total PAP: 2,564 . Land affected = 88,852 M2. Asetaffected : building 111 unit = 2.196 M2 ; Fence 127unit = 1.575 M ; Plant 363 rod ; electricity pole 25 unit
ENVIRONMENTAL : Propose to site visit on Sep 2014 for check theUKL&UPL recommendation will integrated in to the design, Prepareenvironmental mitigation on construction stage for contractor (RKPPL).SOCIAL: PMU/CTC has been coordinate with PPK to speed up thecompletion of land acquisition prior to comencement of work.
13 Sp Rukis - Tj Kemuning Bengkulu 56.3 7 UKL/UPL one link,sensitive/ steepslopes,soft soil and rivers,squater on the street, resident,productive land.
APBN (P2JN 2011)
Length Width
(Km) (m) Result CommentsBudget
Alocated,YearStatus BLH Approval Result Comments
BudgetAlocated,Year
Status
THE WB Approval(A=Studi LARAP ;
B=ImplementationLARAP
Remedial ActionNo Loan Package Name Provinces
Procur
Approval Status by Environmental Agency (BLH)Environmental Screening Social Screening Approval Status by The World Bank
ICB/Prior Larap: Not Yet / target:Oct 2014
ICB/Prior A. NOL LARAP 28 October2013 and NOL revise 05Feb 2014;
B: Monitoring Report onDesember 2014
Seblat - Ipuh including (1 Amdal) 34.5 6 A. NOL LARAP 20November 2013;
Air Lalang & Air Guntung Bridge 64 m 6 B: Monitoring Report onDec 2014 (target)
A. NOL LARAP 16 Sept2013
B: Monitoring Report onDesember 2014 (target)
NCB/Post A. Target of NOL LARAP isMarch 2015;
NCB/Post A. NOL LARAP 20November 2013;B: Monitoring Report onDec 2014 (target)
NCB/Post Larap: Not Yet / Target:Nov 2014
Larap: Not Yet / Target:Nov 2014
NCB/Post
Total PAP 129 . Land affected = 4.124 M2. Asetaffected : building 40 unit = 533 M2 ; Fence 34 unit =384 M ; Plant 51 rod ; electricity pole 5 unit
RP. 4.477.591.000APBN Satker PJN I,Bengkulu, 2014
NOL LARAP.Compensation payment is under process
YES Recommended2011. UKL&UPL no needNOL from the WB.
LARAP
17 Lampung ICB/Prior YES Recommended2012. & NOL WB issuedon 20 Nov 2013
APBN (TLKJ 2011)
100%
16 Bengkulu ICB/Prior
AMDAL
100%AMDAL sensitive areas/steep slopes, softsoil and rivers and beach abrasion
AWP - 3
ENVIRONMENTAL: Propose to site visit on Sep 2014, for check theAMDAL/RKL recommendation will integrated in to the design andPrepare outline,form RKPPL (by PMU letter to Kasatker/PMU letter on7 April 2014): SOC: PMU/CTC is waiting report of implementation ofthe Larap from Head of Satker II Lampung Province.
14 Painan -Kambang (1 doc Amdal) Sumatera Barat 31.5 7 AMDAL Sensitive forest areas, socialissues, slope stability, waterquality, waste managemnt,continued traffic access & quarryproblem
APBN (TLKJ 2011) 100% Completed/YESEnvironmental permitson Feb 2014. & NOL WBissued on 8 Aug 2014
SimpleLARAP
The CTC has received LARAP documents from PMUdated 22 January 2014. CTC has completed reviewingand need some clarification before the LARAP can be
finalized.
APBD Prov Sumbar,Dinas PU,
Finalization of LARAP from CTC ENVIRONMENTAL; Propose to site visit on Sep 2014 for check theAMDAL/RKL recommendation will integrated in to the design andPrepare outline,form RKPPL (by PMU letter to Kasatker/PMU letter on7 April 2014):.Propose to site visit for finding environmental issues onfield. SOCIAL: LARAP will be submitted to WB on Nov 2014
15 Sibolga - Bts Tap Sel Sumatera Utara 36 7 UKL/UPL resident, commersil areas,geometric etc.
APBN (BBPJN I 2011) 100% Total PAP 1.448 . Land affected 1.531 plot = 45,831M2.Aset affected : building 340 unit = 3.399 M2 ; Fence 12unit = 1.563 M ; Plant 385 rod, Terrace=991,607 M2
APBN, Satker PJN II,Sumut, 2014
Satker is waiting an appraisal result priorcompensation payment
Environmental: Propose to site visit on Sep 2014 for check theUKL&UPL recommendation will integrated in to the design issues willintegrated to design, and Prepare outline,form RKPPL (by PMU letterto Kasatker/PMU letter on 7 April 2014):.SOCIAL: SOCIAL: Now, PMUwaiting Larap implementation report from Head of Satker NorthSumatera Province
Sp.Gunung Kemala - Pg. Tampak 36.8 6
ENVIRONMENTAL : Propose to site visit on Sep 2014 for check theAMDAL/RKL recommendation will integrated in to the design andPrepare outline,form RKPPL (by PMU letter to Kasatker/PMU letter on7 April 2014):.Propose to site visit for finding environmental issues onfield. SOCIAL: PMU/CTC has been coordinate with PPK to speed upthe completion of land acquisition prior to contract.
Completed/YESEnvironmental permitson April 2014. & NOLWB issued on 8 Aug2014
sensitive areas/resident, landacquisition, steep slopes,soft soiland rivers and beach abrasion
APBN (TLKJ 2011) LARAP Total PAP 1.885 . Land affected 1.926 plot = 194.278M2. Aset affected : building 440 unit = 4.557 M2 ; ;Plant 4.267 rod ;paddy field 48.602 clumps.
RP.57.414.485 .000APBN, Satker PJN IILampung, 2014
Hire appraisal process by project
SimpleLARAP
APBN, 2015 LARAP is under preparation by Balai III Palembang.This package was changed to Sibolga - Sorkam
ENVIRONMENTAL : Propose to site visit on Oct 2014 for check theUKL&UPL recommendation will integrated in to the design, Prepareoutline,form RKPPL (by PMU letter to Kasatker/PMU letter on 7 April2014):
19 Lais- Bintunan Bengkulu 11.6 7 UKL&UPL one link,sensitive/air pollution,traffic congestion, squater on thestreet, etc
APBN (TLKJ 2011) 100% YES Recommended2010. UKL&UPL no needNOL from the WB.
LARAP Total PAP 82 . Land affected 82 plot = 2.852 M2. Asetaffected : building 14 unit = 201 M2 ; Fence 60 unit =714 M ; Plant 20 rod ; electricity pole 8 unit
Rp.3.349.829.000APBN, Satker PJN IILampung, 2014
NOL LARAP.Compensation payment is under process
ENVIRONMENTAL : Propose to site visit on Oct 2014 for check theUKL&UPL recommendation will integrated in to the design and Prepareoutline,form RKPPL (by PMU letter to Kasatker/PMU letter on 7 April2014):. SOCIAL: PMU/CTC has been coordinate with PPK to speed upthe completion of land acquisition prior to contract.
18 Mukomuko - Bts. Sumbar Bengkulu 25.8 6 UKL&UPL
sensitive areas/resident, landacquisition, steep slopes,soft soiland rivers
APBN (TLKJ 2011) 100%
YES Recommended2010. UKL&UPL no needNOL from the WB.
LARAPone link,sensitive/steepslopes,soft soil and rivers
APBN (TLKJ 2011) 100%
YES Recommended2011. UKL&UPL no needNOL from the WB.
SimpleLARAP
The CTC has received LARAP documents from PMUdated 22 January 2014. CTC has completed reviewingand need some clarification before the LARAP can befinalized.
APBD Prov Sumbar,Dinas PU,
Finalization of LARAP from CTC ENVIRONMENTAL; Propose to site visit on Oct 2014 for check theUKL&UPL recommendation will integrated in to the design and Prepareoutline,form RKPPL (by PMU letter to Kasatker/PMU letter on 7 April2014). SOCIAL: LARAP will be submitted to WB on Nov 2014
21 Lubuk Alung -Kurataji Sumatera Barat 16.8 7 UKL&UPL one link,sensitive/steepslopes,soft soil and rivers
APBN (Balai II 2011) 100% YES Recommended2011. UKL&UPL no needNOL from the WB.
SimpleLARAP
The CTC has received LARAP documents from PMUdated 22 January 2014. CTC has completed reviewingand need some clarification before the LARAP can befinalized.
APBD Prov Sumbar,Dinas PU,
Finalization of LARAP from CTC ENVIRONMENTAL; Propose to site visit on Oct 2014 for check theUKL&UPL recommendation will integrated in to the design. Prepareoutline,form RKPPL (by PMU letter to Kasatker/PMU letter on 7 April2014). SOCIAL: LARAP will be submitted to WB on Nov 2014
20 Lubuk Alung - Sicincin Sumatera Barat 14.6 7 UKL&UPL
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix F
Procurement Plan & Progress
APPENDIX F1
Submission Notification
Sub - Project of ofIDR (x10⁶) Application Qualification Original Addendum
AWP - 1
1 10-17/01-WINRIP-WP1/CE/A/8043-ID/11-13 Krui - BihaLampung Province.
CapacityExpansion 163,534.85 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 PT. Jaya Konstruksi
Manggala Pratama, Tbk. 25-Nov-13 Civil Work ICB 134,909.21 70.00
2 39-06/02-WINRIP-WP1/CE/A/8043-ID/12-13Padang Sawah - Sp.Empat (incl.Air Gadang Bridge), WestSumatera Province.
CapacityExpansion 228,772.24 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 PT. Jaya Konstruksi
Manggala Pratama, Tbk. 06-Dec-13 Civil Work ICB 197,936.70 70.00
3 40-06/03-WINRIP-WP1/CE/A/8043-ID/12-13 Manggopoh - Padang Sawah,West Sumatera Province
CapacityExpansion 167,678.40 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 PT. Jaya Konstruksi
Manggala Pratama, Tbk. 06-Dec-13 Civil Work ICB 143,688.96 70.00
4 01-26/04-WINRIP-WP1/CE/A/8043-ID/11-13 Ipuh - Bantal, Bengkulu Province CapacityExpansion 247,105.24 25-Jan-11 21-Feb-11 02-Nov-11 28-Dec-11 30-Dec-11 28-Feb-12 25-Jan-13 28-Mar-13 17-May-13 27-Jun-12 31-Oct-12 27-May-13 18-Jul-13 10-Sep-13 18-Sep-13 PT. Waskita Karya - PT.
Daya Mulia Turangga, J.O. 14-Nov-13 Civil Work ICB 186,936.75 70.00
AWP - 2
5 Simpang Rampa - Poriaha, NorthSumatera Province.
CapacityExpansion 152,870.49 07-Nov-13 22-Jul-14 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 9-Jun-14 15-Jul-14 22-Jul-14 18-Jul-14 22-Jul-14 11-Aug-14 22-Sep-14 Civil Work ICB 70.00
6 Ps. Pedati - Kerkap, BengkuluProvince
CapacityExpansion 92,127.40 21-Nov-13 Civil Work NCB 70.00
7 Indrapura - Tapan, West SumateraProvince
CapacityExpansion 280,123.02 Civil Work NCB 70.00
8 Bts.Kota Pariaman - Manggopoh,West Sumatera Province
CapacityExpansion 603,016.70 Civil Work ICB 70.00
9
Rantau Tijang - Kota Agung,Lampung Province(proposed change to Biha -Bengkunat, Lampung Province)
CapacityExpansion 149,831.00 Civil Work NCB 70.00
10 Simpang Empat - Sp.Air Balam,West Sumatera Province
CapacityExpansion 819,755.25 Civil Work ICB 70.00
11
Bantal - Mukomuko, BengkuluProvince(proposed change to Sibolga -Sorkam, North Sumatera Province)
CapacityExpansion 246,499.55 07-Nov-13 06-Aug-14 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 16-Jun-14 25-Jun-14 11-Jul-14 21-Jul-14 6-Aug-14 22-Aug-14 3-Oct-14 4-Nov-14 Civil Work ICB 70.00
12 Kambang - Indrapura, WestSumatera Province
CapacityExpansion 773,942.44 Civil Work ICB 70.00
13 Sp Rukis - Tj Kemuning, BengkuluProvince.
CapacityExpansion 316,304.67 07-Nov-13 06-Aug-14 07-Nov-13 18-Nov-13 23-Dec-13 10-Feb-14 16-Jun-14 25-Jun-14 11-Jul-14 21-Jul-14 6-Aug-14 22-Aug-14 3-Oct-14 4-Nov-14 Civil Work ICB 70.00
AWP - 3
14 Painan - Kambang, WestSumatera Province
CapacityExpansion 118,993.00 Civil Work NCB 70.00
15 Sibolga - Batas Tapsel, NorthSumatera Province
CapacityExpansion 376,479.38 30-Dec-13 28-Feb-14 Civil Work ICB 70.00
16Seblat - Ipuh, (incl. Air Lalang & AirGuntung Bridge), BengkuluProvince
CapacityExpansion 110,237.00 Civil Work NCB 70.00
17 Sp.Gng Kemala - Pugung Tampak,Lampung Province
CapacityExpansion 255,269.25 30-Sep-13 10-Oct-13 30-Sep-13 10-Oct-13 11-Nov-13 30-Dec-13 28-Feb-14 13-Jun-14 25-Jun-14 19-Dec-14 7-Jan-14 4-Jul-14 15-Aug-14 10-Oct-14 14-Oct-14 Civil Work ICB 70.00
18 Mukomuko - Batas Sumbar,Bengkulu Province
CapacityExpansion 69,233.00 Civil Work NCB 70.00
19 Lais - Bintunan, BengkuluProvince
CapacityExpansion 35,886.28 21-Nov-13 Civil Work NCB 70.00
20 Lubuk Alung - Sicincin, WestSumatera Province Betterment 54,557.00 Civil Work NCB 70.00
21 Lubuk Alung - Kuraitaji, WestSumatera Province
CapacityExpansion 65,788.00 Civil Work NCB 70.00
World BankFinancingRatio (%)
ContractorContractSignature
DateContract No.
WB NOLDate
Bidding Document
WESTERN INDONESIA NATIONAL ROAD IMPROVEMENT PROJECTPROCUREMENT MANAGEMENT FOR CIVIL WORK
PackageNo. Type of Work
Estimated CostEE (Incl. VAT)
Design PQ Document Invitation forPre-
qualification
Evalt.QualificationReport Category
ContractProcurement Method
Contract Price (IDR 106)including Tax
Invitationfor Bids
Date
BidOpening
Date
Bid Evaluation Report
SubmissionDate NOL Date Submission
DateWB NOL
DateSubmissio
n DateSubmissio
n DateWB NOL
DateSubmission
Date WB NOL
APPENDIX F2
Procurement Plan of Implementation Support and Road Sector Institutional DevelopmentWestern Indonesia National Roads Improvement Project (WINRIP)Name of Executing Agency: Directorate General of Highways , Ministry of Public Works. STATUS October 31, 2014
Ref.No. Contract Description Project Cost (US$) Procurement
Method
Review byBank
(Prior/Post)Schedule
Preparationof DraftREOI
EOIadvertised
in MPWWebsite
SubmissionRFP to WB WB NOL to RFP
Opening ofFinancialProposal
FinalEvaluationReport
ContractSign
Service Startdate
Period(Month) Consultant Remarks
Allocated Contract Actual Submission WB NOL Submission WB NOL Submission Submission WB NOL
2 Implementation Support
Schedule 14-Nov-10 05-Dec-10 23-Jan-11 12-Feb-11 12-Mar-11 02-Apr-11 23-Apr-12 04-Jun-12 22-Jul-12 05-Aug-12 12-Aug-12 15-Sep-12 29-Sep-12 22-Oct-12 12-Nov-12
Actual 26-Nov-10 7-Jun-11 30-Jan-12 7-Mar-12 9-Dec-11 6-Mar-12 20-Mar-14 30-Apr-12 14-Jun-12 29-Jun-12 27-Aug-12 3-Sep-12 21-Sep-12 12-Oct-12 5-Nov-12 16-Nov-12 40
Schedule 11-Dec-11 08-Jan-12 27-Feb-12 26-Mar-12 07-May-12 28-May-12 08-Oct-12 22-Oct-12 05-Nov-12 12-Nov-12 19-Nov-12 26-Nov-12 01-Apr-13 18-Apr-13 02-May-13
Actual 26-Nov-10 7-Jun-11 4/2/2012 10-Aug-12 20-Jan-12 23-May-12 31-Aug-14 23-Oct-12 20-Dec-12 21-Feb-13 5-Mar-13 13-Mar-13 25-Mar-13 19-Apr-13 11-Jun-13 25-Jun-13 42
3 Road Sector Institutional Development (DGH)
Capacity Building for DGH Environment/Risk Mitigation and Road Safety Unit(developing roadmap, norm, standard, procedure,criteria for disaster risk management in road sector,risk analysis and standad implementation)Peningkatan Kapabilitas Penanggulangan Bencana,Ditjen Bina Marga. Schedule 10-Nov-14 17-Nov-14 01-Dec-14 15-Dec-14 02-Jan-15 16-Jan-15 23-Jan-15 06-Mar-15 05-Apr-15 19-Apr-15 03-May-15 10-May-15 24-May-15 07-Jun-15 21-Jun-15 05-Jul-15 18 26-Dec-16
Capacity Building for Disaster Risk Reduction in DGH Actual
Note: Part 3: The packages based on proposed by DTA (Sub-Dit. Of Environmental and Road Safety). TOR of packages had been submitted by DTA (Sub-Dit. Of Environmental and Road Safety) directly to Bank. Draft TOR had submitted to PMU by DTA.
Date ofReceipt ofProposals
Prior
Evaluation and Short List Technical EvaluationReport Negotiation & Draft Contract
Prior
Theissuance
RFP to theshortlisted
firms
aCore Team Consultant (Project Management,Technical Assistant, Enviromental & Social Aspectand Road safety Audit)
5,000,000 3,497,984 QCBS
bDesign and Supervision Consultant (DesignAWP-2 & 3 and Construction Supervision of CivilWorks Project)
10,000,000 6,070,722 QCBS
a. 1,000,000 QCBS Prior
1,000,000
PT. PerentjanaDjaja, YongmaEng. Co. Ltd
and PT.Epadascon
PermataRenardet S.A.,PT. Cipta
Strada, PT.Daya Creasi
Mitrayasa, PT.
T O T A L
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix G
WINRIP Website & Application Progress
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
APPENDIX GManagement Information System (MIS) Status on October, 2014
NO. TASK DESCRIPTION STATUS WORK PLAN1 File Storage The storage server to stored all of
soft files of reports and documents.The server has been completed inMay 2013.
Rebuild the new File Storage Serverwith the root folder that moreefficient and integrated with the DMSapplication.
2 DMS (DocumentManagement System)
The application to record allinformation of letter and documentfiles.
The application has been developedin June 2013.
Rebuild the new DMS applicationthat integrated with the File Storage.
3 Website The WINRIP official website. The website has been developed inAugust 2013.
4 WebGIS The spatial data and roadsinformation that overlay intoGoogle Maps.
The application has been developedin October 2013.
5 FMIS (FinancialManagement InformationSystem)
The application to monitoring afinancial and physical progressreport.
The programming modules that havebeen finished are as follows: Project Data Financial and Physical Progress Progress Summary History of Financial and Physical
Progress User
The programming modules that notyet finished are as follows: Consultant Services Reports
6 CHS (Complaint HandlingSystem)
The application to accommodatecomplaints from the public.
The application has been developedin January 2014.
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix H
ACAP Training /Dissemination Progress
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix H ACAP Activity ProgressAppendix H1
Activities Progress of Community Representative Observers (CROs)from January 2013 – October 2014 and the Works Plan
No Subject of Activities Date of Finish/completed
1. Orientation and studied of WINRIP documents and Development of Works Plan January 2013
2 Prepared of Workshop of Procurement Document Evaluation. February 2013
3. Conducted Workshop of Procurement Document Evaluation for POKJA, Satker/PPK,Balai BBPJN and PMU.
Febr. 28, 2013 –March 01, 2013
4. Provided of Term of Reference (TOR) of the CRO's Selection and Guidelines for CRO’sSelection
March 1, 2013
5. Provided the Materials (Slide Presentation/Power-point) of General Explanationsabout WINRIP and the CRO’s selection and
March 8, 2013
6. Provided Training Materials for CROs. March 8, 2013
7. Sending an official letter No. Hm.0603/Bp-11/0175/2013, from the Director ofPlanning as Chairman of PMU to Head of BBPJN II & III, about the Selection ofCROs/WPM, + TOR and Guidelines Document
March 11, 2013
8 Preparation of Socialization on CROs selection in BBPJN II Padang for package 02Padang Sawah – Simpang Empat and package 03 Manggopoh - Padang Sawah, andSocialization on CROs selection in BBPJN III Palembang for package 01 Krui – Biha andpackage 04 Ipuh – Bantal.
March 31, 2013
9. Socialization on CROs selection in BBPJN II Padang for package 02 Padang Sawah –Simpang Empat and package 03 Manggopoh - Padang Sawah
April 9, 2013
10 Socialization on CROs selection in BBPJN III Palembang for package 01 Krui – Biha andpackage 04 Ipuh – Bantal.
April 11, 2013
11. Sent the Invitation letter from Head of BBPJN III to Rector of Universities /Head ofColleges in Palembang, about selection of the CROs for package 01. Krui – Biha (Prov.Lampung) and package 04. Ipuh – Bantal (Prov. Bengkulu).
May 17, 2013
12. Sent the Invitation letter from Head of BBPJN II to Rector of Universities /Head ofColleges in Padang, about selection of the CROs for package 02. Padang Sawah –Simpang Empat and package 03. Manggopoh - Padang Sawah (Prov. Sumatera Barat).
May 20, 2013
13. Selection of CROs for Packages Krui – Biha Province Lampung and Ipuh – BantalProvince Bengkulu, and training for selected CROs in BBPJN III Palembang
May 23, 2013
14. Selection of WPM/CROs for Packages Manggopoh – Padang Sawah and Padang Sawah– Simpang Empat, and training for selected CROs in BBPJN II Padang
May 27, 2013
15. Sending an official letter No. Hm.0603/Bp-11/0175/2013, from the Director ofPlanning as Chairman of PMU to Head of BBPJN II & III, about the Selection ofCROs/WPM, + TOR and Guidelines Document
May 28, 2013
16. Guiding the Balai Besar Pelaksanaan Jalan Nasional (Balai) II Padang to compose theApplication Letter for Approval of selected CROs for Package 03. Manggopoh – PadangSawah, package 02. Padang Sawah – Simpang Empat, and Balai III Palembang forPackage 01. Krui – Biha Province Lampung and Package 04. Ipuh – Bantal ProvinceBengkulu.
May 29, 2013
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
No Subject of Activities Date of Finish/completed
17. Compiling summary of the results of Selection the Community RepresentativeObservers (CROs)/ Wakil Pengamat dari Masyarakat (WPM) and the Training activitiesfor selected CROs for four Packages AWP-1
June 1 - 9, 2013
18. Assist PMU to prepare the Approval letter of selected CROs for four AWP-1 Packages,and prepare of the Decree on Establishment the CROs of AWP-1 WINRIP from Directorof Planning DGH, as the Chairman of PMU.
June 1 - 9, 2013
19. Monitor and observation the Pre-Bid Meeting and Site Visit activities of ProcurementProcess that held by the Procurement Committee, in BBPJN II and III, on 10 June 2013by CROs in implementing their tasks on the
June 10 - 16,2013
20. Evaluate of the CROs observation on Pre-Bid Meeting and Site Visit activities June 17 - 23,2013
21. Examine the report of CROs on the monitoring and observation of Pre-Bid Meetingand Site Visit at the packages of Annual Works Program - 1 (AWP-1) WINRIP.
Modify the template of monitoring the report of the CROs, to be more focused andmore systematically
June 24 - 30,2013
22. Monitor /Observe of Bids Submission and Bids Opening for four packages AWP-1 byCommunity Representative Observers (CROs) for Package 01, 02, 03, and 04
July 18, 2013
23. Monitoring and examined of the CRO’s Report on the monitoring and observation ofBid Submission and Bid Opening activities for four packages of Annual Works Program- 1 (AWP-1) WINRIP, which have been carried out on July 18, 2013
August, 2013
24 Preparation on the Socialization of CROs selection to the Procurement Committee(POKJA) of Sumatera Utara province, for package Simpang Rampa – Poriaha andpackage Sibolga – Batas Tapanuli Selatan
October 2013
25 Monitored /Observed of Procurement progress on Commencement of Bid Winnersfor four packages AWP-1 (Package 01, 02, 03, and 04) and informed to relatedCommunity Representative Observers (CROs).
November 2013
26 Carried out the dissemination of CROs selection to the Procurement Committee(POKJA) of Sumatera Utara province, for package Simpang Rampa – Poriaha. in Balai(BBPJN) I Medan and in Project Management (Satker) Office.
November 19 –20, 2013
27 Carried out the CROs selection for package 17: Simpang Gunung Kemala – PugungTampak in Lampung..
July 17, 2014
28 Carried out the CROs selection for package 05: Simpang Rampa – Poriaha in NorthSumatera province.
August 20, 2014
29 Carried out the CROs selection for package 11: Bantal – Mukomuko, and package 13:Simpang Rukis – Tanjung Kemuning in Bengkulu province.
Sept. 1, 2014
30 Ms. Hesti Aulia Sari, ST, CRO for Package 11: Bantal - Mukomuko, meet the invitationof the Procurement Committee (Pokja of Procurement Unit/Unit Layanan PengadaanBBPJN III, PIU/Satker PJN Region I Bengkulu Province).
Oct. 03, 2014
31 Ms. Hot Maria Angelina, ST, CRO for Package 13: Simpang Rukis - Tanjung Kemuningwas attended Bid-Opening meeting meet the invitation by the ProcurementCommittee (Pokja of Procurement Unit/Unit Layanan Pengadaan BBPJN III, PIU/SatkerPJN Region II Bengkulu Province).
Oct. 03, 2014
Works Plan for the next steps of CROs subject activities
No Subject of Activities Datelines Plan /Actual condition
1. Prepare selection of the Community Representative Observers (CRO) for packages 06(Pasar Pedati – Kerkap), 19 (Lais – Bintunan), and 15 (Sibolga – Batas Tapsel)
November 2014
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix H.2
The Progress of Third Party Monitoring (TPM) Activitiesfrom January 2013 – October 2014 and Works Plan for Next Steps
No Subject of Activities Target Completed
1. Preparation the initial draft of ToR of selection the TPM Dec, 2013 Dec, 2013
2. Providing the TPM selection guidelines. Dec, 2013 Dec, 2013
3. Providing the Training Materials for the TPM Dec, 2013 Dec, 2013
4.Preparing the official letter from the Director of Planning asChairman of PMU to Head of BBPJN II & III, about the Selection ofTPM.
Jan, 2014 Jan. 24, 2014
5. Preparing the official letter from the Director of Planning asChairman of PMU to Universities, about the Selection of TPM. Jan., 2014 Jan 29, 2014
Preparing the official letter from the Official in Charge/KetuaPelaksana Harian PMU to Satker/PPK, about the Selection of TPM Jan, 2014 Jan 13, 2014
5.Preparing the official letter from the Official in Charge/KetuaPelaksana Harian PMU to Universities and Satker/PPK, about theSocialization of TPM Selection for Package 01, 02, & 03
Feb. 2014 Feb. 07, 2014Feb. 13, 2014
6. Socialization of the TPM selection for package 01: Krui - Biha. Feb. 2014 Febr. 14, 2014
7. Socialization of the TPM selection for package 02: Padang Sawah –Simpang Empat and package 03: Manggopoh – Simpang Empat Feb. 2014 Febr. 18, 2014
8.Preparing the official letter from the Director of Planning asChairman of PMU to University of Bengkulu, about the Selection ofTPM for package 04: Ipuh - Bantal.
Jan, 2014 Febr. 19, 2014
9. Help the PMU on formulating the TPM Evaluation Team March 2014 Febr. 25, 2014
10. Implementation of selection of the TPM for four AWP-1 packages byTPM Evaluation Team March 2014 March 10, 2014
11. Delivery of the Preparatory Training for elected TPM for package 01:Krui – Biha in Lampung June 2014 June 5 - 6, 2014
12.Delivery of the Preparatory Training for elected TPM for package 02:Padang Sawah – Simpang Empat, and package 03: Mangopoh –Padang Sawah in West Sumatera
June 2014 June 17-18, 2014
13. Delivery of the Preparatory Training for elected TPM for package 04:Ipuh – Bantal in Bengkulu July 2014 July 7 – 8, 2014
14 Approval process of elected TPM July 2014 July 7 – 8, 2014
15Assist PMU to prepare the Decree on Establishment the TPM ofAWP-1 WINRIP from Director of Planning DGH, as the Chairman ofPMU.
August 2014 Sept. 1, 2014
16
Sending the Coordination Letter from Director of Planning,Directorate General of Highways to the Head of BBPJN Region IMedan, about Selection of the Third Party Monitoring (TPM) forpackage 05 (Simpang Rampa – Poriaha, and package 15 (Sibolga –Tapanuli Selatan border) in North Sumatera.
October 2014 Oct, 07, 2014
17
Sent the Information Letter about participation of Third PartyMonitoring (TPM) on WINRIP, from Director of Planning, DirectorateGeneral of Highways to the University of Lampung (UNILA) forpackage 17 (Simpang Gunung Kemala – Pugung Tampak) in LampungProvince.
October 2014 Oct, 03, 2014
18
Sent the Information Letter about participation of Third PartyMonitoring (TPM) on WINRIP, from Director of Planning, DirectorateGeneral of Highways to the University of Sumatera Utara (USU) forpackage 05 (Simpang Rampa – Poriaha) in North Sumatera Province
October 2014 Oct, 03, 2014
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
No Subject of Activities Target Completed
19
Sent the Information Letter about participation of Third PartyMonitoring (TPM) on WINRIP, from Director of Planning, DirectorateGeneral of Highways to the University of Bengkulu (UNIB) forpackage 11 (Bantal – Mukomuko) and package 13 (Simpang Rukis -Tanjung Kemuning) in Bengkulu Province.
October 2014 Oct, 20, 2014
20Ensure that the Employment Agreement or Memorandum ofUnderstanding between TPM (packages 01, 02, 03, and 04) with theCTC WINRIP (PT. Planners Djaja) can be signed in November 2014
October 2014 November 2014
21 Prepare selection of the Third Party Monitoring (TPM) Selection forpackages 17, 05, 11, and 13
November 2014 November 2014
Appendix H.3
Works Plan on Complaints Handling Mechanism System (CHS) Activities.
No Subject of Activities / Item of Tasks Completion Plan/Progress Condition
1Review of Minister Decree of Public Works No. 323/2005 concerning theprocedures of Handling input from communities on the environment of theMinistry of Public Works
April 18, 2013
2 Preparation of Complaints Register and the complaints address (developing of website of WINRIP) and provided ACAP to inputting data in the web site.
Completed on themiddle of Feb. 2014.
3 Preparation of Complaint Handling Procedure (already available on the websiteapplication http://www.winrip-ibrd.com) April 2014
4
The completion of the Initial investigation of a complaint Procedure, and theprocedure for the investigation of Complaints, as well as the conclusion ofinvestigation (already available on the website application http://www.winrip-ibrd.com)
April 2014
5 Monitored and noted the public complaints via SiPP website and WINRIP website,but until October 2014 have no complaint about the WINRIP programs October 2014
6 The establishment of the settlement Commission Handling the Complaint underthe Inspectorate General of the Ministry of Public Works (Executing Agency) Nov. - Dec. 2014
7Preparation of the device for Executing Agency such as: Proceduresannouncement of penalties, procedures for the annual Survey, Procedure AnnualIndependent Review, the process of Auctions
Nov. - Dec. 2014
8 The development of a code of conduct and actions for Implementing Institutions/Implementing Agency (Bidders, Suppliers, contractors and Consultants) Nov. - Dec. 2014
9 Support the PMU in the Management and Monitoring of the implementationpolicy in handling public complaints Nov. - Dec. 2014
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix H.4
Works Activities on Publication / Disclosure Activities
No Subject of Activities / Item of Tasks Completion Plan/Progress Condition
1 Conducted Workshop of Procurement Document Evaluation for POKJA,Satker/PPK, Balai BBPJN and PMU
February 28, 2013– March 01, 2013
2 Conducted Workshop of World Bank Guidelines of Procurement forWINRIP to the POKJA, Satker/PPK, Balai BBPJN and PMU
April 24 – 25, 2013
3 Review training materials on Project Management Manual (PMM),especially CHAPTER XI of the anti-Corruption Action Plan (ACAP)
First updating April 29, 2013
4 The second Review of training materials on Project Management Manual(PMM), Chapter I - XII
Second updating onDecember 18, 2013
5 The third Review of training materials on Project Management Manual(PMM), Chapter I - XII
third updating onApril, 2014
6. Preparing Method Transparency to the Public, and Improvement theprocedures to the Public Disclosure through information media (website).
Establishment of InformationSystem (MIS) was finish on
March 2014
7. The updating of Project Management Manual (PMM), Chapter 3, 9, 11, and13, has been held in Bogor June 2014
8 Delivery of the Preparatory Training for elected TPM for AWP-a packages:01, 02, and 03 June 2014
9 Delivery of the Preparatory Training for elected TPM for AWP-a packages:04
July 2014
10 The implementation of Dissemination/training of the PMM toStakeholders
September 10 - 11 2014
11Sent the CRO’s activities Repots and Third Party Monitoring (TPM)activities Reports to Information Management Team to be up load to thewebsite of WINRIP.
October 2014
12 Delivery of PMM Training for PPK, contractors and Supervision Consultants(DSC)
PMM for Project Executorsafter the Work Order to the
Contractors
13 Delivering the training programs will inline of project implementationprogress.
Depend on projectimplementation progress
14Monitoring of the implementation of the methods and proceduresdisclosure and transparency of information to the public in each packetsthat has begun construction
2014
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix I
Performance Indicator
Project Development Objective: The development objective is to increase the effective use of selected sections of national roads along the Western Sumatera Corridor by reducing
road user costs.
PDO Level Results Indicators*
Co
re Unit of Measure Baseline
(2010)
Cumulative Target Values** Frequency Data Source/
Methodology
Responsibility
for Data
Collection YR 1 YR 2 YR3 YR 4 YR5
Indicator One:
Average passenger travel times reduced by
at least 20% on project roads.
(i) For light vehicles with base year Speed
of 51 km/h
(ii) 46 km/h for large buses
(iii) 40 km/h heavy trucks
Km/h
0 % --- --- 5 % --- 20 % Mid-term
and ICR
Travel speed
survey
PMU/CTC
Indicator Two:
Average vehicle operating cost for a
typical car, bus and heavy truck reduced
by at least 5%, 8%, and 10% respectively,
on project roads
(i) For light vehicles with base year
Vehicle Operating Cost of $US0.19 per
veh-km
(ii) $US0.35 veh-km for large buses
(iii) $US0.65 veh-km for heavy trucks
$US/km
0 %
0%
0%
--- --- 3 %
5%
7%
--- 5 %
8%
10%
Mid-term
and ICR
Road condition
and travel speed
surveys. And
use of HDM-IV
VOC estimation
Model
PMU/CTC
Indicator Three:
Increase of AADT on project road sections
as per forecast
AADT PAD-Annex 7 AADT
Increases
as per
forecast
ICR
Traffic surveys
PMU/CTC
INTERMEDIATE RESULTS
Intermediate Result (Component One): Betterment and Capacity Expansion of National Roads
Intermediate Result indicator One:
Number of kilometers of improved
national roads in the project region as
planned.
km
0 km 50
km
100
km
300
km
500
km
715 km Semi-
Annually
Reports from
PMU
PMU/CTC
Intermediate Result indicator Two:
Number of meters of improved bridges
meter
0 m 0 m 100
m
130
m
160
m
194 m Semi-
Annually
Reports from
PMU
PMU/CTC
Appendix I : WINRIP Performance Indicators
PDO Level Results Indicators*
Co
re Unit of Measure Baseline
(2010)
Cumulative Target Values** Frequency Data Source/
Methodology
Responsibility
for Data
Collection YR 1 YR 2 YR3 YR 4 YR5
Intermediate Result (Component Two): Implementation Support
Intermediate Result indicator One:
Satisfactory completion of technical audits
for all road projects of component 1
0 %
20 %
40 %
60 %
80 %
100 %
Semi-
Annually
Reports from
PMU
PMU/CTC
Intermediate Result indicator Two:
Satisfactory completion of road safety
audits for all road projects of component 1
0 %
20 %
40 %
60 %
80 %
100 %
Semi-
Annually
Reports from
PMU
PMU/CTC
Intermediate Result (Component Three): Road Sector Institutional Development
Intermediate Result indicator One:
% of Environment unit staff trained and
capacitated to mitigate disaster risk related
to road network
0%
20 %
40 %
50%
75%
100%
Semi-
Annually
Reports from
PMU and Bank
Supervision
PMU/CTC
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix J
Correspondence
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Appendix J Correspondence
INCOMING LETTER
Correspondence
Date From To ActivityOctober 01, 2014 Kepala BBPJN III
PalembangCTC Undangan Acara Rapat Pleno
Kegiatan Pengadaan Tanah danPemukiman Kembali/LandAcquisition and ResettlementAction Plan (LARAP) Ruas JalanRantau Tijang – Kota Agung
October 01, 2014 Sub-DirektoratPKLN
PMU dan BadanTerkait
Permintaan Hasil Pemantauandan Evaluasi KinerjaPelaksanaan Kegiatan yangdibiayai dari Pinjaman LuarNegeri dan/atau Hibah TriwulanIII (July – Septembet) TA 2014
October 02, 2014 Director ofPlanning:Ir. Harris H.Batubara, M.Eng.Sc
Task Team LeadeWINRIP/SeniorTransport Specialist:Mrs. Elizabeth Goller
Submission of Final BiddingDocument for Package No.11:Bantal-Mukomuko and PackageNo.13: Sp.Rukis-Tj.Kemuning inBengkulu Province; WINRIP
October 02, 2014 Kepala BBPJN IIIPalembang
CTC Undangan Sosialisasi/RembugWarga diKecamatan Kota AgungTentang Pengadaan TanahDalam Rangka Pelebaran JalanNasional Ruas Jalan RantauTijang-Kota Agung
October 02, 2014 Direktur BinaPelaksanaanWilayah I:Ir. Wijaya Seta, M.T
Kepala BBPJN IIMedanKepala BBPJN IIIPalembang
Penyampaian Rencana AuditTFAC Pada Paket Krui-Biha(Lampung), Paket PadangSawah-Simpang Empat(Sumbar), dan PaketManggopoh-Padang Sawah(Sumbar)
October 02, 2014 Kepala BBPJN IIIPalembang
Direktur BinaProgram:Ir. Harris H. Batubara,M.Eng.Sc
Permohonan Surat Keputusan(SK) Pembentukan WPM untukPaket No.17: Sp. Gn. Kemala-Pg.Tampak; WINRIP
October 02, 2014 Kepala BBPJN IIIPalembang
Direktur BinaProgram:Ir. Harris H. Batubara,M.Eng.Sc
Permohonan Surat Keputusan(SK) Pembentukan WPM untukPaket No.11: Bantal-Mukomuko, dan Paket No.13:Sp.Rukis-Tj.Kemuning; WINRIP
October 03, 2014 Kasubdit SistemPengendalianWilayah I/PMU OIC:Ir. Agusta E.
Kasatker PJN WilayahII Provinsi SumateraUtara
Persiapan Pemilihan PemantauPihak Ketiga/Third PartyMonitoring Rencana Tindak AntiKorupsi/Anti Corruption Action
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Date From To ActivitySinulingga, M.T Plan (ACAP) WINRIP
October 03, 2014 Site EngineerPackage No.01:Syafri Hedianto
CTC Monthly Progress Report No.09covering for September 2014
October 03, 2014 Site EngineerPackage No.01:Syafri Hedianto
CTC Quarterly Progress ReportNo.03 covering for July, August,September 2014
October 03, 2014 ProcurementSpecialist 2:M. Edhi Fachri
CTC Progress WINRIP as perSeptember 30, 2014
October 03, 2014 DSC CTC Update Status and Target DatesDuring the Meeting by WorldBank in Jakarta on Sept 30, 2014
October 06, 2014 POKJA Paket No.11:Bantal-Mukomuko
CTC Minutes of Bid Opening forPackage No.11: Bantal-Mukomuko
October 06, 2014 POKJA Paket No.13:Sp.Rukis-Tj.Kemuning
CTC Minutes of Bid Opening forPackage No. 13: Sp.Rukis-Tj.Kemuning
October 06, 2014 Site EngineerPackage No.04:Tjantje Hallatu
CTC Monthly Project Report (MPR)No.09 covering for September2014
October 06, 2014 Site EngineerPackage No.04:Tjantje Hallatu
CTC Quarterly Project Report (QPR)No.03 July, August, September2014
October 06, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
CTC Surat Keputusan (SK) untukPaket No.05: Sp.Rampa-Poriaha; WINRIP
October 06, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
Bapak RektorUniversitas Lampung
Pemantau Pihak Ketiga atauThird Party Monitoring (TPM)Paket No.17: Sp.Gn.Kemala –Pg. Tampak WINRIP
October 07, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
Direktur BinaPelaksanaan WilayahI:Ir. Wijaya Seta, M.T
Usulan Penggantian Ruas Jalan;WINRIP
October 08, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
CTC Surat Keputusan WakilPengamat Masyarakat untukPaket No.17: Sp. Gn. Kemala –Pg. Tampak; WINRIP
October 08, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
CTC Surat Keputusan WakilPengamat Masyarakat untukPaket No.11: Bantal –Mukomuko; WINRIP
October 08, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
CTC Surat Keputusan WakilPengamat Masyarakat untukPaket No.13: Sp.Rukis – Tj.Kemuning; WINRIP
October 10, 2014 Direktur Bina Kepala BBPJN I Pemilihan Pemantau Pihak
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Date From To ActivityProgram:Ir. Harris H.Batubara, M.Eng.Sc
Medan Ketiga/Third Party Monitoring(TPM) Pelaksanaan KomponenRencana Tindak AntiKorupsi/ACAP WINRIP
October 10, 2014 Direktur BinaPelaksanaanWilayah I:Ir. Wijaya Seta, M.T
Kepala BBPJN IMedanKepala BBPJN IIPadang
Penyampaian UsulanPenggantian Ruas Jalan Biha-Bengkunat (Lampung) danSibolga-Sorkam (SumateraUtara)
October 13, 2014 Dekan FakultasUniversitasSumatera Utara
Direktur BinaProgram:Ir. Harris H. Batubara,M.Eng.Sc
Pemantau Pihak Ketiga atauThird Party Monitoring Paket05; WINRIP Loan IBRD 8043 ID
October 13, 2014 Director ofPlanning:Ir. Harris H.Batubara, M.Eng.Sc
Task Team LeadeWINRIP/SeniorTransport Specialist:Mrs. Elizabeth Goller
Submission of Bid EvaluationReport (BER) amdRecommendation for AwardContract of Package No.17:Sp.Gn.Kemala – Pg. Tampak inLampung Province; WINRIP
October 13, 2014 Director ofPlanning:Ir. Harris H.Batubara, M.Eng.Sc
Task Team LeaderWINRIP/SeniorTransport Specialist:Mrs. Elizabeth Goller
Status of Objection from PT.Multi Structure – PT. ModernWidya Technical JO to theResult of Pra-QualificationProcess for Package No.11:Bantal-Mukomuko, and PackageNo.13: Sp.Rukis – Tj. Kemuning;WINRIP
October 14, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
Kepala BBPJN IIIPalembang
Pemilihan Pemantau PihakKetiga/Third Party Monitoring(TPM) Pelaksanaan RencanaTindak Anti Korupsi Anti-Corruption Action Plan; WINRIP
October 15, 2014 Site Engineer Paket03:Ir. Sudjarwo
CTC Monthly Progress Report (MPR)untuk Bulan September 2014
October 16, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
Direktur BinaPelaksanaan WilayahI:Ir. Wijaya Seta, M.T
Implementasi LARAP PaketNo.02: Padang Sawah – Sp.Empat termasuk Jembatan AirGadang, dan Paket 03:Manggopoh – Pd. Sawah;WINRIP
October 20, 2014 Director General forConstructionDevelopmentAgency, Ministry ofPublic Works
World Bank Indonesia; WINRIP Loan IBRD8043 ID Model BiddingDocument for Procurement ofWorks under NationalCompetitive Bidding (NCB) usingMPW’s Full E-ProcurementSystem.
October 20, 2014 Site EngineerPackage No.02:
CTC Monthly Progress Report (MPR)June 2014
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Date From To ActivityStefanus Editya,M.T
October 20, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)July 2014
October 20, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)August 2014
October 20, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)September 2014
October 20, 2014 Direktur BinaPelaksanaanWilayah I:Ir. Wijaya Seta, M.T
Kepala BBPJN IIPadang
Implementasi LARAP PaketNo.02: Padang Sawah – Sp.Empat termasuk Jembatan AirGadang, dan Paket 03:Manggopoh – Pd. Sawah;(Sumbar) WINRIP
October 20, 2014 Menteri PekerjaanUmum
Ketua POKJAPengadaan Barangdan Jasa WINRIPProvinsi Lampung
Penetapan PemenangPelelangan Pekerjaan WINRIPNomor Paket 17: Sp.Gn.Kemala– Pg. Tampak, SNVT PJNWilayah II Provinsi LampungSumber Dana IBRD Loan 8043ID
October 21, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
Direktur BinaPelaksanaan WilayahI:Ir. Wijaya Seta, M.T
Penyampaian Surat Bank DUniaTerhadap Dokumen LARAPPaket No.07: Indrapura – tapan,dan Paket No.12: Kambang –Indrapura di Provinsi SumateraBarat; WINRIP Loan IBRD 8043ID
October 21, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)May 2014
October 21, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
Rektor UniversitasBengkulu
Pemantau Pihak Ketiga atauThird Party Monitoring (TPM)untuk Paket No.11: Bantal-Mukomuko, dan Paket No.13:Sp.Rukis-Tj.Kemuning; WINRIP
October 22, 2014 DirekturPerencanaan danPengembanganPendanaanPembangunan
Direktur BinaProgram, DirekturBina PelaksanaanWilayah I
Rapat Koordinasi Pemantauandan Evaluasi KinerjaPelaksanaan Kegiatan yangdibiayai Pinjaman dan HibahLuar Negeri Triwulan III Tahun2014
October 22, 2014 World Bank Director General for Indonesia; Western Indonesia
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Date From To ActivityConstructionDevelopment Agency,MPW
Roads Improvement Project(WINRIP) (Loan No.8043 ID)Model Bidding Document forProcurement of Works underNational Competitive Bidding(NCB) using MPW’s Full E-Procurement System
October 23, 2014 Direktur BinaProgram:Ir. Harris H.Batubara, M.Eng.Sc
Direktur BinaPelaksanaan WilayahI:Ir. Wijaya Seta, M.T
Sanggahan dari PT. MultiStructure – PT. Modern WidyaTechnical, JO terhadap HasilPrakualifikasi Paket 11: Bantal –Mukomuko dan Paket 13: Sp.Rukis – Tj. Kemuning di ProvinsiBengkulu; WINRIP
October 23, 2014 Site Engineer Paket03
GS Paket 03: PT. JayaKonstruksi Manggala
Kelayakan Produksi AMP
October 24, 2014 Direktur BinaPelaksanaanWilayah I:Ir. Wijaya Seta, M.T
Kepala BBPJN IIPadang
Penyampaian Surat Bank DuniaTerhadap LARAP untuk PaketNo.07: Indrapura – Tapan, danPaket 12: Kambang – IndrapuraProvinsi Sumatera Barat;WINRIP
October 24, 2014 Task Team LeaderWINRIP/SeniorTransportSpecialist:Mrs. ElizabethGoller
Director of Planning:Ir. Harris H. Batubara,M.Eng.Sc
Indonesia; Western IndonesiaRoads Improvement Project(WINRIP) (Loan No.8043 ID)Serious Delays in theImplementation of LARAP forPackage No.13 and 17.
October 28, 2014 Site Engineer Paket03
Lab. TechnicianPackage No.03
Surat Peringatan Pertama/SP. I(Disiplin Kerja)
October 28, 2014 Site Engineer Paket03
GS Paket 03 Pemasangan Rambu Lalu LintasLokasi Pekerjaan
October 29, 2014 Task Team LeaderWINRIP/SeniorTransportSpecialist:Mrs. ElizabethGoller
Director of Planning:Ir. Harris H. Batubara,M.Eng.Sc
No Objection to Award for thePackage No.17: Sp.Gn.Kemala –Pg. Tampak, Lampung Province,International CompetitiveBidding – BER for PackageNo.01: Krui – Biha
October 30, 2014 Site Engineer Paket03
GS Paket 03 Pekerjaan Patching
October 31, 2014 SE Paket 04 CTC Quantity Record dan ExecutiveSummary Oktober 2014
October 31, 2014 PMU ProjectOfficer:Dwisman WIjaya,M.T
CTC Indonesia; Western IndonesiaRoads Improvement Project(WINRIP) (Loan No.8043 ID)Model Bidding Document forProcurement of Works underNational Competitive Bidding(NCB) using MPW’s Full E-Procurement System
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Report Submission
Date From To ActivityOctober 02, 2014 Director of
Planning:Ir. Harris H.Batubara, M.Eng.Sc
Task Team LeadeWINRIP/SeniorTransport Specialist:Mrs. Elizabeth Goller
Submission of Final BiddingDocument for Package No.11:Bantal-Mukomuko and PackageNo.13: Sp.Rukis-Tj.Kemuning inBengkulu Province; WINRIP
October 03, 2014 Site EngineerPackage No.01:Syafri Hedianto
CTC Monthly Progress Report No.09covering for September 2014
October 03, 2014 Site EngineerPackage No.01:Syafri Hedianto
CTC Quarterly Progress ReportNo.03 covering for July, August,September 2014
October 03, 2014 Site EngineerPackage No.01:Syafri Hedianto
CTC Monthly Progress Report No.09covering for September 2014
October 03, 2014 Site EngineerPackage No.01:Syafri Hedianto
CTC Quarterly Progress ReportNo.03 covering for July, August,September 2014
October 06, 2014 Site EngineerPackage No.04:Tjantje Hallatu
CTC Monthly Project Report (MPR)No.09 covering for September2014
October 06, 2014 Site EngineerPackage No.04:Tjantje Hallatu
CTC Quarterly Project Report (QPR)No.03 July, August, September2014
October 20, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)June 2014
October 20, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)July 2014
October 20, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)August 2014
October 20, 2014 Site EngineerPackage No.02:Stefanus Editya,M.T
CTC Monthly Progress Report (MPR)September 2014
Meeting
Date From To ActivityOctober 01, 2014 Kepala BBPJN III
PalembangCTC Undangan Acara Rapat Pleno
Kegiatan Pengadaan Tanah dan
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Date From To ActivityPemukiman Kembali/LandAcquisition and ResettlementAction Plan (LARAP) Ruas JalanRantau Tijang – Kota Agung
October 02, 2014 Kepala BBPJN IIIPalembang
CTC Undangan Sosialisasi/RembugWarga diKecamatan Kota AgungTentang Pengadaan TanahDalam Rangka Pelebaran JalanNasional Ruas Jalan RantauTijang-Kota Agung
October 22, 2014 DirekturPerencanaan danPengembanganPendanaanPembangunan
Direktur BinaProgram, DirekturBina PelaksanaanWilayah I
Rapat Koordinasi Pemantauandan Evaluasi KinerjaPelaksanaan Kegiatan yangdibiayai Pinjaman dan HibahLuar Negeri Triwulan III Tahun2014
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Outgoing Letter
Correspondence
Date To From ActivityOctober 01,
2014Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Submission Report of Anti-Corruption Action Plan (ACAP)WINRIP
October 03,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Establishment Decree of CRO’sfor Package No.17: Sp. Gn.Kemala – Pg. Tampak; WINRIP
October 03,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Establishment Decree of CRO’sfor Package No.11: Bantal –Mukomuko; WINRIP
October 03,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Establishment Decree of CRO’sfor Package No.13: Sp. Rukis – Tj.Kemuning; WINRIP
October 03,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Request to prepare theEnvironmental and MonitoringPlan (RKPPL) WINRIP
October 06,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Evaluation of Show CauseMeeting (SCM) II in Balai forPackage No.01: Krui-Biha, andSCM Level I for Package No.04:Ipuh – Bantal; WINRIP
October 07,2014
CTC Co. TL:Julius J. Sohilait
CTC Team Leader:Cesar T. Arenas
Authorization as Team Leader
October 08,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Submission Report of Anti-Corruption Action Plan (ACAP)WINRIP
October 10, Kasubdit Sistem CTC Team Leader: Renewal and/or Extension of
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
2014 PengendalianWilayah I/PMUOIC:
Ir. Agusta E.Sinulingga, M.T
Cesar T. Arenas Work Visa
October 16,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Co. Team Leader:Julius J. Sohilait
LARAP Implementation forPackage No.2 Padang Sawah –Simpang Empat, include AirGadang Bridge, and PackageNo.3 Manggopoh – PadangSawah; WINRIP Loan IBRD No.8043-ID
October 21,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Co. Team Leader:Julius J. Sohilait
Submission of First RevisedProject Management Manual(PMM) in Bahasa Indonesia;WINRIP Loan IBRD 8043 ID
October 30,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:
Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Review of Bid Evaluation Reportfor Package 11: Bantal –Mukomuko ; WINRIP
October 30,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:
Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Review of Bid Evaluation Reportfor Package 13: Sp.Rukis – Tj.Kemuning ; WINRIP
Report Submission
Date From To ActivityOctober 01,
2014Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Submission Report of Anti-Corruption Action Plan (ACAP)WINRIP
October 08,2014
Kasubdit SistemPengendalianWilayah I/PMUOIC:Ir. Agusta E.Sinulingga, M.T
CTC Team Leader:Cesar T. Arenas
Submission Report of Anti-Corruption Action Plan (ACAP)WINRIP
October 21,2014
Kasubdit SistemPengendalianWilayah I/PMU
CTC Co. Team Leader:Julius J. Sohilait
Submission of First RevisedProject Management Manual(PMM) in Bahasa Indonesia;
Monthly Progress Report October 2014
Western Indonesia National Roads Improvement Project
Date From To ActivityOIC:Ir. Agusta E.Sinulingga, M.T
WINRIP Loan IBRD 8043 ID
Meeting
Date From To Activity- - - -