Date post: | 24-Feb-2018 |
Category: |
Documents |
Upload: | bala-murugan |
View: | 238 times |
Download: | 0 times |
of 30
7/25/2019 Mooring Procedures.ppt
1/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
GENERAL TIE-DOWN AND MOORING
7/25/2019 Mooring Procedures.ppt
2/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
TM 1-1500-250-23
Supplements, clarifies, standardizes the tie-down and
mooring procedures in the -23 Technical Manuals for all
series !-"#, $!-"0, %!-#&, $!-1, !-1, and '!-5(
helicopters to the ma)imum e)tent practica*le+
hen a conflict e)ists *etween this eneral TM and the
aircraft specific -23 TMs, the Tie-.own and Mooring
procedures descri*ed in this eneral TM shall *e followed+
7/25/2019 Mooring Procedures.ppt
3/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
TM 1-1500-250-23
/er installation with rm aiation units
will hae secure mooring points for allassigned aircraft+ here points are not
sufficient, installation engineers will tae
immediate action to install reuiredmooring points+
7/25/2019 Mooring Procedures.ppt
4/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
TM-1-1500-250-23
4'T/ 6f una*le to conform to the
configurations shown within this TM, contact
M%'M /ngineering 7.S4 "83-1"&89 for
guidance+
%hains are to *e attached to the aircraft as
illustrated in the aircraft figure in the TM and areto *e ad:usted to remoe slac in the chains+
7/25/2019 Mooring Procedures.ppt
5/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
TM 1-1500-250-23
/)ceptions to the use of mooring chains is
onl approed under special circumstances
where chain has proen to *e undesira*le such
as the crossoer mooring on the %!-#&.+
The %$-1;, 5000 pound capacit nlon tie-
down strap is onl authorized when hard stand
mooring points are not aaila*le and the field
mooring it is used+
7/25/2019 Mooring Procedures.ppt
6/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
%
7/25/2019 Mooring Procedures.ppt
7/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
%
7/25/2019 Mooring Procedures.ppt
8/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
/)cessie Slac in %hains>
7/25/2019 Mooring Procedures.ppt
9/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
TM 1-1500-250-23
%$T6'4 /nsure chain lins are inserted
into the M;1 chain ad:uster as shown in
figure #-2+ 6ncorrect insertion ma causethe M;1 ad:uster to fail and compromise
the mooring sstem+
7/25/2019 Mooring Procedures.ppt
10/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
7/25/2019 Mooring Procedures.ppt
11/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
7/25/2019 Mooring Procedures.ppt
12/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
6mproper %hain 6nsertion
7/25/2019 Mooring Procedures.ppt
13/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
6mproper %hain 6nsertion 7cont9
7/25/2019 Mooring Procedures.ppt
14/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
7/25/2019 Mooring Procedures.ppt
15/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
%ommon Mistaes
7/25/2019 Mooring Procedures.ppt
16/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
%ommon Mistaes 7cont9
=!? M@?M
A1 ntenna
7/25/2019 Mooring Procedures.ppt
17/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
%hain Boop ssem*l
/asier ccessi*ilit
/asier chain ad:ustment
/asier to use in inclement weather 7Snow9
7/25/2019 Mooring Procedures.ppt
18/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
7/25/2019 Mooring Procedures.ppt
19/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
7/25/2019 Mooring Procedures.ppt
20/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
%ommon Mistaes 7cont+9
7/25/2019 Mooring Procedures.ppt
21/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
%ommon Mistaes 7cont+9
7/25/2019 Mooring Procedures.ppt
22/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
Mooring Crocedures
6f the aircraft *eing moored has more than
one configuration, *e sure that crew
mem*ers are familiar with the propermooring procedures for the specific aircraft
configurations+
/)amples
7/25/2019 Mooring Procedures.ppt
23/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
7/25/2019 Mooring Procedures.ppt
24/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
7/25/2019 Mooring Procedures.ppt
25/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
7/25/2019 Mooring Procedures.ppt
26/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
7/25/2019 Mooring Procedures.ppt
27/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
7/25/2019 Mooring Procedures.ppt
28/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
Creent This ?rom !appening
7/25/2019 Mooring Procedures.ppt
29/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT
;e Sure %rew Mem*ers Dnow
The Croper Techniues
7/25/2019 Mooring Procedures.ppt
30/30
CORPS AVIATION SAFETY AND STANDARDIZATION DETACHMENT