1000
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
SMITHTONJUNCTION
INVERNESS
RAIGMOREINTERCHANGE
HIGHLAND MAIN LINE
INVERNESSRETAIL AND
BUSINESS PARK
SEAFIELDROUNDABOUT
MORAYFIRTH
ABERDEEN TO INVERNESS
RAILWAY LINE
EXISTING A96
N V 001
NV039NV040
NV041
NV038
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 1 of 16
Figure 8.10aEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810a
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design
3800
3900
4000
4100
4200
4300
4400
4500
4600
4700
4800
4900
5000
5100
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
27002800
2900
3000
3100
3200
3300
3400
3500
3600
3700
ABERDEEN TO INVERNESS
RAILWAY LINE
CULLODEN
EXISTING A96
HIGHLAND MAIN LINE
BALLOCHJUNCTION
N V 002
N V 006
N V 003
N V 004
N V 005
NV042
NV043
NV044NV045
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 2 of 16
Figure 8.10bEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810b
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design
3800
3900
4000
4100
4200
4300
4400
4500
4600
4700
4800
4900
5000
5100
52005300
5400
5500
5600
57005800
5900
6000
6100
6200
6300
6400
2900
3000
3100
3200
3300
3400
3500
3600
3700
BALLOCHJUNCTION
ABERDEEN TO INVERNESS
RAILWAY LINE EXISTING A96
N V 006
N V 004
NV043
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 3 of 16
Figure 8.10cEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810c
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design
5900
6000
6100
6200
6300
6400
6500
6600
6700
6800
6900
7000
7100
7200
7300
7400
7500
7600
7700
7800
7900
8000
8100
8200
8300
8400
8500
8600
8700
8800
8900
90009100
92009300
94009500
96009700
9800
ABERDEEN TO INVERNESS
RAILWAY LINE
EXISTING A96
N V 007
N V 008
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 4 of 16
Figure 8.10dEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810d
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design
7700
7800
7900
8000
8100
8200
8300
8400
8500
8600
8700
8800
8900
90009100
92009300
94009500
96009700
9800
9900
10000
10100
10200
10300
10400
10500
10600
10700
10800
10900
11000
MID COULJUNCTION
EXISTING A96
N V 008
N V 009
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 5 of 16
Figure 8.10eEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810e
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design
9900
10000
10100
10200
10300
10400
10500
10600
10700
10800
10900
11000
11100
11200
1130011400
11500
11600
11700
11800
11900
12000
12100
12200
12300
12400
12500
12600
12700
12800
12900
13000
13100
13200
13300
1340013500
1360013700
INVERNESSAIRPORT
ABERDEEN TO INVERNESS
RAILWAY LINE
MID COULJUNCTION
EXISTING A96
N V 011
N V 010
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 6 of 16
Figure 8.10fEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810f
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design
12200
12300
12400
12500
12600
12700
12800
12900
13000
13100
13200
13300
1340013500
1360013700
13800
13900
14000
14100
14200
14300
14400
14500
14600
14700
14800
14900
15000
15100
15200
15300
15400
15500
15600
15700
15800
15900
16000
BRACKLEYJUNCTION
GOLLANFIELD
ABERDEEN TO INVERNESS
RAILWAY LINE
EXISTING A96
N V 011
N V 027
N V 012
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 7 of 16
Figure 8.10gEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810g
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design
14800
14900
15000
15100
15200
15300
15400
15500
15600
15700
15800
15900
16700
16800
16900
17000
17100
17200
17300
17400
17500
17600
17700
17800
17900
18000
18100
18200
18300
18400
18500
18600
16000
16100
16200
16300
16400
16500
16600
NAIRN WESTJUNCTION
ABERDEEN TO INVERNESS
RAILWAY LINE
EXISTING A96
GOLLANFIELD
N V 013
N V 027
N V 014
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 8 of 16
Figure 8.10hEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810h
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design
16700
16800
16900
17000
17100
17200
17300
17400
17500
17600
17700
17800
17900
18000
18100
18200
18300
18400
18500
18600
18700
18800
18900
19000
19100
19200
19300
19400
19500
19600
19700
19800
19900
16600
EXISTING A96
NAIRN WESTJUNCTION
ABERDEEN TO INVERNESS
RAILWAY LINE
N V 015N V 014
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 9 of 16
Figure 8.10iEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810i
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design
18600
18700
18800
18900
19000
19100
19200
19300
19400
19500
19600
19700
19800
19900
20000
20100
20200
20300
20400
20500
20600
20700
20800
20900
21000
21100
21200
21300
21400
21500
21600
21700
21800
21900
22000
ABERDEEN TO INVERNESS
RAILWAY LINE
N V 016
N V 017
N V 015
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 10 of 16
Figure 8.10jEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810j
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design
19700
19800
19900
20000
20100
20200
20300
20400
20500
20600
20700
20800
20900
21000
21100
21200
21300
21400
21500
21600
21700
21800
21900
22000
22100
22200
22300
23000
2310022400
22500
22600
22700
22800
22900
EXISTING A96
RIVERNAIRN
ABERDEEN TO INVERNESS
RAILWAY LINE
NAIRN
N V 016
NV046
NV047
NV054
NV048
NV050
NV049
NV052
NV051
NV053
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 11 of 16
Figure 8.10kEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810k
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design
21800
21900
22000
22100
22200
22300
23000
23100
23200
23300
23400
23500
23600
22400
22500
22600
22700
22800
22900
23700
23800
23900
24000
24100
24200
24300
2440024500
24600
24700
24800
24900
25000
25100
25200
25300
25400
25500
RIVERNAIRN
N V 018
N V 019
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 12 of 16
Figure 8.10lEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810l
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design
25000
25100
25200
25300
25400
2550025600
2570025800
NAIRN
EXISTING A96
RIVERNAIRN
ABERDEEN TO INVERNESS
RAILWAY LINE
NV046
NV047
NV054
NV048
NV050NV055
NV049
NV052
NV051
NV053
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Dra wing title
Dra wing Sta tus
Dra wing number
Sca le
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his dra wing is not to be used in whole or pa rt other tha n for the intendedpurpose a nd project a s defined on this dra wing. R efer to the contra ct for fullterms a nd conditions.
FINAL1:10,000
Ja cobs N o.
LegendP roposed Scheme (a s per Dra ft O rders)SU DS (e.g. Ba sin or P ond)*Ca lcula tion AreaHea lth & Educa tion BuildingsSa mple R eceptorN oise Mitiga tion Ba rrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilometres
Sheet 13 of 16
Figure 8.10mEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810m
95 Bothwell Street, G la sgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fa x:+44(0)141 226 3109
www.ja cobs.com
R ev. R ev. Da te P urpose of revision Apprv'dR ev'dCheckdO rig/DwnKA0 SGES P ublica tion BMCK EHGNOV 2016
© Crown copyright a nd da ta ba se right 2016. All rights reserved. O rdna nce Survey Licence number 100046668.
* Actua l sha pe of pond/ba sin will be subjectto deta iled design
24700
24800
24900
25000
25100
25200
25300
25400
2550025600
2570025800
2590026000
26100
26200
26300
26400
26500
26600
26700
26800
26900
27000
27100
27200
27300 27400 27500 27600 27700 27800 27900 28000 28100 28200 28300 28400
28500
28600
28700
28800
NAIRN EASTJUNCTION
EXISTING A96
AULDEARN
N V 024
N V 022
N V 021
N V 023
N V 020
NV056
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 14 of 16
Figure 8.10nEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810n
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design
2560025700
2580025900
2600026100
26200
26300
26400
26500
26600
26700
26800
26900
27000
27100
27200
27300 27400 27500 27600 27700 27800 27900 28000 28100 28200 28300 28400 28500
28600
28700
28800
28900
29000
29100
ABERDEEN TO INVERNESS
RAILWAY LINE
EXISTING A96
NAIRN EASTJUNCTION
N V 024
N V 022
N V 021
N V 023
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 15 of 16
Figure 8.10oEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810o
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design
28400 28500
28600
28700
28800
28900
29000
29100
29200
29300
29400
29500
29600
29700
29800
29900
30000
30100
30200
30300
30400
30500
30600
30700
30800
30900
31000
31100
ABERDEEN TO INVERNESS RAILWAY LINE
HARDMUIR
EXISTING A96
N V 025
N V 024
N V 026
i ljf
c
kh
n p
ged
a
o
b
m
R ev
Client
P roject
Drawing title
Drawing Status
Drawing num ber
Scale
BIM N o.
DO NOT SCALEB2103500
@ A3
0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.
FINAL1:10,000
Jacobs N o.
LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier
Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor
x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB
?
N
0 0.5 10.25Kilom etres
Sheet 16 of 16
Figure 8.10pEnvironmental Statement
Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs
Do-Something Baseline Year (with Mitigation)
B2103500/EN/EIA/DR/810p
95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109
www.jacobs.com
R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016
© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.
* Actual shape of pond/basin will be subjectto detailed design