15
N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc HMC ARCHITECTS – 3546 Concours Street, Ontario, CA 91764-5583, T:909.989.9979, F:909.483.1400 MEETING MINUTES 5 DATE: September 30, 2009 PROJECT: Riverside Community College District Moreno Valley Campus March Dental Education Center (MDEC) Facility HMC #3251010 PRESENT: Dale Adams, Dale Barajas, Steve Gilson, Rick Hernandez, Dr. Wolde-Ab Isaac, Donna Lesser, Reagan Romali, Gustavo Segura (RCCD) Eera Babtiwale, Ed Salisbury, Ken Salyer (HMC) PURPOSE: The purpose of the meeting was to review schematic floor and site plans. The plans are attached to these Minutes. ITEMS DISCUSSED: 5.1 Developer Items: The following items are not currently defined, and further discussion with March Healthcare Development (MHD) will occur. A. Green Belt: MHD suggested in a previous meeting that a green belt is intended for the site, occupying the space roughly north of the existing water easement. However, a green belt is not indicated in the draft Specific Plan at the project site. B. Entry into Site: HMC distributed an e-mail earlier stating its intention of entering the site not less than 250 feet from the center of Cactus Avenue. C. Undergrounding of Power Poles: HMC distributed another e-mail seeking confirmation that the above ground power poles will be placed underground by MHD, and re-routed as needed to avoid conflicts with potential building locations. D. Specific Plan: Early discussions between RCCD and MHD suggest that the project does not need to comply with the Specific Plan; however, the Schematic Design will be submitted to the developer for review, prior to them submitting it to the Joint Powers Authority. Action/Responsibility: RCCD 5.2 Progress of Site Negotiations: The project should continue to be viewed as following a locally funded, not state funded, process. Nonetheless, specific site design gestures should be restrained, in case the building design must be transferred to a different site. Action/Responsibility: Information
Transcript
Page 1: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc

HMC ARCHITECTS – 3546 Concours Street, Ontario, CA 91764-5583, T:909.989.9979, F:909.483.1400

MEETING MINUTES 5

DATE: September 30, 2009 PROJECT: Riverside Community College District Moreno Valley Campus March Dental Education Center (MDEC) Facility HMC #3251010 PRESENT: Dale Adams, Dale Barajas, Steve Gilson, Rick Hernandez, Dr. Wolde-Ab Isaac, Donna Lesser, Reagan Romali, Gustavo Segura (RCCD) Eera Babtiwale, Ed Salisbury, Ken Salyer (HMC) PURPOSE: The purpose of the meeting was to review schematic floor and site plans. The plans are attached to these Minutes. ITEMS DISCUSSED: 5.1 Developer Items: The following items are not currently defined, and further discussion

with March Healthcare Development (MHD) will occur.

A. Green Belt: MHD suggested in a previous meeting that a green belt is intended for the site, occupying the space roughly north of the existing water easement. However, a green belt is not indicated in the draft Specific Plan at the project site.

B. Entry into Site: HMC distributed an e-mail earlier stating its intention of entering

the site not less than 250 feet from the center of Cactus Avenue.

C. Undergrounding of Power Poles: HMC distributed another e-mail seeking confirmation that the above ground power poles will be placed underground by MHD, and re-routed as needed to avoid conflicts with potential building locations.

D. Specific Plan: Early discussions between RCCD and MHD suggest that the

project does not need to comply with the Specific Plan; however, the Schematic Design will be submitted to the developer for review, prior to them submitting it to the Joint Powers Authority.

Action/Responsibility: RCCD

5.2 Progress of Site Negotiations: The project should continue to be viewed as following

a locally funded, not state funded, process. Nonetheless, specific site design gestures should be restrained, in case the building design must be transferred to a different site.

Action/Responsibility: Information

Page 2: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

Meeting Minutes 5 September 30, 2009 Page 2

N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc

5.3 Site Design: The building designs are organized to allow them to be flipped, with the

building entry and parking oriented either to the north, or to the south. The preferred approach is not defined at this time.

A. North Entry: A north building entry allows the building entry to face Cactus Avenue.

This lay-out may be preferred if there will not be a green belt installed by MHD. B. South Entry: A south entry allows parking for MDEC to be shared with potential

campus expansion to the south, and creates a large landscaped area between the building and Cactus Avenue.

Action/Responsibility: RCCD

5.4 Floor Plan Option A: This option is the preferred option for further development. The

following comments were noted.

A. The proposed courtyard is highly desirable, and can be used for various events by the school.

B. A detailed lay-out of the lab is needed, to determine the best room shape for the desired furniture and equipment lay-out.

C. Storage rooms should be grouped closer to the delivery door, to prevent deliveries from passing through the clinic. A separate custodial supply room should be added, of ~120 sf. Dental Technology supply should be a maximum of 120 sf, Dental Assistant supply should be a maximum of 100 sf, and Dental Hygiene supply should be a maximum of 120 sf.

D. The telecommunications room should be located in a central location, to prevent long data runs from the MDF to the data outlet (maximum run is 300 total feet). Larger instructional rooms like the Lab may require higher than normal ceilings, to accommodate the District standard 16’x10’ screen used for projection.

E. The Reception area should be directly at the entry, and the Student Lounge and Group Study areas should also be closer to the entry.

F. A patient file storage area of ~300 sf, although not part of the building program, is very desirable. If it is not possible to add a new storage room, storage units within classrooms can also fulfill this function.

G. The size of the large classroom can be reduced to accommodate 40 students, rather than 50.

H. Access to the classroom wing should be separated from the entry by a set of doors.

Action/Responsibility: HMC 5.5 Floor Plan Option B: This option was not preferred. The following comments were

noted.

A. The lay-out is very efficient, but lacks variety. B. The courtyard proportions are not as favorable as Option A.

Action/Responsibility: Information

Page 3: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

Meeting Minutes 5 September 30, 2009 Page 3

N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc

5.6 Updated Building Program: The previously approved building program has been

updated to reflect the areas in Option A, and is attached to these Minutes.

Action/Responsibility: Information 5.7 Future Meetings:

A. The next design review meeting is scheduled for 9:00 a.m. October 28, 2009. The location will be determined by RCCD.

B. A small group meeting will occur prior to this, to resolve the best Lab room lay-out. Time, date, and location will be determined.

Action/Responsibility: Information

The above notes document our understanding of items discussed in the above referenced meeting. Unless notice to the contrary is received, the notations will be considered acceptable and HMC will proceed with work based on these understandings. Any discrepancies should be brought to our attention within seven (7) working days of receipt. Submitted by, HMC Architects

Ed Salisbury Project Architect Attachments cc: Those present

Jim Wurst (HMC), Orin Williams (RCCD) File-MM.MI

Page 4: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

R C C D : M O R E N O V A L L E Y C O M M U N I T Y C O L L E G E

M A R B D e n t a l E d u c a t i o n a l C e n t e r

Page 5: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

09

:29

:09

0 FEET

M D E C : M A R C H A R B D E N T A L E D U C A T I O N A L C E N T E R

S I T E P L A NO P T I O N A

PROPERTY LINE

SETBACKS

PROPOSED BUILDING ZONE

MASTER PLAN PROPERTY LINE10.6 ACRES

PARKING ZONE

EXISTING BUILDINGS

LANDSCAPE ZONE

DEMO BUILDINGS

WATER UTILITY

400’-0” SETBACKFROM STREET CORNER

WATER UTILITY

10’-0” SETBACKSUGGESTED PARKING

SETBACK PER SPECIFIC PLAN

250’-0” SETBACK

N

PROPOSED BUILDING ZONE

PARKING ZONE(APPROXIMATELY

9,000 SF OF PARKINGREQUIRED

PER SPECIFIC PLAN)

LANDSCAPE ZONE

ENTRY

BIOSWALE

Page 6: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

09

:29

:09

0 FEET

M D E C : M A R C H A R B D E N T A L E D U C A T I O N A L C E N T E R

400’-0” SETBACK

PROPERTY LINE

SETBACKS

PROPOSED BUILDING ZONE

MASTER PLAN PROPERTY LINE10.6 ACRES

PARKING ZONE

EXISTING BUILDINGS

LANDSCAPE ZONE

DEMO BUILDINGS

WATER UTILITY

400’-0” SETBACKFROM STREET CORNER

WATER UTILITY

10’-0” SETBACKSUGGESTED PARKING

SETBACK PER SPECIFIC PLAN

S I T E P L A NO P T I O N B

N

PROPOSED BUILDING ZONE

PARKING ZONE(APPROXIMATELY

9,000 SF OF PARKINGREQUIRED

PER SPECIFIC PLAN)

ENTRY

LANDSCAPE ZONE BIOSWALE

Page 7: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

SE

RV

ICE

LOA

DIN

G

09

:29

:09

0 FEET

M D E C : M A R C H A R B D E N T A L E D U C A T I O N A L C E N T E R

S I T E P L A NO P T I O N A

PROPERTY LINE

SETBACKS

MASTER PLAN PROPERTY LINE10.6 ACRES

PARKING ZONE

LANDSCAPE ZONE

WATER UTILITY

250’-0” SETBACKFROM STREET CORNER

WATER UTILITY

10’-0” SETBACKSUGGESTED PARKING

SETBACK PER SPECIFIC PLAN

250’-0” SETBACK

N

Page 8: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

09

:29

:09

0 FEET

M D E C : M A R C H A R B D E N T A L E D U C A T I O N A L C E N T E R

S P A T I A LM A S S I N G P L A N 1

ENTRY/RECEPTION/

WAITING

ACADEMIC

STUDENT COMMON AREA

ACADEMIC

FACULTY/STAFF

FACULTY/STAFF

FACULTY/STAFF

CLINIC BUILDINGSUPPORT

BUILDINGSUPPORT

20 40 60 80

N

Page 9: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

09

:29

:09

0 FEET

M D E C : M A R C H A R B D E N T A L E D U C A T I O N A L C E N T E R

C O N C E P T U A L F L O O R P L A N 1

radiology

clinic support

operatory

staff/faculty

classrooms/lab

class./lab support

building support

recept./waiting

student commonareas

SERVICELOADING

20 40 60 80

N

Page 10: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

SE

RV

ICE

LOA

DIN

GZO

NE

09

:29

:09

0 FEET

M D E C : M A R C H A R B D E N T A L E D U C A T I O N A L C E N T E R

S I T E P L A NO P T I O N B

PROPERTY LINE

SETBACKS

MASTER PLAN PROPERTY LINE10.6 ACRES

PARKING ZONE

LANDSCAPE ZONE

WATER UTILITY

250’-0” SETBACKFROM STREET CORNER

WATER UTILITY

10’-0” SETBACKSUGGESTED PARKING

SETBACK PER SPECIFIC PLAN

250’-0” SETBACK

N

Page 11: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

09

:29

:09

0 FEET

M D E C : M A R C H A R B D E N T A L E D U C A T I O N A L C E N T E R

S P A T I A LM A S S I N G P L A N 2

ACADEMIC

CLINIC

FACULTY/STAFF

BUILDINGSUPPORT

ENTRY/RECEPTION/

WAITING

BUILDINGSUPPORT

BUILDINGSUPPORT

20 40 60 80

STUDENT COMMON AREA

N

Page 12: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

09

:29

:09

0 FEET

M D E C : M A R C H A R B D E N T A L E D U C A T I O N A L C E N T E R

C O N C E P T U A L F L O O R P L A N 2

radiology

clinic support

operatory

staff/faculty

classrooms/lab

class./lab support

building support

recept./waiting

student commonareas

SERVICELOADINGZONE

20 40 60 80

N

Page 13: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

09

:29

:09

0 FEET

M D E C : M A R C H A R B D E N T A L E D U C A T I O N A L C E N T E R

E X I S T I N GF L O O R P L A N

20 40 60 80

Page 14: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

RIVERSIDE COMMUNITY COLLEGE DISTRICT BUILDING AREA PROGRAM

MORENO VALLEY CAMPUS Date: October 6, 2009

MARCH ARB MDEC FACILITY

HMC # 3251010

Assignable Program Elements

No. Type TOP Code Room Name Units

Unit

Area ASF

Subtotal

ASF

FT

Staff

PT

Staff Remarks

1.0 Dental Occupations 6,015

Special Lab/Special Lab Service 3,875

1.1 * 1240 Operatory 24 100 2,400 *

1.2 * 1240 Radiology 6 100 600 *

1.3 * 1240 Panoramic X-Ray 1 100 100 *

1.4 * 1240 Sterilization 1 200 200 *

1.5 * 1240 Radiology Processing - Digital 1 150 150 *

1.6 * 1240 Radiology Processing - Traditional 1 150 150 *

1.7 * 1240 Faculty/Student Counseling 1 75 75 *

1.8 1240 Clinical Supply 1 200 200 *

Lab/Lab Service 2,140

1.9 * 1240 Lab 1 1,800 1,800 *

1.10 * 1240 Dental Hygiene Supply 1 120 120 *

1.11 * 1240 Dental Assistant Supply 1 100 100 *

1.12 * 1240 Dental Lab Tech Supply 1 120 120 *

2.0 Shared 5,570

Lecture/Lecture Service 3,950

2.1 * 1240 Classroom 2 900 1,800

includes casework for record

storage

PrgmArea-091006.xls

2.1 * 1240 Classroom 2 900 1,800 storage

2.2 * 1240 Classroom 1 750 750

includes casework for record

storage

2.3 * 1240 Classroom 1 1,200 1,200

includes casework for record

storage

2.4 * 1240 Group study area 1 200 200 *

Office 1,620

2.5 * 0099 Director's Office 1 140 140 *

2.6 * 0099 Faculty Work Area 1 200 200

double as a conference

room

2.7 * 0099 Staff Office 7 90 630 *

2.8 * 0099 Open Office 1 300 300 For part time instructors

2.9 * 0099 Student Lounge 1 200 200 *

2.10 * 0099 Staff Lounge 1 150 150 *

Non-Assignable Program Elements

Room Name SF Total SF Remarks

3.0 Support Spaces 7,045

3.1 Entry 450 *

3.2 Waiting 300 *

3.3 Reception 300 *

3.4 Circulation/ Corridors 4,000 *

3.5 Toilet Rooms - Men Public 70 *

3.6 Toilet Rooms - Women Public 70 *

3.7 Toilet Rooms - Men Staff 200 Includes student lockers

3.8 Toilet Rooms - Women Staff 300 Includes student lockers

3.12 Telecommunications Room 100 *

3.14 Electrical Room 150 *

3.17 Fire Riser Room 25 *

3.19 Janitor Room 80 *

3.21 Janitor Room Storage 120 *

3.23 Laundry and Linen Storage 80 *

3.25 Miscellaneous 800 Interior/Exterior walls

PrgmArea-091006.xls

Page 15: Moreno Valley Campus March Dental Education Center (MDEC ... · N:\Projects\3251 Riverside Community College District\010_MDEC\05-MM\01. MI\MM05 090930.doc 5.3 Site Design: The building

ASSIGNABLE SQUARE FEET (ASF) 11,585

NON-ASSIGNABLE SQUARE FEET 7,045

EFFICIENCY FACTOR 62.18%

GROSS SQUARE FEET (GSF) 18,630