17
MOZART MELLO - DIRECTOR LATAM Uptime Institute, Brasil
Transcript
Page 1: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

MOZARTMELLO

-D I R E C T O R L A T A MU p t i m e I n s t i t u t e , B r a s i l

Page 2: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

Who we surveyed

Page 3: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

Efficiency gains at primary data centers

Page 4: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

Outages

31% have experienced an IT downtime incident or severe service degradation in the past year

48% had an outage in their own site or a service provider’s in the past three years

Page 5: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

Are 2N architectures more resilient?

Of those with a 2N architecture (cooling & power), 22% had an outage in the past year

• Rises to 35% in the past 3 years (for all failures, not just on-site facility failures)

Those with an N+1 architecture did not fare so well: 33% had an outage in the past year

• Rises to 51% in the past 3 years – higher than the overall average

Page 6: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

Causes of downtime

80% report their most recent outage was preventable

Leading causes:• On-premises power failure 33%• Network failure 30%• IT/software error 28%• On-premises non-power failure 12%

31% had a failure at a third-party provider

Page 7: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

Tracking recovery time & outage costs

Most downtime incidents last 1-4 hrs

43% did not calculate the cost of a ‘significant’ outage

Half estimate the costs to be less than $100,000

Eight respondents estimated costs over $10 million

Page 8: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

Multi-site, multi-service disasters?

Increasingly, outages will create cascading failures across multiple sites & services

24% of respondents say incidents impacted services delivered from multiple data centers

69% single site

7% did not know

Page 9: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

Hybrid IT: Visibility, accountability still lacking

61% say having workloads spread across on-premises, colo, and cloud data centers has made their organization more resilient

30% say less resilient (& 9% did not know)

Slightly more than half of the respondents have confidence in their organization’s ability to compare cost, risk, & performance between options

Maybe 24%

No 24%

Page 10: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

Achieving or enhancing resiliency

68% regularly back up to a secondary site

to achieve or enhance resiliency

51% use near real-time replication to a

secondary site and 40% replicate to two

or more data centers

42% utilize disaster recovery as a service

36% use cloud-based high availability

services

Page 11: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

Climate change is here, now what? 33% re-evaluating climate-dependent tech choices

19% preparing for increased severity & frequency of extreme weather

14% applying climate change models to site selection decisions

11% planning for increased flood risk

45% of respondents are not adapting policies for climate

change impacts

Page 12: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

Rack densities rising?

31% of respondents don’t have any racks above 10 kW

For 28%, their highest-density rack is 10-19 kW; for 22% it is 20-29 kW

56% are using precision air cooling for highest density equipment. 30% use room-level cooling

But 14% using liquid cooling

Page 13: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

DCIM is (finally) mainstream

54% of respondents have purchased some sort of commercial DCIM software

75% consider their deployment successful

47% looking to supplement with more tools

Page 14: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

New wave of edge capacity

43% of respondents expect they will require edge computing capabilities

30% not sure27% will not require

38% of those who will require edge capacity expect to mostly deploy it in sites they own & operate

26% a mix of on-prem & colos14% mostly in public clouds11% mostly in colos

In our supply-side survey, 63% of providers believe that most of their customers will own micro modular (less

than 100 kW) edge data centers within 5 years

Page 15: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

Looking ahead: Supply-side view

70% of suppliers believe that AI will be widely used in data centers

Just 23% believe that robots will replace significant human employment in data centers in the next 5-7 years

44% believe that a shortage of facilities staff will limit the data center industry’s growth in the coming 5-7 years

Page 16: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

Data center staffing trends

56% of respondents have been in the industry for 20+ years

38% had difficulty finding qualified candidates for the open jobs

Hybrid IT adoption is driving a shift in skill set

Highly sought after skills:

• Automation • Cloud • Electrical Engineering • Mechanical Engineering

•Networking •Operations & Management •Partner SLA Management

Page 17: MOZART MELLO - Summit 360º · MOZART MELLO-D I R E C TO R L ATA M U p t i m e I n s t i t u t e , B r a s i l. Who we surveyed. Efficiency gains at primary data centers . Outages

Contact us for more information about Uptime Institute Research & other commercial offerings:

https://uptimeinstitute.com

[email protected]

Gracias !


Recommended