13
March 2010 Business Plan MPX Colombia
Transcript
Page 1: Mpx colombia's business plan presentation

March 2010

Business Plan

MPX Colombia

Page 2: Mpx colombia's business plan presentation

2

DisclaimerThe material that follows is a presentation of general background information about MPX Energia S.A. and its subsidiaries

(collectively, “MPX” or the “Company”) as of the date of the presentation. It is information in summary form and does not purport

to be complete. No representation or warranty, express or implied, is made concerning, and no reliance should be placed on, the

accuracy, fairness, or completeness of this information.

This presentation may contain certain forward-looking statements and information relating to MPX that reflect the current views

and/or expectations of the Company and its management with respect to its performance, business and future events. Forward

looking statements include, without limitation, any statement that may predict, forecast, indicate or imply future results,

performance or achievements, and may contain words like “may”, “plan”, “believe”, “anticipate”, “expect”, “envisages”, “will likely

result”, or any other words or phrases of similar meaning. Such statements are subject to a number of risks, uncertainties and

assumptions. We caution you that a number of important factors could cause actual results to differ materially from the plans,

objectives, expectations, estimates and intentions expressed in this presentation. In no event, neither the Company, any of its

affiliates, directors, officers, agents or employees nor any of the placement agents shall be liable before any third party (including

investors) for any investment or business decision made or action taken in reliance on the information and statements contained

in this presentation or for any consequential, special or similar damages.

This presentation does not constitute an offer, or invitation, or solicitation of an offer, to subscribe for or purchase any securities.

Neither this presentation nor anything contained herein shall form the basis of any contract or commitment whatsoever.

Recipients of this presentation are not to construe the contents of this summary as legal, tax or investment advice and recipients

should consult their own advisors in this regard.

The market and competitive position data, including market forecasts, used throughout this presentation were obtained from

internal surveys, market research, publicly available information and industry publications. Although we have no reason to believe

that any of this information or these reports are inaccurate in any material respect, we have not independently verified the

competitive position, market share, market size, market growth or other data provided by third parties or by industry or other

publications. MPX, the placement agents and the underwriters do not make any representation as to the accuracy of such

information.

This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or

in part without MPX’s prior written consent.

Business Plan MPX Colombia March 2010

Page 3: Mpx colombia's business plan presentation

3

� Integrated Mining System:

World-Class Mining Assets + Efficient Logistics

� 1.74 billion tons in potencial coal

resources

� Maximum output capacity of 20 Mtpy in

2021

� Production start-up in 2012

� 3 open-cast and 1 underground mine

2.0 Mty *2.0 Mty *

0.7 Mty *0.7 Mty *

3.5 Mty *3.5 Mty *

5.4 Mty **5.4 Mty **

Mty: MM tons/year

* 65% Dispatch

** 90% Dispatch

MPX Colombia System

Estimated Coal

Demand from MPX’s

power plants

Page 4: Mpx colombia's business plan presentation

4

Mining

Resources and Reserves

� 1.74 billion tons in potential resources

� 66,225 ha along 25 km of coal bearingCerrejón Formation

� 266 boreholes, 195 positive

� 90,000 m drilled

RESOURCES IN SITU BY AREA

Mar/2010

Mt Type

Cañaverales 93.8 Measured/Indicated

San Benito 21.9 Measured

Papayal 28.2 Measured

TOTAL 143.9

San Juan 1,600 Potential

Production Output Ramp-up in current concessions (Mty)

An additional 5Mty

will come from new

areas in La Guajira

and other

Departments

Page 5: Mpx colombia's business plan presentation

5

Cañaverales

Open-Cast Mine

5,812Calorific power GAR* (kcal/kg)

Production start-up 2Q12

Maximum output (2022) 5.0 Mty

Total CAPEX USD 45 M

OPEX USD 37.5/ton

Capex Disbursements (USD M in real terms)

Production Output Ramp-up

* GAR – Gross as received

Page 6: Mpx colombia's business plan presentation

6

Papayal

Open-Cast Mine

7,226Calorific power GAR (kcal/kg)

Production start-up 2Q12

Maximum output (2017) 2 Mty

Total CAPEX USD 30 M

OPEX USD 45/t

Capex Disbursements (USD M in real terms)

Production Output Ramp-up

Page 7: Mpx colombia's business plan presentation

7

San Benito

Open-Cast Mine

5,811Calorific power GAR (kcal/kg)

Production start-up 1Q13

Maximum output (2015) 0.5 Mty

Acumulated CAPEX USD 8 M

OPEX USD 40/ton

Capex Disbursements (USD M in real terms)

Production Output Ramp-up

Page 8: Mpx colombia's business plan presentation

8

San Juan

Underground Mine

6,300Calorific power GAR (kcal/kg)

Production start-up 2Q14

Maximum production 3.0 Mty / Mine

Acumulated CAPEX USD 293 M / Mine

OPEX USD 35/ton

Capex Disbursements (USD M in real terms)

Production Output Ramp-up

Page 9: Mpx colombia's business plan presentation

9

� La Guajira � Other Departments

New Areas

Mine Capex + Concession

AcquisitionsUSD 50.0 M

Contingencies USD 7.5 M

Total CAPEX USD 57.5 M

CAPEX USD 28,8 M/ty

Production Output Ramp-upProduction Output Ramp-up

Page 10: Mpx colombia's business plan presentation

10

MPX Port

� Start-up in 1Q14

� Port Area: 521 ha

� 150 km from mines

Traduzir p/ Inglês

MPX Port

Papayal

Canaverales

San Benito

Underground mine

Highway: 150 Km

La Guajira

Venezuela

MPX Concessions Areas drilled Port

Caribbean Sea

MPX Port Phase 1 Phase 2

Capacity 10 Mty 20 Mty

Cummulative

CapexUSD 284 M USD 400 M

Opex USD 3.5/t USD 3.0/t

Capacity Ramp-up

Capex Disbursements (USD M in real terms)

Page 11: Mpx colombia's business plan presentation

11

MPX Railroad

� Start-up in 1Q16

� 3 alternative routes under study

1

3

2

Capacity 10 Mty 20 Mty

Cummulative

CapexUSD 333 M USD 400 M

Opex USD 2.5/t USD 2.5/t

Capacity Ramp-up

Capex Disbursements (USD M in real terms)

Page 12: Mpx colombia's business plan presentation

12

� Production of up to 20 Mtpy of production in 2021

Capacity Ramp-up

Mines, Port and Railroad

Page 13: Mpx colombia's business plan presentation

13

� Cash generation shall cover most of equity need

Uses & Sources

Total Capex USD 1.906 M

Debt Financing USD 1.374 M

Cash Generation* USD 275 M

Total Equity USD 257 M

*

* Reinvested

Debt/Equity

Mining 70/30

Logistics Infrastructure 75/25


Recommended