Samuel John Personnel Resumé [email protected] 013-3811298 PERSONAL DETAILS Name : Samuel John Date of Birth : 3 rd September 1968 Residential Address : No. 15 Lorong Samarinda 11E/KS7, Taman Klang Indah, 41200 Klang Contact Number : (H) +603-5166 9687 (M) +6013-3811 298 Education : Bachelor of Mech Eng (Hons) University Malaya 1992 SUMMARY I have more than twenty two (22) years of experience in Project Management, Engineering Design, Procurement and Contracting Management, Construction and Erection Management in the Oil and Gas, Power Generation and Building Services projects. SPECIFIC CAPABILITIES Project Management Engineering Design Management Procurement and Contracting Management COMPUTER LITERACY/SOFTWARE EXPERIENCE Microsoft Project Microsoft Office Pipesim Offpipe Autopipe PDMS AutoPlant Caesar II PVE5 AutoCad MathCad
Transcript
Page 1: Mr  Samuel John CV

Samuel John Personnel Resumé

[email protected] 013-3811298

PERSONAL DETAILS Name : Samuel John

Date of Birth : 3rd September 1968

Residential Address : No. 15 Lorong Samarinda 11E/KS7, Taman Klang Indah, 41200 Klang

Contact Number : (H) +603-5166 9687 (M) +6013-3811 298

Education : Bachelor of Mech Eng (Hons) University Malaya 1992

SUMMARY I have more than twenty two (22) years of experience in Project Management, Engineering Design, Procurement and Contracting Management, Construction and Erection Management in the Oil and Gas, Power Generation and Building Services projects. SPECIFIC CAPABILITIES Project Management Engineering Design Management Procurement and Contracting Management COMPUTER LITERACY/SOFTWARE EXPERIENCE Microsoft Project Microsoft Office Pipesim Offpipe Autopipe PDMS AutoPlant Caesar II PVE5 AutoCad MathCad

Page 2: Mr  Samuel John CV

Samuel John Personnel Resumé

SJ -2- 09/03/15

DETAILED PROFESSIONAL EXPERIENCE

BERACHAH September 2010 – Present

Berachah Group Sdn Bhd

Advising Managing Director (company owner) on company strategies for project tendering, project implementation and manpower requirements

Represent company for introduction of company to potential clients Represent company for negotiations with clients for projects Manage project execution Manage manpower resources including formulating training programs Management Representative for Quality Assurance Management Obtained ISO 9001 accreditation in 2011 Managing ISO 9001 surveillance and renewal audits to date Setting up the Health, Safety and Environment Management System Berachah Engineering Sdn Bhd

Manage obtaining and renewal of Petronas License Obtained ISO 9001 accreditation in 2015 Setting up the Health, Safety and Environment Management System

Page 3: Mr  Samuel John CV

Samuel John Personnel Resumé

SJ -3- 09/03/15

SK310 B15 Field Development

Carry out FEED Engineering review for SapuraKencana Energy Sarawak Inc. as Senior Pipeline Engineer for the following items:

Pipeline & Riser Design Basis Pipeline Design Basis Steady State Flow Assurance Analysis Transient Flow Assurance Analysis Internal Corrosion Study And Material Selection Pipeline Operation & Maintenance Philosophy Pipeline Wall Thickness And Material Grade Selection Pipeline On-Bottom Stability Report Pipeline Free Span Analysis Report Pipeline End Expansion Report Preliminary Pipeline Installation Study Report Pipeline External Corrosion Study Report Pipeline Cathodic Protection Report Preliminary Global Buckling Analysis Report Pipeline Route Selection Report Riser Viv Analysis Report Riser Stress Design Report Pipeline Crossing Study Report Pipeline Overall Field Layout Pipeline Route Layout Drawing Pipeline Approach Drawings Riser General Arrangements Pipeline Material Take-Off

Carry out Conceptual Engineering review for SapuraKencana Energy Sarawak Inc. as Senior Pipeline Engineer for the following items:

Pipeline & Riser Design Basis Pipeline Sizing Pipeline Route Selection

Page 4: Mr  Samuel John CV

Samuel John Personnel Resumé

SJ -4- 09/03/15

SK408 Development

Carry out Conceptual Engineering review for SapuraKencana Energy Sarawak Inc. as Senior Pipeline Engineer for the following items:

Pipeline & Riser Design Basis Pipeline Sizing Pipeline Route Selection

PRP3- Season 2 Detailed design of 2 thermally insulated pipelines End to end design analyses and installation feasibility study Use of dry insulation material with HDPE jackets Study on usage of hybrid field joints and insulated field joints Project and purchase specifications Technical clarification Wibawa- 7 Crossings Detailed design of 2 water pipelines Internally cemented lines across 7 rivers Mechanical design (Stability, Pull force, wall thickness) Cathodic Protection Design Installation method design Specification review ANGSI CEOR Project Involved in the complete engineering activities for the Angsi CEOR Project for Water Standard MHNRDII Crossing Review Review of 33 as-built crossings and evaluation for fitness of service Stress analyses of all crossings Analysis of support stability Settlement analysis SHWE FIELD Development Project Detailed material take-off for piping and manual valve sections of 13 flowlines Material take-off for installation material required.

Page 5: Mr  Samuel John CV

Samuel John Personnel Resumé

SJ -5- 09/03/15

ICOEEP Project Technical Support Managing settlement issues of supports for the onshore pipeline Design and installation evaluation of spring supports to replace existing rigid supports Technical evaluation of as-built pipe supports based on ASME B31.4 Technical evaluation and verification of barred tee design by vendor Conceptual Engineering Design Services For Petronas Gas Development for Sarawak CO2

Involved in Conceptual Engineering Design Services For Petronas Gas Development for Sarawak CO2, Scope of work included pipeline and hydraulic analysis study and wall thickness and material grade selection report.

Badas Raw Water Supply Lines Rejuvenation Project for Brunei Liquefied Natural Gas Sdn Bhd.

Carry out Detail Design for the following items: Pipeline Routing Stress Analysis Material Take-Off Technical Bid Evaluation Constructability Study Operation and Maintenance Philosophy

Pipeline Installation Analysis for 36” Ø Pipeline X 7.5km from XUX-A to Tsimin-A & 24” Ø X 2.1km Pipeline from XUX-B to XUX-A

Carry out Bid Engineering for the following items: Pipeline Installation Riser Installation Analysis Davit Lift Analysis Expansion Spool Lifting Analysis

Brunei Shell - Pipeline Replacement Project (PRP2)

Carry out Installation Engineering for the following items: Pipeline Installation Analysis Riser Installation Analysis Davit Lift Analysis Transportation Analysis Mooring Analysis

Petronas - FEED for Bokor Redevelopment Phase 3 EOR iWAG Project

Page 6: Mr  Samuel John CV

Samuel John Personnel Resumé

SJ -6- 09/03/15

Carry out FEED Engineering for the following items: Pipeline & Riser Design Basis Pipeline & Riser Optimization Study Pipeline Route Selection Pipeline Material and Wall Thickness Study Pipeline Crossing Analysis Pipeline Installation Feasibility Study Pipeline On-bottom Stability Analysis Riser/J-Tube Design

Sepat Gas Development Project, Conceptual Engineering Design for Petronas Carigali Sdn Bhd.

Carry out Conceptual Engineering for the following items: Pipeline Design Basis Pipeline Cost Optimization Study Pipeline Sizing Pipeline Material and Wall Thickness Study Pipeline Crossing Analysis Pipeline Installation Feasibility Study Pipeline On-bottom Stability Analysis

Shell Bukom SBM 48” Subsea Pipeline Repair Project Installation Engineering Carry out Installation Engineering for the following items:

Pipeline Installation Analysis Pipeline Recovery Analysis Tie-in Spool Lifting Analysis Existing PLEM Removal Lifting Analysis New PLEM Installation Lifting Analysis

The Integrated Gas Development - North Malay Basin (IGD NMB) Project Provision of Technical Verification Services for the following items:

Page 7: Mr  Samuel John CV

Samuel John Personnel Resumé

SJ -7- 09/03/15

Proposed equipment for pipelay, riser installation and pre commissioning Proposed execution plan for pipelay, riser installation and pre-commissioning

Provision of Technical Support for preparation of procedures for the execution of pipelay,

riser installation and pre commissioning Provide technical input and review the following technical documents

Pipelay engineering analysis and procedures Riser installation engineering analysis and procedures Linepipes transportation analysis Pre-commissioning technical analysis and procedures Preparation of linepipe coating scope, specifications and data sheets

Conceptual Design For F14 & F29 Gas Field Development Project for Shell Sarawak Carry out Conceptual Design for the following items:

Subsea Pigging Analysis Subsea Pig Launcher Design

Provide Engineering Support for the following activities: Coordination between pipeline and topside for pigging requirements Review of Design Basis Review of Mechanical Design of pipeline Review of On-bottom Stability design

Pipeline Defect Assessment and Corrosion Study for Talisman Malaysia Limited Project Manager for engineering activities and coordination for the following parties in the project:

Aker Engineering Malaysia (Client) Talisman Malaysia Limited(Owner)

Carry out Pipeline Defect Assessment and Corrosion Study for the following Gas Lift pipelines:

4.5-inch pipeline from BRB to BSA 4.5-inch pipeline from BSA to BKC 4.5-inch pipeline from BKC to BKA 4.5-inch pipeline from BRD to BRC 4.5-inch pipeline from BRC to BTA

Carry out the following activities for the Pipeline Defect Assessment and Corrosion Study:

Prepare the Design Basis Review of Intelligent Pig Inspection data

Page 8: Mr  Samuel John CV

Samuel John Personnel Resumé

SJ -8- 09/03/15

Establish corrosion rate Assess the pipelines and respective risers status against ASME B31G requirement Conduct pipeline repair requirement and method study Prepare Pipeline Defect Assessment and Corrosion Study report

B-193 Subsea Pipeline Project for ONGC, India Project Manager for engineering activities and coordination for the following parties in the project:

Aker Engineering Malaysia (Client) Aker Power Gas of India (Project Design Partner) Swiber Limited, Singapore (Installation Contractor) ONGC (Owner)

Carry out Detail Design for the following items:

Pipeline Survey Route Drawing and Specification Pipeline and Riser Design Basis Pipeline Mechanical Design On-Bottom Stability Design Riser and J-Tube Design End Expansion Analysis Corrosion Protection Design (External) Tie-in Spool Design Pipeline Crossing Design Technical Bid Evaluation

Elk Antelope Development Project in Papua New Guinea for PNGEPCM Pte Ltd Project Manager for Technical and Commercial Feasibility Study and coordination for the following

parties in the project: PNGEPCM Pte Ltd (Client) DOPCO, Korea (Potential Investment Partner for PNGEPCM) Interoil (Owner)

Carry out the following activities: Preliminary pipeline and pipeline component sizing study Preliminary pipeline routing and logistic study Technical Feasibility Study Preliminary project execution costing Commercial Feasibility Study Prepare Technical and Commercial Study report Carry out Technical and Commercial Study presentation and discussion with DOPCO

Page 9: Mr  Samuel John CV

Samuel John Personnel Resumé

SJ -9- 09/03/15

Detail Design for Gas Riser Replacement at Bunga Raya B Platform for Talisman Malaysia Limited. Carry out the following activities:

Data collection of the existing gas riser Concept selection study on options of riser replacement methods Detail design of the new riser Existing riser demolition study New riser installation study Prepare Detail Design report Provide follow on engineering support for installation team

MMHE SDN BHD July 2009 – August 2010 Project Manager Gumusut Kakap FPS Project Project Manager for two Modules (North & South) for the Gumusut Kakap Topside Manage multi discipline Project Management Team of 30 personal Manage 15 numbers of sub-contractors of various disciplines Liaise with 9 support departments related on the project execution Liaise with Design Consultant (Technip) for Topside Module Design Liaise with Superlift Design Consultant (Zentech) for interface issue on Superlifting Liaise with Project Managers for East and West Modules and for PLQ and Demi Modules Liaise with Project Management Team of Gumusut Kakap Hull Liaise with Mechanical Completion team Liaise with Client (MISC) and the Host Construction Team (SSPC) Responsible for implementation and management of Project Execution Plan Responsible for implementation and management of Project QHSE Plan Responsible for implementation and management of Shell’s Life Saving Rules Responsible for implementation and management of Project QA/QC plans Responsible for technical clarifications and commercial negotiations for awarding of Sub-contracts

and Variation Orders

Page 10: Mr  Samuel John CV

Samuel John Personnel Resumé

SJ -10- 09/03/15

ZELAN CONSTRUCTION SDN BHD May 2006 – June 2009 Mechanical Manager Shuqaiq II Fuel Oil Unloading Facility, Saudi Arabia Project Manager for subsea fuel oil pipelines (20” and 36”) for the following activities:

Site Visit of existing facility (Onshore Tie-in and SPM) Conceptual Design of the pipeline system Route Selection Study Route Survey Drawing and Specification Wall Thickness Calculation Corrosion Protection Design On-bottom Stability Design Risers and Clamp Design Alignment Sheet Material Specification Hybrid Cable Specification Heat Tracing Specification Pipeline Installation (S-Lay) Specification Pipeline Installation (Rentis Method) Specification Shore Approach Pipeline Tie-in to Subsea PLEM Pipeline Tie-in to Onshore Facility Hybrid Cable Tie-in to Onshore and Topside Facility Hydrotest, Cleaning and Pre-Commissioning Specification Potential Vendor and Subcontractor Identification Technical and Commercial Bid Evaluation Technical and Commercial Negotiation Attend to Source Inspection with Client

Page 11: Mr  Samuel John CV

Samuel John Personnel Resumé

SJ -11- 09/03/15

Project Manager for Mechanical, Piping and E&I of the platform for the following activities: Operational Concept System Flow Diagram and P&ID Equipment Layout Piping Layout Mechanical Equipment Specification Piping Specification Fire Protection Specification Electrical Specification Instrument and Control Specification Marine Communication Equipment Specification Security System Specification Interface with Pipeline Interface with Onshore Facility Hydrotest, Flushing and Pre-Commissioning Specification Potential Vendor and Subcontractor Identification Technical and Commercial Bid Evaluation Technical and Commercial Negotiation Project Expediting Attend to FAT with Client

Liaise with Client Consultant Liaise with Client (Mitsubishi Heavy Industries) Liaise with Erection Group on design, logistic and erection Rembang Coal Fired Powered Plant, Indonesia Project Manager for water system Liaise with Consultant on design of water system Liaise with Client (PLN Indonesia) on water system Sourcing for specialist contractors for project complete with tender preparation, tender negotiation

and award Liaise with Erection Group on design, logistic and erection issues

Page 12: Mr  Samuel John CV

Samuel John Personnel Resumé

SJ -12- 09/03/15

NOVA NUSANTARA SDN BHD June 2000 – April 2006 Project Manager (Sabah Region) Kunak Hospital Site Agent Prepare project overall schedule complete with manpower and cash flow projection Oversee submission of shop drawings, materials and method statements to client consultant Oversee M&E Installation and Testing & Commissioning Liaising with client and consultant Kuala Penyu Hospital Interim Site Agent Provide technical support on M&E Installation and Testing & Commissioning Liaising with client and consultant for technical and commercial issues Pitas Hospital Interim Site Agent Provide technical support on M&E Installation and Testing & Commissioning Liaising with client and consultant for technical and commercial issues Keningau Hospital Maintenance Manager & Commissioning Engineer Co-ordinate Testing & Commissioning Setup Preventive Maintenance Team and Preventive Maintenance Program Liaising with hospital representative Liaising with client and consultant for technical and commercial issues Liaising with sub-contractors for technical and commercial issues Lahad Datu Hospital Interim Site Agent & Commissioning Engineer Co-ordinate Testing & Commissioning Co-ordinate M&E Installation Supervise M&E Installation Liaising with client and consultant for technical and commercial issues Liaising with sub-contractors for technical and commercial issues

Page 13: Mr  Samuel John CV

Samuel John Personnel Resumé

SJ -13- 09/03/15

ABB POWER GENERATION SDN BHD 1997 – 2000 Project/Mechanical Engineer Senoko Power Plant, Singapore Design and material selection for cooling water refurbishment works Piping design for Balance Of Plant Tender preparation, evaluation, award and manage sub-contract packages Ensure refurbishment works carried out within shutdown period of 3 months Mentakab Power Plant, Pahang Piping design for Main Cooling Water and Balance Of Plant Tender preparation, evaluation, award and manage sub-contract packages Supervise high pressure steam piping installation and testing & commissioning Taranaki Power Plant, New Zealand Piping design for Main Cooling Water and Balance Of Plant Responsible to verify sub-contractors shop drawings and detail design Provide technical support for BOP installation Sengkang Power Plant, Indonesia Responsible for the Defect Liability Period Responsible to select sub-contractor defect rectifications Verify defect rectification is carried out Liaising with client representative on DLP ABB Power Generation, Baden, Switzerland Design Piping system for Power Plant using PDMS Prepare Project Specific material Specification Prepare Material Take Off using PDMS Do Piping Stress Analysis

Page 14: Mr  Samuel John CV

Samuel John Personnel Resumé

SJ -14- 09/03/15

SIME ENGINEERING SDN BHD 1994 –1996 Mechanical Engineer 1 Passenger Loading Bridge and Apron Services for KLIA

Project Engineer for the Potable Water supply System. Coordination work with the contractors of the other utilities and the building contractor Conceptual design of the Potable Water system and follow up with a detail design work Source for equipment, materials and contractors for the construction phase of this job

Fire Protection for Port Dickson Power Sdn Bhd

Do detail design of fire detection and hose reel system Prepare and evaluate tender Supervise execution of project at site Testing and Commissioning of installtion Liaise for Bomba inspection Clear client punch list items Liaising with sub-contractor Trouble shooting on fire detection system and fuel tank cooling system.

Co-Generation Plant for DMIB Bhd

To propose a complete co-generation plant for a DMIB Bhd plant in Petaling Jaya, Selangor To do a conceptual study of the system to come up with a co-generation plant Upon completion of the conceptual, source for gas-turbine generators, heat recovery boilers and

the balance of plant equipment To do a technical and economic evaluation of the equipment To coordinate the multi-discipline information and prepare the proposal document. This consisted

of doing a life cycle study and investment pay back study.

Page 15: Mr  Samuel John CV

Samuel John Personnel Resumé

SJ -15- 09/03/15

PROTEK ENGINEERS SDN BHD, KUALA LUMPUR 1992 – 1994 Graduate Mechanical Engineer APS Project for Esso Malaysia Bhd (EMB)

Piping Stress Engineer (On secondment to JGC) Do piping stress analysis Prepare piping drawing based on stress analysis

Detail Design of the Duyong Gas Compression for Petronas Carigali Sdn Bhd

Piping Stress Engineer Do piping stress analysis Prepare piping drawing based on stress analysis Lead site verification team at Duyong B platform.

General Company Policy (GCP) for Temana, D18, E11, F6 & F23 fields for Sarawak Shell Berhad (SSB)

Mechanical Piping Engineer Detail design for the upgrading of platforms Prepare a document control software in Dbase III Prepare and monitor deliverables list Prepare and review design specifications Review MTO and prepare MDF using MTOSYS

Lawit A Living Quarters for Esso Production Malaysia Inc.

Prepare safety equipment and escape route layout Do cold and hot water pipe sizing calculation and do plumbing riser duct design

Detail Design of Guntong D Living Quarters for Esso Production Malaysia Inc.

Do plumbing riser duct design and design a gutter system to prevent leakage Be the mechanical drawing checker and coordinate issuing of mechanical drawing for AFC.