MRP MANAGEMENT IN INDIA Presented By: Golak B.Mahanta (14-22- 212) M.Tech-(D&M), 2 ND Sem, 06/21/2022 MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR 1 Guided by:- Mr.S.K.PATTANAYAK
Transcript
Page 1: Mrp of Toyota India

04/21/2023 1

MRP MANAGEMENT

IN INDIA

Presented By:

Golak B.Mahanta (14-22-212)

M.Tech-(D&M), 2ND Sem,

MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

Guided by:-Mr.S.K.PATTANAYAK

Page 2: Mrp of Toyota India

04/21/20232MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

SEMINAR OUTLINE

1.HISTORY

2.TOYOTA INDIA

3.MRP

4.MRP AT TOYOTA INDIA

5.CONCLUSION

Page 3: Mrp of Toyota India

04/21/20233MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

Established in Japan in Year 1937 Largest and most profitable automobile manufacturer in the world since 2008.Largest listed company in Japan.14th largest listed company world over.Factories in 27 countries in the world. Over 3,33,498 employees world over.

HISTORY

Page 4: Mrp of Toyota India

04/21/20234MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

TOYOTA INDIAJOINT VENTURE: Toyota Motors And Kirloskar groups on oct 6th ,1997PLACE: Toyota Kirloskar Motors(TKM),Bidadi, Banglore, Karnataka.INVESTMENT:1500 Crore

Page 5: Mrp of Toyota India

04/21/20235MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

TKM Have 2 Plants:

Plant 1:-Start of production Dec 1999

capacity 90,000 vehicles per annum producing innova,fortuner,camry

Plant 2:-Strart of Production Dec 2010

capacity 120,000 vehicles per annum corolla altis, etios, etios liva

Page 6: Mrp of Toyota India

04/21/20236MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

WHAT IS MRP?

In 1964,Joseph Orlicky developed Material Requirements Planning (MRP). The first company to use MRP was Black & Decker in 1964MRP is a systematic planning-and-control methodology for production and inventory. Procedure for planning and controlling the raw material, purchased parts, and work in progress (WIP) inventories required in

manufacturing a product.

Page 7: Mrp of Toyota India

04/21/20237MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

An MRP system is intended to simultaneously meet three objectives:

Ensure materials are available for production and products are available for delivery to customers.Maintain the lowest possible material and product levels in store.Plan manufacturing activities, delivery schedules and purchasing activities.

Page 8: Mrp of Toyota India

04/21/20238MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

Thus, MRP is designed to answer three questions:

what is needed? how much is needed? when is it needed?

Page 9: Mrp of Toyota India

04/21/20239MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

MRP

MAIN INPUTS/REQUIREMENTS TO MRP

Page 10: Mrp of Toyota India

04/21/202310MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

MRP AT TOYOTA INDIA

Only assembly .

Engine, sensor,chip etc imported from japan

Other component are purchased from local industries.

Industries are generally within the main campus.

Page 11: Mrp of Toyota India

04/21/202311MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

The maximum amount of raw material at the factory

at any point of time does not exceed two hour

production requirements.

Within 48hrs ,all finished car left the factory.

No dealer is sent more than 15days stock.

Toyota managed this by Milk Run policy.

Page 12: Mrp of Toyota India

04/21/202312MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

What is milk run ?

A milk run ,in logistics ,is a round trip that facilitates either distribution or collection.Picking small quantities of supplies from vendors.

Page 13: Mrp of Toyota India

04/21/202313MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

Page 14: Mrp of Toyota India

04/21/202314MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

Page 15: Mrp of Toyota India

04/21/202315MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

Page 16: Mrp of Toyota India

04/21/2023 16MECHANICAL ENGINEERING DEPARTMENT, NIT SILCHAR

REFERENCES:


Recommended