+ All Categories
Home > Documents > MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and...

MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and...

Date post: 07-Jul-2018
Category:
Upload: vuongdan
View: 240 times
Download: 1 times
Share this document with a friend
69
MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017
Transcript
Page 1: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

MSD Rules & Regulations and Fee

Updates

New MSD Online Plan Review, Permitting & Inspection Website

Fall 2017

Page 2: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

2

Updated Contact List

for MSD Development Review Group

Page 3: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

3

Page 4: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

4

• Draft Regulations Update redline version with proposed changes was advertised for public comment August 11, 2017. Email blast was sent to stakeholders, and also DRAFT changes posted on MSD website.

• Comments received until September 22, 2017. • Most changes are clarifications • Six previous amendments from the last 10 years have

been incorporated. New list of amendments goes to zero.

• Will be adding information pertaining to formatting requirements for electronic submittal of plans & other documents for online review & permitting. This to be included in the new version of Regulations proposed for February 1, 2018 effective date, or in an Amendment 1 thereto later Spring 2018

MSD Rules & Regulations

Page 5: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

5

• Regulations will only be available on www.stlmsd.com – no hard copies will be printed

• Clarifications to address sewer maintenance issues • Wording added to align with CSR & state rules & laws • Administration and plan submittal requirement

clarifications • Sanitary sewer requirement clarifications • Storm sewer and stormwater management requirement

clarifications • Land surveyor seal requirements on easement plats • Minimum insurance requirements for construction –

added pollution liability when MSD is providing cost reimbursement

• Plan submittal and preconstruction meeting requirements for projects with pump stations and force mains

Summary of Clarifications & Changes

Page 6: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

6

• Section 1.030 – Allows Professional Landscape Architect Seal for non-structural

post construction stormwater BMPs only (Stormwater Credits) – Allows design professional to send in a Sealed letter if Seal on

project plans is more than one year old, and project site conditions have not changed

• Section 1.040.02 – Will include information on electronic submittal requirements for

the new MSD online Plan Review, Permitting, and Construction Inspection website

• Section 1.040.03 – Specifies that any proposed change to property lines shall at a

minimum require submittal of the proposed changes to the District for review, and that submittal of full site improvement plans for review and approval will be required in most cases, unless directed otherwise by the District

Administration

Page 7: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

7

• Section 3.020.08 – Sanitary sewer separation from water main as allowed in 10 CSR

20-8 • Section 3.030.09 1. c.

– Further describes manhole lining requirements where force main connections are made into the gravity sanitary system

• Section 3.030.09 5. – Describes requirements for sanitary sewers with locations in

conjunction with water mains • Section 3.030.09 13.

– Allows for private sewers in some industrial or institutional situations where the same entity owns adjacent parcels and lot consolidation is not possible

Sanitary Sewers

Page 8: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

8

• Section 3.030.09 18. – Sanitary sewer special requirements for levee-protected areas and

high groundwater table areas • Section 3.030.09 19.

– References lateral tracer wire requirements per local plumbing codes and Missouri Revised Statute 319.033.1

• Section 3.030.09 20. and 21. – Connections to Brick, Non-Reinforced Concrete or Other Non-

Circular Sewers – Connections to Drop Shafts

Sanitary Sewers

Page 9: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

9

• Section 4.020.07 10. – Requirements for storm sewers in levee-protected areas and high

groundwater table areas • Section 4.020.08

– Clarification on requirements in sinkhole areas, to protect water quality and preserve the sinkhole’s existing hydrologic condition (tributary flow rate and tributary flow volume)

• Section 4.020.08 2. d. – Requires geotechnical engineer to provide a P.E. Sealed

certification letter stating the project was constructed in accordance with the design plans and geotechnical report

Storm Sewers

Page 10: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

10

• Section 4.030.05 – Title of this section changed from “Open Channels” to “Improved

Channels” and clarifications added to minimize channelization of natural streams, and that such work shall meet Corps of Engineers requirements

• Section 4.060 – Clarification added to align with the current MS4 Stormwater Phase

II Permit, particularly Minimum Control Measure 5 – Post-Construction Stormwater Management in New Development and Redevelopment

• Table 4-5, second page, part A. and B. – Describes instances when stormwater management facilities may

be required when runoff differential increase is less than 2 cfs – Mentions runoff volume techniques shall be incorporated into the

detention design to the maximum extent practicable

Storm Sewers

Page 11: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

11

• Section 7.060.03 5. – Requires easement plats to be sealed, signed, and dated by a

Missouri Registered Professional Land Surveyor. – Sample Easement Plat included at the end of Chapter 7

• Section 10.090.03 – Pollution Liability Coverage Required if MSD is providing cost

reimbursement in excess of $100,000 • Sections 13.020 and 13.030.02

– Requires submittal and review of plans for pump station, force main, and low pressure sewer system components of a project to be a separate record that is reviewed and approved separately from the rest of the development plans

• Section 13.020.04 and 13.030.04 – Requires preconstruction meeting for pump station, force main,

and low pressure sewer system work • Section 13.020.05

– Pump Station Radio Connection Fee

Easement Plats, Insurance, Pump Stations & Force Mains

Page 12: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

New Engineering Fees

Page 13: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

13

• Fees charged for services to recover actual costs • Ensure costs not borne by general users of System • Fees are fair and reasonable • Analysis of Engineering and Service Fees completed

3

Engineering Fee Basis

Page 14: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

14

• Plan Submittal and Review Fees – Submittal Charge - $450.00 – Subdivisions, commercial projects - $150.34 per acre – Sewer extensions - $0.57 per lineal foot – Conceptual Review – Basic $440.00, Detailed $2,000.00

• Permit and Inspection Fees – Connection Permit - $50.00 – Construction Permit - $195.00 – Sanitary and Combined Sewer - $3.39 per foot – Storm Sewer - $2.50 per foot – Pump Station - $2,500.00 per station

• Industry Permit Fees – Base Fee - $150 – Sample Point Fee - $100/sample point – Volume Fee - $0.72/CCF

• Connection Fees

3

Current Engineering Fees (2007)

Page 15: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

15

Plan Review Current Revenues

4

Description Number (3yr Ave) Revenue Plan Submittals 529 $238,000

Review Fees 1211 acre $186,000

Conceptual 43 $23,000

Total $447,000

Page 16: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

16

Permit and Inspection Current Revenues

4

Description Number (3yr Ave) Revenue Construction Permits

549 $107,000

Footage Permits 185,000 ft $527,000

Connection Permits 2,247 $112,000

Pump Station 3 $7,500

Total Revenue $754,000

Page 17: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

17

Engineering Fees Revenue and Costs

4

Current Revenue Actual Costs Plan Review $ 447,000 $ 762,000 Permit & Inspection $ 754,000 $1,505,000 Total $1,201,000 $2,267,000 Difference ($1,066,000)

Page 18: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

18

Significant Changes

4

• Nature of Development and Land – Projects: 950 then, 600 now – Acres: 2800 then, 1300 now

• Complexity of Reviews – Site characteristics – Consent decree coordination – MS4 Water Quality Requirements

• Stormwater BMPs in Rules and Regs (2006) • BMPs: 0 then, 1000 now

• Inspection – Tap crew eliminated – Permits: 2700 then, 3900 now

• Increased Labor Benefit Costs

Presenter
Presentation Notes
Fringe Benefit Costs: 41% then, 66% now
Page 19: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Regulatory ($0.02 tax) • District-wide Stormwater Regulatory fund

– Ad Valorem Tax – $0.0197 per $100 assessed valuation – For stormwater services required by State and

Federal regulations

• Costs allocated to fund – Municipal Separate Storm Sewer System (MS4)

Permit compliance – Stormwater BMP plan review, permit, inspection

19

Page 20: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Public Benefits • Services provided directly to the public

– Engineer of the Day – Easement Encroachment/Vacation – Public Education, HOA Assistance – Municipal Coordination – Community Facing Software - Accela

• Services on behalf of the public – Protecting Public Health and the Environment – Coordination with Project Clear – Researching System Complaints – Economic Development

20

Page 21: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

21

Proposed Plan Review Fees

4

Current Fee Proposed Fee Update

Ordinance 12413 New Ordinance

$450.00 Plan Submittal Charge $450.00

$150.34 per acre Review Fee (1 acre minimum)

$375.00 per acre (0.5 acre minimum)

$0.57 per foot Review Fee on Linear projects

$1.40 per foot

$ 440.00 Basic Conceptual $2000.00 Detailed

$470.00 Conceptual Review

Page 22: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

22

Proposed Permit/Inspection Fees

4

Current Fee Proposed Fee Update

$195.00 Construction Permit $195.00

$3.39 per foot Sanitary/Combined

$5.80

$2.50 per foot Storm Sewer $4.20

$50.00 Connection Permit $75.00

$2,500.00 Pump Station $4,000.00

Page 23: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

23

Proposed Industry Permit Fees

4

Current Fee Proposed Fee Update

Base Fee $150.00 $180.00

$100.00 per sample point $120.00 per sample point

$0.72 per CCF $0.86 per CCF

Page 24: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

24

• Connection Fees recover the cost of system capacity constructed for new users

• Last study to set fees performed in 1994, and implemented by Ordinance 9346

• Current review used Water Environment Federation Manual, “buy-in method”

• Based on asset equity: investments less depreciation less debt

3

Connection Fee Basis

Page 25: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

25

Connection Fees

4

Page 26: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

26

Impact on Typical Projects

4

Project Fee Type Current Proposed % Diff

Single Family Residence

Plan Rev $ 600 $ 825

Permit/Insp $ 100 $ 150

Connection $1,072 $1,126

Total $1,772 $2,101 19%

Large (62 lot) Subdivision

Plan Rev $ 2,216 $ 4,856

Permit/Insp $22,904 $37,486

Connection $66,464 $69,812

Total $91,585 $112,154 22%

Page 27: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

27

Impact on Typical Projects

4

Project Fee Type Current Proposed % Diff

Small Commercial

Plan Rev $ 657 $ 967

Permit/Insp $4,821 $6,449

Connection $4,736 $4,812

Total $10,214 $12,229 20%

Large Commercial

Plan Rev $ 4,809 $11,775

Permit/Insp $24,741 $40,431

Connection $ 4,008 $ 3,970

Total $33,558 $56,176 67%

Page 28: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

MSD PLAN REVIEW – ACCELA SYSTEM • MSD has reviewed about 600

development and redevelopment projects each year for the last 8 years or so

• New online system to track plan review, permitting, and construction inspection on these projects

• Could become part of a larger regional permitting portal? MSD for now…St. Louis County and Other Municipalities later…

• Each agency would still have its own unique website configuration to perform its particular permitting functions

• Regional Portal would be a “launch pad” to direct users to each agency’s permitting and plan review website

Page 29: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Like a “File Folder in the Cloud” • You will be able to submit plans and other

documents electronically online • Can also still submit plans in hard copy

format, only need to send in 1 copy • MSD will “work” the projects electronically,

no hard copy files will be kept • You may have started seeing some

automated emails on some existing projects

• Can pull permits online • MSD Inspectors will use tablets for

inspections

Page 30: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

ACA - Customer Side • ACA (Accela Citizen Access) • More customer friendly version, displays same project

information as internal version of software • Customer registers for an Account & sets Password • Project Contacts include Engineer, Developer,

Municipality, Requestor, Authorized Representative • WE WILL NEED YOUR EMAIL ADDRESS !!! • After registering for an account, customers can access

project info, workflow status, review comments, docs • Can pay fees same methods as before, now also can pay

online with credit card (NOTE: +2.5% credit card vendor charge if paying online with credit card)

• Can upload documents – Plans, Agreements, Calcs, Etc. to records that you are a contact on

• Customers who are registered in the system can also research other MSD Development Review Projects

• Transparent, Intuitive System

30

Page 31: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

31

ACA is LIVE!!! Soft Roll-Out to Customers

4

Date: Monday, October 16, 2017 9:50:08 AM

Subject: St. Louis MSD Accela Online Development Review, Permitting, and Construction Inspection link Hello, The MSD Development Review, Permitting, and Construction Inspection customer website is now live. Please click on the link below and Register for an Account. Please be sure to enter your email address. With this website, you will be able to submit and view development plans and obtain permits online. https://aca3.accela.com/STLMSD If you have any questions please contact MSD Development Review at 314-768-6272. Thank you.

Page 32: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Record Types, New Format is YRXXXXX-XXXXX

(YEAR)(TYPE)-(CONSECUTIVE NUMBER) • Converted P-Jobs are still the old numbering format

(example P-0034003-01 will be P003400301) • Project 17MSD-00001 (New, Municipal) • Conceptual Basic 17CNCPB-00001 • Conceptual Detailed 17CNCPD-00003 • Floodplain Study 17FLPLS-00008 • Easement 17EASMT-00006 • Maintenance Agreement 17MAINT-00042 • Easement Vacation 17VACAT-00009 • Easement Encroachment 17ENCRO-00002 • Information File 17INFOR-00004 • Temporary Record 17TMP-000060 • Various Permit Records, MODST, BLDST, REACH,

Others • Various Other Converted Records

32

Page 33: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Parent and Child Records

• MSD type are project (New or Municipal) records, these are usually parents

• P003146700 types are converted records – usually parents

• CNCPB, CNCPD, INFOR types usually stand alone records

• FLPLS, MAINT, EASMT, VACAT, ENCRO could be child records or stand-alone

• Permit type records REACH, SPECI, MODST, BLDST, CONCT, BMPUA will usually be child records, or could stand alone

• Permit type OTCPT usually stand alone

33

Page 34: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Auto-Notification Emails

• Plans Accepted for Review • Return to Consultant (“Out” to the Customer) • Request Final Plans for Approval • Record Approval • Conceptual Review Completed • Record Recorded • Permits Ready for Pickup • Construction Inspection Status • Deposit Release Information • Construction Approval • Inactivity Notice if One Year Passes

34

Page 35: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

ACA Home Page https://aca3.accela.com/STLMSD

Page 36: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Your Account Home Page (Some Redundancy in Navigation)

36

Page 37: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 1

37

Page 38: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 2

38

Page 39: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 3 (Look Up Contacts in System)

39

Page 40: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 4 (Specify the Contact Type)

40

Page 41: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 5

41

Page 42: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 6 (Search System for Address - # and Street,

can enter manually if not found)

42

Page 43: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 7

43

Page 44: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 8

44

Page 45: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 9

45

Page 46: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 10

46

Page 47: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 11

47

Page 48: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 12

48

Page 49: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 13

49

Page 50: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 14

50

Page 51: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 15

51

Page 52: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating an Application 16

• Can Save and resume later – will get 17TMP-xxxxxx number, and this number will change into record number when application process is done

• OK to upload documents if paying submittal fee online with credit card

• If paying submittal fee by check, please wait and upload documents AFTER the payment has been entered and project record number has been created

52

Page 53: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Record Info

53

Page 54: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Related Contacts & Application Information

54

Page 55: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Application Information Table = General Plan Review Comments

55

Page 56: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Processing Status

56

Page 57: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Related Records = Parents & Children

57

Page 58: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Attachments – (Can Click on Column Titles to Sort)

Page 59: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Construction Inspection Information Still “Under Construction”

59

Page 60: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Permits

60

Page 61: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Permits are Usually Child Records

61

Page 62: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Permitting Points…

• Drainlayers will need to call the office to get added to the permits needed. You cannot do this from ACA.

• Drainlayers will need to call in all permits to be inspected, even if some permits have been called in for previously. In the past, if a job was already working, you did not need to do this.

• No online inspections are currently available. • No fee permits (Sampling

Tees/MH’s/Underdrains are not printing on ACA. Please let us know and we can e mail to you.

62

Page 63: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

ACA General Search

Page 64: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

ACA General Search Tips • Default is a 30-day date range, may need to

expand this to an earlier “from” date to expand the search range, especially on older projects

• Use wildcard % sign before, after, or before and after certain text to find certain text

• Example %zoo should find anything ending in “zoo”

• Example zoo% should find anything starting with “zoo”

• Example %zoo% should find anything that contains the text string “zoo”

• To avoid lengthy searches, try to accurately define parameters

• Sometimes helps to try searching again with same criteria – Accela server issues?

Page 65: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Finding Donuts

65

Page 66: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

ACA Search Results

Page 67: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Creating Search Collections

67

Page 68: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Accessing Your Collections

68

Page 69: MSD Rules & Regulations and Fee Updates New MSD Online ... Regs... · MSD Rules & Regulations and Fee Updates New MSD Online Plan Review, Permitting & Inspection Website Fall 2017

Q & A

For questions related to Plan Review please contact: John Grimm, P.E. Program Manager MSD Development Review 314-768-2743 [email protected] For questions related to Permits please contact: Terri Stewart Permit Supervisor MSD Permit Department 314-768-6288 [email protected] For questions related to Construction Inspection please contact: Mike Shelton Manager of Development Inspection MSD Construction Management 314-768-6387 [email protected]

For general MSD Accela questions please call 314-768-6272, this is the Development Review general number


Recommended