+ All Categories
Home > Documents > MSD System Design Review Agenda P11212 : LVE Controls, RF Module

MSD System Design Review Agenda P11212 : LVE Controls, RF Module

Date post: 31-Dec-2015
Category:
Upload: sade-haney
View: 26 times
Download: 5 times
Share this document with a friend
Description:
MSD System Design Review Agenda P11212 : LVE Controls, RF Module. Meeting Purpose 1. Present an overview of the project. 2. Confirm understanding of Customer Needs and Engineering Specifications. 3. Review Concept Generation and Refinement process. - PowerPoint PPT Presentation
Popular Tags:
21
MSD System Design Review Agenda P11212 : LVE Controls, RF Module Meeting Purpose 1. Present an overview of the project. 2. Confirm understanding of Customer Needs and Engineering Specifications. 3. Review Concept Generation and Refinement process. 4. Proposal for a design solution and analysis of benefits vs. disadvantages. 5. Discuss Feasibility and possible alteration of plan. Materials to be Reviewed 1. Project Description 2. Work Breakdown Structure 3. Customer Needs 4. Engineering Specifications 5. Interface Document 6. Concept Selection Matrix 7. Proposed Ideas 8. LVE Controls vs. LV 1 Gen 1 Design and RP1 Gen 2 Design 9. Project Plan Moving Forward 10. Risk Management
Transcript

MSD System Design Review AgendaP11212 : LVE Controls, RF Module

• Meeting Purpose• 1. Present an overview of the project.• 2. Confirm understanding of Customer Needs and Engineering Specifications.• 3. Review Concept Generation and Refinement process.• 4. Proposal for a design solution and analysis of benefits vs. disadvantages.• 5. Discuss Feasibility and possible alteration of plan.• Materials to be Reviewed• 1. Project Description • 2. Work Breakdown Structure • 3. Customer Needs• 4. Engineering Specifications • 5. Interface Document • 6. Concept Selection Matrix • 7. Proposed Ideas• 8. LVE Controls vs. LV 1 Gen 1 Design and RP1 Gen 2 Design • 9. Project Plan Moving Forward• 10. Risk Management

Meeting TimelineStart Time Topic of Review

12:30 Project Introduction12:40 Work Break Down structure12:45 Customer Needs12:50 Engineering Specifications

1:00 Interface Control Document1:10 Concept Generation and Selection1:20 LVE vs LV1 and RP11:35 Project Plan1:40 Risk Assessment1:50 Are we ready to design?

Work Break Down Structure

Work Break Down Assignments

• Wireless Interface – Dan• Microcontroller – Dan• Communication Bus – Gokhan• Logic Power – Nick• Motor Power – Nick• H-bridge Drivers – Gokhan• Pulse Width Modulation - Gokhan

Customer Needs

Engineering Specifications

Interface Control Document

Concept SelectionRF Module

Concept SelectionMicrocontroller

Concept SelectionMotor Control

Concept SelectionMSA Communication

System Analysis

• Delay through transmission: – Theoretical message size: 18 bits – Single Message Latency:

• Time through USART: 18b / 31kBps = 72us • Time through RF: 18b / 40kbps = 450us • Total time: 72us + 450us = 522us

– Max messages: 5 – Max messages size: 54 bits – Max Message Latency:

• Time through USART: 54b / 31kBps = 217us • Time through RF: 54b / 40kbps = 1.35ms • Total time: 217us + 1350us = 1.567ms

– Forward Backward Left Right M1 + M1 - M2 + M2 - M3 + M3 - M4 + M4 - M5 + M5 - M6 + M6 - M7 + M7 - M8 + M8 – – 5 bit: instruction 0-31 – 4 bit: speed 0-15 – X bit: redundancy – 5 instructions at once – (5+4+9)*3= 54 bits/instruction set

System Analysis

• Heat Transfer Rate:• Q = ΔT/R • ΔT = Tinteral - Texternal

• R = d/ka• d = material thickness• k = thermal conductivity• a = exposed surface area• so Q = ΔTka/d

System Architecture

Previous Architecture

Previous Architecture

Project Plan

Project Plan Gannt Chart

Risk Assessment


Recommended