$ pr /Hr R15513 R24452 UCL673/674 R46618/1 R46618/2 R37702 R24913 R24510 R46688 R46562 TOTAL
Crellin/
Braizier St
Inlet
Foreshore
Adjacent to
Mokare
Bridge East
Zimmerman
Street Rear
of Depot
Mt
Hallowell
NW of OB
Fire Shed
Mt
Hallowell
Nth of
Northern
Fire Break
BuckeySt
Ocean
Beach Rd
Btwn Surf
Club Car
Park OB rd
Lot
1424,1423
Peaceful
Bay Rd Near
Tip
Crn Peace
&
Henwood
St
Highlands
Rear Of
Water Corp
Inlet Drive
FIRE BREAKS ha 11.4 7.2 1.6 2 45 1.5 2 87 13.2 45 215.9ha
Mulching Excavator $200.00 $1,000.00 $1,000.00 $600.00 $600.00 $0.00 $1,000.00 $0.00 $1,600.00 $1,500.00 $0.00 $7,300.00
Merlot $145.00 $725.00 $0.00 $0.00 $0.00 $0.00 $0.00 $435.00 $1,160.00 $0.00 $870.00 $3,190.00
Slashing $100.00 $0.00 $0.00 $0.00 $300.00 $400.00 $0.00 $0.00 $0.00 $400.00 $0.00 $1,100.00
TRAFFIC MANAGEMENT
Shire of Denmark $90.00 $1,440.00 $0.00 $0.00 $720.00 $0.00 $540.00 $720.00 $1,440.00 $1,440.00 $360.00 $6,660.00
Appliances
Light Tanker (Fuel only) $10.00 $160.00 $160.00 $40.00 $160.00 $120.00 $60.00 $40.00 $160.00 $160.00 $160.00 $1,220.00
2.4 Heavy Duty (Fuel only) $20.00 $480.00 $480.00 $160.00 $480.00 $240.00 $240.00 $160.00 $480.00 $480.00 $480.00 $3,680.00
Loader $160.00 $480.00 $640.00 $0.00 $640.00 $0.00 $0.00 $0.00 $1,280.00 $640.00 $640.00 $4,320.00
MEALS and REFRESHMENTS
Level 1 (Drinks only) $5.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Level 2 (Snacks tea, Coffee+L1) 10.00 $0.00 $0.00 $90.00 $150.00 $100.00 $100.00 $110.00 $0.00 $0.00 $0.00 $550.00
Level 3 (Meal, L1+2) 18.00 $270.00 $270.00 $0.00 $0.00 $0.00 $0.00 $0.00 $324.00 $270.00 $270.00 $1,404.00
ALLOCATED FIELD WORK
$90.00 $900.00 $900.00 $900.00 $900.00 $900.00 $900.00 $900.00 $900.00 $900.00 $900.00 $9,000.00
Land Owner Consultation $157.60 $157.60 $157.60 $157.60 $157.60 $157.60 $157.60 $157.60 $157.60 $157.60 $1,576.00
TOTAL $5,612.60 $3,607.60 $1,947.60 $4,107.60 $1,917.60 $2,997.60 $2,522.60 $7,501.60 $5,947.60 $3,837.60 $40,000.00
Note: Not Including extra costs asssociated with the prescription preperation and pre-burn plans spotting outside of the burn area
Costings for Proposed Prescribed Burn Plan Autumn 2010
or further fire suppression in the event of hop over or spotting outside of the burn area.
Hrs $ pr /Hr TOTAL
FIRE BREAKS
Mulching Excavator 5.00 $200.00 $1,000.00
Merlot 5.00 $145.00 $725.00
Slasher 0.00 $100.00 $0.00
TRAFFIC MANAGEMENT
Shire of Denmark 16.00 $90.00 $1,440.00
Appliances
Light Tanker 16.00 $10.00 $160.00
2.4 Heavy Duty 24.00 $20.00 $480.00
Loader 3.00 $160.00 $480.00
MEALS and REFRESHMENTS
Level 1 $5.00 $0.00
Level2 $10.00 $0.00
Level3 15.00 18.00 $270.00
ALLOCATED FIELD WORK
10.00 $90.00 $900.00
Land Owner Consultation $157.60
TOTAL $5,612.60
R15513Recreation Centre
Crn Brazier and Crellin and East of McClean Oval 11.4ha
Hrs $ pr /Hr TOTAL
FIRE BREAKS
Mulching Excavator 5.00 $200.00 $1,000.00
Merlot 0.00 $145.00 $0.00
Slasher 0.00 $100.00 $0.00
TRAFFIC MANAGEMENT
Shire of Denmark 0.00 $90.00 $0.00
Appliances
Light Tanker 16.00 $10.00 $160.00
4x4 24.00 $20.00 $480.00
Loader 4.00 $160.00 $640.00
MEALS and REFRESHMENTS
Level 1 $5.00 $0.00
Level2 $10.00 $0.00
Level3 15.00 18.00 $270.00
ALLOCATED FIELD WORK
10.00 $90.00 $900.00
Land Owner Consultation $157.60
TOTAL $3,607.60
R24452Inlet Foreshore adjacent to Mokare Trail 11.4ha
Hrs $ pr /Hr TOTAL
FIRE BREAKS
Mulching Excavator 3.00 $200.00 $600.00
Merlot 0.00 $145.00 $0.00
Slasher 0.00 $100.00 $0.00
TRAFFIC MANAGEMENT
Shire of Denmark 0.00 $90.00 $0.00
Appliances
Light Tanker 4.00 $10.00 $40.00
2.4 Heavy Duty 8.00 $20.00 $160.00
Loader 0.00 $160.00 $0.00
MEALS and REFRESHMENTS
Level 1 $5.00 $0.00
Level2 9.00 $10.00 $90.00
Level3 18.00 $0.00
ALLOCATED FIELD WORK
10.00 $90.00 $900.00
Land Owner Consultation $157.60
TOTAL $1,947.60
UCL 674/673Rear of Shire Depot Zimmerman Street 1.6ha
Hrs $ pr /Hr TOTAL
FIRE BREAKS
Mulching Excavator 3.00 $200.00 $600.00
Merlot 0.00 $145.00 $0.00
Slasher 3.00 $100.00 $300.00
TRAFFIC MANAGEMENT
Shire of Denmark 8.00 $90.00 $720.00
Appliances
Light Tanker 16.00 $10.00 $160.00
2.4 Heavy Duty 24.00 $20.00 $480.00
Loader 4.00 $160.00 $640.00
MEALS and REFRESHMENTS
Level 1 $5.00 $0.00
Level2 15.00 $10.00 $150.00
Level3 18.00 $0.00
ALLOCATED FIELD WORK
10.00 $90.00 $900.00
Land Owner Consultation $157.60
TOTAL $4,107.60
R46618/1Mt Hallowell Reserve
NW of Ocean Beach Fire Shed Ocean Beach Road 2ha
Hrs $ pr /Hr TOTAL
FIRE BREAKS
Mulching Excavator 0.00 $200.00 $0.00
Merlot 0.00 $145.00 $0.00
Slasher 4.00 $100.00 $400.00
TRAFFIC MANAGEMENT
Shire of Denmark 0.00 $90.00 $0.00
Appliances
Light Tanker 12.00 $10.00 $120.00
2.4 Heavy Duty 12.00 $20.00 $240.00
Loader $160.00 $0.00
MEALS and REFRESHMENTS
Level 1 $5.00 $0.00
Level2 10.00 $10.00 $100.00
Level3 18.00 $0.00
ALLOCATED FIELD WORK
10.00 $90.00 $900.00
Land Owner Consultation $157.60
TOTAL $1,917.60
R46618/2Mt Hallowell Reserve
North of Northen Fire Break 45ha
Hrs $ pr /Hr TOTAL
FIRE BREAKS
Mulching Excavator 5.00 $200.00 $1,000.00
Merlot 0.00 $145.00 $0.00
Slasher 0.00 $100.00 $0.00
TRAFFIC MANAGEMENT
Shire of Denmark 6.00 $90.00 $540.00
Appliances
Light Tanker 6.00 $10.00 $60.00
4x4 12.00 $20.00 $240.00
Loader 0.00 $160.00 $0.00
MEALS and REFRESHMENTS
Level 1 $5.00 $0.00
Level2 10.00 $10.00 $100.00
Level3 0.00 18.00 $0.00
ALLOCATED FIELD WORK
10.00 $90.00 $900.00
Land Owner Consultation $157.60
TOTAL $2,997.60
R37702Buckley Street 1.5ha
Hrs $ pr /Hr TOTAL
FIRE BREAKS
Mulching Excavator 0.00 $200.00 $0.00
Merlot 3.00 $145.00 $435.00
Slasher 0.00 $100.00 $0.00
TRAFFIC MANAGEMENT
Shire of Denmark 8.00 $90.00 $720.00
Appliances
Light Tanker 4.00 $10.00 $40.00
2.4 Heavy Duty 8.00 $20.00 $160.00
Loader $160.00 $0.00
MEALS and REFRESHMENTS
Level 1 $5.00 $0.00
Level2 11.00 $10.00 $110.00
Level3 18.00 $0.00
ALLOCATED FIELD WORK
10.00 $90.00 $900.00
Land Owner Consultation $157.60
TOTAL $2,522.60
R24913Wilson Head
Ocean Beach Surf Club Ocean Beach RdBetween car park bike path and Ocean Beach Road 2ha
Hrs $ pr /Hr TOTAL
FIRE BREAKS
Mulching Excavator 7.50 $200.00 $1,500.00
Merlot $145.00 $0.00
Slasher 4.00 $100.00 $400.00
TRAFFIC MANAGEMENT
Shire of Denmark 16.00 $90.00 $1,440.00
Appliances
Light Tanker 16.00 $10.00 $160.00
2.4 Heavy Duty 24.00 $20.00 $480.00
Loader 4.00 $160.00 $640.00
MEALS and REFRESHMENTS
Level 1 $5.00 $0.00
Level2 $10.00 $0.00
Level3 15.00 18.00 $270.00
ALLOCATED FIELD WORK
10.00 $90.00 $900.00
Land Owner Consultation $157.60
TOTAL $5,947.60
R46688Henwood/ Peace Street Highlands 13.2ha
Hrs $ pr /Hr TOTAL
FIRE BREAKS
Mulching Excavator 8.00 $200.00 $1,600.00
Merlot 8.00 $145.00 $1,160.00
Slasher 0.00 $100.00 $0.00
TRAFFIC MANAGEMENT
Shire of Denmark 16.00 $90.00 $1,440.00
Appliances
Light Tanker 16.00 $10.00 $160.00
2.4 Heavy Duty 24.00 $20.00 $480.00
Loader 8.00 $160.00 $1,280.00
MEALS and REFRESHMENTS
Level 1 $5.00 $0.00
Level2 $10.00 $0.00
Level3 18.00 18.00 $324.00
ALLOCATED FIELD WORK
10.00 $90.00 $900.00
Land Owner Consultation $157.60
TOTAL $7,501.60
R24510Lot 1424,1423 Peaceful Bay
Peaceful Bay Rd 87 ha
Hrs $ pr /Hr TOTAL
FIRE BREAKS
Mulching Excavator 0.00 $200.00 $0.00
Merlot 6.00 $145.00 $870.00
Slasher 0.00 $100.00 $0.00
TRAFFIC MANAGEMENT
Shire of Denmark 4.00 $90.00 $360.00
Appliances
Light Tanker 16.00 $10.00 $160.00
2.4 Heavy Duty 24.00 $20.00 $480.00
Loader 4.00 $160.00 $640.00
MEALS and REFRESHMENTS
Level 1 $5.00 $0.00
Level2 $10.00 $0.00
Level3 15.00 18.00 $270.00
ALLOCATED FIELD WORK
10.00 $90.00 $900.00
Land Owner Consultation $157.60
TOTAL $3,837.60
R46562/UCLRear of Water Corp Inlet Drive 9.6ha +36.4ha
Location: Brigade:
Burn Coordinator: Prescribed Burn No:
Intended burn season: Spring Burn Area (ha):
BURN TYPE: Edging Main PERMIT REQUIRED
A separate prescription will be required for each ignition. Permit Required: Yes No
If Yes, date obtained:
OBJECTIVE (MUST BE MEASURABLE & ACHIEVABLE)
STANDARDS REQUIRED
PRE-PLANNING
1. Burn Map (scale 1 : ) WHICH SHOULD INCLUDE THE FOLLOWING
Burn History - may include map Access Water Points
Power Lines/Utilities Plant Types Plantation/orchard
Buildings/Improvements Hazards Historical/cultural sites
Other feature/s that need consideration
2. Breaks
Mineral Earth
Remarks
PRESCRIPTION FORM FOR HAZARD REDUCTION BURNING (CONT)
Autumn
Shire of Denmark
PAGE 1 OF 2
PRESCRIPTION FORM
BURNING
Break ID
4WD TANKER 2WD TANKER
FOR HAZARD REDUCTION
F/A
Access Condition
Req Improvement
Forest or Vegetation type:
Operations Officer:
Prescribed Burn No:
IGNITION METHOD
Recommended SMC 12%–18%.Temperature 20°–28°. Max wind strength 15 km/h. Wind Direction:
Description of ignition pattern
RESOURCES REQUIRED
Fast Attack 2.4 Tanker 3.4 Tanker 4.4 Tanker Slip-on/Portable Pump
DAY OF THE BURN CHECK
Forecast max wind speed: km/h Forecast wind direction: Today’s forecast C
NOTIFICATIONS
Notification comments
Safety signage: Boundaries of burn area checked: Confirmed
PRE-BURN CHECKLIST:
Completed Name: Signature:
POST-BURN REVIEW
Burn Result Good Fair Poor
Were the burn objectives met: Yes No Checklist
If not,why? Unburnt pockets do not pose a threat.
Sparks from stags do not pose a threat.
Other comments/future planning: Mop up standards have been achieved:
Time: Day:
Post-burn patrol conducted until: Burn perimeter walked and checked for hazards.
Road warning signs have been removed:
Signed off by: Date: Time: Day:
No of persons
CALM Shire FESA
PAGE 2 OF 2
BackburnStripSpot
BURN AUTHORISED BY:
Other
N/ADone
Adjoining Landholders
Convection
Shire of Denmark
PAGE 1 OF 2
The purpose of this form is to illustrate any potential Burn Location:
problems in the areas subject to prescribed burning.
It should be completed during the early stages Burn Number:
of preparing a prescription.
Date:
Any issues identified on this checklist must be Compiling Officer:
attended to before the burn can commence.
Issue Yes No N/A Action (if ‘Yes’)
Environmental Issues
SMOKE
Will the smoke affect roads?
Will the smoke affect airstrip?
Will the smoke affect townsite/settlement?
GAZETTED WATER CATCHMENTS
Is a catchment involved?
Is a water storage boundary involved?
Is ash likely over water?
Is a burn approval required from WAWA?
WATERWAYS
Name of stream, river or lake
Significance
Leave a buffer from river/stream reserves _____ (m)
ROAD RESERVES AND RECREATION AREAS
Are tourist or major road verges involved?
Will roadside aesthetic values be affected?
Are there any walk trails/lookouts?
Are there any picnic/campsites?
IMPORTANT AREAS
Are there any important conservation sites?
Are there areas subject to erosion (steep slopes etc)?
Historical structures (bridges, buildings etc)?
Are there aboriginal/archaeological sites?
Is there any known rare/endangered flora or fauna?
Are there any special requirements for flora/fauna?
Is MRWA approval to burn road reserves required?
PAGE 2 OF 2
PRE-BURN CHECKLIST
Issue Yes No N/A Action (if ‘Yes’)
Environmental Issues (cont)
DISEASE/WEEDS/VERMIN PROGRAMS
Is this a Disease Risk Area?
Are dieback precautions required?
Is there a noxious weed eradication program?
Is there a vermin eradication program?
RESEARCH SITES
Are there any scientific trials/plots?
Are there any other monitoring sites?
Property
PROPERTY
Are there any buildings at risk?
Are there any bridges at risk?
Are there any crops at risk?
PUBLIC UTILITY/SERVICES
Will any of these utilities be affected?
• Western Power
• Telstra
• MRWA
• Water Authority
• Alinta Gas
People (check on the day of the burn)Are there any people in the burn area?
In particular, check for:
• Bush walkers
• Campers
• Apiarists (and/or bee hives)
• Recreationists
• Researchers/Students
• Other
Priority Burn Sites 2010 Natural Resource Management Officer Report prepared by Melinda Lyons, 4th January 2010
R 15513 – (Pin 593366 Rec Centre and 593106, Crellin Street, 11.4 ha)
Natural Resource Values
Baudin’s Cockatoo nesting site (Pin 593106) – public information has noted that a set of Baudin’s Cockatoos have been disappearing into a tree hollow along the eastern boundary of the reserve in a tree closest to the river foreshore edge. These birds are protected under Western Australia’s Wildlife Conservation Act 1950. On inspection there appears to be a number of hollow tree stags within this reserve that provide important bird nesting habitat (see map).
There is a swamp paperbark woodland within Pin 593366 which is of important ecological value. The trees are an important nutrient sink prior to stormwater reaching the Denmark River. They are of historical value due to their age. Any fire in this zone has the potential to open up the forest canopy and increases fire hazard. A fire in a dried out peat swamp is difficult to control as flames often continue to smoulder underground, fed by the dried peat (see map).
The northern boundary of Pin 593106 is currently a relatively weed free section of the reserve. Fire in this zone has the potential to introduce weeds into exposed soils (see map)
There has been extensive revegetation works within the cleared gravel pit section of Pin 593106 (see map).
There are no known landscape protection sites within or surrounding this reserve.
There are no known priority flora species listed within the reserves. Heritage Site
The old post office building while not within in the reserve is situated in close proximity to the southern boundary of Pin 593106. It is a registered Heritage Site on the Shire Municipal Heritage Register.
Both Pin 593366 and Pin 593106 reserves border the Denmark River which is an aboriginal heritage site (Site ID 22081). A Section 18 is currently being sort for proposed trail upgrade works along the foreshore.
Social and Community Values
Upgrade to the Karri Walk Trail. This is part of a grant funded by the Department Sport and Recreation and Lotterywest. Works include grading path and timber signage and bollarding to increase delineation of walk trail in open clearings and road crossings. The upgrade covers both Pin 593366 and Pin 593106.
The Bibbulmun Track and the Denmark Nornalup Heritage Rail Trail traverses close to the southernmost end of the reserve.
A request has been received on behalf of Denmark Arts to request permission to use the large clearing off the Karri Walk (between Crellin St and Brazier St) for two performances of ‘Our Secret River’ as part of Brave New Works #17, 2nd and 3rd April 2010 (see attached email).
There are no known strategic tourism sites within or surrounding this reserve.
Recommendations
1. Preparation involving grading or creation of firebreaks prior to burns be in consultation with NRM Officers and Nursery Manager to ensure protection of any significant ecological values or seed stock.
2. Budget preparation for the site includes follow up weed control to ensure exposed soils do not create a weed problem (further fire hazard).
3. Pin 593366 not be included in planned controlled burns
southern section of reserve is already of low fire risk with low open canopy
swamp paperbark canopy be retained as is to prevent peat drying out 4. Significant tree stags within the reserve be retained for wildlife habitat (to be tagged
prior to burn). 5. Burn to avoid revegetation in open gravel pit. 6. The Department of Environment and Conservation to be informed of an imminent burn
to warn Bibbulmun Track walkers. 7. Consultation with Noongar elders prior to any burning as Pin 593106 overlaps an
Aboriginal Heritage site. The burn should be included in the Section 18 application for trail upgrade permissions to the DIA.
8. Signage warning of imminent burn be put in place on trails for Bibbulmun and Rail Trail users.
9. A controlled burn is planned for the southern reserve Pin 593106 after the Easter long weekend 2010.
FUEL ASSESSMENT SHEET FOR FOREST FUELSAll Tables referred to are in Forest Fire Behaviour Tables for Western Australia, commonly called the ‘Red Book’, (3rd Edition, 1998) by R.J. Sneeuwjagt and G.B. Peet.
To complete this form, write answers in space provided or tick the box where appropriate.
Location: Today’s Date: / /
Sample Line No: of Burn No.:
Compiler: Brigade:
Last Burnt: Spring Autumn Summer Year:
OBSERVATION NO. 1 2 3 4 5 6 7 8 9 10 Total Average
Litter Depth (mm)
Trash Height (m)
Trash Density (D, M/D, S)
Scrub Structural Type(TABLE 7.4.1)
Scrub Height (m)
Density of Scrub (D, M, S)
Scrub Foliage Condition (GREEN, 20%, 50+% DEAD)
Average Tree Height (m): Maximum Scorch Height (m):
Dominant Tree Species: Karri Nth Jarrah Wandoo Pine
Banksia Sth Jarrah Flats Paperbark
Other
Wind ratio: : 1 Slope (°): Aspect: Topography:
Total Weight(t/ha)
Corr. Factor Available Fuel(t/ha)
(level, undulating etc.)
(1&2)*(3&6)(4&5)
Available Fuel Summary(t/ha)
1
1
2
3 4
5 6
6
7 8
Total Fuels (t/ha)
Available Fuels (t/ha)
10
11
Calculate Total Weight of fuel from Table 7.2.1.
Multiply Total Weight of litter by Correction Factor (Table 5.4.1H or5.4.1P) to calculate the Available Fuel (use 1.0 for Nth Jarrah).
Apply the figures for Trash Height plus Trash Density to Table 7.3.1 tocalculate the Total Trash Weight.
Apply the figures for Trash Height plus Trash Density to Table 7.3.1 tocalculate the Available Trash Weight.
Use the Scrub Structural Type plus the Average Scrub Height plus ScrubDensity (with Table 7.4.1) to calculate the Total Scrub Weight(Section 1).
2
3
4
5
6 Use the Scrub Structural Type plus the Average Scrub Height plus Scrub Density (with Table7.4.1) to calculate the Available Scrub Weight (Section 2 or 3).
Determine the Scrub Flammability Factor (Table 7.4.2) by using the Average ScrubFlammability and the Average Scrub Foliage Condition (%).
Multiply the Available Scrub (from )by the Scrub Flammability Factor to calculate theAvailable Fuel quantity that will burn.
Multiply the Total Scrub (from )by the Scrub Flammability Factor to calculate the TotalAvailable Scrub quantity that will burn.
Add Total Litter plus Total Trash plus Total Available Scrub to obtain the Total Fuels.
Add Available Litter plus Available Trash plus Available Scrub to obtain the Available Fuelsto be consumed in the burn.
7
8
10
11
S.F.F.
(or vegetation type)*For Karri, indicate type
Forest or vegetation type:
Dominant scrub species:
Notes:
9
9 5