POWER
MUARA TAWAR 5 – Indonesia 234 MW – KA13E2 Combined-Cycle Power Plant
PROJECT FEATURESPROJECT HIGHLIGHTS- This project involves extension of the existing power plant with a fifth block.
The new KA13E2 block adds an additional 234 MW to the current 1800 MW
plant, helping the country to cope with the current electricity crisis on the
Java/Bali grid.
- The Alstom-Marubeni consortium already built combined-cycle block 1 and gas
turbine peaking block 2 in 1995.
- Alstom has already been a key player in the Indonesian power generation
market since the 1960’s. It has supported the client PT PLN in meeting the
growing energy demand of the country through the construction of gas, coal
and hydro power plants.
CUSTOMER BENEFITS- High availability and reliability thanks to the KA13E2 proven technology
- Optimised base load through Plant Integrator™ methodology
- High operational flexibility to meet the booming demand for power
- An environmentally-responsible power solution with low emissions
The power plant is located in Muara Tawar,
35 km from Jakarta, on the northern coast of
Java Island, Indonesia.
JAKARTABandung Surabaya
Medan
Ujung Pandang(Makassar)
Palembang
Semarang
Kupang
Padang
Yogyakarta
Banjarmasin
Manila
Koror
Bangkok
Kuala Lumpur
Davao
Darwin
Bam
We
Da Nang
Kuching
Ipoh
Dili
Zamboanga
Hô Chi Minh(Saigon)
Phnom-Penh
Rangoon
Bandar Seri Begawan
Manado
Palu
GorontaloPekanbaru
Jambi
Bandar Lampung
SamarindaPontianak
Balikpapan
Surakarta
Malang
Kendari Ambon
Jayapura
Manokwari
Ternate
Banda Aceh
Bengkulu
Denpasar Mataram
Palangkaraya
Serang
Pangkalpinang
Tanjungpinang
Indonesia
Plant Integrator™ Factors Customer benefits
INVESTMENT Optimised capital investment
LEAD-TIME Shorter lead-times to produce electricity faster
Higher plant efficiency for increased power output at a wide range of operational modes
PERFORMANCE Reduced emissions to meet environmental concerns
Lower Operating & Maintenance (O&M) costs
AVAILABILITY & FLEXIBILITY Better reliability, availability and flexibility
RETROFIT Better power plant economics through Integrated Retrofit Solutions
LIFE EXTENSION Extended plant life options
Our Plant Integrator™ approach offers more value for customers
The Plant Integrator™ concept is Alstom’s unique way of creating more valuefor customers. We combine outstanding expertise at a component and plantlevel, as we are both an equipment designer and manufacturer. In addition, weare an Engineering, Procurement and Construction (EPC) contractor withextensive proven worldwide references. Through close collaboration, weguarantee that our customers meet their business objectives and serve theirmarket more effectively. There are six Plant Integrator™ factors , which helpincrease the Net Present Value for our customers.
Customer: Perusahan ListrikNegara Limited (PT PLN)
Notice to proceed: June 2008
Fuel: gas / oil back-up
Cooling system: Seawater
Application: Power Generation
Unique Plant Integrator™ capabilities to deliver a highlyavailable and reliable power plant
POWER
PT-
PE/
BP
RO
S/M
RTW
PS0
8/en
g/P
PS/
04.0
8/FR
/647
3 -
allr
eady
- 5
00 3
85 4
89 R
CS
Lyo
n
MUARA TAWAR 5 – Indonesia 234 MW – KA13E2 – Combined-Cycle Power Plant
ALSTOM’s SCOPE• Turnkey Engineering Procurement Construction (EPC) contract for the power
island of a KA13E2 multi-shaft Combined-Cycle Power Plant including:
- overall plant engineering,
- global procurement & logistics,
- electrical and mechanical construction supervision,
- commissioning of the power plant.
• Alstom's proven equipment and mature technology is designed and
manufactured in-house:
- One highly reliable & clean power producing GT13E2 gas turbine with unique
EV (EnVironmental) burner technology,
- One horizontal dual pressure Heat Recovery Steam Generator,
- One COMAX steam turbine,
- One air-cooled TOPAIR turbogenerator for the gas turbine,
- One air-cooled TOPACK turbogenerator for the steam turbine,
- One seawater cooled condenser,
- ALSPA power control systems.
The Muara Tawar project benefits from superior integration throughAlstom’s project management skills, EPC capabilities and state-of-the-artkey components.
Meeting Perusahan Listrik
Negara Limited’s requirements
Demand for power has grownconsiderably in Indonesia, stimulatedby economic recovery. This increasein demand, combined withdecreasing generation capacities inageing existing power plants, couldhave led to a deteriorating demand-supply balance. To avoid such asituation, an investment programmewas launched to develop the existingMuara Tawar power plant. Thisproject will help the country to faceits present growth in power demand,while protecting the environmentwith clean power solutions.
With its environmental and economic advantages, this plant is another example of Alstom capability
to deliver clean integrated power solutions.
www.power.alstom.com