+ All Categories
Home > Documents > MTH Graduate Portfolio

MTH Graduate Portfolio

Date post: 24-Mar-2016
Category:
Upload: matthew-hill
View: 222 times
Download: 0 times
Share this document with a friend
Description:
 
44
SELECTED GRADUATE WORKS - TEXAS TECH UNIVERSITY - M. ARCH - MBA CONTACT INFO - MATTHEWTARVERHILL@GMAIL.COM - (806)543-5770 DESIGN PORTFOLIO MATTHEW TARVER HILL
Transcript
  • SELECTED GRADUATE WORKS - TEXAS TECH UNIVERSITY - M. ARCH - MBA

    CONTACT INFO - [email protected] - (806)543-5770

    DESIGN PORTFOLIO

    MATTHEW TARVER HILL

  • TABLE OF CONTENTS

    This project was completed for our comprehensive design studio. The goal was to create a multi purpose mid-rise building to house the Dallas AIA offices, gallery space, and small theater at a site located along the newly completed Klyde Warren Park over the Woodal Rogers Freeway. Work was completed using Revit and post processing in Adobe Photoshop and Illustrator. 2012

    PROJECT 1DALLAS ANTHENEUM

    02

    The short project was completed in a half semester long period in a topical studio that focussed on housing. Research was done to find an appropriate style for the region and choosing a construction type and materiality that were not only sustainable, but affordable were the main goals to achieve. Work was completed using Revit, AutoCad, and post processing in Adobe Photoshop and Illustrator. 2013

    AFFORDABLE HOUSING12PROJECT 2

    This project was completed in the second half of a multi project topical studio focussed on housing. The main goal of the project was to successfully transform an old powerplant building into a dynamic apartment complex. Work completed using Revit with post processing in Adobe Photoshop and Illustrator. 2013

    ADAPTIVE REUSE LIVING

    16PROJECT 3

    This redevlopment project was completed in the UrbanTech topical studio focussing on street level urban design. The first half of the semester was spent working in collaboration with other students before individual blocks along a selected street were assigned for each student to design. Work was shown publicly and with local city officials to gain feedback. Completed using Rhino and Sketchup3D with post processing done in Adobe Photoshop and Illustrator. 2013

    URBAN REDEVELOPMENT20PROJECT 4

    Various projects completed during my time at school. Work shown completed in Revit, Autocad, Rhino, ArchiCad, with post processing done in Adobe Photoshop and Illustrator.

    ASSORTED PROJECTS24OTHER WORKS

    39RESUME

  • Dallas Antheneum

    Process Diagrams

    02

    The proposed Dallas Antheneum project is located on the Woodall Rogers Freeway on the border of Uptown and Downtown in Dallas. A mid-rise, multifunctional space was the answer to a unique site which overlooks the park that spans atop the freeway. The building houses the Dallas AIA offices and library, along with a large public gallery and theater. Because of its proximity to the park and an active street, the decision was made to incorporate a semi-connected cafe and roof garden space, along with a penthouse bar and observation deck. Construction techniques used in this project are hollow structural section columns, with predominantly a glass curtain wall envelope and a secondary zinc paneling system. Special attention was paid to orientation as well as the use of shading devices in order to provide for maximum efficiency without sacrificing the desired views or functionality.

    PA

    RT

    I

    PIE

    CE

    S

    RO

    TA

    TE

    INF

    ILT

    RA

    TE

    CO

    NN

    EC

    TIO

    N

    MIRRORED L SHAPE RESPONDS TO THE SURROUNDING SITE CONDITIONS AND ALLOWS FOR MAXIMUM OPPORTUNITY. THE SHAPE ALSO RESPONDS TO THE THREE MAIN PROGRAMS IMPLEMENTED IN THE PROJECT AND SETS UP A BASIC HIERARCHY AMONGST THEM.

    PIECES ARE THEN EXTRACTED FROM THE GENERIC FORM AND ARE TREATED AS INDIVIDUALS. THIS ALLOWS THEM TO RESPOND DIFFERENTLY TO SITE LINES AND CONDITIONS WHILE STILL MAINTAINING AN OVERALL HIERARCHY AND RELATIONSHIP TO THE SITE.

    AS A REACTION TO LINES AND VIEWS THE MAJOR ELEMENT IS ROTATED IN ORDER TO CREATE A RELATIONSHIP WITH THE SURROUNDING CONTEXT. THIS SETS UP VIEWS FROM THE SITE THAT CAN NOW BE BETTER CAPTURED FOR THE USER.

    THE MAJOR SPACE IS INFILTRATED BY ANOTHER SPACE TO ENCLOSE THE SPACES INTO A SINGLE SHELL. THIS ENHANCES THEIR RELATIONSHIP AND IN REACTION THE GALLERY SPACE IS LIFTED FROM THE SITE TO MAINTAIN THEM AS SEPARATE PIECES.

    THE SITE IS CONNECTED WITH AREAS OF CIRCULATION THAT DRIVE THE MOVEMENT THROUGH THE BUILDING. THESE HELP TO MAINTAIN THE ORIGINAL HIERARCHY AS WELL AS MESH THE SEPARATE PIECES INTO A SINGLE WORKING UNIT.

  • Dallas Antheneum

    Process Diagrams

    02

    The proposed Dallas Antheneum project is located on the Woodall Rogers Freeway on the border of Uptown and Downtown in Dallas. A mid-rise, multifunctional space was the answer to a unique site which overlooks the park that spans atop the freeway. The building houses the Dallas AIA offices and library, along with a large public gallery and theater. Because of its proximity to the park and an active street, the decision was made to incorporate a semi-connected cafe and roof garden space, along with a penthouse bar and observation deck. Construction techniques used in this project are hollow structural section columns, with predominantly a glass curtain wall envelope and a secondary zinc paneling system. Special attention was paid to orientation as well as the use of shading devices in order to provide for maximum efficiency without sacrificing the desired views or functionality.

    PA

    RT

    I

    PIE

    CE

    S

    RO

    TA

    TE

    INF

    ILT

    RA

    TE

    CO

    NN

    EC

    TIO

    N

    MIRRORED L SHAPE RESPONDS TO THE SURROUNDING SITE CONDITIONS AND ALLOWS FOR MAXIMUM OPPORTUNITY. THE SHAPE ALSO RESPONDS TO THE THREE MAIN PROGRAMS IMPLEMENTED IN THE PROJECT AND SETS UP A BASIC HIERARCHY AMONGST THEM.

    PIECES ARE THEN EXTRACTED FROM THE GENERIC FORM AND ARE TREATED AS INDIVIDUALS. THIS ALLOWS THEM TO RESPOND DIFFERENTLY TO SITE LINES AND CONDITIONS WHILE STILL MAINTAINING AN OVERALL HIERARCHY AND RELATIONSHIP TO THE SITE.

    AS A REACTION TO LINES AND VIEWS THE MAJOR ELEMENT IS ROTATED IN ORDER TO CREATE A RELATIONSHIP WITH THE SURROUNDING CONTEXT. THIS SETS UP VIEWS FROM THE SITE THAT CAN NOW BE BETTER CAPTURED FOR THE USER.

    THE MAJOR SPACE IS INFILTRATED BY ANOTHER SPACE TO ENCLOSE THE SPACES INTO A SINGLE SHELL. THIS ENHANCES THEIR RELATIONSHIP AND IN REACTION THE GALLERY SPACE IS LIFTED FROM THE SITE TO MAINTAIN THEM AS SEPARATE PIECES.

    THE SITE IS CONNECTED WITH AREAS OF CIRCULATION THAT DRIVE THE MOVEMENT THROUGH THE BUILDING. THESE HELP TO MAINTAIN THE ORIGINAL HIERARCHY AS WELL AS MESH THE SEPARATE PIECES INTO A SINGLE WORKING UNIT.

  • Dallas Antheneum

    04

  • Dallas Antheneum

    04

  • Dallas Antheneum

    06

    UP

    UP

    UP

    OPEN TO ABOVE

    1 5 10 20 N

    cafe

    kitchen

    mech

    rest

    room

    s

    stor

    age

    loading dock

    reception

    courtyard

    book sto

    re

    check out

    servicelobby

    seminar

    mech

    mechanical room

    janitor

    book

    theaterstorage

    stage

    thea

    ter

    storage

    mens room

    womens room

    XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

    XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

    Notes: 1. Sedum Material. 2. Sedum Substrate. 3. Drainage Board, with integral filter fleece. 4. Membrane Protection Layer, as specification. 5. Single - ply membrane. 6. Thermal Insulation, as specified. 7. Vapor control layer. 8. Substrate, prepared in accordance with current instructions. 9. Substrate Filter Fleece.10. Perimeter free-draining gravel border.11. Hot air weld.12. Edge Restraint, secured with membrane strap.13. Fixing Bar and mechanical fasteners.14. Contact Adhesive.15. Galvanised steel angle, as hard edge.16. Coated Metal, mechanically fastened. 17. Continuous cleat, mechanically fastened.

    XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

    13

    14

    5

    15

    11

    1245678910 312

    SUBSTRATE

    Wall Section Level 01

    Roof Detail

  • Dallas Antheneum

    06

    UP

    UP

    UP

    OPEN TO ABOVE

    1 5 10 20 N

    cafe

    kitchen

    mech

    rest

    room

    s

    stor

    age

    loading dock

    reception

    courtyard

    book sto

    re

    check out

    servicelobby

    seminar

    mech

    mechanical room

    janitor

    book

    theaterstorage

    stage

    thea

    ter

    storage

    mens room

    womens room

    XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

    XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

    Notes: 1. Sedum Material. 2. Sedum Substrate. 3. Drainage Board, with integral filter fleece. 4. Membrane Protection Layer, as specification. 5. Single - ply membrane. 6. Thermal Insulation, as specified. 7. Vapor control layer. 8. Substrate, prepared in accordance with current instructions. 9. Substrate Filter Fleece.10. Perimeter free-draining gravel border.11. Hot air weld.12. Edge Restraint, secured with membrane strap.13. Fixing Bar and mechanical fasteners.14. Contact Adhesive.15. Galvanised steel angle, as hard edge.16. Coated Metal, mechanically fastened. 17. Continuous cleat, mechanically fastened.

    XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

    13

    14

    5

    15

    11

    1245678910 312

    SUBSTRATE

    Wall Section Level 01

    Roof Detail

  • Dallas Antheneum

    08

    OPEN TO BELOW

    OPEN TO

    ABOVE

    DN

    DN

    DN

    DN

    DN

    DN

    UP

    1 5 10 20 N 1 5 10 20 N 1 5 10 20 N 1 5 10 20 N

    green roof

    gallery

    gallery

    service

    seminar

    mech janitor

    gallery

    stage

    thea

    ter

    storage

    gallerystorage

    gallerystorage

    mens room

    womens room

    OPEN TO BELOW

    OPEN TO

    BELOW

    DN

    DN

    DN

    gallery

    gallery

    service

    conference

    conference

    mech janitor

    reception

    officesmens room

    womens room

    OPEN TO BELOW

    OPEN TO

    BELOW

    DN

    DN

    DN

    DN

    gallery

    gallery

    service

    breakroom

    computer lab

    kitchen

    mech janitor

    storagelibrary

    storage

    exec office

    library

    mens room

    womens room

    OPEN TO BELOW

    DN

    DN

    DN

    observation deck

    service

    penthouse

    mechbar

    kitchen

    Level 10' - 0"

    Level 217' - 0"

    Level 334' - 0"

    Level 451' - 0"

    Level 568' - 0"

    Roof85' - 0"

    Level 10' - 0"

    Level 217' - 0"

    Level 334' - 0"

    Level 451' - 0"

    Level 568' - 0"

    Roof85' - 0"

    Level 10' - 0"

    Level 217' - 0"

    Level 334' - 0"

    Level 451' - 0"

    Level 568' - 0"

    Roof85' - 0"

    Level 10' - 0"

    Level 217' - 0"

    Level 334' - 0"

    Level 451' - 0"

    Level 568' - 0"

    Roof85' - 0"

    Harwood Street ElevationWoodall Rogers ElevationSt. Paul Street ElevationService Drive Elevation

    Level 02 Level 03 Level 04 Level 05

  • Dallas Antheneum

    08

    OPEN TO BELOW

    OPEN TO

    ABOVE

    DN

    DN

    DN

    DN

    DN

    DN

    UP

    1 5 10 20 N 1 5 10 20 N 1 5 10 20 N 1 5 10 20 N

    green roof

    gallery

    gallery

    service

    seminar

    mech janitor

    gallery

    stage

    thea

    ter

    storage

    gallerystorage

    gallerystorage

    mens room

    womens room

    OPEN TO BELOW

    OPEN TO

    BELOW

    DN

    DN

    DN

    gallery

    gallery

    service

    conference

    conference

    mech janitor

    reception

    officesmens room

    womens room

    OPEN TO BELOW

    OPEN TO

    BELOW

    DN

    DN

    DN

    DN

    gallery

    gallery

    service

    breakroom

    computer lab

    kitchen

    mech janitor

    storagelibrary

    storage

    exec office

    library

    mens room

    womens room

    OPEN TO BELOW

    DN

    DN

    DN

    observation deck

    service

    penthouse

    mechbar

    kitchen

    Level 10' - 0"

    Level 217' - 0"

    Level 334' - 0"

    Level 451' - 0"

    Level 568' - 0"

    Roof85' - 0"

    Level 10' - 0"

    Level 217' - 0"

    Level 334' - 0"

    Level 451' - 0"

    Level 568' - 0"

    Roof85' - 0"

    Level 10' - 0"

    Level 217' - 0"

    Level 334' - 0"

    Level 451' - 0"

    Level 568' - 0"

    Roof85' - 0"

    Level 10' - 0"

    Level 217' - 0"

    Level 334' - 0"

    Level 451' - 0"

    Level 568' - 0"

    Roof85' - 0"

    Harwood Street ElevationWoodall Rogers ElevationSt. Paul Street ElevationService Drive Elevation

    Level 02 Level 03 Level 04 Level 05

  • Level 1

    Level 217' - 0"

    Level 334' - 0"

    Level 451' - 0"

    Level 568' - 0"

    Roof85' - 0"

    1 5 10 20 1 5 10 20 1 5 10 20

    Longitudinal SectionTransverse Section 02Transverse Section

    Dallas Antheneum

    10

  • Level 1

    Level 217' - 0"

    Level 334' - 0"

    Level 451' - 0"

    Level 568' - 0"

    Roof85' - 0"

    1 5 10 20 1 5 10 20 1 5 10 20

    Longitudinal SectionTransverse Section 02Transverse Section

    Dallas Antheneum

    10

  • DogTrot House Series

    12

    The Canyon Lake area is arguably one of the best plots of land in Lubbock. However, the residential area that surrounds this is rundown and overlooked. In order to revitalize this area, we must capture the essence of the area and respond to it in a natural, contemporary way. Looking back in history, dogtrot houses were popular in the 1800s because of their simplicity and how they were able to provide for ample natural ventilation and daylighting. This style of home also makes the most of mixing indoor and outdoor spaces. By bringing the outside in, we can utilize numerous possibilities that take advantage of the ideal weather and climate of Lubbock. This mixture of indoor and outdoor space fits perfectly with the topography that surrounds this neighborhood. These homes also respond to the non-typical living situation; where residences arent just for ideal families and can contain an array of types of people all under the same. By taking a known and proven concept, amending it for a more modern lifestyle, integrating sustainable ideas, and using economical materials, the new Dogtrot house will bring life into this area and create a distinctive new neighborhood that embraces the environment and lifestyle of the 21st century.

    HOUSE NOTES1Corner of 9th and Oak3 Bed / 3.5 Bath2,400 Sq. ftLot size 7,093 Sq. ft

    HOUSE NOTES2Corner of 7th and Oak2 Bed / 2.5 Bath1,800 Sq. ftLot size 6,025 Sq. ft

    HOUSE NOTES3Corner of 6th and Oak2 Bed / 2.5 Bath1,750 Sq. ftLot size 6,025 Sq. ft

    HOUSE NOTES3Corner of 9th and Nutmeg3 Bed / 2.5 Bath1,600 Sq. ftLot size 4,987 Sq. ft

    MAR

    TIN

    LUTH

    ER K

    ING

    , JR.

    BLV

    D

    E MAIN ST

    E 10TH ST

    E 9TH ST

    O

    NUTM

    EG A

    VE

    AK A

    VE

    E 8TH ST

    E 7TH ST

    E 6TH ST

    E 5TH ST

    OAK

    AVE

    TEXAS TECH UNIVERSITY

    SITE NEIGHBORHOOD

    SITE SELECTIONS

    N

    Sites were selected scattered amongst the entire neighborhood at different street corners to allow for maximum growth opportunity.

  • DogTrot House Series

    12

    The Canyon Lake area is arguably one of the best plots of land in Lubbock. However, the residential area that surrounds this is rundown and overlooked. In order to revitalize this area, we must capture the essence of the area and respond to it in a natural, contemporary way. Looking back in history, dogtrot houses were popular in the 1800s because of their simplicity and how they were able to provide for ample natural ventilation and daylighting. This style of home also makes the most of mixing indoor and outdoor spaces. By bringing the outside in, we can utilize numerous possibilities that take advantage of the ideal weather and climate of Lubbock. This mixture of indoor and outdoor space fits perfectly with the topography that surrounds this neighborhood. These homes also respond to the non-typical living situation; where residences arent just for ideal families and can contain an array of types of people all under the same. By taking a known and proven concept, amending it for a more modern lifestyle, integrating sustainable ideas, and using economical materials, the new Dogtrot house will bring life into this area and create a distinctive new neighborhood that embraces the environment and lifestyle of the 21st century.

    HOUSE NOTES1Corner of 9th and Oak3 Bed / 3.5 Bath2,400 Sq. ftLot size 7,093 Sq. ft

    HOUSE NOTES2Corner of 7th and Oak2 Bed / 2.5 Bath1,800 Sq. ftLot size 6,025 Sq. ft

    HOUSE NOTES3Corner of 6th and Oak2 Bed / 2.5 Bath1,750 Sq. ftLot size 6,025 Sq. ft

    HOUSE NOTES3Corner of 9th and Nutmeg3 Bed / 2.5 Bath1,600 Sq. ftLot size 4,987 Sq. ft

    MAR

    TIN

    LUTH

    ER K

    ING

    , JR.

    BLV

    D

    E MAIN ST

    E 10TH ST

    E 9TH ST

    O

    NUTM

    EG A

    VE

    AK A

    VE

    E 8TH ST

    E 7TH ST

    E 6TH ST

    E 5TH ST

    OAK

    AVE

    TEXAS TECH UNIVERSITY

    SITE NEIGHBORHOOD

    SITE SELECTIONS

    N

    Sites were selected scattered amongst the entire neighborhood at different street corners to allow for maximum growth opportunity.

  • DogTrot House Series

    14

    HARDIEPLANK LAP SIDING

    WATER RESISTIVE BARRIER

    MIN. 1 1/4 OVERLAP

    EXTERIOR SHEATHING

    WINDOW FRAME

    FLASHING

    HARDIETRIM BOARDS

    CAULKING

    BATT. INSULATION

    2x6 WOOD FRAMING

    INTERIOR SHEATHING

    HARDIEPLANK LAP SIDING

    WATER RESISTIVE BARRIER

    MIN. 1 1/4 OVERLAP

    EXTERIOR SHEATHING

    WINDOW FRAME

    WINDOW HEADER

    FLASHING

    FLASHING

    1/4 GAP

    STARTER STRIP

    HARDIETRIM BOARDS

    BATT. INSULATION

    2x6 WOOD FRAMINGINTERIOR SHEATHING

    HARDIEPLANK LAP SIDING

    WATER RESISTIVE BARRIER

    MIN. 1 1/4 OVERLAP

    EXTERIOR SHEATHING

    FOUNDATION

    MOISTURE BARRIER

    BOTTOM PLATE

    MIN. 6 CLEARANCE

    CONCRETE SLAB

    STARTER STRIP

    BATT. INSULATION

    2x6 WOOD FRAMING

    INTERIOR SHEATHING

    Section Details

    Site Plan1

    House Iteration2 House Iteration3 House Iteration4

    Ground Level1

    Sub Level1

    UP

    Section Perspective1Cross Section1

  • DogTrot House Series

    14

    HARDIEPLANK LAP SIDING

    WATER RESISTIVE BARRIER

    MIN. 1 1/4 OVERLAP

    EXTERIOR SHEATHING

    WINDOW FRAME

    FLASHING

    HARDIETRIM BOARDS

    CAULKING

    BATT. INSULATION

    2x6 WOOD FRAMING

    INTERIOR SHEATHING

    HARDIEPLANK LAP SIDING

    WATER RESISTIVE BARRIER

    MIN. 1 1/4 OVERLAP

    EXTERIOR SHEATHING

    WINDOW FRAME

    WINDOW HEADER

    FLASHING

    FLASHING

    1/4 GAP

    STARTER STRIP

    HARDIETRIM BOARDS

    BATT. INSULATION

    2x6 WOOD FRAMINGINTERIOR SHEATHING

    HARDIEPLANK LAP SIDING

    WATER RESISTIVE BARRIER

    MIN. 1 1/4 OVERLAP

    EXTERIOR SHEATHING

    FOUNDATION

    MOISTURE BARRIER

    BOTTOM PLATE

    MIN. 6 CLEARANCE

    CONCRETE SLAB

    STARTER STRIP

    BATT. INSULATION

    2x6 WOOD FRAMING

    INTERIOR SHEATHING

    Section Details

    Site Plan1

    House Iteration2 House Iteration3 House Iteration4

    Ground Level1

    Sub Level1

    UP

    Section Perspective1Cross Section1

  • SevenLoft Studios

    16

    The LHUCA campus is becoming a staple in the downtown area of Lubbock for its creativity and revitalization of the area. However, the campus in its current state is still scattered, unfinished, and is missing that true urban feel. The old PowerPlant building located in the north east corner is arguably one of the most interesting structures around, and brings an opportunity to capture an urbanistic center for the LHUCA campus. In its existing state, the powerplant is not much more than a big eyesore, as it is the tallest structure in the area and very much run down and dilapidated. However, this also leads to big possibilities for giving the campus a new life. By bringing in permanent residents and providing them with adequate work and studio space, the new apartments will bring life into an area that is relatively quiet aside from a few monthly events. The apartments will combine the showcase of art that is true to the campus, while inviting people inside to explore the revitalized power station in its new purpose. By displaying art and exhibits at both ground level and at the 2nd floor, a powerful movement will occur that will create a new welcoming urban feel and overall improvement to the area.

    ORIGINAL MASSING RECLAIMED SPACE PUBLIC DISPLAY PUBLIC CIRCULATION

    5TH STREET

    AVEN

    UE

    J

    N

    A

    B

    D

    CE

    F

    01

    02

    0304

    05

    06

    A_MULTI-USE APARTMENTS

    B_RESTAURANT | BAR

    C_ROOF TOP SEATING

    D_PERFORMANCE | STAGE

    E_GARDEN | LAWN

    F_ADDITIONAL PARKING

    01_CHARLES ADAMS STUDIO

    02_GRAFFITI EDUCATION

    03_HELEN DEVITT CLAY STUDIO

    04_LHUCA MAIN

    05_CHRISTINE DEVITT ICEHOUSE

    06_CHARLES ADAMS STUDIO FLATS

    SITE IMPROVEMENTS & CONSIDERATIONS

    Site Plan

    Massing Diagrams

    Interior Renders

    Section Perspective

  • SevenLoft Studios

    16

    The LHUCA campus is becoming a staple in the downtown area of Lubbock for its creativity and revitalization of the area. However, the campus in its current state is still scattered, unfinished, and is missing that true urban feel. The old PowerPlant building located in the north east corner is arguably one of the most interesting structures around, and brings an opportunity to capture an urbanistic center for the LHUCA campus. In its existing state, the powerplant is not much more than a big eyesore, as it is the tallest structure in the area and very much run down and dilapidated. However, this also leads to big possibilities for giving the campus a new life. By bringing in permanent residents and providing them with adequate work and studio space, the new apartments will bring life into an area that is relatively quiet aside from a few monthly events. The apartments will combine the showcase of art that is true to the campus, while inviting people inside to explore the revitalized power station in its new purpose. By displaying art and exhibits at both ground level and at the 2nd floor, a powerful movement will occur that will create a new welcoming urban feel and overall improvement to the area.

    ORIGINAL MASSING RECLAIMED SPACE PUBLIC DISPLAY PUBLIC CIRCULATION

    5TH STREET

    AVEN

    UE

    J

    N

    A

    B

    D

    CE

    F

    01

    02

    0304

    05

    06

    A_MULTI-USE APARTMENTS

    B_RESTAURANT | BAR

    C_ROOF TOP SEATING

    D_PERFORMANCE | STAGE

    E_GARDEN | LAWN

    F_ADDITIONAL PARKING

    01_CHARLES ADAMS STUDIO

    02_GRAFFITI EDUCATION

    03_HELEN DEVITT CLAY STUDIO

    04_LHUCA MAIN

    05_CHRISTINE DEVITT ICEHOUSE

    06_CHARLES ADAMS STUDIO FLATS

    SITE IMPROVEMENTS & CONSIDERATIONS

    Site Plan

    Massing Diagrams

    Interior Renders

    Section Perspective

  • SevenLoft Studios

    18NN

    STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO

    OPEN TO BELOW

    OPEN TO BELOW

    Level 01 Level 02

    E Elevation

    N Elevation

    W Elevation

    W Elevation

    Section 01 Section 02

  • SevenLoft Studios

    18NN

    STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO STUDIO

    OPEN TO BELOW

    OPEN TO BELOW

    Level 01 Level 02

    E Elevation

    N Elevation

    W Elevation

    W Elevation

    Section 01 Section 02

  • Urban Redevelopment

    20

    The project is located on the East side of Avenue J between Broadway Ave and 13th Street. This area is in the heart of the central business district of downtown Lubbock. In its cureent state. much of the area is run down and dilapidated. Hardscape dominates the existing site as well as its surroundings. In order to bring life back into the area, it is important to address these issues in a unique way that will contribute to the overall goal of making Avenue J a great street for the city. A mixed use building that combines the convenience of shopping and retail, with the luxury of living in a dense urban environment will help to bring life into the street. The project also focuses on reusing existing buildings that meet the level of density desired to increase the quality of life. A true immersion of live, work, and play begins to take place. With the focus on the street, we vegin to see the buildings take on the playful environment of the street by using natural elements from the region. The street then becomes a conyon in which we can find different types of activities taking place.

    N

    SITE

    PLA

    N

    SCALE: 1 = 50

    BROADWAY AVE

    AVEN

    UE

    J

    TEXA

    S AV

    E

    13TH STREET

    Broadway

    BIC

    YCLE

    LA

    NE

    TRA

    FFIC

    LA

    NE

    INSE

    T PA

    RKIN

    G

    PED

    ESTR

    IAN

    REA

    LM

    STREET SECTION - BROADWAYINTERSECTION WITH AVENUE J

    PED

    ESTR

    IAN

    REA

    LMC

    AFE

    SEA

    TIN

    G A

    REA

    OA

    K TR

    EES

    & B

    ENC

    HES

    OA

    K TR

    EES

    12-6 12-68-0 8-012-0 12-010-0

    CA

    FE S

    EATI

    NG

    ARE

    A

    PLA

    NTE

    R BU

    FFER

    TRA

    FFIC

    LA

    NE

  • Urban Redevelopment

    20

    The project is located on the East side of Avenue J between Broadway Ave and 13th Street. This area is in the heart of the central business district of downtown Lubbock. In its cureent state. much of the area is run down and dilapidated. Hardscape dominates the existing site as well as its surroundings. In order to bring life back into the area, it is important to address these issues in a unique way that will contribute to the overall goal of making Avenue J a great street for the city. A mixed use building that combines the convenience of shopping and retail, with the luxury of living in a dense urban environment will help to bring life into the street. The project also focuses on reusing existing buildings that meet the level of density desired to increase the quality of life. A true immersion of live, work, and play begins to take place. With the focus on the street, we vegin to see the buildings take on the playful environment of the street by using natural elements from the region. The street then becomes a conyon in which we can find different types of activities taking place.

    N

    SITE

    PLA

    N

    SCALE: 1 = 50

    BROADWAY AVE

    AVEN

    UE

    J

    TEXA

    S AV

    E

    13TH STREET

    Broadway

    BIC

    YCLE

    LA

    NE

    TRA

    FFIC

    LA

    NE

    INSE

    T PA

    RKIN

    G

    PED

    ESTR

    IAN

    REA

    LM

    STREET SECTION - BROADWAYINTERSECTION WITH AVENUE J

    PED

    ESTR

    IAN

    REA

    LMC

    AFE

    SEA

    TIN

    G A

    REA

    OA

    K TR

    EES

    & B

    ENC

    HES

    OA

    K TR

    EES

    12-6 12-68-0 8-012-0 12-010-0

    CA

    FE S

    EATI

    NG

    ARE

    A

    PLA

    NTE

    R BU

    FFER

    TRA

    FFIC

    LA

    NE

  • Urban Redevelopment

    22

    DOUBLE ALLEY

    TRA

    FFIC

    LA

    NE

    BIKE

    PAT

    H

    BIKE

    PAT

    H

    PLA

    NTE

    R BO

    X

    PLA

    NTE

    R BO

    X

    PED

    ESTR

    IAN

    REA

    LM

    PED

    ESTR

    IAN

    REA

    LM

    STORE FRONTS STORE FRONTS TRAFFIC TRAFFICSTOREFRONT PLANTER PLANTER

    STRE

    ET L

    AM

    PALLEY SPACECAFE SEATING CAFE SEATINGBICYLCLE RACKS BICYLCLE RACKS

    LUBBOCKLUBBOCKALLEY ENTRANCETRAFFIC LANEDANCING WATER FOUNTAIN ALLEY WATER FEATURE

    PLA

    NTE

    R B

    OX

    PLA

    NTE

    R B

    OX

    PLA

    NTE

    R B

    OX

    PED

    ESTR

    IAN

    REA

    LM

    PED

    ESTR

    IAN

    REA

    LM

    PED

    ESTR

    IAN

    REA

    LM PARKING ENTRANCE CAFE POND ENTRANCE ALLEY EXIT

  • Urban Redevelopment

    22

    DOUBLE ALLEY

    TRA

    FFIC

    LA

    NE

    BIKE

    PAT

    H

    BIKE

    PAT

    H

    PLA

    NTE

    R BO

    X

    PLA

    NTE

    R BO

    X

    PED

    ESTR

    IAN

    REA

    LM

    PED

    ESTR

    IAN

    REA

    LM

    STORE FRONTS STORE FRONTS TRAFFIC TRAFFICSTOREFRONT PLANTER PLANTER

    STRE

    ET L

    AM

    PALLEY SPACECAFE SEATING CAFE SEATINGBICYLCLE RACKS BICYLCLE RACKS

    LUBBOCKLUBBOCKALLEY ENTRANCETRAFFIC LANEDANCING WATER FOUNTAIN ALLEY WATER FEATURE

    PLA

    NTE

    R B

    OX

    PLA

    NTE

    R B

    OX

    PLA

    NTE

    R B

    OX

    PED

    ESTR

    IAN

    REA

    LM

    PED

    ESTR

    IAN

    REA

    LM

    PED

    ESTR

    IAN

    REA

    LM PARKING ENTRANCE CAFE POND ENTRANCE ALLEY EXIT

  • Deans Cup Competition

    24

    Completed for the 2011 Deans Cup Competition. The prompt for the charrette was titled Siteless Landscape and the submissions were to be idea based, judged by the Dean of the College of Architecture along with other notable faculty. Done in collaboration with a group of three other students, the project was completed over the course of a just a few days. The idea was that a continuously moving object has no site, only a path with transient resting points. A modular plan becomes rolled into a truncated icosahedron. Overlapping spaces become inextricable of themselves and create a multi-functional environment, occupied by a single person. Directional movement begins by walking up the walls until the surroundings shift and the unit begins to roll. Continued walking brings the person to a place that was overhead only moments before. This same movement causes the unit to move along an undetermined path. The submission earned 3rd place honors, and work was done in Rhino, Autocad, and Adobe Photoshop.

  • Deans Cup Competition

    24

    Completed for the 2011 Deans Cup Competition. The prompt for the charrette was titled Siteless Landscape and the submissions were to be idea based, judged by the Dean of the College of Architecture along with other notable faculty. Done in collaboration with a group of three other students, the project was completed over the course of a just a few days. The idea was that a continuously moving object has no site, only a path with transient resting points. A modular plan becomes rolled into a truncated icosahedron. Overlapping spaces become inextricable of themselves and create a multi-functional environment, occupied by a single person. Directional movement begins by walking up the walls until the surroundings shift and the unit begins to roll. Continued walking brings the person to a place that was overhead only moments before. This same movement causes the unit to move along an undetermined path. The submission earned 3rd place honors, and work was done in Rhino, Autocad, and Adobe Photoshop.

  • This purpose of this group project was to take an empty lot in downtown Lubbock and transform it into a new office building that not only responded to the environment, but that was visually satisfying in its surroundings. The office was modeled using BIM software and was detailed completely to code. The structural, HVAC, electrical, and plumbing systems were all planned out and implemented into our building as well. The team went through a series of progressions before coming to a final product with all of our design decisions. The focus on the class was not to look at form as a driver, but instead to understand how we must work with coding issues and combine all of the different systems to form a cohesive and functional building. Identifying certain zones and splitting the spaces into relatable functions, we were able to achieve both maximum convenience and customization for the inhabitants. Overall the building is successful in that it is easy to manage, provides ample office space, creates a striking new landmark, and is environmentally friendly.

    26

    BIM Ofce Building

    BASEMENT floor

    123456789

    10 11 12 13 14 15 16 17 18

    86'-11 13/16"

    33'-1

    1 5/

    8"

    19'-4

    1/2

    "

    5'-4

    0 N 5 10 20

    1/8"

    12'-10 11/16" 17'-11 7/8" 54'-1 5/8"

    8'-1

    13/

    16"

    13'-8 11/16"

    GROUND floor

    6'

    86'-11 13/16"

    10'-2 9/16"32'-10 9/16"12'-10 11/16" 16'-1/4"

    20'-6

    1/1

    6"

    33'-1

    1 5/

    8"

    32'

    39'

    54'-11 13/16"

    13'-9"

    72'-1

    1 5/

    8"

    0 N 5 10 20

    123456789

    10 11 12 13 14 15 16 17 18

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    1415161718

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14 15 16 17 18

    OFFICE floors

    87'

    55'

    10'-6

    "41

    '-6"

    11'-8

    "

    8'-3"7'-11"20'-3"14'-7"

    35'-10"17'-4"

    87'

    10'-2

    "6'-1"

    15'-9

    "

    123456789

    10 11 12 13 14 15 16 17 18

    0 N 5 10 20

    GALLERY floor

    87'

    25'

    32'-11"

    10'-6

    "21

    '-6"

    35'

    76'

    123456789

    10 11 12 13 14 15 16 17 18

    123456789

    10 11 12 13 14 15 16 17 18

    0 N 5 10 20

    Floor Plans

    RETAIL SPACE

    OFFICE SPACE

    GALLERY SPACE

    LOUNGE SPACE

  • This purpose of this group project was to take an empty lot in downtown Lubbock and transform it into a new office building that not only responded to the environment, but that was visually satisfying in its surroundings. The office was modeled using BIM software and was detailed completely to code. The structural, HVAC, electrical, and plumbing systems were all planned out and implemented into our building as well. The team went through a series of progressions before coming to a final product with all of our design decisions. The focus on the class was not to look at form as a driver, but instead to understand how we must work with coding issues and combine all of the different systems to form a cohesive and functional building. Identifying certain zones and splitting the spaces into relatable functions, we were able to achieve both maximum convenience and customization for the inhabitants. Overall the building is successful in that it is easy to manage, provides ample office space, creates a striking new landmark, and is environmentally friendly.

    26

    BIM Ofce Building

    BASEMENT floor

    123456789

    10 11 12 13 14 15 16 17 18

    86'-11 13/16"

    33'-1

    1 5/

    8"

    19'-4

    1/2

    "

    5'-4

    0 N 5 10 20

    1/8"

    12'-10 11/16" 17'-11 7/8" 54'-1 5/8"

    8'-1

    13/

    16"

    13'-8 11/16"

    GROUND floor

    6'

    86'-11 13/16"

    10'-2 9/16"32'-10 9/16"12'-10 11/16" 16'-1/4"

    20'-6

    1/1

    6"

    33'-1

    1 5/

    8"

    32'

    39'

    54'-11 13/16"

    13'-9"

    72'-1

    1 5/

    8"

    0 N 5 10 20

    123456789

    10 11 12 13 14 15 16 17 18

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    1415161718

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14 15 16 17 18

    OFFICE floors

    87'

    55'

    10'-6

    "41

    '-6"

    11'-8

    "

    8'-3"7'-11"20'-3"14'-7"

    35'-10"17'-4"

    87'

    10'-2

    "

    6'-1"

    15'-9

    "

    123456789

    10 11 12 13 14 15 16 17 18

    0 N 5 10 20

    GALLERY floor

    87'

    25'

    32'-11"

    10'-6

    "21

    '-6"

    35'

    76'

    123456789

    10 11 12 13 14 15 16 17 18

    123456789

    10 11 12 13 14 15 16 17 18

    0 N 5 10 20

    Floor Plans

    RETAIL SPACE

    OFFICE SPACE

    GALLERY SPACE

    LOUNGE SPACE

  • 28

    Digital MediaThe purpose of this project was to create a component using a pre-determined sized strip of paper. We were then to take specific measurements of the strip and model them using rhinoceros. The next step was to play with the flexibility and functionality, and come up with a series of arrangements. Again paying attention to detail, we were to model the connections, and come up with a series of forms only using our components in different arrangements. The following is a collection of works from this project and the forms that could be created using my particular arrangement of the component. Modeled in Rhino, post production in Illustrator. 2010

    Original arrangement of component

    Volumetric form created throughdifferent arrangements

  • 28

    Digital MediaThe purpose of this project was to create a component using a pre-determined sized strip of paper. We were then to take specific measurements of the strip and model them using rhinoceros. The next step was to play with the flexibility and functionality, and come up with a series of arrangements. Again paying attention to detail, we were to model the connections, and come up with a series of forms only using our components in different arrangements. The following is a collection of works from this project and the forms that could be created using my particular arrangement of the component. Modeled in Rhino, post production in Illustrator. 2010

    Original arrangement of component

    Volumetric form created throughdifferent arrangements

  • 30

    Digital MediaThe purpose of this project was to create wall like surface using different components each with a certain aperture. The shapes were created in rhino and then arranged in a way that created a blurred surface. The different apertures, along with slight color variation help to create the desired effect. The final result was a wall that could also have a floor and base. The shape and size of the apertures would allow for a unique experience for visitors. Modeled in Rhino, post processing in Illustrator.

    Component Apertures

    Wall Detail Base Fold Detail

    Roof Corner Detail

    Complete Blurred Surface

  • 30

    Digital MediaThe purpose of this project was to create wall like surface using different components each with a certain aperture. The shapes were created in rhino and then arranged in a way that created a blurred surface. The different apertures, along with slight color variation help to create the desired effect. The final result was a wall that could also have a floor and base. The shape and size of the apertures would allow for a unique experience for visitors. Modeled in Rhino, post processing in Illustrator.

    Component Apertures

    Wall Detail Base Fold Detail

    Roof Corner Detail

    Complete Blurred Surface

  • 32

    Digital MediaAn archemedian solid, the Truncated Octahedron consists of 8 regular hexagons and 6 squares. It contains 36 edges and 24 vertices.

    Formation

    Solid Deformation

    Panel Surface

    Truncated Octahedron -

    Cluster

    The purpose of this project was to take a three dimensional shape and transform it into a dynamic surface. The original shapes were created and then underwent a number of transformations that allowed for greater customization. The shape was then arranged and draped along a surface to create an installation that took on a new life and created a feeling of movement. The end result was a panel that could serve as unique form that accentuated the space that it occupied. Modeled in Rhino, post processing in Illustrator.

  • 32

    Digital MediaAn archemedian solid, the Truncated Octahedron consists of 8 regular hexagons and 6 squares. It contains 36 edges and 24 vertices.

    Formation

    Solid Deformation

    Panel Surface

    Truncated Octahedron -

    Cluster

    The purpose of this project was to take a three dimensional shape and transform it into a dynamic surface. The original shapes were created and then underwent a number of transformations that allowed for greater customization. The shape was then arranged and draped along a surface to create an installation that took on a new life and created a feeling of movement. The end result was a panel that could serve as unique form that accentuated the space that it occupied. Modeled in Rhino, post processing in Illustrator.

  • Study Abroad Italy

    34

    site

    This short project was aimed at identifying a plaza and revitalizing its use to be a central public space. As a group we chose the crisis of the original plaza carefully. We then took our analysis and researched some of the history of the area. We found that our location allowed us to utilize some more modern features without taking away from the rich history of the town. By transforming our site and merging technology, nature, and customs, we were able to bring life back in to the plaza. This joint project was performed over the course of one half week in Gioiosa Marea, Sicily.

    CRISIS

    TECHNOLOGY

    MULTIFUNCTIONALITY

    baron, uninhabited, run-down

    lights, interaction, mist

    festivals, market, theater

    1

    1

    2

    2

    33net-infill merging nature site flow

  • Study Abroad Italy

    34

    site

    This short project was aimed at identifying a plaza and revitalizing its use to be a central public space. As a group we chose the crisis of the original plaza carefully. We then took our analysis and researched some of the history of the area. We found that our location allowed us to utilize some more modern features without taking away from the rich history of the town. By transforming our site and merging technology, nature, and customs, we were able to bring life back in to the plaza. This joint project was performed over the course of one half week in Gioiosa Marea, Sicily.

    CRISIS

    TECHNOLOGY

    MULTIFUNCTIONALITY

    baron, uninhabited, run-down

    lights, interaction, mist

    festivals, market, theater

    1

    1

    2

    2

    33net-infill merging nature site flow

  • Study Abroad Italy

    36

    The purpose of this group project was to take an existing plaza area that had become rundown and forgotten and transform it along with a pre-existing cafe into a theatre and performing arts school. The location here is key because of the citys history and connection with the ancient Roman Theatre across the river. By using some of the citys historical context, my partner and I were able to make major changes to the area, while still respecting the classic style of the surrounding area. This project was conducted while studying abroad in Verona, Italy in the summer of 2011. The design was a collaboration effort with a single partner where all of the work was done together in its entirety. It was presented and displayed in the International Stone Competition later that fall in Verona.

    ponte pietra

    area of interesttheatro romano

    ponte postumius(non existing)

    general site location

    decumano axis

    1

    2

    3

    1

    2

    3

    Churches

    Theatres

    Performance Space Main Circulation

    Major Grid Lines Minor Grid Lines

    cardo

    decumano

  • Study Abroad Italy

    36

    The purpose of this group project was to take an existing plaza area that had become rundown and forgotten and transform it along with a pre-existing cafe into a theatre and performing arts school. The location here is key because of the citys history and connection with the ancient Roman Theatre across the river. By using some of the citys historical context, my partner and I were able to make major changes to the area, while still respecting the classic style of the surrounding area. This project was conducted while studying abroad in Verona, Italy in the summer of 2011. The design was a collaboration effort with a single partner where all of the work was done together in its entirety. It was presented and displayed in the International Stone Competition later that fall in Verona.

    ponte pietra

    area of interesttheatro romano

    ponte postumius(non existing)

    general site location

    decumano axis

    1

    2

    3

    1

    2

    3

    Churches

    Theatres

    Performance Space Main Circulation

    Major Grid Lines Minor Grid Lines

    cardo

    decumano

  • Study Abroad Italy

    38

    3rd Floor Library | Lecture

    2nd Floor Classroom | Teaching

    1st Floor Office | Conference

    Sub 1 Changing | MakeUp

    Sub 2 Storage | Mechanical

    Ground Public | Performance

    Render Site | Detail

    Render Terrace | Perspective

    Render Perspective | Facade

    Render Facade | Detail

    Render Performance | Perspective

    MaterialLegend

    Rosso Verona | Marble Bianco Verona | Marble Grass Green | Space

    LongitudinalSection

    SectionPerspective

    SitePlan

  • Study Abroad Italy

    38

    3rd Floor Library | Lecture

    2nd Floor Classroom | Teaching

    1st Floor Office | Conference

    Sub 1 Changing | MakeUp

    Sub 2 Storage | Mechanical

    Ground Public | Performance

    Render Site | Detail

    Render Terrace | Perspective

    Render Perspective | Facade

    Render Facade | Detail

    Render Performance | Perspective

    MaterialLegend

    Rosso Verona | Marble Bianco Verona | Marble Grass Green | Space

    LongitudinalSection

    SectionPerspective

    SitePlan

  • ResumeMatthew Tarver Hill

    6802 86th Street, Lubbock, TX 79424 (806) [email protected]

    EDUCATION

    EXPERIENCE

    HONORS

    Bachelor of Science Texas Tech University, Lubbock, TexasMajor: Architecture3.12 GPA

    May 2012

    Masters Texas Tech University, Lubbock, TexasDegree: Business Administration3.5 GPA

    May 2014

    Masters Texas Tech University, Lubbock, TexasDegree: Architecture3.7 GPA

    May 2014

    Teaching AssistantEnvironmentalSystems

    Ceramics & Clay Studio

    Texas Tech University, Lubbock, Texas Graded papers Created lesson plans Worked with students to resolve class issues

    January 2012

    Graduate Assistant Texas Tech University, Lubbock, Texas Assited with publicly displayed art Helped students complete projects Oversight of laser cutter equipment

    January 2014

    Awards Deans Cup - 3rd Place Team First Friday Art Trail - Participant International Stone Competition - Participant First Friday Art Trail - Studio Exhibition Deans List - Honor Roll Presidents List - Honor Roll

    201120102011201320122013

  • SELECTED GRADUATE WORKS - TEXAS TECH UNIVERSITY - M. ARCH - MBA

    CONTACT INFO - [email protected] - (806)543-5770

    DESIGN PORTFOLIO

    MATTHEW TARVER HILL

    Blank PageBlank Page


Recommended