Date post: | 23-Jan-2017 |
Category: |
Presentations & Public Speaking |
Upload: | microcredit-summit-campaign |
View: | 159 times |
Download: | 3 times |
3/13/2016 13/13/2016 1
#18M
CSum
mit
Ethiopian Productive Safety Net Program (PSNP)
Graduation pathwayBulleted list
Sub list 1 Sub list 2
o Sub list 3• Sub list 4
• Sub list 5
3/13/2016 2
#18M
CSum
mit
Ethiopia PSNP: Public work participation
Bulleted list on left Bulleted list on right
3/13/2016 33/13/2016 3
#18M
CSum
mit
Ethiopia PSNP: Asset building through Public Work
Under construction - Mereb Leke After completion - Mereb Leke
Phot
o: R
EST
PCU
Phot
o: R
EST
PCU
3/13/2016 43/13/2016 4
#18M
CSum
mit
Ethiopia PSNP: Asset building through Public Work
3/13/2016 53/13/2016 5
#18M
CSum
mit
Consumption
Food
Consum
ption
**
Total
Consum
ption
***0
200400600800
100012001400
ControlTreatment
3/13/2016 63/13/2016 6
#18M
CSum
mit
Financial behavior
0200040006000
ControlTreatment