Our integrated approach removes all the guesswork and the footwork from equation by combining assessment, engineering, design and implementation into one package that is easy to understand, financially appealing and ecologically responsible.

Mynt Systems was founded with the idea of building a

company that could provide turn key energy efficiency

projects. Our goal was to simplify the design and

financing of the projects to help increase project

implementation.

COMPANY INTRODUCTION

Page 3: Mynt Systems Intro

Cost of Energy

1COST The cost of energy has risen an average of 3% annually since 2003 and is projected to increase 4% by 2020

2EXPENSEAccording to the National Federation of Independent Business energy costs are one of the top three expenses in 35% of small businesses

3EFFICIENCYRenewable energy are gaining in popularity, but energy efficiency remains the most cost-effective way to cut costs

4BENEFITSIn addition to the cost savings, energy efficiency projects come with additional benefits such as improved comfort and security

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

7.44 7.618.14

8.9 9.139.74 9.82 9.83 9.9 9.84 10.07

Average cost of electricity in the US (per kWh)

Page 4: Mynt Systems Intro

What We Do

We have developed a system to provide customers with a customized energy efficiency plan designed for their specific

goals.

ASSESSMENTAssessments include a

consultation to determine the client's goals and a thorough

audit of the propertyDESIGN

Each project is engineered with the

client's and property's unique aspects in mind

IMPLEMENTATIONAs a general

contractor we will manage the entire

project under a single contract

VERIFICATIONWe perform quarterly utility analysis to evaluate project performance after completion

ADMINISTRATIONWe work directly

with utility companies to

secure the largest rebates available

Page 5: Mynt Systems Intro

Our Services

We have a network of preferred contractors and manufacturers, but we remain 100% product agnostic.

o Lighting Design

o 3D Modeling

o Project Management

o Rebate Processing

HVAC

WindowsLED Lighting

Controls

At the core of our business is the idea that anything is possible.

The technology to achieve massive energy savings is out there.

Page 6: Mynt Systems Intro

Additional Services

Utility Rate Analysis Title 24 Compliance

Tax Planning Rebate Processing

Energy Modeling Financing

Benchmarking

Page 7: Mynt Systems Intro

Energy Efficiency=Increased Property Values

Sample Lighting Projects Office Building Parking Garage

Project Cost $50,000 $120,000

Monthly Savings $1,250 $4,000

Simple Payback Period (Years) 3.3 2.5

Annual Hours of Operation 2,600 8,760

Equipment Life (Years) 23 7

Life Cycle Savings $436,000 $248,000

Increase In Property Value $187,500 $600,000

Many projects have an estimated life three to five times longer than the project

payback period.

Assumes cap rate of 8% and an annual utility cost increase of 3%

Page 8: Mynt Systems Intro

BENEFITS

Tax CreditsFederal, state, and local

governments provide tax incentives for energy efficiency measures

Productivity

Studies have shown that employees in energy efficient buildings are more productive

SalesEnvironmentally conscious customers are eager to use businesses that make an effort to reduce energy consumption

MaintenanceEnergy efficiency measures can significantly reduce annual maintenance costs and occupant complaints

SecurityHigh kelvin LED lighting provides increased visibility at night, increasing safety and reducing crime

HealthEnergy efficiency measures aimed at addressing low ventilation rates and airflow reduce the risk of transmitting infectious disease

Page 9: Mynt Systems Intro

Financing

CASH

Lack of budget is the number one reason energy efficiency projects don't get completed. We've partnered with Noesis, a

financing company backed by the world's largest provider of credit for equipment purchases. With low rates and a 5 minute paperless application process, they take the headaches out of

financing.

What's the biggest obstacle in energy efficiency project implementation?

Page 10: Mynt Systems Intro

Mountain Elementary SchoolSoquel, CA

HGSTSan Jose, CA

Visa HeadquartersFoster City, CA

Bonny Doon ElementarySanta Cruz, CA

Sonic ManufacturingFremont, CA

Happy Valley ElementarySanta Cruz, CA

Page 11: Mynt Systems Intro

facebook linkedin twitter youtube google+

Contact Us: Social NetworkConnect with us to keep up to date on the latest developments in energy efficiency

Page 12: Mynt Systems Intro

Thank you for your attention

1025 Water Street, Suite ASanta Cruz, CA 95065

Phone 408.426.5420Email: [email protected]

Page 13: Mynt Systems Intro

THANK YOUFOR YOUR ATTENTION


Recommended