Review Presentation
Prepared by: Mzwandile MananaSap Number: 0146615ID: 9304126131082ECSA Registration number:Date: 04 November 2016
Results Announcement 2016
CONTENT
• Signals TIT progress cycle• Transnet Structure• Organogram• Safety• Market Demand Strategy• Budget• Other Discipline• ITCMS• Phoenix hotbox detector• Vehicle identification system• Measurement systems• Course attended
Results Announcement 2016
Signals - TIT Progress Cycle (Overview)
• Wpms & Skew Bogie• Market Demand Strategy• Project involvement• Explore Other Disciplines• Issued with a section• Fill maintenance
documents• Attend CPD courses• Signalling at Esselen Park.
• General Business Understanding• Market Demand Strategy• Budgets• Explore the section• Understand the work structure• Attend IMDCRE• ECSA candidate registration
0 – 6 M 6-12 M
12 – 18 M
18 – 24 M
Results Announcement 2016
Transnet Structure
Transnet Group
National Port AuthorityPipelinesPort Terminal EngineeringFreight Rail
Rail Network
Richards Bay Depot
Central Region
Eastern Region
Western Region
Results Announcement 2016
Organogram
TFR• CHIEF EXECUTIVE• RAVI NAIR
TFR• GENERAL MANAGER• CEASAR MTHETHWA
TFR• CHIEF ENGINEER• TSHILIDZI MUNYAI
TFR• INFRA MANAGER• BONGUMUSA THUSI
TFR• DEPOT ENGINEER• THULANI FAKUDE
TFR• M.MANAGER PROD. MANAGER CAS - MANAGER• F.STOLTZ X. KHUMALO B. BIYELA
TFR• TECHNICIAN - TECHNICIAN IN TRAINING
TFR• TECHNICAL WORKER• INFRA WORKER
Results Announcement 2016
Safety
Transnet 5’s Supervision Substance Abuse Speed ( Train Driver & Drivers) Signals Sleepiness
Why the 5’s High level of serious injuries High level of serious incidents Image of Transnet Freight Rail Negative impact on employees
Depot level Housekeeping Safety talks Green area meetings
Results Announcement 2016
Market Demand Strategy
Core Strategies
Market Demand Strategy
Market Development
Operational Efficiency
Capital Investment
Regional Integration Safety People
Results Announcement 2016
Budget
Budget
Opex Copex Capex
Budget Year Depot Amount
OPEX 2016/17 R160 204 378
COPEX 2016/17 R89 426 103
What is EBITDA
Results Announcement 2016
Other Disciplines
• Perway• Technical Support• OHTE and substations• Train authorisation & Condition Assessment• Telecommunication• War-room• Rail Network Planning
Results Announcement 2016
Integrated Train Conditions Monitoring Systems
• This is a system that integrate information from different types of measurement systems in one system.
• The primary purpose of the system is to collect important data on the condition of trains passing along the rail line and to generate alarms when train condition is out of tolerance.
• This information can also be used for maintenance planning.
FCS FCSFCS
MEASUREMENT SYSTEMS
MEASUREMENT SYSTEMS
MEASUREMENT SYSTEMS
OPS
INTRANET
(OAT) PROVIDES ALARMS RAISED TO THE TCO
(MAT) PROVIDE ROLLING STOCK MAINTENANCE ALARMS TO MAINTENANCE PERSONNEL
(MTT) THIS IS WHERE THE MANAGER CAN VIEW & CONFIGURE SYSTEM SETTING & WHERE THE TECHNICIAN CAN VIEW SETTINGS
MAILERQuery PC
Results Announcement 2016
Phoenix Hotbox Detector
Results Announcement 2016
Vehicle Identification System
WSWS
JBOX
Antenna Cabinet
Results Announcement 2016
Measurement Systems.
Skew Bogie Wheel Profile Monitoring System Wim-Wim Weighbridge Cwrm Wilma
Results Announcement 2016
Courses Attended
Formal Courses COMPLETED
CWRM 30-August-2016
IMDCRE 19th - 23th September 2016
Formal Courses DUE
RIMM 7th – 11th November 2016
Thank You