N A V A L DEF EN CE & MA R I N E
CA P A B I L I T Y S T A T EMEN T
1997 1998 1999 2003 2005 2006 20
SEPTEMBER:Eptec founded by Dr Enrico Piccioli,
in Sydney with head office at
Gladesville
NOVEMBER:Eptec’s 1st job was the HMAS Success
for Sofraco
MARCH:Eptec establishes
beginning of 18 years at Williamstown Dockyard VIC with the start of the ANZAC Frigate Project
DECEMBER:First job for US
Navy, USS Constellation, Garden Island
NSW
AUGUST:Eptec establishes
beginning of 14 year & ongoing
relationship with TT Line
JANUARY:USS Abraham Lincoln
flight deck at sea. First USN aircraft carrier flight deck completed at sea
DECEMBER:Eptec awarded 2
OPVs for the New Zealand Navy by Tenix Defence,
Williamstown VIC
AUGUST:Eptec awarded
MV Delos conversion to
HMAS Sirius by Tenix Defence
MAY:Delivery of HMAS Perth, last of 10 Anzac Class Frigates.
Eptec completed preservation, insulation,
lagging, flooring & cleaning
FEBRUARY:Awarded FFG
Upgrade by Thales Australia, Garden
Island NSW
JUAwa
preservinsulationin New Ze
Tenix D
AUGEptec un
1st sipaint pr
SpirTasma
AUGUST:Eptec establishes
WA office
INTRODUCTION We are positi oned to deli er pro ects in all States and erritories with offi ces across ustralia, and a core wor orce o o er 2 0 direct employees. he wor orce comprises o mana ers and uali ed en ineers, supported by experienced super isors and permanent sta .
Eptec s stren th is the use o our own direct wor orce rather than reliance on subcontractors. With s ills de eloped o er decades, Eptec uarantees hi hly responsi e, exible and commi ed teams, ready to underta e pro ects in e en the most remote areas.
Eptec is an ustralian owned specialist na al de ence, marine and industrial contractor in sset Preser ati on and ehabilitati on.
Our marine experti se is in en ineered soluti ons usin resin technolo y, to pro ide preser ati on, corrosion protecti on, thermal insulati on and lass rein orced composites across a ran e o pro ects.
Eptec s scope is inclusi e o the blasti n and painti n o ship units bloc s, unit bloc consolidati on, compartment completi on and uture maintenance, alon side or in-doc .
Key Services
• Acoustic, Fire & Thermal Insulation• Ballistic Protection Coating• Corrosion Protection• Deck Coverings• Fibre Reinforced Plastics• Preservation
• Health and safety of our employees and stakeholders• Environmental consideration and management• Delivery of quality services exceeding specified
requirements• On time delivery• On budget delivery
The Key To Everything We Do Is:
ma e epartment o e ence
008 2010 2011 2012 2014 2015 2016
LY:rded
vation & of 4 IPVs ealand by
Defence
UST:ndertook licone oject for rit of ania II
APRIL:Awarded
preservation of AWD blocks by BAE
Systems, Williamstown VIC
AUGUST:Awarded
preservation of 2 LHDs by BAE
Systems, Williamstown VIC
MARCH:Awarded HMAS Canberra pre-delivery docking by
Thales Australia including underwater hull & flight
deck, Garden Island NSW
APRIL:Awarded ASMD upgrade by BAE Systems on the
remaining 4 vessels
JANUARY:Delivery of HMAS
Adelaide. Second & last LHD delivered to the Royal Australian
Navy
AUGUST:Awarded 1st
ASMD upgrade by BAE Systems HMAS Arunta,
Perth WA
MAY: Founding Director/CEO
Dr Enrico Piccioli passes away. Mr
Claudio Di Berardino appointed CEO
JULY:Joe Viglione
appointed CEO
FEBRUARY: Awarded Full
Cycle Docking of Collins
Submarine by ASC, Adelaide SA
MAY:Delivery of HMNZS
Wellington, last of 7 Project Protector
Vessels delivered to NZ Navy
JULY:Eptec Marine
Pty Ltdestablished
Eptec s pro essionalism, reliability and success can be measured by the return business rom many clients includin owners and primes.
ABOUT EPTEC
| 04
About Eptec
P ustralia S SP Ship ana ement roup ustal E Systems ormerly enix e ence For acs now i mec Harbour ity Ferries ermaid arine ustralia oa es S a al Ship ana ement ustralia P O, arni al olls oyce arine ustralia oyal ustralian a y oyal ew ealand a y Serco ormerly S S it er ustralia hales ustralia ormerly Shippin ine ompany United roup n rastructure ormerly U United States a y US
Third Party Cer fi ca ons: S S SO 900 uality ana ement Systems S S 4 0 Occupati onal Health Sa ety ana ement System S S SO 400 En ironmental ana ement System P P lass -4 lass lass 6
Memberships to Industry Associa ons: ustralasian orrosion ssociati on ustralian ndustry e ence etwor ustralian ndustry roup ustralian nsti tute o Protecti e oati n s P ustralian Shipbuilders ssociati on S ustralian Ship epairers roup S e ence eamin entre ndustry apability etwor
Eptec’s Prime Contractors Include:
Eptec’s Involvement
Eptec has o er 20 years experience as ustralia s lar est and leadin preser ati on contractor to the ustralian
a y, US a y and a y. Eptec has also extended this ser ice to include sheet metal wor , ship urniture and pipe wor o both na al and commercial essels.
Speci cally, Eptec is the only specialised preser ati on contractor with o er 3,000,000 man hours experience and capability or new ship build wor .
Eptec has urther applied its nowled e and experti se in rein orced plasti c composites to the marine en ironment in the desi n and abricati on o the mast access pla orms or the 0 n ac Fri ates.
Eptec has also underta en wor on a si ni cant number o na al and commercial essels both in doc and alon side, throu hout ustralia.
| 0
| 2
Eptec completed the ollowin new build pro ects and is the only
ustralian specialist preser ati on contractor with this experience.
Fri ate Pro ram Pro ect Protector W loc s H s arious ommercial essels
ma e epartment o e ence
NEW BUILD
| 06
Commissioned Date: 4 ecember 20
Commissioned Date: 2 o ember 20 4
New Build - Canberra Class LHD (Landing Helicopter Dock)
HMAS Canberra Landing Helicopter Dock (LHD) Project
Loca on: Williamstown, Sydney, SW
Client: E Systems hales ustralia
Scope of Work: brasi e blasti n applicati on o protecti e coati n s to the modules or the constructi on o the andin Helicopter oc ships
H s , consolidati on o wor s and pre-deli ery doc in .
HMAS Adelaide Landing Helicopter Dock (LHD) Project
Loca on: Williamstown, Sydney, SW
Client: E Systems hales ustralia
Scope of Work: brasi e blasti n applicati on o protecti e coati n s to the modules or the constructi on o the andin Helicopter oc ships
H s , consolidati on o wor s and pre-deli ery doc in .
LHD (Landing Helicopter Dock)E Systems contracted Eptec to pro ide all blasti n
and painti n ser ices and dec coati n s, rom bloc sta e to ship consolidati on at their Williamstown,
ictoria acility. Eptec also undertoo the pre-deli ery doc in wor s on both essels at arden sland East in Sydney, includin underwater hull,
topsides, and i ht dec coati n .
ma e epartment o e ence
| 07
Commissioned Date: 6 ay 20 0
Commissioned Date: February 20 0
New Build - Project Protector
HMNZS Otago OPV1
Loca on: Williamstown,
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.
HMNZS Wellington OPV2
Loca on: Williamstown,
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.
Project ProtectorEptec was commissioned to carry out blasti n , painti n , dec co erin insulati on on Pro ect Protector or the
oyal ew ealand a y. his pro ect comprised o our new build m nshore Patrol essels P and
two new build O shore Patrol essels OP .
Ser ices pro ided to the Pro ect Protector essels included:
Preser ati on blasti n painti n o ship bloc s loc consolidati on ompartment completi on Floorin and dec co erin hermal, re and acousti c insulati on H la in and inta e upta e insulati on Pipe la in Ship cleanin
For this pro ect, Eptec established speci c site aciliti es includin offi ce, ameniti es and accommodati on at the Williamstown site in ictoria and Whan arei in ew ealand.
ma e ew ealand e ence Force
| 0
Commissioned Date: 29 ay 2009
Commissioned Date: 6 ay 2009
Commissioned Date: ay 2009
Commissioned Date: 7 pril 2009
HMNZS Rotoi IPV1
Loca on: Whan arei, ew ealand
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.
HMNZS Hawea IPV2
Loca on: Whan arei, ew ealand
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.
HMNZS Pukaki IPV3
Loca on: Whan arei, ew ealand
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.
HMNZS Taupo IPV4
Loca on: Whan arei, ew ealand
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.| 09
Eptec was commissioned by enix e ence now E Systems to carry
out preser ati on and insulati on on the new build Fri ates.
Executi on o wor s at the Williamstown shipyard re uired close mana ement and cooperati on o all sta eholders includin
a y, prime contractor and other contractors on site.
Wor s in ol ed a wide ran e o acti iti es includin :
Preser ati on blasti npainti n o ship bloc s
loc consolidati on ompartment completi on esi n and abricati on o
composite structures Sheet metal wor and t out
in-situ Floorin and dec co erin Pipe la in hermal, re and acousti c
insulati on allisti c protecti on coati n H la in and inta e
upta e insulati on Ship cleanin
ma e epartment o e ence
ANZACFRIGATES
| 0
Commissioned Date: 0 ecember 999
Commissioned Date: 2 ecember 99
New Build - ANZAC Frigates
HMAS Arunta (151)
Loca on: Williamstown,
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.
Te Mana (F111)
Loca on: Williamstown,
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.
Commissioned Date: 22 uly 997
Commissioned Date: ay 996
HMAS Anzac (150) *
Loca on: Williamstown,
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.
Te Kaha (F77) *
Loca on: Williamstown,
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.
* Worked on by Eptec Personnel |
Commissioned Date: 26 une 2004
Commissioned Date: 4 October 2003
Commissioned Date: 7 u ust 2002
Commissioned Date: 3 arch 200
New Build - ANZAC Frigates
HMAS Warramunga (152)
Loca on: Williamstown,
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.
HMAS Stuart (153)
Loca on: Williamstown,
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.
HMAS Parrama a (154)
Loca on: Williamstown,
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.
HMAS Ballarat (155)
Loca on: Williamstown,
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.| 2
Project Date: 2002
Commissioned Date: 26 u ust 2006
Commissioned Date: 0 October 200
HMAS Toowoomba (156)
Loca on: Williamstown,
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.
HMAS Perth (157)
Loca on: Williamstown,
Client: enix e ence E Systems
Scope of Work: brasi e blasti n painti n rom ship bloc sta e to essel consolidati on, compartment completi on and pre-deli ery doc in . pplicati on o insulati on, la in and claddin to essel systems and
compartments. Post bloc preser ati on durin consolidati on and a oat.
Mast Access Pla orms
Loca on: reenacre, SW
Client: enix e ence E Systems
Scope of Work: nno ati e desi n, abricati on manu acture o F P mast access pla orms or the Fri ate Pro ect.
| 3
Eptec has been the leadin pro ider o maintenance ser ices to the
oyal ustralian a y and US a y on hi hly demandin na al de ence wor underta en within ustralia. We also pro ide maintenance and preser ati on ser ices to all classes o commercial essel.
Wor s ha e in ol ed a wide ariety o acti iti es includin :
brasi e blasti n wet or dry Ultra hi h pressure hydro
blasti n up to 40 000 psi UHP pplicati on o protecti e
coati n s ec coati n replacement
includin non-s id ec co erin , epoxy, inyl
ti les, carpets, etc e urbishment o tan s -
reshwater, ballast, uel, rey echanical cleanin hemical sur ace preparati on Encapsulati on Silicone anti oulin inc chromate, coal tar epoxy,
lead remo al ha ardous coati n remo al
ma e U.S. a y
CONVERSIONS &MAINTENANCE
| 4
Project Date: 2006 - urrent
Loca on: Perth, W
Conversion - MV Delos to HMAS Sirius
HMAS Sirius Maintenance
Client: SP Ship ana ement roup
Scope of Work: brasi e blasti n or hydro-blasti n and preser ati on o external hull, in rastructure and dec , as well as tan s. his was carried out both a oat and in doc .
EFO E as elos
F Eon ersion into H S Sirius
Project Date: 2003
Loca on: Perth, W
MV Delos to HMAS Sirius Conversion
Client: enix e ence E Systems
Scope of Work: on ersion o a commercial essel into a e ence supply essel. ll corrosion protecti on wor s included in-situ con ersion o a
commercial coati n system to de ence standards.
|
Project Date: 997 - urrent
Project Date: 20 2 - 20 7
Project Date: 99 - urrent
Project Date: 20 6 - urrent
Loca on: Sydney, SW
Loca on: Henderson, W
Loca on: Sydney, SW
Loca on: delaide, S
Maintenance - Signifi cant Projects
Collins Class Full Cycle Docking
Client: S
Scope of Work: Full blast paint o ollins lass submarine. brasi e blasti n o ha ardous coati n s on tan s, machinery bil es and submarine externals.
FFG Frigate Upgrade Project
Client: hales ustralia ormerly
Scope of Work: Preparati on coati n o external hull, dec s internal areas, ha ardous inc-chromate coati n remo al. his included H S
elbourne, H S ewcastle, H S arwin and ormer H S delaide and H S Sydney.
ASMD (An -Ship Missile Defence) Project on ANZAC Fleet
Client: E Systems
Scope of Work: he eet has been extensi ely up raded as part o the S Pro ect. Wor s in ol ed complete blast paint o all external areas includin hull, superstructure and dec s or H S n ac,
runta, allarat, Parrama a, Perth, Stuart, oowoomba Warramun a.
Supply Ships
Client: olls oyce arine, SP Ship ana ement roup, P ustralia, hales ustralia
Scope of Work: Wor s in ol e complete blast and paint or essels H S Sirius, Success, obru , houles.
| 6
Project Date: 999 - 2006
Project Date: 2003
Project Date: 99 - urrent
Project Date: 20 - urrent
Loca on: Sydney, SW ac ay, Perth, W
Loca on: Fremantle, W
Loca on: arwin, S Sydney, SW Henderson W
Loca on: Sydney, SW
Landing Helicoper Docks (Canberra Class)
Client: E Systems
Scope of Work: Sur ace preparati on and applicati on o protecti e coati n s to underwater hull, hull abo e water, superstructure, externalinternal dec s, tan s, compartments and passa eways.
Patrol Boats Armidale Class
Client: Serco Formerly S , hales ustralia, ustal
Scope of Work: Sur ace preparati on and applicati on o protecti e coati n s to underwater hull, hull abo e water, superstructure, externalinternal dec s, tan s and compartments.
US Aircra Carriers
Client: US a y
Scope of Work: UHP blasti n , abrasi e blasti n , painti n , i ht dec non-s id replacement and encapsulati on on US aircra carrier USS braham incoln.
USS Fleet Vessels
Client: US a y
Scope of Work: Hull and dec preser ati on. essels included the USS lue id e, USS onstellati on, USS Shiloh, USS hach, USS Paul F Foster.
| 7
Project Date: 2003 - urrent
Loca on: Sydney, SW elbourne,
Spirit of Tasmania I & II
Client: hales ustralia, ine
Scope of Work: Sur ace preparati on and coati n o dec and external sur aces, silicone oul release coati n to underwater hull, superstructure, topsides.
COMMERCIALVESSELMAINTENANCE
|
Project Date: 99 - urrent
Project Date: 99 - urrent
Project Date: 2009 - urrent
Project Date: 20 4 - urrent
Loca on: Sydney, SW Henderson, W
Loca on: Perth, W ampier, W Sydney, SW Williamstown,
Loca on: Sydney, SW
Loca on: Sydney, SW risbane,
Maintenance - Signifi cant Projects
Cruise Ships - P&O, Carnival
Client: hales ustralia, For acs
Scope of Work: orrosion protecti on o underwater hull, boot top, sea chests, topsides superstructure, water blasti n , abrasi e blasti n , mechanical cleanin . pplicati on o coati n s ia airless spray and power roller.
Ferries
Client: hales ustralia, Harbour ity Ferries, ustal
Scope of Work: orrosion protecti on o underwater hull, boot top, sea chests, topsides superstructure, water blasti n , abrasi e blasti n , mechanical cleanin . pplicati on o coati n s ia airless spray and power roller.
Work Boats (Tugs/Trawlers)
Client: ermaid arine ustralia, ustal, S ariti ne, S it er
Scope of Work: orrosion protecti on o underwater hull, boot top, sea chests, topsides superstructure, water blasti n , abrasi e blasti n , mechanical cleanin . pplicati on o coati n s ia airless spray and power roller.
Cargo Vessels
Client: hales ustralia, E Systems
Scope of Work: orrosion protecti on o underwater hull, boot top, sea chests, topsides superstructure, water blasti n , abrasi e blasti n , mechanical cleanin . pplicati on o coati n s ia airless spray and power roller.
| 9
Eptec Marine Contact DetailsHead Office: 463-467 Harris Street, Ultimo, Sydney
Phone: 02 9034 6969 | Fax: 02 9034 6970 | Email: [email protected] | Web: www.eptec.com.au