N
MASTER PLAN
4507 North Front St | Ste 302 | Harrisburg, PA 17110717.232.0200 (o) | www.hillwood.comChris Fencel717.603.4143 (o) | [email protected]
Cushman & Wakefield of Pennsylvania, Inc.4507 North Front St | Ste 203 | Harrisburg, PA 17110www.cushmanwakefield.comPat McBride | Managing Director717.231.7290 (o) | 717.919.1689 (c) | [email protected]
For Information Contact:
A Joint Venture Development:
MASTER PLAN
4507 North Front St | Ste 302 | Harrisburg, PA 17110717.232.0200 (o) | www.hillwood.comChris Fencel717.603.4143 (o) | [email protected]
Cushman & Wakefield of Pennsylvania, Inc.4507 North Front St | Ste 203 | Harrisburg, PA 17110www.cushmanwakefield.comPat McBride | Managing Director717.231.7290 (o) | 717.919.1689 (c) | [email protected]
For Information Contact:
A Joint Venture Development:
ORCHARDBusiness Park
Phase II
ORCHARDBusiness Park
Phase II
PROPERTIES
ORCHARDBusiness Park
Phase II
ORCHARDBusiness Park
Phase II
700 Canal Road ExtensionYork, Pennsylvania
A Development Of:
N
83
30
24
83
921
921
24
83
74 462
4001
1008
30
462
295
1031
83
181
EXIT 24
ChurchRd.
30
83
EXIT 28
YORK
To Harrisburg
To Lancaster
Manchester
To B
altimo
re /
Wash
ing
ton
DC
Emigsville
ORCHARDBusiness Park
Phase II
010218
Area Amenities
Building Features
» 90-acre site in a key York County submarket andlocated in the heart of Central Pennsylvania’snationally recognized industrial market
» NEW, state-of-the-art project offers unparalleled access to the premier labor base of Central York County
» Frontage on I-83 for maximum brand exposure fromboth north and southbound lanes
» Convenient access to oth I–78 / I–81 corridor andBaltimore’s etro arket and port
» Easy rive to Baltimore / Washington (BWI) andHarrisburg International Airport
» 780,056 SF available on 90 acres
» Cast in place concrete panels 9.25” thick typical;interior joints fully caulked with R-9.5 rigid interior insulation
» Office-to-suit
» 36’ clear height beyond staging bay
» ESFR sprinkler system with diesel fire pump K-22heads
» Clerestory windows along dock walls alternating with mechanical wall louvers
» 45 mil TPO fully adhered membrane roof system
» Roof mounted exhaust fans and wall louvers for 1.0 air changes per hour
» Gas-fired Cambridge (or equal) heaters for 55 degreesat 0 degrees ambient
» Cross-dock configuration
» 48’ deep x 56’ wide typical column spacing; 60’ instaging bays
» 111 – 9’ x 10’ insulated dock doors with single visionpanel and Z-Guards for door protection
» 4 – concrete drive-in ramps with 12’ x 14’ doors withGuards and exterior bollards
» 190’ truck court with 60’ concrete truck apron andtrailer parking
» 352 auto parking spaces
» Up to 233 trailer stalls at 11’ wide (167 stalls atbuilding; 66 in remote lot)
» 4,000 amp / 480 volt, 3 phase electrical service provided by Met Ed
ORCHARDBusiness Park
Phase II 700 Canal Road Extension | York, PA
N
N
MASTER PLANMASTER PLAN
A DEVELOPMENT OF::
ORCHARDBusiness Park
Phase II
ORCHARDBusiness Park
Phase II
ORCHARDBusiness Park
Phase II
ORCHARDBusiness Park
Phase II
700 Canal Road ExtensionYork, Pennsylvania
ort ront t te arris urg o i oo co
ris ence o c ris ence i oo co
us an ake ie o enns ania nc ort ront t te arris urg
cus an ake ie co
oint enture ropert
at c ri e anaging irector o c pat c ri e cus ake co