N. Summary Phil Hinz Principal Investigator
Transcript
Page 1: N. Summary Phil Hinz Principal Investigator. Performance N-2.

N. Summary

Phil HinzPrincipal Investigator

Page 2: N. Summary Phil Hinz Principal Investigator. Performance N-2.

Performance

N-2

Page 3: N. Summary Phil Hinz Principal Investigator. Performance N-2.

Compliance Matrix

PLRA Section

SuccessCriteria

March 2014

Now (ORR)

End of SVP

In-Guide Plan (FY17)

With Lien (FY18)

L0 4.3 A: 10 better 2.8 better 12 better 24 better 24 better 24 better

L0 4.3 B: Inform missions 6 zodi median

1.13 zodi median

0.51 zodi median

0.51 zodi median

0.50 zodi median

L1 4.1.2 C: 6-zodi, 1σ 54 zodi 12 zodi 6 zodi 6 zodi 6 zodi

L1 4.1.4 D: 50 stars in 4 yrs 1 3 18 35 50

L2 4.1.4 E: 0.3 mJy sens. 0.4 mJy 0.4 mJy 0.3 mJy 0.3 mJy 0.3 mJy

L2 4.1.4 F: 1.510-4 null stb 1800 ppm 400 ppm 150 ppm 150 ppm 150 ppm

L2 4.1.4 G: 30% efficiency 30% 32% 40% 40% 40%

N-3

Red = not compliantBlue = compliant, assuming in-guide completionOrange = compliant with ORR criteria, but not PLRAGreen = compliant with PLRA

Page 4: N. Summary Phil Hinz Principal Investigator. Performance N-2.

Current Performance Summary

• We have demonstrated– 0.4 mJy photometric uncertainty– 400 ppm null uncertainty– 32% efficiency per pointing

• The analysis of mean zodi-sensitivity for the current instrument performance and HOSTS sample is 11 zodi for the in-guide plan

N-4

Page 5: N. Summary Phil Hinz Principal Investigator. Performance N-2.

HOSTS Survey Will Inform the Designof a Future NASA Space Mission

• We identified 68 good LBTI targets• There is great overlap between good LBTI

targets and future space mission targets

N-5

Page 6: N. Summary Phil Hinz Principal Investigator. Performance N-2.

“HOSTS Plan Is Consistent with Science Scope”

N-6 Typical Zodi Measurement Uncertainty per Star (1s)

• Uses star-dependent null uncertainty, including– Null floor = 350 ppm (irreducible, 400 ppm for 7 Jy star)– Photometric null error

• Uses best 32 stars from the HOSTS target list – Mean uncertainty is 10.3 zodi

Num

ber S

tars

Obs

erve

d

Page 7: N. Summary Phil Hinz Principal Investigator. Performance N-2.

Science Validation Summary

• We have defined a list of tasks to execute over the next 6–9 months to address– Improved data acquisition approaches– Sensitivity improvements– PWV impact– Continued vibration improvement

• The planned performance improvements are sufficient to meet the threshold requirements– The modeled performance is not precise, and provides

some level of risk to achieving the threshold performance

N-7

Page 8: N. Summary Phil Hinz Principal Investigator. Performance N-2.

Operation and Survey Plans

N-8

Page 9: N. Summary Phil Hinz Principal Investigator. Performance N-2.

LBT Is Ready to Support LBTI HOSTS Survey

• All LBT systems have been functioning during LBTI commissioning block– Addressed maintenance issues with adaptive optics

without impact to LBTI commissioning– Worked systems-level issues with LBTI to

completion– Added engineering nights prior to LBTI runs to

demonstrate readiness with margin for corrective action

• LBT has demonstrated it is ready to support LBTI HOSTS survey

N-9

Page 10: N. Summary Phil Hinz Principal Investigator. Performance N-2.

Science Operations Summary

N-10

Page 11: N. Summary Phil Hinz Principal Investigator. Performance N-2.

NExScI Readiness Summary

N-11

PLRA ID Description Status Comment3.1.3.1 Data formats, interface to UA, NExScI

archive✔ • Archive will be made public following ORR

board report• Archive dev frozen after ORR until FY16 due

to funding invested instead in additional resources towards instrument commissioning success

• Data still expected to evolve during SVP• Level of funding supports only minor archive

modifications post public release3.1.3.2 HOSTS Science Team selection and

activities✔

3.1.3.3 Project Scientist functions ✔

3.1.3.4 Management oversight at NExScI ✔ • Deferred to end of SVP3.4 Data rights and data to be archived ✔ • LEECH work deferred to FY16

• Other modes pending GO program decision4.2 Types of data products and timeliness

of transfers. Data Management Plan✔

Page 12: N. Summary Phil Hinz Principal Investigator. Performance N-2.

Data Analysis Pipeline Is in Place

N-12

Level 1

DATA REDUCTION

Level 3

DATA INTERPRETATION

Level 2

DATA CALIBRATION

Raw L0 files

Level 2 FITS files

Science results

Level 1 FITS files

Level 0 FITS files′

3 log files:- Master log- Data log- Reduction log

Diagnostic plots:- Reduction: ~80/OB - Calibration: ~20/night

See description in Rafael’s presentation

Page 13: N. Summary Phil Hinz Principal Investigator. Performance N-2.

Current Risk Summary

N-13

Page 14: N. Summary Phil Hinz Principal Investigator. Performance N-2.

LBTI Self-Assessment

• The LBTI project has demonstrated both the performance and the operational readiness to carry out the HOSTS survey

• A plan is in place to provide additional improvements to the current performance

• Execution of the HOSTS survey will provide an important deliverable to NASA for planning future exo-Earth missions

We are excited to begin the survey!

N-14