DRAWING NO.
STATUS
JOB NO.
SCALE
DATE
DRAWING TITLE
PROJECT
REVISION
CHECK
DRAWN
DATE/DRAWNREVISION
The Old School,
Exton S
treet, London
T: 020 7261 9577 F: 020 7261 1081
SE1 8U
Ew
ww
.ghm-group.co.uk
a Division of the G
HM
Consultancy G
roup
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS,DIMENSIONS, CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TOCOMMENCEMENT OF THE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHMCONSULTANCY GROUP SHALL BENOTIFIED OF ANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARERECEIVED IN WRITING
SETTING OUT - NOTE FOR CONTRACTOR
THIS DRAWING IS COPYRIGHT. ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OFWORK. GHM CONSULTANCY GROUP TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS. THIS DRAWING IS NOT TOBE SCALED.
GHM CONSULTANCY GROUP CAN NOT BE HELD RESPONSIBLE FOR THE ACCURCY OF INFORMATION PRODUCEDBY OTHERS FOR THE PURPOSES OF PRODUCING OUR DRAWINGS I.E. TOPOGRAPHICAL SURVEYS. AREAMEASUREMENTS ARE PROVIDED FOR INFORMATION ONLY. ANY VERIFICATION OF MEASUREMENTS SHOULD BESOUGHT FROM A SUITABLY QUALIFIED SURVEYOR. GHM CONSULTANCY GROUP CAN NOT BE HELD RESPONSIBLEFOR THE ACCURACY OF COMPUTER SOFTWARE USED TO DETERMINE MEASUREMENTS.
Woodland View
Primary School
Site Location
Plan
RX2517
L00-010
PLANNING
1:1250@a3
0 25 50 100 m75
1:1250NorthSchool site area: 1.44ha
Application site area: 0.74ha
MH C
L 81.7
7
MH IL
80.73
Foul
RBC/
CB
All 100
mm di
a
Appro x
positio
n
of MH
, need
s
confine
d spac
e
entry
to lift
IC belo
w MH
B
A
X
MH C
L 79.0
0
SW/C
atch p
it
RCC
Base
level 7
7.54
Water
level 7
7.78
X 150m
m dia,
IL 77.
91
A 150m
m dia,
IL 78.
08
B 100
mm di
a, IL
78.41
X
B A
MH C
L 79.2
4
MH IL
76.19
Comb
ined?
CCC/
CB
X 375m
m dia
A 300m
m dia
B 150
mm di
a, IL
77.55
MH C
L 79.2
5
SWRC
C
Base
level 7
8.25
Water
level 7
8.61
A 100m
m dia,
IL 78.
54
B 100
mm di
a, IL
78.58
A
B
MH C
L 81.6
6
MH IL
80.59
SWRC
C/PB
All 150
mm di
a
MHC
CL 81.
64
MHC
IL 80.7
8
SWCP
C/PB
All 150
mm di
a
MH C
L 81.6
3
MH IL
80.43
Foul
RBC/
CB
X 150m
m dia
Rest 1
00mm
dia
X
MH C
L 81.4
0
MH IL
80.45
SWRC
C/CB
X,D 15
0mm
dia
A,B,C
100mm
dia
X
A BC
D
MH C
L 81.5
0
UTL, c
over ja
mmed
MH C
L 81.4
7
UTL, C
over ja
mmed
MH C
L 81.5
1
MH IL
80.19
Foul
RBC/
CB
All 100
mm di
a
MH C
L 81.6
2
MH IL
80.41
Foul
RBC/
CB
All 100
mm di
a
Sonic
connec
tion
Sonic
connec
tion
Sonic
connec
tion
MH C
L 81.4
8
MH IL
80.06
Comb
ined
RBC/
PB
All 150
mm di
a
AR
AR
AR
MH C
L 81.4
8
MH IL
79.82
SW?
RBC/
CB
All 150
mm di
a
4 No s
mall cov
ers
at bas
e of c
hamber
with filt
ers un
derneit
h ,
poss s
urface
water
purifica
tion fo
r re-u
se
MH C
L 80.1
6
MH IL
77.00
SW?
CCC/
CB
X 300m
m dia
A 225m
m dia
B 150
mm di
a
X
A
B
XA
B
C
MH C
L 81.3
5
MH IL
79.59
SWRB
C/CB
X,B 22
5mm
dia
A 100m
m dia
C 150
mm di
a
MH C
L 81.4
4
MH IL
79.81
SWRB
C/PB
All 150
mm di
a
MH C
L 81.4
5
MH IL
79.79
SWRB
C/CB
All 150
mm di
a
MH C
L 81.6
1
MH IL
80.86
Foul
RBC/
CB
All 100
mm di
a
MH C
L 81.6
1
MH IL
80.69
SWRB
C/CB
All 100
mm di
a
AR
AR
AR
X
A BCD
E FG
H
MH C
L 81.5
8
SW/C
atch p
it
RCC
Base
Level
79.89
Water
Level
80.20
X 150m
m dia,
IL 80.
23
A,B,C,D
100m
m dia
, DI'S
80.20
E 100m
m dia
, IL 80
.36
F 100m
m dia,
IL 80.
30
G 100m
m dia,
IL 80.
26
H 100
mm di
a
X Poss
overf l
ow pipe
AR
AR
AR
AR, so
nic
connec
tion
proven
,
poss C
CTV
require
d
Traced
with GP
R
Elec 0
.79d
BT 0.7
2d
S/L 0.
82d
S/L 0.
53d
S/L 0.
79d
S/L 0.
59d
AR
AR thro
ugh
vegeta
tion
AR
Elec 0
.65d
Elec 0
.83d
Water
AR
S/L 0.
72d
S/L 0.
34d
Gas an
d Wate
r
AR, m
entione
d
by s ite
mana
ge r
Faint
GPR tra
ce
at this
point
S/L 0.
74d
S/L 0.
45dS/L 0.
59d
S/L 0.
44d
Unable
to sur
vey th
is
area d
ue to
sports
equipm
ent, S
/L AR
Water
AR
Elec 0
.70d
Elec 0
.53d
R ising
main A
R
Rising
main A
R
Trench
scar
Assum
ed fou
l
gravity
dra in
,
poss r
ising m
ain
Water
AR
Uniden
tified t
race
found
with GP
R
EOT
EOT
Trench
scar v
isible
Trench
scar v
isible
assum
ed risi
ng main
mentio
ned by
site m
anager
End of
trench
scar
Trench
scar
Assum
ed fou
l
gravity
dra in
,
poss r
ising m
ain
AR
AR
AR
AR
AR
AR
BT TFR
Blackto
p
Blackto
p
Blackto
p
Blackto
pBla
cktop
Blackto
p
Blackto
p
Blackto
p
Blackto
p
Blackto
p
Blackto
p
Blackto
p
Blackto
p
Blackto
p
Blackto
p
Blackto
p
Blackto
p
Blackto
p
Setts
Setts
SettsSet
ts
Setts
Setts
Gravel
Gravel
Slabs
Gravel
Gravel
Gravel
Gravel
Gravel
Gravel
Gravel
Gravel
Gravel
Gravel
Gravel
Gravel
Gravel
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
GrassGra
ssGra
ss
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Grass
Flower
Bed
Flower
Bed
Flower
Bed
Flower
Bed
Flower
Bed
Flower
Bed
Flower
Bed
Flower
Bed
Flower Bed
Flower
Bed
Vegeta
tion
Ht 1.2
m
Vegeta
tion
Ht 1.2
m
Vegeta
tion
Ht 1.2
m
Hedge
Ht 1.2
m
Hedge
Ht 1.2
m
Vegeta
tion
Ht 1.2
m
Vegeta
tion
Ht 1.2
m
Plante
r
Planter
Planter
Planter
Flower
Bed
I/R Ht 1
.2M
I/R Ht 1.2M
I/R H
t 1.2M
I/R Ht 1.2M
W/M Ht 2.0M
W/M Ht 2.0M
W/M Ht 2.0M
W/M Ht 2.0M
W/M Ht 2.0M
W/M Ht
2.0M
W/M Ht
2.0M
W/M Ht
2.0M
W/M Ht 2.0
M
W/M Ht 2.0M
W/M Ht 2.0M
W/M Ht 2.0M
W/M Ht 2.0M
W/M Ht
2.0M
W/M Ht 2.0M
W/M Ht 2.0M
W/M Ht 3.5M
W/M Ht 3.5M
W/M Ht 3.5M
W/M Ht 3.5M
W/M Ht 3.5M
W/M Ht 3.5M
Slabs
W/M Ht 2.0MW/M Ht 2.0M
W/M Ht
2.0M
H/M Ht
1.8M
W/M Ht 2.0M
Bike Rack
Bike Rack
Bike R
ack
Bike
Bike Rack
Bike Rack
Rack
Bike
Rack
Flower Bed
Flower Bed
Activity Area
Activity Area
Vegeta
tion
Vegeta
tion
Vegeta
tionVeg
etation Veg
etation
H/M H
t 2.0M
H/M H
t 2.0M
Shed
Shed
Shed
Shed
Shed
Mobile
Class
room
Mobile
Class
room
Mobile
Class
room
Col
Col
H/M Ht 0.6M
H/M Ht 0.6M
Slabs
Concr
ete
Concr
ete
R/W
Hand R
ail
Hand R
ail
Hand R
ailHand R
ail
Hand R
ailHan
d Rail
Hand R
ail
Hand R
ail
Hand R
ail
Hand R
ail
Slabs
Slabs
Slabs
Slabs
Concrete
B lackto
p
Slabs
Slabs
Slabs
Slabs
Slabs
Box
Box
Box
Ramp
Ramp
RampRamp
Brick
Buildin
g
Rough
Ground
Astro
Turf
Astro
Turf
Astro
Turf
Astro
Turf
Astro
Turf
Astro
Turf
B lackto
p
Blackto
p
Flower
Bed
Flower
Bed
Flower
Bed
Flower
Bed
Flower
Bed
Grass
Grass
BNH
BNH
BNH
BNH
BNH
BNH
BNH
BNH
BNH
BNH
BNH
BNH
BNH
BNH
81.57STN/01
79.00STN/02
77.49STN/03
82.40STN/05
83.26STN/06
81.60STN/07
83.02STN/08
81.70STN/09
81.44STN/10
81.26STN/11
79.54STN/12
79.33STN/13
81.70STN/14
81.63STN/15
80.14
80.13
80.27
80.26
79.5379.
7379.9179.93
79.92
79.92
79.70
79.3179.
5979.
88
79.89
79.89 79.
61
SV
79.95
79.93
79.83
79.83
RE
RE
81.83
81.89
81.90
81.79
82.24
81.32
81.38
81.34
81.31
81.26
81.23
81.17
81.16
81.30
81.1481.
03
80.61
80.18
79.89
79.94
79.97
79.97
80.05
80.08
80.76
80.99
81.07
80.9480.
81
80.60
80.26
80.02
79.97
80.00 80.
01
80.05
80.22
80.32
80.57
79.74
79.83
79.8079.
78
81.60
81.73
82.12
82.76
81.76
81.75
82.83
81.84
81.74
81.71
81.60
81.57
81.61
81.65
81.71
81.26
81.37
79.4979.
46
81.64
79.2379.
19
79.20
81.89
81.85
81.8081.
83
81.81
81.80
79.81
79.79
79.46
79.47
79.48
79.59
79.64
79.82
79.40
79.34
79.27
79.6679.
6079.5679.
5279.4879.
4379.3879.
33
79.31 79.
3679.
4079.
46 79.50
79.55
79.60
79.66
79.6579.
5979.5579.
4979.4479.
4079.3579.
30
79.29
79.34
79.39
79.45
79.50
79.57
79.62
79.62
79.5579.
5079.
45
79.4079.
3779.34
79.26
76.41
76.87
77.01
76.70
76.44
76.50
76.18
76.31
76.53
76.65
76.94
77.20
77.43
77.30
77.33
77.05
76.84
76.67
76.62
76.89
77.10
77.04
77.01
77.10
76.83
76.92
77.03
77.11
76.94
77.09
76.98
76.77
76.52
76.24
75.87
81.70
81.77
81.74
81.79
81.84
81.82
81.84
81.45
81.52
81.56
81.53
81.49
81.49
81.46
81.46
81.44
81.42
81.45
81.47
81.52
81.54
81.48
81.45
81.39
81.32
81.37
81.44
81.46
81.53
81.54
81.48
81.43
81.36
81.31
81.26
81.25
81.31
81.36
81.42
81.46
81.54
81.53
81.46
81.41
81.39
81.34
81.28
80.02
79.92
79.88
79.88
79.88
79.84
79.80
79.8179.
74
79.77
79.75
79.78
79.80
79.82
79.88
79.84
79.83
79.82
79.79
79.74
79.77
79.73
79.67
79.61
79.69
79.73
79.76
79.77
79.79
79.83
79.86
79.80
79.80
79.79
79.74
79.70
79.69
79.61
79.56
79.51
79.54
79.58
79.61
79.66
79.75
79.77
79.7179.
67
79.71
79.72
79.63
79.57
79.54
79.50
79.4979.
43
79.46
79.50
79.51
79.54
79.62
79.63
79.59
79.59
79.54
79.51
79.46
79.45
79.41
79.37
79.32
79.36
79.40
79.47
79.48
79.51
79.54
79.5379.
48
79.53
79.52
79.52
79.45
79.37
79.30
79.31
79.23
79.26
79.28
79.33
79.40
79.45
79.41
79.38
79.29
79.29
79.00
79.06
78.94 79.
21 79.41
81.44
81.45
81.46
81.49 81.
46
81.52
81.63
81.81
81.86
81.93
81.97
82.12
82.26
82.36
82.37
82.35
82.22
81.98
81.77
81.77
81.68
81.69
81.63
81.70
81.65
81.60
81.58
81.58
81.60
81.57
81.52
81.49
81.39
81.39
81.37
81.37
81.28
81.40
81.37
81.44
81.46
81.49
81.51
81.54
81.52
81.72
GP
GP
GP
GP
GPGP
GPGP
GP
GP
GP
GP
GP
GPGP
GP
GP
GP
GPGP
GP
GP
GP
GPGP
GPGP
GP
GP
GP
GP
GP
GP
GP
79.79
79.93
80.18
80.57 80.
9281.
14
81.31
81.34
81.34
79.73
79.70
79.69
79.69
79.67
79.67
79.66
79.67
79.63
79.6079.
5979.
56
79.5479.
48
79.54
79.4679.
4279.37
79.39
79.34
79.31
79.31
79.2779.
24
79.26
79.27
79.28
79.28
79.31
79.32
79.34
79.40
79.40
79.41
79.45
79.45
79.50
79.54
79.59
79.62
79.62
79.65
79.66
79.69
79.72
79.02
78.82
78.00
77.54
77.44
77.32
77.15
76.88
76.76
76.47
76.27
76.05
75.86
75.88
75.78
75.78
75.74
75.91
75.90
75.98
76.05
76.09
76.16
76.35
76.55
76.75
76.87
77.09
77.00
76.99
77.02
77.07
77.09
77.11
77.27
77.71
77.93
78.37
78.77
79.08
79.40
79.69
79.96
80.25
80.61
80.90
81.24
81.41
81.61
81.73
82.04
82.23
82.77
82.85
82.04
82.27
82.42
82.88
82.96
83.03
83.06
83.08
83.04
82.36
82.35
82.51
83.07
83.08
83.01
82.89
82.85
82.83
82.80
82.87
82.78
82.68
82.62
81.68
81.84
82.33
80.36
81.16
81.24
81.43
SaplingSap
ling
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
Sapling
SaplingSap
lingSap
lingSap
lingSaplingSap
lingSap
lingSapling
Sapling
Sapling
Sapling
SaplingSap
ling
Sapling
Sapling
Sapling
TE/01
TE/02
TE/03
TE/04
TE/05
TE/06
TE/07
TE/08
81.63
81.57
81.54
82.56
82.33
82.41
82.99
82.85
81.71
81.72
81.61
81.63 81.62
81.6481.62
81.67
81.70
81.73
81.68
COL
COL
RWP
RWP
RWP RW
P
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
RWP
81.46
81.6581.60
81.58
81.60
81.61
81.64
81.76
81.75
81.71
81.78
81.77
81.58
81.72
81.71
81.57
81.72
81.61
81.63
81.61
81.53
81.55
79.77
79.6979.
3579.
27
81.65
81.66
81.69
81.58
81.59
81.77
81.52
80.19
79.60
79.50
79.51
79.49
79.51
79.52
79.48
79.21
79.03
79.16
81.67
81.52
81.68
81.46
81.62
RSRS
RS RS
81.54
81.49
81.56
81.54
81.57
81.57
81.58
81.61
81.61
81.71
81.21
81.38
81.29
81.2581.
22
81.15
81.17
81.07
80.97
80.77
80.42
79.21
79.20
79.19
79.21
79.20
79.20
79.17
79.14
79.07
79.17
79.14
79.80
80.41
81.19
81.30
79.79
81.11
81.66
81.62
81.61
81.58
81.62
81.56
VP
81.40MH
81.48MH
81.47MH
81.48MH
81.64MHC
81.63MH
79.60MH
79.56MH
79.09MH
77.03MH
79.00MH
81.77MH
81.66MH
80.16MH
81.48MH
81.60MH
81.58MH
81.44MH
81.62MH
81.51MH
81.45MH
81.35MH
79.25MH
79.24MH
81.61MH
81.61MH
81.49
81.24
81.50
81.52
81.53
81.54
81.58
81.53 81.
57
81.94
81.47
81.46
81.42
81.73
81.77
81.82
81.85
81.90
81.94
81.54
81.55
81.93
81.4781.
49
81.46SGY
81.48G
81.39G
81.29G
SGY
79.52
SGY
79.52
78.25
SGY
78.24
81.60G
81.70G
81.59G
81.58G
SGY
SGY
SGY
G
SGY
SGY
81.49
81.51
81.43
81.42
81.44
81.45
81.46
81.49
81.53
81.66
81.69
81.67
81.67
81.67
81.67
81.64
81.6381.
63
81.67
81.76
81.76
81.73
81.60
81.55
81.50
81.51
81.45
81.45
81.47
81.50 81.
4881.
47 81.48
81.59
81.61
81.59
81.61
81.45
79.65
79.6279.
6379.
62
79.62
79.61
79.60
79.61 79.
62
79.59
81.48
81.48
81.51
81.36
81.39
81.41 Drop Ke
rb
81.46
81.46
81.28
81.28
81.21
81.44
81.45
Drop Kerb
Drop Kerb
81.80
79.47 79.8979.
4979.90
79.30
79.85
79.31
80.25
79.66
80.26
82.05
82.10
82.01
81.95
81.87
81.78
81.84
81.88
81.47
81.5081.
49
81.48
79.56
79.55
79.25
81.61
81.96
81.91
81.59
81.76
81.31
81.20
81.02
80.59
80.00
79.97
79.95
79.90
79.86
79.82
79.8479.
87
79.81
79.84
79.88
79.93
79.97
79.98
80.09
80.40
80.90
81.19 81.
26
81.36
79.73
79.50
79.50
79.56 79.
6479.
67
79.69
79.7179.
6679.58
79.53
79.58
79.66 79.53
79.52
79.51
79.52
79.55
79.48
79.41
79.28
79.26
79.25
79.26
79.29
79.29
79.34
79.37 79.
4479.
52
81.62
81.78
81.90
81.81
81.82
81.82
81.85
81.95
81.96
82.08
82.21
82.08
82.16
82.24
82.30
82.39
82.38
82.28
82.06
81.87
81.64
81.55
81.61
81.6181.
63
81.67
81.61
81.64
81.63
81.69
81.56 81.
6081.
6681.
71
81.76
81.81
81.75
81.70
81.70
81.65
81.6581.
6181.
59
81.57
82.52
82.17
81.80
81.72
81.70
82.15
82.47
82.49
82.45
82.52
82.54
82.67
82.75
82.32
82.18
82.02
81.86
81.64
81.39
81.11
80.90
80.63
80.33
80.10
79.98
79.67
79.57
79.20
78.88
78.59
78.20
77.84
77.56
77.29
77.01 77.
42
77.82
78.21
78.58
78.91
79.33
79.56
79.87
80.18
80.51
80.83
81.17
81.45
81.73
82.13
82.20
82.36
82.46
83.00
83.20
83.26
83.28
83.27
83.27
83.25
83.14
83.00
82.88
83.13
82.40 83.
10
83.16
83.21
83.23
83.22
83.26
83.20
83.26
83.29
83.24
83.26
83.27
83.24
83.21
83.17
83.17
83.16
83.05
83.02
83.00 83.
13
83.09
82.92
82.98
82.94
82.93
82.87
82.78
82.69
82.72
82.80
82.88
82.88
82.90
82.95
82.99
83.05
83.09
83.10
82.33
82.05
Kerb
Kerb
Kerb
Kerb
81.61
81.60
81.61
81.59
81.36
81.21
80.96
80.78
80.62
80.44
80.26
80.09
79.93
79.75
79.65
79.66
80.03 80.
00 80.19 80.
35 80.51
80.65 80.
77
80.96
81.16
81.40
81.51
81.51
81.51
81.53
81.51
78.47
78.69
78.83
78.93
79.03
79.13
79.22
79.29
79.38
79.44 79.
59
79.59
79.44
79.4479.
3079.23
79.1479.
0578.9578.
8578.
6878.42
78.07
78.12
78.11
77.93
77.72
77.53
77.38
77.26
77.22
77.37
77.57
77.88
77.87
81.76
81.72
81.73
81.65
81.66
81.72
81.93
81.94
81.83
81.72
81.63
81.63
81.74
81.70
81.70
81.72
81.70
81.74
81.77
81.72
81.88
82.02
81.6481.71
81.72
81.65
81.59
81.6581.70
81.63
81.5781.
57
82.01
82.01
82.01
82.01
82.25
81.82
81.59
81.59
81.54
81.50
81.47
81.42
81.39
81.37
81.35
81.38
81.38
81.36
81.30
81.26
81.20
81.22
81.25
81.30
81.32
81.36
81.36
81.37
81.36
81.37
81.38
81.41
81.44
81.46
81.42
81.36
81.35
81.29
80.75
80.35
80.14
79.90
79.82
79.8479.
74
79.69 79.
99
80.51
80.92
81.15
81.58
81.55
81.55
81.56
81.55
81.57
81.55
81.53
81.54
81.58
81.6281.
5881.
59
81.75
81.58
81.48
81.51
81.41
81.47
81.73
81.74
81.74
81.72
81.69
81.66
81.75
81.75
81.65
81.64
81.39
81.34
81.27
81.25
81.33
81.2781.
31
81.35
81.39
81.40
81.42
81.44
81.44
81.47
81.37 81.
42
81.52
81.24
81.21
81.25
81.19
81.17
81.16
81.18
81.21
81.19
81.15
81.74
81.64
81.74
81.71
81.61
81.62
81.75
81.76
81.61
81.74
81.74
81.63
81.62
81.61
81.65
81.65
81.57
81.62
81.63
81.73
80.86P
80.86P
80.87P
P P
PP
80.36P
79.93P
79.84P
80.33P
79.95P
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
79.74
79.64
79.27
78.91
78.45
78.07
77.67
77.23
75.78
75.82
75.83
75.71
75.67
75.71
75.68
75.73
75.66
75.83
75.87
78.99
79.04
78.92
79.03
78.97
79.13
79.09
78.99
78.85
78.77
78.94
79.05
79.15
79.20
79.26
76.19
76.12
76.01
75.94
75.89
75.89
75.97
76.13
76.37
76.54
76.64
76.28
76.45
76.50
76.52
76.60
76.68
76.78
76.71
76.55
76.42
76.13
79.25
79.23
79.36
79.39
79.32
79.33 79.
4679.
5079.
5479.
56 79.61
79.63
79.66
79.73 79.
8179.
9179.
87
80.00 80.
07
80.09
82.27
82.15
82.13
81.95
81.86
81.81
81.50
80.38
80.86
81.51
81.43
81.1381.
01
80.95
80.69
80.73
80.84
80.82
80.76
80.50
80.44
80.63
80.73
80.77
81.01
81.36
81.72
81.81
81.84
82.03
80.12
80.19
80.43
80.34
80.18
80.04
80.0379.
86
79.64
79.76
80.01
80.32
80.37
80.17
79.91
79.89
79.82
79.5879.
25
78.96
78.87
78.69
78.71
78.88
78.84
79.05
79.23
79.39
79.34
79.49
79.79
80.38
80.69
80.70
80.65
80.42
78.2977.
83
77.47
77.20
77.12
76.05
77.08
77.01
76.47
81.07
80.91
80.83
80.77
80.74
80.92
80.95
80.95 81.
09
81.22
476300E
476320E
476320E
476340E
476360E
476380E
476400E
476420E
255120
N
255140
N
255140
N
255160
N
255160
N
81.40
80.90
80.40
79.90
81.55
81.78
SOFT PLAYFOOTBALL
PITCH
NEWHARDPLAYNETBALLCOURT
Existingrelocatedracetrack
Existing temporaryclassroom (to be removed
after works completed)
Existing temporaryclassrooms (to be removed
after works completed) Existing temporaryclassroom (to be removed
after works completed)
EXISTING MUGA
Existing ActivityArea
Existingvehicular ramp
New fence &vehicular gate
New fence &vehicular gates
NEW CAR
PARKING SPACES
Newpedestrian
ramp
Newsteps
EXISTINGBICYCLEPARKING
EXISTING CAR PARKINGEXISTING CAR PARKING
Main schoolentrance
Existing pedestrianentrance
Existingvehicularentrance
Existingpedestrianentrance
Existingfence &gate
Existing pedestrianentrance gate &footpath link widened
Existingvehicular gate
New pavingslabs
New fence &pedestrian gate
NEWRECEPTIONSOFT PLAY
NEWRECEPTIONCOVEREDEXTERNAL
PLAY
NEWRECEPTIONHARD PLAY
New fence &pedestrian gate
New powder coatedgalvanised steel verticalpale fencing at top ofgrass bank
Existingperimeterfencing
EXISTINGHARD PLAY
Existing grassbank
New tarmac
EXISTING SCHOOL
Existing vehiculargate
Existingbrick
building
Existingshed
Existingshed
Existingshed
Existing path
New powder coatedgalvanised steel verticalpale fencing at top ofgrass bank
81.40
HABITATAREA
S c h o o l L a n eTurning Circle
S p
r i n
g w
e l
l C
l o
s e
Turn
ing
Hea
d
FOOTPATH
FOOTPATH
FOOTPATH FOOTPATH
NEWSPRINKLER
TANK
PUMP
HOUSE
Retaining wall - height varies:150mm at ends,
approx 1200mm at centre
'Air Lock'
New pedestrian entrance gateoff of existing footpath
POND
Fenced wild life pond with timberboarded viewing platform withprotection rail
Gate
gate
(Tarmac)
Existing mounded area levelled
NEW EXTENSION Covered link roofover
1
2
3
4
5
6
7
EXISTING CAR PARKING
Existingshed
Existingshed
COURTYARD
COVERED
PLAY AREA
EXISTINGHARD PLAY
Sprinkler tank approx. 4m dia x 2m high(subject to confirmation) with retaining wallenclosure to set into embankment and2.4m high timber screen fence
REVISIONS DATE/DRAWN
KEYPLAN
PROJECT
DRAWING TITLE
DATE
SCALE
STATUS
JOB NO.
DRAWING NO.
DRAWN
CHECK
REVISION
THIS DRAWING IS COPYRIGHT. © ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK.GHM ROCK TOWNSEND TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS THIS DRAWING IS NOT TO BE SCALED.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS,CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OFTHE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM ROCK TOWNSEND SHALL BE NOTIFIED OFANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING
SETTING OUT - NOTE FOR CONTRACTOR
Wheatham
pstead Place, Wheatham
pstead, Hertfordshire
T: 01582 834233 F: 01582 832176A
L4 8SB
ww
w.ghm
-group.co.uk
a Division of the C
onsultancy Group
GH
M
GHMRock Townsend
@ A11 : 250
18/09/09 SPB
RX 2517
L00-011
PLANNING
WOODLAND VIEW SCHOOL
PROPOSED SITE PLAN
PROPOSED EXTENSION
North
0 m205 10 15
1:250
- SEE BELOW LEFT
L00-014
1a
L00-014 2a
L00-014
3a
L00-015
4a
L00-015
5a
70.1 m²reception classroom
001
66.7 m²reception classroom
002
63.2 m²
key stage 1classroom
003
63.2 m²
Key stage 1classroom
004
61.0 m²
multi purpose &music
005
99.5 m²small hall
006
10.0 m²reception store
014
97.7 m²
circulation andbreakout space
007
10.0 m²special store
011
16.5 m²plant
01014.2 m²boys wc
016
13.3 m²girls wc
015
3.5 m²shower
017
3.8 m²dwc
018
15.0 m²sm and group
009
3.9 m²cloaks
002a
1.5 m²cloaks
003a
1.5 m²cloaks
004a
10.0 m²multi store
013
8.5 m²hall store
012
1
L00-016
3
L00-016
L00-015
6a
4
L00-016
11.8 m²external store
019
2
L00-016
91.4 m²external covered play
020
2.0 m²clnr
21
-
-
1.3 m²storage
004b
1.3 m²storage
003b
roof canopy over
roof canopy over
roof canopy over
sprinklertank
pumphouse
retaining wall
retaining wall
exsistingschoolbuilding
REVISIONS DATE/DRAWN
KEYPLAN
PROJECT
DRAWING TITLE
DATE
SCALE
STATUS
JOB NO.
DRAWING NO.
DRAWN
CHECK
REVISION
THIS DRAWING IS COPYRIGHT. © ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK.GHM ROCK TOWNSEND TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS THIS DRAWING IS NOT TO BE SCALED.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS,CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OFTHE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM ROCK TOWNSEND SHALL BE NOTIFIED OFANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING
SETTING OUT - NOTE FOR CONTRACTOR
Wheatham
pstead Place, Wheatham
pstead, Hertfordshire
T: 01582 834233 F: 01582 832176A
L4 8SB
ww
w.ghm
-group.co.uk
a Division of the C
onsultancy Group
GH
M
GHMRock Townsend
@ A1 1 : 100
18/09/09 SPB
RX 2517
L00-012
PLANNING
WOODLAND VIEW SCHOOL
PROPOSED GROUND FLOOR
PLAN
PROPOSED EXTENSION
North
GIA: 655sqm
0 2 4 6 m
1:100
8
-
L00-014
1a
L00-014 2a
L00-014
3a
L00-015
4a
L00-015
5a
1
L00-016
3
L00-016
L00-015
6a
4
L00-016
2
L00-016
-
-
turretpassive
vent
rooflight
rooflight
rooflight
rooflight
rooflight
rooflight
REVISIONS DATE/DRAWN
KEYPLAN
PROJECT
DRAWING TITLE
DATE
SCALE
STATUS
JOB NO.
DRAWING NO.
DRAWN
CHECK
REVISION
THIS DRAWING IS COPYRIGHT. © ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK.GHM ROCK TOWNSEND TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS THIS DRAWING IS NOT TO BE SCALED.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS,CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OFTHE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM ROCK TOWNSEND SHALL BE NOTIFIED OFANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING
SETTING OUT - NOTE FOR CONTRACTOR
Wheatham
pstead Place, Wheatham
pstead, Hertfordshire
T: 01582 834233 F: 01582 832176A
L4 8SB
ww
w.ghm
-group.co.uk
a Division of the C
onsultancy Group
GH
M
GHMRock Townsend
@ A1 1 : 100
18/09/09 SPB
RX 2517
L00-013
PLANNING
WOODLAND VIEW SCHOOL
PROPOSED ROOF PLAN
PROPOSED EXTENSION
P1
P1 TURRET ROOF VENT ADDED 21.09.09 SPB
Level 0
0
Level 1
3600
Level 00
Level 13600
Level 0
0
Level 1
3600
REVISIONS DATE/DRAWN
KEYPLAN
PROJECT
DRAWING TITLE
DATE
SCALE
STATUS
JOB NO.
DRAWING NO.
DRAWN
CHECK
REVISION
THIS DRAWING IS COPYRIGHT. © ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK.GHM ROCK TOWNSEND TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS THIS DRAWING IS NOT TO BE SCALED.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS,CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OFTHE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM ROCK TOWNSEND SHALL BE NOTIFIED OFANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING
SETTING OUT - NOTE FOR CONTRACTOR
Wheatham
pstead Place, Wheatham
pstead, Hertfordshire
T: 01582 834233 F: 01582 832176A
L4 8SB
ww
w.ghm
-group.co.uk
a Division of the C
onsultancy Group
GH
M
GHMRock Townsend
@ A1 1 : 100
18/0909 SPB
RX 2517
L00-014
PLANNING
WOODLAND VIEW SCHOOL
PROPOSED ELEVATIONS
1a to 3a
PROPOSED EXTENSION
P1
1 : 100Elevation 1 - a1a
1 : 100Elevation 2 - a2a
1 : 100Elevation 3 - a3a
P1 TURRET ROOF VENT ADDED 21.09.09 SPB
Level 0
0
Level 1
3600
Level 0
0
Level 13600
Level 00
Level 13600
REVISIONS DATE/DRAWN
KEYPLAN
PROJECT
DRAWING TITLE
DATE
SCALE
STATUS
JOB NO.
DRAWING NO.
DRAWN
CHECK
REVISION
THIS DRAWING IS COPYRIGHT. © ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK.GHM ROCK TOWNSEND TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS THIS DRAWING IS NOT TO BE SCALED.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS,CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OFTHE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM ROCK TOWNSEND SHALL BE NOTIFIED OFANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING
SETTING OUT - NOTE FOR CONTRACTOR
Wheatham
pstead Place, Wheatham
pstead, Hertfordshire
T: 01582 834233 F: 01582 832176A
L4 8SB
ww
w.ghm
-group.co.uk
a Division of the C
onsultancy Group
GH
M
GHMRock Townsend
@ A1 1 : 100
18/0909 SPB
RX 2517
L00-015
PLANNING
WOODLAND VIEW SCHOOL
PROPOSED ELEVATIONS
4a to 6a
PROPOSED EXTENSION
P1
1 : 100Elevation 5 - a5a
1 : 100Elevation 6 - a6a
1 : 100Elevation 4 - a4a
P1 TURRET ROOF VENT ADDED 21.09.09 SPB
Level 0
0
Level 13600
circulation andbreakout space
Level 0
0
Level 1
3600
multi purpose &music small hall
Level 0
0
Level 13600
hall store special store boys wccirculation andbreakout space reception classroomdwc
Level 00
Level 1
3600
key stage 1classroom
circulation andbreakout space small hall
REVISIONS DATE/DRAWN
KEYPLAN
PROJECT
DRAWING TITLE
DATE
SCALE
STATUS
JOB NO.
DRAWING NO.
DRAWN
CHECK
REVISION
THIS DRAWING IS COPYRIGHT. © ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK.GHM ROCK TOWNSEND TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS THIS DRAWING IS NOT TO BE SCALED.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS,CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OFTHE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM ROCK TOWNSEND SHALL BE NOTIFIED OFANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING
SETTING OUT - NOTE FOR CONTRACTOR
Wheatham
pstead Place, Wheatham
pstead, Hertfordshire
T: 01582 834233 F: 01582 832176A
L4 8SB
ww
w.ghm
-group.co.uk
a Division of the C
onsultancy Group
GH
M
GHMRock Townsend
@ A1 1 : 100
18/09/09 SPB
RX 2517
L00-016
PLANNING
WOODLAND VIEW SCHOOL
PROPOSED SECTIONS
PROPOSED EXTENSION
P1
1 : 100Section 11
1 : 100Section 22
1 : 100Section 33
1 : 100Section 44
P1 TURRET ROOF VENT ADDED 21.09.09 SPB
P1 TURRET ROOF VENT ADDED 21.09.09 SPB
REVISIONS DATE/DRAWN
KEYPLAN
PROJECT
DRAWING TITLE
DATE
SCALE
STATUS
JOB NO.
DRAWING NO.
DRAWN
CHECK
REVISION
THIS DRAWING IS COPYRIGHT. © ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK.GHM ROCK TOWNSEND TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS THIS DRAWING IS NOT TO BE SCALED.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS,CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OFTHE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM ROCK TOWNSEND SHALL BE NOTIFIED OFANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING
SETTING OUT - NOTE FOR CONTRACTOR
Wheatham
pstead Place, W
heathampstead, H
ertfordshireT: 01582 834233 F: 01582 832176
AL4 8SB
ww
w.ghm
-group.co.uk
a Division of the C
onsultancy Group
GH
M
GHMRock Townsend
@ A1
18/09/09 SPB
RX 2517
L00-017
PLANNING
WOODLAND VIEW SCHOOL
PROPOSED 3D VIEWS
PROPOSED EXTENSION
P1
Multi-Purpose Space & Link to Existing School5
Classroom Block & Covered External Play3
Entrance1 Covered External Play2
Classroom Block4P1 TURRET ROOF VENT ADDED 21.09.09 SPB