+ All Categories
Home > Documents > N: x2517 Woodland ViewDrawingsL00-010 L00-010 (1) all cove rs at ba se o f ch amb er with filt er s...

N: x2517 Woodland ViewDrawingsL00-010 L00-010 (1) all cove rs at ba se o f ch amb er with filt er s...

Date post: 25-Mar-2018
Category:
Upload: voliem
View: 213 times
Download: 1 times
Share this document with a friend
8
DRAWING NO. STATUS JOB NO. SCALE DATE DRAWING TITLE PROJECT REVISION CHECK DRAWN DATE/DRAWN REVISION The Old School, Exton Street, London T: 020 7261 9577 F: 020 7261 1081 SE1 8UE www.ghm-group.co.uk a Division of the GHM Consultancy Group IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS, CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OF THE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM CONSULTANCY GROUP SHALL BE NOTIFIED OF ANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING SETTING OUT - NOTE FOR CONTRACTOR THIS DRAWING IS COPYRIGHT. ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK. GHM CONSULTANCY GROUP TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS. THIS DRAWING IS NOT TO BE SCALED. GHM CONSULTANCY GROUP CAN NOT BE HELD RESPONSIBLE FOR THE ACCURCY OF INFORMATION PRODUCED BY OTHERS FOR THE PURPOSES OF PRODUCING OUR DRAWINGS I.E. TOPOGRAPHICAL SURVEYS. AREA MEASUREMENTS ARE PROVIDED FOR INFORMATION ONLY. ANY VERIFICATION OF MEASUREMENTS SHOULD BE SOUGHT FROM A SUITABLY QUALIFIED SURVEYOR. GHM CONSULTANCY GROUP CAN NOT BE HELD RESPONSIBLE FOR THE ACCURACY OF COMPUTER SOFTWARE USED TO DETERMINE MEASUREMENTS. Woodland View Primary School Site Location Plan RX2517 L00-010 PLANNING 1:1250@a3 0 25 50 100 m 75 1:1250 North School site area: 1.44ha Application site area: 0.74ha
Transcript

DRAWING NO.

STATUS

JOB NO.

SCALE

DATE

DRAWING TITLE

PROJECT

REVISION

CHECK

DRAWN

DATE/DRAWNREVISION

The Old School,

Exton S

treet, London

T: 020 7261 9577 F: 020 7261 1081

SE1 8U

Ew

ww

.ghm-group.co.uk

a Division of the G

HM

Consultancy G

roup

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS,DIMENSIONS, CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TOCOMMENCEMENT OF THE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHMCONSULTANCY GROUP SHALL BENOTIFIED OF ANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARERECEIVED IN WRITING

SETTING OUT - NOTE FOR CONTRACTOR

THIS DRAWING IS COPYRIGHT. ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OFWORK. GHM CONSULTANCY GROUP TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS. THIS DRAWING IS NOT TOBE SCALED.

GHM CONSULTANCY GROUP CAN NOT BE HELD RESPONSIBLE FOR THE ACCURCY OF INFORMATION PRODUCEDBY OTHERS FOR THE PURPOSES OF PRODUCING OUR DRAWINGS I.E. TOPOGRAPHICAL SURVEYS. AREAMEASUREMENTS ARE PROVIDED FOR INFORMATION ONLY. ANY VERIFICATION OF MEASUREMENTS SHOULD BESOUGHT FROM A SUITABLY QUALIFIED SURVEYOR. GHM CONSULTANCY GROUP CAN NOT BE HELD RESPONSIBLEFOR THE ACCURACY OF COMPUTER SOFTWARE USED TO DETERMINE MEASUREMENTS.

Woodland View

Primary School

Site Location

Plan

RX2517

L00-010

PLANNING

1:1250@a3

0 25 50 100 m75

1:1250NorthSchool site area: 1.44ha

Application site area: 0.74ha

MH C

L 81.7

7

MH IL

80.73

Foul

RBC/

CB

All 100

mm di

a

Appro x

positio

n

of MH

, need

s

confine

d spac

e

entry

to lift

IC belo

w MH

B

A

X

MH C

L 79.0

0

SW/C

atch p

it

RCC

Base

level 7

7.54

Water

level 7

7.78

X 150m

m dia,

IL 77.

91

A 150m

m dia,

IL 78.

08

B 100

mm di

a, IL

78.41

X

B A

MH C

L 79.2

4

MH IL

76.19

Comb

ined?

CCC/

CB

X 375m

m dia

A 300m

m dia

B 150

mm di

a, IL

77.55

MH C

L 79.2

5

SWRC

C

Base

level 7

8.25

Water

level 7

8.61

A 100m

m dia,

IL 78.

54

B 100

mm di

a, IL

78.58

A

B

MH C

L 81.6

6

MH IL

80.59

SWRC

C/PB

All 150

mm di

a

MHC

CL 81.

64

MHC

IL 80.7

8

SWCP

C/PB

All 150

mm di

a

MH C

L 81.6

3

MH IL

80.43

Foul

RBC/

CB

X 150m

m dia

Rest 1

00mm

dia

X

MH C

L 81.4

0

MH IL

80.45

SWRC

C/CB

X,D 15

0mm

dia

A,B,C

100mm

dia

X

A BC

D

MH C

L 81.5

0

UTL, c

over ja

mmed

MH C

L 81.4

7

UTL, C

over ja

mmed

MH C

L 81.5

1

MH IL

80.19

Foul

RBC/

CB

All 100

mm di

a

MH C

L 81.6

2

MH IL

80.41

Foul

RBC/

CB

All 100

mm di

a

Sonic

connec

tion

Sonic

connec

tion

Sonic

connec

tion

MH C

L 81.4

8

MH IL

80.06

Comb

ined

RBC/

PB

All 150

mm di

a

AR

AR

AR

MH C

L 81.4

8

MH IL

79.82

SW?

RBC/

CB

All 150

mm di

a

4 No s

mall cov

ers

at bas

e of c

hamber

with filt

ers un

derneit

h ,

poss s

urface

water

purifica

tion fo

r re-u

se

MH C

L 80.1

6

MH IL

77.00

SW?

CCC/

CB

X 300m

m dia

A 225m

m dia

B 150

mm di

a

X

A

B

XA

B

C

MH C

L 81.3

5

MH IL

79.59

SWRB

C/CB

X,B 22

5mm

dia

A 100m

m dia

C 150

mm di

a

MH C

L 81.4

4

MH IL

79.81

SWRB

C/PB

All 150

mm di

a

MH C

L 81.4

5

MH IL

79.79

SWRB

C/CB

All 150

mm di

a

MH C

L 81.6

1

MH IL

80.86

Foul

RBC/

CB

All 100

mm di

a

MH C

L 81.6

1

MH IL

80.69

SWRB

C/CB

All 100

mm di

a

AR

AR

AR

X

A BCD

E FG

H

MH C

L 81.5

8

SW/C

atch p

it

RCC

Base

Level

79.89

Water

Level

80.20

X 150m

m dia,

IL 80.

23

A,B,C,D

100m

m dia

, DI'S

80.20

E 100m

m dia

, IL 80

.36

F 100m

m dia,

IL 80.

30

G 100m

m dia,

IL 80.

26

H 100

mm di

a

X Poss

overf l

ow pipe

AR

AR

AR

AR, so

nic

connec

tion

proven

,

poss C

CTV

require

d

Traced

with GP

R

Elec 0

.79d

BT 0.7

2d

S/L 0.

82d

S/L 0.

53d

S/L 0.

79d

S/L 0.

59d

AR

AR thro

ugh

vegeta

tion

AR

Elec 0

.65d

Elec 0

.83d

Water

AR

S/L 0.

72d

S/L 0.

34d

Gas an

d Wate

r

AR, m

entione

d

by s ite

mana

ge r

Faint

GPR tra

ce

at this

point

S/L 0.

74d

S/L 0.

45dS/L 0.

59d

S/L 0.

44d

Unable

to sur

vey th

is

area d

ue to

sports

equipm

ent, S

/L AR

Water

AR

Elec 0

.70d

Elec 0

.53d

R ising

main A

R

Rising

main A

R

Trench

scar

Assum

ed fou

l

gravity

dra in

,

poss r

ising m

ain

Water

AR

Uniden

tified t

race

found

with GP

R

EOT

EOT

Trench

scar v

isible

Trench

scar v

isible

assum

ed risi

ng main

mentio

ned by

site m

anager

End of

trench

scar

Trench

scar

Assum

ed fou

l

gravity

dra in

,

poss r

ising m

ain

AR

AR

AR

AR

AR

AR

BT TFR

Blackto

p

Blackto

p

Blackto

p

Blackto

pBla

cktop

Blackto

p

Blackto

p

Blackto

p

Blackto

p

Blackto

p

Blackto

p

Blackto

p

Blackto

p

Blackto

p

Blackto

p

Blackto

p

Blackto

p

Blackto

p

Setts

Setts

SettsSet

ts

Setts

Setts

Gravel

Gravel

Slabs

Gravel

Gravel

Gravel

Gravel

Gravel

Gravel

Gravel

Gravel

Gravel

Gravel

Gravel

Gravel

Gravel

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

GrassGra

ssGra

ss

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Flower

Bed

Flower

Bed

Flower

Bed

Flower

Bed

Flower

Bed

Flower

Bed

Flower

Bed

Flower

Bed

Flower Bed

Flower

Bed

Vegeta

tion

Ht 1.2

m

Vegeta

tion

Ht 1.2

m

Vegeta

tion

Ht 1.2

m

Hedge

Ht 1.2

m

Hedge

Ht 1.2

m

Vegeta

tion

Ht 1.2

m

Vegeta

tion

Ht 1.2

m

Plante

r

Planter

Planter

Planter

Flower

Bed

I/R Ht 1

.2M

I/R Ht 1.2M

I/R H

t 1.2M

I/R Ht 1.2M

W/M Ht 2.0M

W/M Ht 2.0M

W/M Ht 2.0M

W/M Ht 2.0M

W/M Ht 2.0M

W/M Ht

2.0M

W/M Ht

2.0M

W/M Ht

2.0M

W/M Ht 2.0

M

W/M Ht 2.0M

W/M Ht 2.0M

W/M Ht 2.0M

W/M Ht 2.0M

W/M Ht

2.0M

W/M Ht 2.0M

W/M Ht 2.0M

W/M Ht 3.5M

W/M Ht 3.5M

W/M Ht 3.5M

W/M Ht 3.5M

W/M Ht 3.5M

W/M Ht 3.5M

Slabs

W/M Ht 2.0MW/M Ht 2.0M

W/M Ht

2.0M

H/M Ht

1.8M

W/M Ht 2.0M

Bike Rack

Bike Rack

Bike R

ack

Bike

Bike Rack

Bike Rack

Rack

Bike

Rack

Flower Bed

Flower Bed

Activity Area

Activity Area

Vegeta

tion

Vegeta

tion

Vegeta

tionVeg

etation Veg

etation

H/M H

t 2.0M

H/M H

t 2.0M

Shed

Shed

Shed

Shed

Shed

Mobile

Class

room

Mobile

Class

room

Mobile

Class

room

Col

Col

H/M Ht 0.6M

H/M Ht 0.6M

Slabs

Concr

ete

Concr

ete

R/W

Hand R

ail

Hand R

ail

Hand R

ailHand R

ail

Hand R

ailHan

d Rail

Hand R

ail

Hand R

ail

Hand R

ail

Hand R

ail

Slabs

Slabs

Slabs

Slabs

Concrete

B lackto

p

Slabs

Slabs

Slabs

Slabs

Slabs

Box

Box

Box

Ramp

Ramp

RampRamp

Brick

Buildin

g

Rough

Ground

Astro

Turf

Astro

Turf

Astro

Turf

Astro

Turf

Astro

Turf

Astro

Turf

B lackto

p

Blackto

p

Flower

Bed

Flower

Bed

Flower

Bed

Flower

Bed

Flower

Bed

Grass

Grass

BNH

BNH

BNH

BNH

BNH

BNH

BNH

BNH

BNH

BNH

BNH

BNH

BNH

BNH

81.57STN/01

79.00STN/02

77.49STN/03

82.40STN/05

83.26STN/06

81.60STN/07

83.02STN/08

81.70STN/09

81.44STN/10

81.26STN/11

79.54STN/12

79.33STN/13

81.70STN/14

81.63STN/15

80.14

80.13

80.27

80.26

79.5379.

7379.9179.93

79.92

79.92

79.70

79.3179.

5979.

88

79.89

79.89 79.

61

SV

79.95

79.93

79.83

79.83

RE

RE

81.83

81.89

81.90

81.79

82.24

81.32

81.38

81.34

81.31

81.26

81.23

81.17

81.16

81.30

81.1481.

03

80.61

80.18

79.89

79.94

79.97

79.97

80.05

80.08

80.76

80.99

81.07

80.9480.

81

80.60

80.26

80.02

79.97

80.00 80.

01

80.05

80.22

80.32

80.57

79.74

79.83

79.8079.

78

81.60

81.73

82.12

82.76

81.76

81.75

82.83

81.84

81.74

81.71

81.60

81.57

81.61

81.65

81.71

81.26

81.37

79.4979.

46

81.64

79.2379.

19

79.20

81.89

81.85

81.8081.

83

81.81

81.80

79.81

79.79

79.46

79.47

79.48

79.59

79.64

79.82

79.40

79.34

79.27

79.6679.

6079.5679.

5279.4879.

4379.3879.

33

79.31 79.

3679.

4079.

46 79.50

79.55

79.60

79.66

79.6579.

5979.5579.

4979.4479.

4079.3579.

30

79.29

79.34

79.39

79.45

79.50

79.57

79.62

79.62

79.5579.

5079.

45

79.4079.

3779.34

79.26

76.41

76.87

77.01

76.70

76.44

76.50

76.18

76.31

76.53

76.65

76.94

77.20

77.43

77.30

77.33

77.05

76.84

76.67

76.62

76.89

77.10

77.04

77.01

77.10

76.83

76.92

77.03

77.11

76.94

77.09

76.98

76.77

76.52

76.24

75.87

81.70

81.77

81.74

81.79

81.84

81.82

81.84

81.45

81.52

81.56

81.53

81.49

81.49

81.46

81.46

81.44

81.42

81.45

81.47

81.52

81.54

81.48

81.45

81.39

81.32

81.37

81.44

81.46

81.53

81.54

81.48

81.43

81.36

81.31

81.26

81.25

81.31

81.36

81.42

81.46

81.54

81.53

81.46

81.41

81.39

81.34

81.28

80.02

79.92

79.88

79.88

79.88

79.84

79.80

79.8179.

74

79.77

79.75

79.78

79.80

79.82

79.88

79.84

79.83

79.82

79.79

79.74

79.77

79.73

79.67

79.61

79.69

79.73

79.76

79.77

79.79

79.83

79.86

79.80

79.80

79.79

79.74

79.70

79.69

79.61

79.56

79.51

79.54

79.58

79.61

79.66

79.75

79.77

79.7179.

67

79.71

79.72

79.63

79.57

79.54

79.50

79.4979.

43

79.46

79.50

79.51

79.54

79.62

79.63

79.59

79.59

79.54

79.51

79.46

79.45

79.41

79.37

79.32

79.36

79.40

79.47

79.48

79.51

79.54

79.5379.

48

79.53

79.52

79.52

79.45

79.37

79.30

79.31

79.23

79.26

79.28

79.33

79.40

79.45

79.41

79.38

79.29

79.29

79.00

79.06

78.94 79.

21 79.41

81.44

81.45

81.46

81.49 81.

46

81.52

81.63

81.81

81.86

81.93

81.97

82.12

82.26

82.36

82.37

82.35

82.22

81.98

81.77

81.77

81.68

81.69

81.63

81.70

81.65

81.60

81.58

81.58

81.60

81.57

81.52

81.49

81.39

81.39

81.37

81.37

81.28

81.40

81.37

81.44

81.46

81.49

81.51

81.54

81.52

81.72

GP

GP

GP

GP

GPGP

GPGP

GP

GP

GP

GP

GP

GPGP

GP

GP

GP

GPGP

GP

GP

GP

GPGP

GPGP

GP

GP

GP

GP

GP

GP

GP

79.79

79.93

80.18

80.57 80.

9281.

14

81.31

81.34

81.34

79.73

79.70

79.69

79.69

79.67

79.67

79.66

79.67

79.63

79.6079.

5979.

56

79.5479.

48

79.54

79.4679.

4279.37

79.39

79.34

79.31

79.31

79.2779.

24

79.26

79.27

79.28

79.28

79.31

79.32

79.34

79.40

79.40

79.41

79.45

79.45

79.50

79.54

79.59

79.62

79.62

79.65

79.66

79.69

79.72

79.02

78.82

78.00

77.54

77.44

77.32

77.15

76.88

76.76

76.47

76.27

76.05

75.86

75.88

75.78

75.78

75.74

75.91

75.90

75.98

76.05

76.09

76.16

76.35

76.55

76.75

76.87

77.09

77.00

76.99

77.02

77.07

77.09

77.11

77.27

77.71

77.93

78.37

78.77

79.08

79.40

79.69

79.96

80.25

80.61

80.90

81.24

81.41

81.61

81.73

82.04

82.23

82.77

82.85

82.04

82.27

82.42

82.88

82.96

83.03

83.06

83.08

83.04

82.36

82.35

82.51

83.07

83.08

83.01

82.89

82.85

82.83

82.80

82.87

82.78

82.68

82.62

81.68

81.84

82.33

80.36

81.16

81.24

81.43

SaplingSap

ling

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

SaplingSap

lingSap

lingSap

lingSaplingSap

lingSap

lingSapling

Sapling

Sapling

Sapling

SaplingSap

ling

Sapling

Sapling

Sapling

TE/01

TE/02

TE/03

TE/04

TE/05

TE/06

TE/07

TE/08

81.63

81.57

81.54

82.56

82.33

82.41

82.99

82.85

81.71

81.72

81.61

81.63 81.62

81.6481.62

81.67

81.70

81.73

81.68

COL

COL

RWP

RWP

RWP RW

P

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

RWP

81.46

81.6581.60

81.58

81.60

81.61

81.64

81.76

81.75

81.71

81.78

81.77

81.58

81.72

81.71

81.57

81.72

81.61

81.63

81.61

81.53

81.55

79.77

79.6979.

3579.

27

81.65

81.66

81.69

81.58

81.59

81.77

81.52

80.19

79.60

79.50

79.51

79.49

79.51

79.52

79.48

79.21

79.03

79.16

81.67

81.52

81.68

81.46

81.62

RSRS

RS RS

81.54

81.49

81.56

81.54

81.57

81.57

81.58

81.61

81.61

81.71

81.21

81.38

81.29

81.2581.

22

81.15

81.17

81.07

80.97

80.77

80.42

79.21

79.20

79.19

79.21

79.20

79.20

79.17

79.14

79.07

79.17

79.14

79.80

80.41

81.19

81.30

79.79

81.11

81.66

81.62

81.61

81.58

81.62

81.56

VP

81.40MH

81.48MH

81.47MH

81.48MH

81.64MHC

81.63MH

79.60MH

79.56MH

79.09MH

77.03MH

79.00MH

81.77MH

81.66MH

80.16MH

81.48MH

81.60MH

81.58MH

81.44MH

81.62MH

81.51MH

81.45MH

81.35MH

79.25MH

79.24MH

81.61MH

81.61MH

81.49

81.24

81.50

81.52

81.53

81.54

81.58

81.53 81.

57

81.94

81.47

81.46

81.42

81.73

81.77

81.82

81.85

81.90

81.94

81.54

81.55

81.93

81.4781.

49

81.46SGY

81.48G

81.39G

81.29G

SGY

79.52

SGY

79.52

78.25

SGY

78.24

81.60G

81.70G

81.59G

81.58G

SGY

SGY

SGY

G

SGY

SGY

81.49

81.51

81.43

81.42

81.44

81.45

81.46

81.49

81.53

81.66

81.69

81.67

81.67

81.67

81.67

81.64

81.6381.

63

81.67

81.76

81.76

81.73

81.60

81.55

81.50

81.51

81.45

81.45

81.47

81.50 81.

4881.

47 81.48

81.59

81.61

81.59

81.61

81.45

79.65

79.6279.

6379.

62

79.62

79.61

79.60

79.61 79.

62

79.59

81.48

81.48

81.51

81.36

81.39

81.41 Drop Ke

rb

81.46

81.46

81.28

81.28

81.21

81.44

81.45

Drop Kerb

Drop Kerb

81.80

79.47 79.8979.

4979.90

79.30

79.85

79.31

80.25

79.66

80.26

82.05

82.10

82.01

81.95

81.87

81.78

81.84

81.88

81.47

81.5081.

49

81.48

79.56

79.55

79.25

81.61

81.96

81.91

81.59

81.76

81.31

81.20

81.02

80.59

80.00

79.97

79.95

79.90

79.86

79.82

79.8479.

87

79.81

79.84

79.88

79.93

79.97

79.98

80.09

80.40

80.90

81.19 81.

26

81.36

79.73

79.50

79.50

79.56 79.

6479.

67

79.69

79.7179.

6679.58

79.53

79.58

79.66 79.53

79.52

79.51

79.52

79.55

79.48

79.41

79.28

79.26

79.25

79.26

79.29

79.29

79.34

79.37 79.

4479.

52

81.62

81.78

81.90

81.81

81.82

81.82

81.85

81.95

81.96

82.08

82.21

82.08

82.16

82.24

82.30

82.39

82.38

82.28

82.06

81.87

81.64

81.55

81.61

81.6181.

63

81.67

81.61

81.64

81.63

81.69

81.56 81.

6081.

6681.

71

81.76

81.81

81.75

81.70

81.70

81.65

81.6581.

6181.

59

81.57

82.52

82.17

81.80

81.72

81.70

82.15

82.47

82.49

82.45

82.52

82.54

82.67

82.75

82.32

82.18

82.02

81.86

81.64

81.39

81.11

80.90

80.63

80.33

80.10

79.98

79.67

79.57

79.20

78.88

78.59

78.20

77.84

77.56

77.29

77.01 77.

42

77.82

78.21

78.58

78.91

79.33

79.56

79.87

80.18

80.51

80.83

81.17

81.45

81.73

82.13

82.20

82.36

82.46

83.00

83.20

83.26

83.28

83.27

83.27

83.25

83.14

83.00

82.88

83.13

82.40 83.

10

83.16

83.21

83.23

83.22

83.26

83.20

83.26

83.29

83.24

83.26

83.27

83.24

83.21

83.17

83.17

83.16

83.05

83.02

83.00 83.

13

83.09

82.92

82.98

82.94

82.93

82.87

82.78

82.69

82.72

82.80

82.88

82.88

82.90

82.95

82.99

83.05

83.09

83.10

82.33

82.05

Kerb

Kerb

Kerb

Kerb

81.61

81.60

81.61

81.59

81.36

81.21

80.96

80.78

80.62

80.44

80.26

80.09

79.93

79.75

79.65

79.66

80.03 80.

00 80.19 80.

35 80.51

80.65 80.

77

80.96

81.16

81.40

81.51

81.51

81.51

81.53

81.51

78.47

78.69

78.83

78.93

79.03

79.13

79.22

79.29

79.38

79.44 79.

59

79.59

79.44

79.4479.

3079.23

79.1479.

0578.9578.

8578.

6878.42

78.07

78.12

78.11

77.93

77.72

77.53

77.38

77.26

77.22

77.37

77.57

77.88

77.87

81.76

81.72

81.73

81.65

81.66

81.72

81.93

81.94

81.83

81.72

81.63

81.63

81.74

81.70

81.70

81.72

81.70

81.74

81.77

81.72

81.88

82.02

81.6481.71

81.72

81.65

81.59

81.6581.70

81.63

81.5781.

57

82.01

82.01

82.01

82.01

82.25

81.82

81.59

81.59

81.54

81.50

81.47

81.42

81.39

81.37

81.35

81.38

81.38

81.36

81.30

81.26

81.20

81.22

81.25

81.30

81.32

81.36

81.36

81.37

81.36

81.37

81.38

81.41

81.44

81.46

81.42

81.36

81.35

81.29

80.75

80.35

80.14

79.90

79.82

79.8479.

74

79.69 79.

99

80.51

80.92

81.15

81.58

81.55

81.55

81.56

81.55

81.57

81.55

81.53

81.54

81.58

81.6281.

5881.

59

81.75

81.58

81.48

81.51

81.41

81.47

81.73

81.74

81.74

81.72

81.69

81.66

81.75

81.75

81.65

81.64

81.39

81.34

81.27

81.25

81.33

81.2781.

31

81.35

81.39

81.40

81.42

81.44

81.44

81.47

81.37 81.

42

81.52

81.24

81.21

81.25

81.19

81.17

81.16

81.18

81.21

81.19

81.15

81.74

81.64

81.74

81.71

81.61

81.62

81.75

81.76

81.61

81.74

81.74

81.63

81.62

81.61

81.65

81.65

81.57

81.62

81.63

81.73

80.86P

80.86P

80.87P

P P

PP

80.36P

79.93P

79.84P

80.33P

79.95P

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

79.74

79.64

79.27

78.91

78.45

78.07

77.67

77.23

75.78

75.82

75.83

75.71

75.67

75.71

75.68

75.73

75.66

75.83

75.87

78.99

79.04

78.92

79.03

78.97

79.13

79.09

78.99

78.85

78.77

78.94

79.05

79.15

79.20

79.26

76.19

76.12

76.01

75.94

75.89

75.89

75.97

76.13

76.37

76.54

76.64

76.28

76.45

76.50

76.52

76.60

76.68

76.78

76.71

76.55

76.42

76.13

79.25

79.23

79.36

79.39

79.32

79.33 79.

4679.

5079.

5479.

56 79.61

79.63

79.66

79.73 79.

8179.

9179.

87

80.00 80.

07

80.09

82.27

82.15

82.13

81.95

81.86

81.81

81.50

80.38

80.86

81.51

81.43

81.1381.

01

80.95

80.69

80.73

80.84

80.82

80.76

80.50

80.44

80.63

80.73

80.77

81.01

81.36

81.72

81.81

81.84

82.03

80.12

80.19

80.43

80.34

80.18

80.04

80.0379.

86

79.64

79.76

80.01

80.32

80.37

80.17

79.91

79.89

79.82

79.5879.

25

78.96

78.87

78.69

78.71

78.88

78.84

79.05

79.23

79.39

79.34

79.49

79.79

80.38

80.69

80.70

80.65

80.42

78.2977.

83

77.47

77.20

77.12

76.05

77.08

77.01

76.47

81.07

80.91

80.83

80.77

80.74

80.92

80.95

80.95 81.

09

81.22

476300E

476320E

476320E

476340E

476360E

476380E

476400E

476420E

255120

N

255140

N

255140

N

255160

N

255160

N

81.40

80.90

80.40

79.90

81.55

81.78

SOFT PLAYFOOTBALL

PITCH

NEWHARDPLAYNETBALLCOURT

Existingrelocatedracetrack

Existing temporaryclassroom (to be removed

after works completed)

Existing temporaryclassrooms (to be removed

after works completed) Existing temporaryclassroom (to be removed

after works completed)

EXISTING MUGA

Existing ActivityArea

Existingvehicular ramp

New fence &vehicular gate

New fence &vehicular gates

NEW CAR

PARKING SPACES

Newpedestrian

ramp

Newsteps

EXISTINGBICYCLEPARKING

EXISTING CAR PARKINGEXISTING CAR PARKING

Main schoolentrance

Existing pedestrianentrance

Existingvehicularentrance

Existingpedestrianentrance

Existingfence &gate

Existing pedestrianentrance gate &footpath link widened

Existingvehicular gate

New pavingslabs

New fence &pedestrian gate

NEWRECEPTIONSOFT PLAY

NEWRECEPTIONCOVEREDEXTERNAL

PLAY

NEWRECEPTIONHARD PLAY

New fence &pedestrian gate

New powder coatedgalvanised steel verticalpale fencing at top ofgrass bank

Existingperimeterfencing

EXISTINGHARD PLAY

Existing grassbank

New tarmac

EXISTING SCHOOL

Existing vehiculargate

Existingbrick

building

Existingshed

Existingshed

Existingshed

Existing path

New powder coatedgalvanised steel verticalpale fencing at top ofgrass bank

81.40

HABITATAREA

S c h o o l L a n eTurning Circle

S p

r i n

g w

e l

l C

l o

s e

Turn

ing

Hea

d

FOOTPATH

FOOTPATH

FOOTPATH FOOTPATH

NEWSPRINKLER

TANK

PUMP

HOUSE

Retaining wall - height varies:150mm at ends,

approx 1200mm at centre

'Air Lock'

New pedestrian entrance gateoff of existing footpath

POND

Fenced wild life pond with timberboarded viewing platform withprotection rail

Gate

gate

(Tarmac)

Existing mounded area levelled

NEW EXTENSION Covered link roofover

1

2

3

4

5

6

7

EXISTING CAR PARKING

Existingshed

Existingshed

COURTYARD

COVERED

PLAY AREA

EXISTINGHARD PLAY

Sprinkler tank approx. 4m dia x 2m high(subject to confirmation) with retaining wallenclosure to set into embankment and2.4m high timber screen fence

REVISIONS DATE/DRAWN

KEYPLAN

PROJECT

DRAWING TITLE

DATE

SCALE

STATUS

JOB NO.

DRAWING NO.

DRAWN

CHECK

REVISION

THIS DRAWING IS COPYRIGHT. © ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK.GHM ROCK TOWNSEND TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS THIS DRAWING IS NOT TO BE SCALED.

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS,CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OFTHE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM ROCK TOWNSEND SHALL BE NOTIFIED OFANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING

SETTING OUT - NOTE FOR CONTRACTOR

Wheatham

pstead Place, Wheatham

pstead, Hertfordshire

T: 01582 834233 F: 01582 832176A

L4 8SB

ww

w.ghm

-group.co.uk

a Division of the C

onsultancy Group

GH

M

GHMRock Townsend

@ A11 : 250

18/09/09 SPB

RX 2517

L00-011

PLANNING

WOODLAND VIEW SCHOOL

PROPOSED SITE PLAN

PROPOSED EXTENSION

North

0 m205 10 15

1:250

- SEE BELOW LEFT

L00-014

1a

L00-014 2a

L00-014

3a

L00-015

4a

L00-015

5a

70.1 m²reception classroom

001

66.7 m²reception classroom

002

63.2 m²

key stage 1classroom

003

63.2 m²

Key stage 1classroom

004

61.0 m²

multi purpose &music

005

99.5 m²small hall

006

10.0 m²reception store

014

97.7 m²

circulation andbreakout space

007

10.0 m²special store

011

16.5 m²plant

01014.2 m²boys wc

016

13.3 m²girls wc

015

3.5 m²shower

017

3.8 m²dwc

018

15.0 m²sm and group

009

3.9 m²cloaks

002a

1.5 m²cloaks

003a

1.5 m²cloaks

004a

10.0 m²multi store

013

8.5 m²hall store

012

1

L00-016

3

L00-016

L00-015

6a

4

L00-016

11.8 m²external store

019

2

L00-016

91.4 m²external covered play

020

2.0 m²clnr

21

-

-

1.3 m²storage

004b

1.3 m²storage

003b

roof canopy over

roof canopy over

roof canopy over

sprinklertank

pumphouse

retaining wall

retaining wall

exsistingschoolbuilding

REVISIONS DATE/DRAWN

KEYPLAN

PROJECT

DRAWING TITLE

DATE

SCALE

STATUS

JOB NO.

DRAWING NO.

DRAWN

CHECK

REVISION

THIS DRAWING IS COPYRIGHT. © ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK.GHM ROCK TOWNSEND TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS THIS DRAWING IS NOT TO BE SCALED.

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS,CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OFTHE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM ROCK TOWNSEND SHALL BE NOTIFIED OFANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING

SETTING OUT - NOTE FOR CONTRACTOR

Wheatham

pstead Place, Wheatham

pstead, Hertfordshire

T: 01582 834233 F: 01582 832176A

L4 8SB

ww

w.ghm

-group.co.uk

a Division of the C

onsultancy Group

GH

M

GHMRock Townsend

@ A1 1 : 100

18/09/09 SPB

RX 2517

L00-012

PLANNING

WOODLAND VIEW SCHOOL

PROPOSED GROUND FLOOR

PLAN

PROPOSED EXTENSION

North

GIA: 655sqm

0 2 4 6 m

1:100

8

-

L00-014

1a

L00-014 2a

L00-014

3a

L00-015

4a

L00-015

5a

1

L00-016

3

L00-016

L00-015

6a

4

L00-016

2

L00-016

-

-

turretpassive

vent

rooflight

rooflight

rooflight

rooflight

rooflight

rooflight

REVISIONS DATE/DRAWN

KEYPLAN

PROJECT

DRAWING TITLE

DATE

SCALE

STATUS

JOB NO.

DRAWING NO.

DRAWN

CHECK

REVISION

THIS DRAWING IS COPYRIGHT. © ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK.GHM ROCK TOWNSEND TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS THIS DRAWING IS NOT TO BE SCALED.

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS,CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OFTHE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM ROCK TOWNSEND SHALL BE NOTIFIED OFANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING

SETTING OUT - NOTE FOR CONTRACTOR

Wheatham

pstead Place, Wheatham

pstead, Hertfordshire

T: 01582 834233 F: 01582 832176A

L4 8SB

ww

w.ghm

-group.co.uk

a Division of the C

onsultancy Group

GH

M

GHMRock Townsend

@ A1 1 : 100

18/09/09 SPB

RX 2517

L00-013

PLANNING

WOODLAND VIEW SCHOOL

PROPOSED ROOF PLAN

PROPOSED EXTENSION

P1

P1 TURRET ROOF VENT ADDED 21.09.09 SPB

Level 0

0

Level 1

3600

Level 00

Level 13600

Level 0

0

Level 1

3600

REVISIONS DATE/DRAWN

KEYPLAN

PROJECT

DRAWING TITLE

DATE

SCALE

STATUS

JOB NO.

DRAWING NO.

DRAWN

CHECK

REVISION

THIS DRAWING IS COPYRIGHT. © ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK.GHM ROCK TOWNSEND TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS THIS DRAWING IS NOT TO BE SCALED.

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS,CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OFTHE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM ROCK TOWNSEND SHALL BE NOTIFIED OFANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING

SETTING OUT - NOTE FOR CONTRACTOR

Wheatham

pstead Place, Wheatham

pstead, Hertfordshire

T: 01582 834233 F: 01582 832176A

L4 8SB

ww

w.ghm

-group.co.uk

a Division of the C

onsultancy Group

GH

M

GHMRock Townsend

@ A1 1 : 100

18/0909 SPB

RX 2517

L00-014

PLANNING

WOODLAND VIEW SCHOOL

PROPOSED ELEVATIONS

1a to 3a

PROPOSED EXTENSION

P1

1 : 100Elevation 1 - a1a

1 : 100Elevation 2 - a2a

1 : 100Elevation 3 - a3a

P1 TURRET ROOF VENT ADDED 21.09.09 SPB

Level 0

0

Level 1

3600

Level 0

0

Level 13600

Level 00

Level 13600

REVISIONS DATE/DRAWN

KEYPLAN

PROJECT

DRAWING TITLE

DATE

SCALE

STATUS

JOB NO.

DRAWING NO.

DRAWN

CHECK

REVISION

THIS DRAWING IS COPYRIGHT. © ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK.GHM ROCK TOWNSEND TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS THIS DRAWING IS NOT TO BE SCALED.

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS,CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OFTHE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM ROCK TOWNSEND SHALL BE NOTIFIED OFANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING

SETTING OUT - NOTE FOR CONTRACTOR

Wheatham

pstead Place, Wheatham

pstead, Hertfordshire

T: 01582 834233 F: 01582 832176A

L4 8SB

ww

w.ghm

-group.co.uk

a Division of the C

onsultancy Group

GH

M

GHMRock Townsend

@ A1 1 : 100

18/0909 SPB

RX 2517

L00-015

PLANNING

WOODLAND VIEW SCHOOL

PROPOSED ELEVATIONS

4a to 6a

PROPOSED EXTENSION

P1

1 : 100Elevation 5 - a5a

1 : 100Elevation 6 - a6a

1 : 100Elevation 4 - a4a

P1 TURRET ROOF VENT ADDED 21.09.09 SPB

Level 0

0

Level 13600

circulation andbreakout space

Level 0

0

Level 1

3600

multi purpose &music small hall

Level 0

0

Level 13600

hall store special store boys wccirculation andbreakout space reception classroomdwc

Level 00

Level 1

3600

key stage 1classroom

circulation andbreakout space small hall

REVISIONS DATE/DRAWN

KEYPLAN

PROJECT

DRAWING TITLE

DATE

SCALE

STATUS

JOB NO.

DRAWING NO.

DRAWN

CHECK

REVISION

THIS DRAWING IS COPYRIGHT. © ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK.GHM ROCK TOWNSEND TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS THIS DRAWING IS NOT TO BE SCALED.

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS,CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OFTHE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM ROCK TOWNSEND SHALL BE NOTIFIED OFANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING

SETTING OUT - NOTE FOR CONTRACTOR

Wheatham

pstead Place, Wheatham

pstead, Hertfordshire

T: 01582 834233 F: 01582 832176A

L4 8SB

ww

w.ghm

-group.co.uk

a Division of the C

onsultancy Group

GH

M

GHMRock Townsend

@ A1 1 : 100

18/09/09 SPB

RX 2517

L00-016

PLANNING

WOODLAND VIEW SCHOOL

PROPOSED SECTIONS

PROPOSED EXTENSION

P1

1 : 100Section 11

1 : 100Section 22

1 : 100Section 33

1 : 100Section 44

P1 TURRET ROOF VENT ADDED 21.09.09 SPB

P1 TURRET ROOF VENT ADDED 21.09.09 SPB

REVISIONS DATE/DRAWN

KEYPLAN

PROJECT

DRAWING TITLE

DATE

SCALE

STATUS

JOB NO.

DRAWING NO.

DRAWN

CHECK

REVISION

THIS DRAWING IS COPYRIGHT. © ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO COMMENCEMENT OF WORK.GHM ROCK TOWNSEND TO BE NOTIFIED OF ANY OMISSIONS OR ERRORS THIS DRAWING IS NOT TO BE SCALED.

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK ALL SETTING OUT INFORMATION (LEVELS, DIMENSIONS,CO-ORDINATES, ETC) INDICATED ON THIS DRAWING FOR THE WHOLE OF THE WORKS PRIOR TO COMMENCEMENT OFTHE WORKS AND RECORD THE RESULTS ON A COPY OF THIS DRAWING. GHM ROCK TOWNSEND SHALL BE NOTIFIED OFANY DISCREPANCIES AND NO WORK SHALL BE COMMENCED UNTIL FURTHER INSTRUCTIONS ARE RECEIVED IN WRITING

SETTING OUT - NOTE FOR CONTRACTOR

Wheatham

pstead Place, W

heathampstead, H

ertfordshireT: 01582 834233 F: 01582 832176

AL4 8SB

ww

w.ghm

-group.co.uk

a Division of the C

onsultancy Group

GH

M

GHMRock Townsend

@ A1

18/09/09 SPB

RX 2517

L00-017

PLANNING

WOODLAND VIEW SCHOOL

PROPOSED 3D VIEWS

PROPOSED EXTENSION

P1

Multi-Purpose Space & Link to Existing School5

Classroom Block & Covered External Play3

Entrance1 Covered External Play2

Classroom Block4P1 TURRET ROOF VENT ADDED 21.09.09 SPB


Recommended