M A Th Ca Co Re N5 Provision calming i Mallaran Mayo County ras an Chont he Mall astlebar o. Mayo ev. 0 COMHA PA 59 MULRA n of footpa in the villa nny and M W y Council tae AIRLE CON ART 8 PLA ANNY FO (MO/11 Partic aths, pede age of Mu Murrevagh West, Cou NTAE MHA ANNING OOTPATH 1/4249) culars estrian cro ulranny in h, in the D nty Mayo Mayo Nat AIGH EO G HS SCHEM ossings an n the town D.E.D. of N o. tional Roads F ME nd traffic nlands of Newport s Design Offi February 20 ce 13
Transcript

   

   

    

    

    

 

 

 

 

 

 

  

  

   

 

 MAThCaCo   Re

N5

Provisioncalming iMallaran

Mayo Countyras an Chonthe Mall astlebar o. Mayo

ev. 0   

COMHA

PA59 MULRA

n of footpain the villanny and M

W

y Council tae 

 

 

AIRLE CON

ART 8 PLAANNY FO

(MO/11

Partic

aths, pedeage of MuMurrevaghWest, Cou

 

         

NTAE MHA

ANNINGOOTPATH

1/4249) 

culars 

estrian croulranny inh, in the Dnty Mayo

    Mayo Nat

   

AIGH EO 

G –  HS SCHEM

ossings ann the townD.E.D. of No. 

tional Roads

         F

ME 

 

nd traffic nlands of Newport 

s Design Offi

February 20

ce

13

 

 

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

1  

PARTICULARS 

Table of Contents 

1 INTRODUCTION ............................................................................................................................................................. 3 

1.1 PROPOSED DEVELOPMENT ............................................................................................................................................. 3 

1.2 BENEFITS OF THE PROPOSED DEVELOPMENT ................................................................................................................. 3 

Creation of Employment & Accessibility / Tourism .......................................................................................................... 3 

Road Safety ...................................................................................................................................................................... 3 

Public Transport ............................................................................................................................................................... 4 

1.3 PLANNING AND DEVELOPMENT REGULATIONS .............................................................................................................. 4 

2 DESCRIPTION OF SCHEME .............................................................................................................................................. 5 

2.1 ROAD / FOOTPATHS ........................................................................................................................................................ 5 

2.2 JUNCTIONS ...................................................................................................................................................................... 5 

2.3 TRAFFIC CALMING ........................................................................................................................................................... 5 

2.4 GREAT WESTERN GREENWAY / CYCLEWAYS ................................................................................................................... 5 

2.5 PEDESTRIAN CROSSINGS ................................................................................................................................................. 6 

2.6 RETAINING WALLS ........................................................................................................................................................... 6 

2.7 DRAINAGE ....................................................................................................................................................................... 6 

2.8 LANDSCAPING & VISUAL ................................................................................................................................................. 6 

2.9 PUBLIC UTILITIES ............................................................................................................................................................. 6 

2.10 PARKING ........................................................................................................................................................................ 6 

2.11 TRAFFIC MANAGEMENT ................................................................................................................................................ 7 

2.12 IMPACTS ON THE ENVIRONMENT ................................................................................................................................. 7 

Human Beings .................................................................................................................................................................. 7 

Ecology ............................................................................................................................................................................. 7 

Soils, Geology and Hydrogeology: .................................................................................................................................... 8 

Water / Hydrology............................................................................................................................................................ 8 

Air & Climate .................................................................................................................................................................... 9 

Noise and Vibration .......................................................................................................................................................... 9 

Landscape & Visual Assessment ....................................................................................................................................... 9 

Archaeology, Architecture and Cultural Heritage .......................................................................................................... 10 

Environmental Impact Assessment Screening ............................................................................................................... 10 

Habitats Directive Assessment Screening ...................................................................................................................... 10 

Overall ............................................................................................................................................................................ 10 

3 LAND ACQUISITION AND ACCOMMODATION WORKS .................................................................................................. 11 

APPENDIX A .................................................................................................................................................................... 12 

Notice of Proposed Development (Newspaper & Site) ....................................................................................................... 12 

APPENDIX B ..................................................................................................................................................................... 15 

Bodies Notified in accordance with Section 82 of the Planning and Development Regulations ........................................ 15 

APPENDIX C ..................................................................................................................................................................... 17 

Environmental  Impact  Assessment  Screening  Determination  and  Habitats  Directive  Assessment  Screening Determination ..................................................................................................................................................................... 17 

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

2  

 

   

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

3  

 N59 MULRANNY FOOTPATHS 

PART 8 PARTICULARS 

1 INTRODUCTION 

1.1 PROPOSED DEVELOPMENT 

This document relates to  the proposed  improvements of the N59 road  in Mulranny village. The scheme is progressing through planning and design in conjunction with the National Roads Authority (NRA). 

The proposed development will consist of the following: ‐ 

Provision of footpaths for a distance of approximately 890m; 

Provision of a promenade/amenity area 170m long; 

Provision of car and bus parking; 

Enhancements to the existing Great Western Greenway by the provision of an access with improved gradient into the village; 

Improvement of one sideroad junction; 

Provision of a zebra crossing and six uncontrolled pedestrian crossings; 

Provision of a traffic calming scheme and cycleways at the east end of the village; 

Associated earthworks, drainage, landscaping and diversion of services and ancillary works. 

The proposed scheme  is  in  the  townlands of Mallaranny and Murrevagh  in  the D.E.D. of Newport West, County Mayo. 

More details of the scheme are shown in the Part 8 Plans. 

1.2 BENEFITS OF THE PROPOSED DEVELOPMENT 

Creation of Employment & Accessibility / Tourism 

The N59 National Secondary Route in Co. Mayo is approximately 139km long and serves as the main access route for tourists visiting Westport, Newport, Mulranny, Achill Island and north to Belmullet, Erris and the Céide Fields  in North Mayo.  It serves the Gaeltacht areas of Acaill  (Achill) and  Iorrais (Erris).  

Westport, Newport, Mulranny, Achill  and  the  surrounding  area of Mayo  is  a major  attraction  for visitors  to  Ireland.  In  2011,  the  number  of  visitors  to Mayo  was  approximately  267,000  (Fáilte Ireland). These figures emphasise the region’s importance as a visitor destination in Ireland.  

This road project will provide an  improved transport  link to this region and will enhance economic growth and employment, particularly in the area of tourism. 

Road Safety 

This  section  of  National  Secondary  Road  is  deficient  in  terms  of  horizontal  alignment,  vertical alignment and cross‐section, and  there  is a proliferation of  junctions and private accesses causing traffic hazards. 

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

4  

The narrow cross‐section of the existing N59 route through the village also makes  it unsuitable for Non‐Motorised Users (pedestrians and cyclists). 

There have been a number of  incidents  involving vehicular  traffic and pedestrians  in  the village of Mulranny.    Some  of  these  accidents  were  due  to  the  absence  of  a  footpath,  necessitating pedestrians to walk on the carriageway. 

There have been 12  reported accidents  in  the  village of Mulranny between 2006 and  the end of 2011.   4 of these were serious  injury accidents, 5 of these were minor  injury accidents and 3 were recorded as Material Damage. 

There was  a  near  fatal  accident  in  2011 when  a  child who was walking  along  the  edge  of  the carriageway was knocked down and seriously injured.   

The provision of a consistent alignment will reduce driver confusion and error. These measures will have a beneficial effect on road safety. As part of  the scheme,  footpaths and pedestrian crossings will  be  provided  and,  in  conjunction with  the Great Western Greenway,  improved  access  to  the greenway, which will  have  a  positive  effect  on  both  the  quality  and  safety  of  the  road  for Non‐Motorised Users. 

Public Transport 

Improvement  of  the N59 will  improve  road‐based  public  transport  between  Achill, Newport  and Westport.  

1.3 PLANNING AND DEVELOPMENT REGULATIONS 

In  accordance  with  the  Planning  and  Development  Acts  2000‐2006,  Planning  and  Development Regulations 2001 as amended by Planning and Development Regulations 2006‐2011, Mayo County Council  is making available  for  inspection  to members of  the public, documentation and drawings describing  the  proposed works.  The  following  drawings  should  be  read  in  conjunction with  this document: 

Drawing Number       Title 

NRD/MO 11 4249/308/Loc    Site Location Map; 

NRD/MO 11 4249/308/0    Site Layout Map; 

NRD/MO 11 4249/308/1‐5    Plans Layouts 1‐5; 

NRD/MO 11 4249/308/6    Greenway Link Plan & Longitudinal Section. 

A copy of the Newspaper and Site Notices for the proposed development as required by the above Regulations is included in Appendix A.  

Appendix B  consists of  the  list of  relevant bodies  to which notice of  the proposed development, including the Plans & Particulars, have been sent as required by the above Regulations. 

   

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

5  

2 DESCRIPTION OF SCHEME 

2.1 ROAD / FOOTPATHS 

The existing carriageway through the village varies between 5.2m and 6.2m and  for the most part has no  footpaths.  It  is proposed  to maintain  a  carriageway width of 6m  through  the  village.  It  is proposed to provide footpaths at the following locations: 

Side  From Ch.  To. Ch.  Length 

RHS  20  180  160m 

LHS  420  450  30m 

LHS  560  685  125m 

RHS  685  1000  315m 

LHS  745  1005  260m 

TOTAL 890m 

The  proposed  footpath width  is  typically  2m  (with  a  0.5m wide  grass  verge where  appropriate), although this may be reduced in certain locations due to physical constraints. 

2.2 JUNCTIONS 

It is proposed to improve one sideroad junction at Ch. 915. 

2.3 TRAFFIC CALMING 

It  is proposed to  improve the visibility of the existing speed  limit sign at Ch.1420 and provide two new sets of signs at Ch.1610 and Ch.1820 in order to calm traffic entering the village from the east. 

It  is  also  proposed  to  provide  build‐outs  at  Ch.1025,  Ch.1125  and  Ch.1280  (incorporating  an uncontrolled crossing point) to further calm traffic. 

2.4 GREAT WESTERN GREENWAY / CYCLEWAYS 

It is proposed to improve the gradient of the Great Western Greenway approach to the village. The existing gradient is approximately 22%. It is proposed to provide a gradient of approximately 10.5% as shown on drawing NRD/MO 11 4249/308/6. 

It also proposed to provide two cycleways each approximately 1.2m wide between Ch. 1000 and Ch. 1725. 

   

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

6  

2.5 PEDESTRIAN CROSSINGS 

It is proposed to provide pedestrian crossings at the following locations: 

Ch.  Type 

170  Uncontrolled crossing 

580  Uncontrolled crossing 

685  Uncontrolled crossing 

790  Uncontrolled crossing 

905  Zebra crossing 

980  Uncontrolled crossing 

1280  Uncontrolled crossing (incorporated with build‐out) 

2.6 RETAINING WALLS 

Retaining walls will be required at the following locations: 

Side  From Ch.  To. Ch.  Length 

LHS  580  600  20m 

LHS  640  685  45m 

RHS  790  820  30m 

LHS  825  910  85m 

RHS  870  960  90m 

TOTAL 270m 

2.7 DRAINAGE 

Existing roadside drainage will be maintained. Gulleys provided along the kerbs of the new footpaths will be channeled into the existing drains on the south side of the N59. 

2.8 LANDSCAPING & VISUAL 

Landscaping will be carried out taking account of the existing vegetation so that the scheme can be carefully integrated into the receiving environment. Native species will be used. 

2.9 PUBLIC UTILITIES 

Local  utility  diversions  and  alterations will  be made  as  necessary  to  facilitate  the  new  proposed improvement. These include water, telecommunications and electricity services. 

2.10 PARKING 

It is proposed to provide car and bus parking at the locations indicated on the drawings. 

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

7  

2.11 TRAFFIC MANAGEMENT 

Traffic management will be required along the length of the scheme during construction. 

2.12 IMPACTS ON THE ENVIRONMENT 

Human Beings 

During the construction phase the increased development activity associated with the project should prove to have positive benefits to the local economy. 

All along its route, the location of the proposed development is used by pedestrians and cyclists, in particular people using the adjacent Great Western Greenway, which attracts many tourists to the area.  Traffic  management  plans  during  the  construction  phase  should  ensure  safety  of  the vulnerable  road  users  and  continued  usage  during  construction.  Long  term,  with  the  improved interaction between the Greenway and the village core, the use of both will be enhanced. 

The  N59  is  identified  as  one  of  the most  important  tourist  routes  in  the  State.    The  proposed development has  the potential  to positively  impact on  tourism  in Mulranny and  the wider  region with safer traffic movements and pedestrian/cyclist movement.   This will result  in a more pleasant and safer environment in the village and will allow the area to develop to its true potential.   

During the construction phase there may be some minor short term negative impacts along the N59 transport corridor as a result of potential traffic delays. 

Local community,  tourist and business  facilities are  located within Mulranny.  It  is considered  that there will be a positive increase in the use of these facilities arising from the proposed development.  The proposed development has the potential to improve safety and access to these facilities. 

Community  severance may  be  described  as  being  the  separation  of  residents  from  facilities  and services used within their community, caused by new or improved roads or changes in access and/or traffic flows.  As the proposed works primarily involve an online at‐grade provision and improvement of pedestrian /cyclist facilities along the N59, there is minimal scope for affecting existing severance, as  the  project will  provide  improved  safety  for  pedestrians,  cyclists  and  vehicles  accessing  these community facilities and services. 

Ecology 

There are five Natura 2000 sites situated within 15km of the proposed development, including Clew Bay Complex cSAC (Site Code 001482), Owenduff/Nephin Complex cSAC (Site Code 000534) and SPA (004098), Lough Gall Bog cSAC (Site Code 000522), and Corraun Plateau cSAC (Site Code 000485). 

There  are  a  further  four  proposed Natural Heritage Areas  (pNHAs) within  15km of  the proposed development, including Clew Bay pNHA (Site Code 0001482), Owenduff/Nephin Complex pNHA (Site Code  000534),  Lough Gall  Bog  pNHA  (Site  Code  000522),  and  Corraun  Plateau  pNHA  (Site  Code 000485),  

The  designated  sites which may  be  impacted  by  the  proposed works  include,  Clew Bay  Complex cSAC/pNHA,  Owenduff/Nephin  Complex  cSAC/SPA/pNHA  and  Corraun  Plateau  cSAC/pNHA.  The proposed  development  does  not  traverse  any  habitats  listed  under  Annex  I  of  the  EU  Habitats Directive within the Clew Bay cSAC, Owenduff/Nephin Complex cSAC/SPA/pNHA and Corraun Plateau cSAC/pNHA,  which  would  be  listed  as  qualifying  interests  of  the  designated  site.  The  proposed development  crosses  a  number  of  watercourses  which  flow  into  Clew  Bay  and  drain  the Owenduff/Nephin  Complex.  There  is  potential  for  aquatic  species  to  be  disturbed  either  through deterioration  in water quality or a disruption of hydrological processes as a  result of construction 

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

8  

operations. Construction activities may cause some disruption to the protected bird species found in Owenduff/Nephin Complex SPA. 

The proposed development  is an online provision and  improvement of pedestrian /cyclist  facilities along the N59. The majority of the impacts that are likely to have an impact on the environment are associated with the construction stage. These construction stage impacts are temporary in nature, of short  duration,  will  not  recur  once  construction  has  been  completed  and  the  effects  will  be reversible over time.  

The exception to this  is mainly  loss of roadside vegetation where the existing road cross‐section  is widened. This will be minimal and consist of removal of hedgerows and agricultural grassland. In this case the duration is permanent and is not reversible.  

Where  any  vegetation  clearance  is  required  this  shall be done outside  the  bird nesting  season  – March 1st to August 31st.   

In areas of vegetation clearance, where there is the presence of non‐native invasive plant species, in particular  Japanese  Knotweed  (Fallopia  japonica), Himalayan Balsam  (Impatiens  glandulifera)  and Giant Rhubarb (Gunnera tinctoria), care will be taken in the excavation and movement of material in these areas to prevent the spread of invasive species. The NRA’s Guidelines on the Management of Noxious Weeds and Non‐Native  Invasive Plant Species on National Roads will be  followed  in  these instances. Roadside habitat loss can be compensated for through creative and ecologically sensitive landscaping.   

The  proposed  development  will  be  developed  in  accordance  with  the  NRA  and  other  relevant environmental  guidelines  and  specific  environmental  avoidance  and mitigation measures will  be implemented. 

Soils, Geology and Hydrogeology:  

The geology and hydrogeology along the N59 in this area is mainly a poor aquifer associated with the Anaffrin Formation, described as Psammitic schists and quartzites. The groundwater vulnerability is considered extreme.  Impacts both constructional and operational to the geology and hydrogeology will be minor to imperceptible and do not require any specific mitigation. 

There will be a permanent but imperceptible negative impact due to the need to import material to fill sections of the proposed development and to excavate material.  

Water / Hydrology 

The  proposed  N59  Mulranny  Footpaths  area  is  within  the  Murrevagh  River  catchment.  The Murrevagh River  is classed at  ‘Good’  status  in  the Clew Bay Water Management Unit Action Plan (March 2012). Along the proposed development there are two watercourse channel crossings with a number of potential road drainage outfall locations. All of these watercourses discharge to the Clew Bay SAC complex.  The drainage system will be designed to protect the water quality of the receiving waters from operational impacts associated with routine road runoff and accidental spillages. 

The design of the drainage system for the project recognizes that the scheme is a low volume route, and  is  an  online  upgrade  of  an  existing  road  carriageway/cross‐section.  It  is  considered  that  the design  should  seek  to  be  as  simple  and  as  low maintenance  as  possible  and  reflect  broadly  the existing drainage regime  in the area, while still seeking to protect any vulnerable and/or  important receiving watercourses.  

It is proposed that a concrete channel / kerb and gully drainage system is the most desirable solution for the scheme.  

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

9  

The majority  of  the  catchment  areas  associated with  this  study  comprise  Soil  Type  5  (Very High Runoff)  with  areas  of  Soil  Type  4  (High  Runoff)  on  the  lower  slopes  of  the  Nephins.    These characteristics give rise to high rates of runoff and large flood flows in the watercourses intercepted by the road.   

The principal hydrological  impact of the scheme will be associated with sediment runoff generated by  construction  works  near  watercourses  and  the  handling  of  unsuitable material,  its  removal, transport and recovery.  Appropriate sediment control measures during the construction phase will be required to minimise  impact to receiving watercourses and ensure  imperceptible  impact to the downstream Clew Bay SAC.   The operational  impact on surface water quality due to the proposed development as a whole  is expected to be slightly positive through  improved road runoff drainage and treatment.   

Air & Climate 

Due to the fact that the proposed development will not generate extra vehicular traffic volumes or significantly divert vehicular traffic, it is predicted that at a local level the proposed development will have no  significant  impact on air quality.   At a  regional  level,  the proposed development will not result  in  a  detrimental  impact  on  background  air  quality.    Levels  of  vehicular  traffic‐derived  air pollutants in the locality will not exceed the ambient air quality standards either with or without the proposed development in place.  As part of the mitigation strategy, a dust minimisation plan will be incorporated  into  the Environmental Operating Plan  formulated  for  the construction phase of  the project in accordance with industry guidelines. 

Noise and Vibration 

The existing background noise  levels are  typical of a  semi‐urban area  influenced by a  rural/semi‐urban  national  road.    Due  to  the  fact  that  the  proposed  development  will  not  generate  extra vehicular  traffic volumes or divert vehicular  traffic,  it  is predicted  that  the proposed development will have no significant impact on background noise levels in the area.  Mitigation measures such as acoustic barriers or  low noise  road surfacing are not necessary. The proposed development  is not expected  to  give  rise  to  vibration  that  is  either  significantly  intrusive or  capable of  giving  rise  to structural or cosmetic damage. 

Construction may  lead to temporary adverse noise  impacts at nearby residences.   Subject to good working practice during the construction phase and non‐exceedence of any noise limits stipulated in industry guidelines, construction noise impacts will be kept to a minimum.  There is the potential for vibration  impacts  during  construction  at  properties  close  to  the  works.    However,  contract documents  will  specify  that  the  Contractor  will  be  obliged  to  undertake  specific  abatement measures and to comply with industry guideline vibration limits. 

Landscape & Visual Assessment 

Generally  the  landscape  either  side  of  the  proposed  development  is  either  rural  or residential/commercial,  rising  to  the  north  and  includes  mature  roadside  planting.  The  visual envelope  i.e. where  the  site  and  any  activities  associated with  the  site  during  construction  and operation will be visible without mitigation measures in place, is narrow and within 100m either side of  the proposed development.  From  the preliminary  visual  assessment  carried out, no  significant visual impacts will result.  

The  proposed  development  is  described  in  the  Landscape Appraisal  of  County Mayo  (CAAS  Ltd., 2008) within the Landscape Character Zone Area E: North Mayo Mountain Moorland. The Appraisal notes that the N59  is a designated scenic route from Bangor to east of Rosturk. The project  is fully within this designated scenic route.  

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

10  

Impacts  on  the  landscape  and  its  associated  character  will  result  from  the  removal  of mature vegetation  along  the  project  required  from  the  creation  of  the  widened  road  cross‐section. Mitigation including providing areas suitable for planting, reinstatement of hedgerow and road edge planting  plus  sensitive  treatment  to  finishes  to  the  promenade  area will  reduce  impacts  on  the landscape. 

Archaeology, Architecture and Cultural Heritage 

The proposed development will not  impact on  any national monuments,  recorded  archaeological monuments or any other known archaeological sites. 

The  potential  for  previously  unidentified  or  subsurface  archaeological  remains  within  the development area  is deemed very  low  to negligible. Nevertheless, a programme of archaeological fieldwalking shall be carried out by a suitably qualified archaeologist.  If archaeological remains are identified an archaeological mitigation strategy will be implemented in agreement with the relevant statutory bodies. This may include test trenching that, if required, shall be carried out by a suitably qualified  archaeologist  under  licence  from  the  National  Monuments  Service  and  the  National Museum of Ireland. 

The  proposed  development  will  not  have  any  direct  or  significant  impacts  on  any  Recorded Protected Structures. Two Recorded Protected Structures ‘The Great Southern Hotel’ (ID:0121) and ‘St. Mary’s RC Church’  (ID:0122) are  located adjacent  to  the  scheme but will not be  impacted on negatively by the proposed development. 

One structure  included  in the Mayo Thatch survey  is  located within  the study area but will not be impacted on.   Also  it  should be noted  that  the Great Western Railway  (Now  the  greenway  cycle path) and associated features, run parallel and adjacent to the study area but will not be  impacted on by the development. 

Environmental Impact Assessment Screening 

An Environmental  Impact Assessment  Screening was  carried out on  the N59 Mulranny  Footpaths Project and  it determined  that  the proposed development would not be  likely  to have  significant effects  on  the  environment  and  that  the  project  does  not  require  an  Environmental  Impact Assessment. The determination on  the Environmental  Impact Assessment Screening  is  included  in Appendix C.  

Habitats Directive Assessment Screening 

In addition and due to the location of a number of European sites (Natura 2000 sites) in the vicinity of  the  proposed  development  a Habitats Directive Assessment  Screening was  carried  out  on  the proposed  development.  The  screening  determined  that  the  N59  Mulranny  Footpaths  Project, individually or in combination with other plans or projects, would not be likely to have a significant effect on a European site on the basis of objective  information. This determination  indicates that a Stage  2  Appropriate  Assessment  is  not  required  for  the  proposed  development.  A  copy  of  the determination is included in Appendix C. 

Overall 

The  impacts of all aspects of  the project have been addressed.  It  is evident  that  there will not be significant effects on the receiving environment or on effected designated sites, if all precautionary measures are implemented.   

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

11  

3 LAND ACQUISITION AND ACCOMMODATION WORKS  

Land acquisition will be required  in order to construct this proposed  improvement of the N59. The preliminary  design  has  focused  on  the  development  of  the  proposed  project  to  permit  Land Acquisition procedures to be undertaken. 

The alignment  is online  and as a  result  the  impact on properties will be  limited  to  landtake only along the external boundary with the national road. Likely impacts are expected to include impacts on  the curtilage of properties,  impacts  to property boundaries and entrances,  impacts on services including water, utilities and to a more limited extent, direct impacts on properties. 

Accommodation works will  be  required  along  the  length  of  the  scheme,  and will  be  designed  in consultation with the landowners. 

   

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

12  

 

 

 

 

 

 

APPENDIX A  

 

Notice of Proposed Development (Newspaper & Site) 

 

   

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

13  

 

Comhairle Contae Mhaigh Eo 

Mayo County Council 

 

Part 8 of the Planning and Development Regulations 2001 

Planning and Development Regulations 2001 to 2011 

 

N59 Mulranny Footpaths Scheme 

Provision of  footpaths, pedestrian crossings and traffic calming  in the village of Mulranny  in the townlands of Mallaranny and Murrevagh, in the D.E.D. of Newport West, County Mayo. 

 

In accordance with Articles 80 and 81 of the Planning and Development Regulations 2001, as amended by the Planning & Development Regulations 2006 ‐ 2012, notice is hereby given that Mayo County Council proposes to carry out development, as described below, in the above‐named townlands in the D.E.D. of Newport West, County Mayo: 

 

Provision of footpaths for a distance of approximately 890m; 

Provision of a promenade/amenity area 170m long; 

Provision of car and bus parking; 

Enhancements to the existing Great Western Greenway by the provision of an access with improved gradient into the village; 

Improvement of one sideroad junction; 

Provision of a zebra crossing and six uncontrolled pedestrian crossings; 

Provision of a traffic calming scheme and cycleways at the east end of the village; 

Associated earthworks, drainage, landscaping and diversion of services and ancillary works. 

 

An Environmental  Impact Assessment  Screening process was  carried out  for  the project, and Mayo County Council has determined that the scheme would not have a significant effect on the environment, and that an Environmental Impact Assessment is not required. 

A Habitats Directive Assessment Screening process was carried out for the project, and Mayo County Council has determined  that  the  scheme,  individually or  in combination with other plans or projects, would not be likely to have a significant effect on a European site. 

Plans and particulars of the proposed development, and the Environmental Impact Assessment Screening and Habitats Directive Assessment Screening determinations will be available for inspection between the hours of 9.30am to 1.00pm and 2.00pm to 4.30 pm on Mondays to Fridays (bank holidays excluded) from Tuesday 26th February 2013 to Tuesday 9th April 2013 at the following locations: 

 

Mulranny Post Office, Mulranny, Co. Mayo; 

The offices of Mayo County Council, Church Road, Belmullet, Co. Mayo  

The offices of Mayo County Council, Civic Offices, Altamount Street, Westport, Co. Mayo;  

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

14  

The  offices  of  Mayo  County  Council,  National  Roads  Design  Office,  Glenpark  House,  The  Mall, Castlebar, Co. Mayo; 

and will be available for purchase at a fee not exceeding the reasonable cost of making a copy at: 

 

The  offices  of  Mayo  County  Council,  National  Roads  Design  Office,  Glenpark  House,  The  Mall, Castlebar, Co. Mayo; 

until 9th April 2013. 

Submissions or observations with respect to the proposed development dealing with the proper planning and sustainable development of the area in which the development will be situated may be made in writing to the undersigned before 4 p.m. on Tuesday 23rd April 2013. 

 

Dated this 26th day of February, 2013. 

 

J. Condon, County Secretary, Mayo County Council,   Aras an Chontae,   The Mall,   Castlebar,   Co. Mayo. 

 

 

   

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

15  

 

 

 

 

 

 

APPENDIX B  

 

Bodies Notified in accordance with Section 82 of the Planning and Development Regulations 

 

 

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

16  

 Director West Regional Authority, Woodquay Court, Woodquay, Galway.   The Minister Dept. of Agriculture, Food and the Marine, Agriculture House Kildare St. Dublin 2.   The Minister c/o The Manager Development Applications Unit Department of Arts, Heritage & Gaeltacht Newtown Road Wexford   The Minister Dept.  of  Environment,  Community  &  Local Government Custom House Dublin 1   Director The Arts Council An Chomhairle Ealaíonn 70 Merrion Square Dublin 2   Manager of Environment & Planning Fáilte Ireland 88‐95 Amiens Street Dublin 1   Chairman An Taisce The National Trust for Ireland The Tailor’s Hall,  Back Lane Dublin 8    

 Chief Executive The Heritage Council Áras na hOidhreachta Church Lane Kilkenny   Chief Executive Officer Inland Fisheries Ireland Ardnaree House,  Abbey Street Ballina Co. Mayo   The Secretary National Roads Authority St. Martin’s House Waterloo Road Dublin 4   Chairman Coras Iompair Eireann Tara House 8‐16 Tara Street Dublin 2 

 

Mayo National Roads Design Office    N59 Mulranny Footpaths Mayo County Council    Part 8 

17  

 

 

 

 

 

 

APPENDIX C  

 

Environmental Impact Assessment Screening Determination and Habitats Directive Assessment Screening Determination 

   

Mayo NatMayo Cou

 

 

tional Roads Deunty Council 

esign Office 

 

 

N59 Mulrannyy Footpaths Part 8 

18  

Mayo NatMayo Cou

tional Roads Deunty Council 

esign Office  N59 Mulrannyy Footpaths Part 8 

19  

 


Recommended