(HS(D) 7819 ) PT 12199Land Area : 62939 M2 (6.2930 ha / 15.5525 acre)
SITE PLANQ
292 39'
SKALA 1 : 750
24' WIDE TARMAC ROAD
ENTRANCE-1
20' WIDE BACKLANE
20' WIDE BACKLANE50' WIDE TARMAC ROAD
24' WIDE TARMAC ROAD
TBM G1 (AL=17.056m)
Paku Atas Sump
2
3
5
2
3
2
3
5
2
4
2
3
5
2
5
23526
30
22
23531
2
3
5
3
4
23527
23513
23512
PutraHeights
TamanPuchongPermai
PUCHONG
Taman Puchong Perdana
BandarPuteri
TamanPuchong Prima Taman
Tasik Prima
TamanPuchongUtama
Saujana Puchong
Bandar Bukit Puchong
KotaPerdana
Taman DesaAyer Hitam
TamanPutra Prima
Taman Meranti Permai
Saujana Putra
KampungCheeding
Utara-Selatan Hubungan Tengah Hghway
Lebuhraya Utara-Selatan Hubungan Tengah
Taman Putra Perdana
Taman Aman Putra
CYBERJAYA PUTRAJAYA
Taman Lestari Perdana
Taman Pinggiran Putra
TamanUniversiti Indah
UPM SERDANG
Taman Wetland
Presint 11
Presint 10
Presint 1Presint 9
WPPUTRAJAYA
Presint 16
Presint 18Presint 3
Presint 4
Presint 5Presint 6
Taman Dengkil Jaya
DENGKIL
Palm Garden Golf Club
TAPAKCADANGAN
Universiti Multimedia Malaysia
Persi
aran
Bes
tari
Persi
aran
Bes
tari
Persiaran Multimedia
Jalan Fauna 1
Jalan SilikonLingk
aran
Silik
on
Persiaran Neutron
Persiaran Sepang
Persiaran Ceria
Lingkaran Cyber Point Timur
Persiaran Multimedia
Lingkaran Cyber Point Barat
Persiaran Ceria
TAPAKCADANGAN
PELAN LOKASIPELAN KUNCI
Majlis Perbandaran Sepang
SLOPING WALKWAY
SLOPING WALKWAY
SILTATION AND EROSION BY WAY OF SILT TRAPS, DITCHES ETC. TO THE APPROVAL OF THE S0.
8. THE FINISHED LEVEL OF THE PROPOSED ROADS AND PLATFORM LEVELS ARE SUCH THAT THEY WILL
10. NO ENROACHMENT INTO ADJACENT LOT WILL OCCUR.
LOCATION TO BE CONFIRMED BY SO PRIOR TO START WORK.
PERMIT CONNECTION OF ROADS TO ADJOINING EXISTING OR FUTURE ROADS.
9. NO PONDING WILL OCCUR AS A RESULT OF THE PROPOSED EARTHWORKS.
2. FILLED MATERIAL SHALL BE FREE FROM TREE STUMPS, ROOTS AND OTHER UNSUITABLE MATERIALS.
6. COMPACTION TEST SHALL FOLLOW SPECIFICATION OR AS APPROVED BY THE S.O.
TROUGH EXISTING WATER COURSES FOR EASE OF CONSTRUCTION AND TO CONTROL
7. CONTRACTOR MAY CONSTRUCT TEMPORARY EARTH DRAIN FOR DRAINING SWAMP LAND
IN DEPTH AND COMPACTED WITH MIN. 20 TONS ROLLER.
ON THE SUITABILITY OF EARTH MOVING EQUIPMENT TO BE USED.
5. WHERE CUT OR FILL ENCROACH INTO NEIGHBOURING LOTS, PERMISSION SHALL BE OBTAINED
4. FILLING OTHERS THAN ROCKS SHALL BE IN HORIZONTAL LAYERS OF NOT MORE THAN 225mm
3. CONTACTOR TO NOTE THE EXTEND OF SWAMPY LAND AND ASCERTAIN THE SITE CONDITION
OF UNSUITABLE MATERIAL) ACCORDING TO THE FORMATION LEVEL INDICATED.
1. THE CONTRACTOR SHALL CARRY OUT THE EARTHWORKS (INCLUSIVE OF REMOVAL
FROM THE OWNER.
EARTHWORK NOTES :