+ All Categories
Home > Documents > NA 2014-2015 YETS: schedule week by week S. Evrard.

NA 2014-2015 YETS: schedule week by week S. Evrard.

Date post: 14-Dec-2015
Category:
Upload: micheal-ellicott
View: 215 times
Download: 1 times
Share this document with a friend
Popular Tags:
16
NA 2014-2015 YETS: schedule week by week S. Evrard
Transcript
Page 1: NA 2014-2015 YETS: schedule week by week S. Evrard.

NA 2014-2015 YETS: schedule week by weekS. Evrard

Page 2: NA 2014-2015 YETS: schedule week by week S. Evrard.

Week 51Painting works in TA801 by Presiozo •Repair work of TT84 floor by CE contractor (4/5)

ED stop on 19/12PR PA80 maintenanceLight modification H2 zone 152.PPE132 shieldingXEMC.516 in PPE 124Ouverture visee geometres H6 et H8H6/H8 alignment campaign (TT82 & EHN1)

Page 3: NA 2014-2015 YETS: schedule week by week S. Evrard.

Week 2MCWV:• Consignations• Service removal• Plexiglas protection removal• Transport to B. 867

Light modification (and cabinet relocation, in week 3) H2 zone 142.

PPE132 shieldingPR PA80 maintenance•MNP22 (Ship) to be moved - CANCELED• Installation XTDV GIF: in progress• EHN1 gallery cleaning: not startedH6/H8 alignment campaign (TT82)

Page 4: NA 2014-2015 YETS: schedule week by week S. Evrard.

Week 3• Remplacement de 4 réducteurs de pression sur T2

T4 T6 et TCSC (F. Moro) S3,4,5Repair work of TT84 floor(last section)MCWV:Transport to B. 867

PR 537 (TCC2) maintenanceEHN1 gallery cleaningLight modification H2 zone 132.H2: zone 142/134 steel beam installation (with

QNL500 & QNL 524 removal/reinstallation)H6/H8 alignment campaign (TT82&TCC2)magnet MBW.043089 exchangeStarter exchange on TDC2 lights. Cubicle

exchange in mezzanine (TCC2 led light control)

Page 5: NA 2014-2015 YETS: schedule week by week S. Evrard.

Week 4Remplacement de 4 réducteurs de pression sur T2

T4 T6 et TCSC (F. Moro) S3,4,5H6/H8 alignment campaign (TCC2)Target T2 T4 T6 upgrade (preparation)• Slot for magnet MBW.043089 exchange(Friday)Close survey shielding at the end of and TT83 door

(by Friday)Overhead crane load test (PA80 & TCC2)MDX cabling and piping installation• MDX magnet installation• MDX service connexionCovers on DC cable cumbs (Test + implementation)ILS tetra installationTarget shielding motor exchange (Fri PM)

Page 6: NA 2014-2015 YETS: schedule week by week S. Evrard.

S. Girod EM-MEF 6

TCC2 new MDX.042.094

Page 7: NA 2014-2015 YETS: schedule week by week S. Evrard.

Week 5Target T2 T4 T6 upgrade (target box, monitors) (lun – mar)MDX support installation (Mar)MDX magnet installation (Mar)MDX service connexion (Mar)• Water leaks TDC2• Réparation des fuites et/ou remplacement des vannes si

réparations impossible S5 (B. Bannister) Remplacement de 4 réducteurs de pression sur T2 T4 T6 et TCSC

(F. Moro) S3,4,5H6/H8 alignment campaign (TCC2)MBW.043089 reinstallation (Mer)• H6 collimator exchange (Vendredi)• Alignment MDX + collimator + MBW (jeu-ven)MBPL 498 magnet to be installed in H4_134 + RE21 shielding• Re-Connexion of vacuum pipes, collars,.. H6 & H8.• Beam line configuration for ions H2 H4 H8: https://

edms.cern.ch/file/1462531/1/YETS_2014_4162531.pdf • Revision des coffrets pompes a vide (Jeu-Ven)Installation peignes TDC2

Page 8: NA 2014-2015 YETS: schedule week by week S. Evrard.

H4 shielding PPE134 – RE21

Page 9: NA 2014-2015 YETS: schedule week by week S. Evrard.

Peignes TDC2

Page 10: NA 2014-2015 YETS: schedule week by week S. Evrard.

MDX

Page 11: NA 2014-2015 YETS: schedule week by week S. Evrard.

Reducteur de pression

Page 12: NA 2014-2015 YETS: schedule week by week S. Evrard.

Tableaux VAC

Page 13: NA 2014-2015 YETS: schedule week by week S. Evrard.

MBW.043089

Page 14: NA 2014-2015 YETS: schedule week by week S. Evrard.

Week 6• Contingency week• RE21 shielding• Re-Connexion of vacuum pipes, collars,.. H6 & H8.• Beam line configuration for ions H2 H4 H8:

https://edms.cern.ch/file/1462531/1/YETS_2014_4162531.pdf • Revision des coffrets pompes a vide (Jeu-Ven)• All magnets on !• H6/H8 Magnet patrol (after survey)• Retrait du materiel• Fermeture puits• Nettoyage TA801 (aspirateur + nettoyage humide)

mercredi

• Closure TCC2+TT81+TT82+TT83 on Thu 5th 5:30 PM• DSO test Fri 6th - Mon 9th

Page 15: NA 2014-2015 YETS: schedule week by week S. Evrard.

Week 7• Beam to TCC2: 09/02 PM• Scan EHN1

!! NEXT MEETINGS on FRIDAY at 9.00 !!

LaterMCWV repair and reinstallation beforeMCWV control cable replacementrestart of P+ run in April