+ All Categories
Home > Documents > Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL...

Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL...

Date post: 30-Mar-2015
Category:
Upload: donna-willy
View: 213 times
Download: 1 times
Share this document with a friend
Popular Tags:
33
GIS/RS USER CONFERENCE 2011 TELECOM FIJI LTD. Nacanieli Senibaravi
Transcript
Page 1: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

GIS/RS USER CONFERENCE 2011

TELECOM FIJI LTD.

Nacanieli Senibaravi

Page 2: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

CONTENTS:

1. Introduction

2. Background

3. Objective

4. Project Phases

5. TFL Network

6. Application

7. OSS/BSS

8. Future Plans

9. Conclusion

Page 3: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

Introduction

TFL is committed to building a better Fiji by being the best in service, providing quality communications and making it easier for people to keep in touch.

GIS is part of the development of the TFL network where it assists in providing the necessary information and network design for the framework.

Page 4: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

Background 1994 Initial Planning looked at CAD

1996 Calling of expression of interest

July 1996 Intergraph awarded tender

January 1997 Two pilot data capture

July 1998 100% Completion of data conversion

January 1999 Awarded 100% Club for excellence in data conversion

2003-2004 Upgrade to G/Comms

Page 5: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

OBJECTIVE

GIS project objective1. To design online all cable projects.2. Update and maintain Telecom assets.3. Easy access for our end users.

Page 6: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

1st Phase

• CAD Conversion

• GIS Upgrade

• Wireless

• GeoMedia

• CDP

Project Phases

2nd Phase

• M6/U6 Interface

• Automated Update GIS to M6

• Monitoring System

Page 7: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

TFL NETWORK

Page 8: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

‘E’ Side Cable ‘D’ Side Cable

Loop

TFL Network Exchange

Cabinet DSLAM

Joint

Fibre Cable

CopperCable

Manhole Jointing Box Jointing Pit

Distibution Point

Drop-wire

Customer

Page 9: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

RESIDENTIAL

SOHO

SME

Optical Transmission Ring

ADSL/ADSL2/ADSL2+SHDSLEthernetE1

IP

POTSISDNADSL2+VoIP

Leased linesADSL2+VDSL2

Softswitch

ClearAccess+ EMS

Video Server

BroadAccess-1000

BroadAccess-1000

BroadAccess-1000

BroadAccess-1000PSTN

BroadAccess-1000

Page 10: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

G/TECHNOLOGY

Page 11: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

GIS PRODUCTS

G/Technology Suite of Products• G/Administrator - 1• G/Designer - 8• G/NetViewer - 25• G/MobileViewer - 0

GeoMedia - 1

Page 12: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

• G/Designer is the base client software component within the G/Technology suite of products. It is used for network design and maintenance activities of the feature-based asset information within the G/Technology database.

• The Designer client seat provides the user environment for accessing the corporate asset database..

Designer

Page 13: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.
Page 14: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.
Page 15: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.
Page 16: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.
Page 17: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

PROJECT STATUS

CLOSED PROJECT

UNDER CONSTRUCTION

PROJECT

PROPOSED PROJECTS

Page 18: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

• G/NetViewer provides view/read only access to the TFL GIS database and allows users to view, query and extract data on TFL’s External Plant network.

• G/NetViewer accesses the live G/Technology database via our (TFL) local area network connection.

Page 19: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

KEY FEATURES

Access to predefined queries, traces, andreports for analysis.

Some types of queries are: • Locating assets,• Locating Street Name,• Trace Count,• Customer Report…..etc

Page 20: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

QUERIES

Page 21: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

QUERIES

Page 22: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

QUERIES

Page 23: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

GeoMedia can combine data from different sources, in different formats with different map projections to be viewed and analyzed in one environment. No translations required. GeoMedia just reads the data in whatever format it’s in and presents it for viewing and analysis in a user-friendly Windows environment.

Page 24: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

Population stats with TFL plant

Page 25: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

FUTURE

Interface (GIS-METASOLV-UNICORN)

Page 26: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

• Provisioning• Service Activation• Inventory Management

External Plant/Cable Network

METASOLV

Building and maintaining inventory of Cable Access equipment/assets/ infrastructure

• DPs• Cabinets• Cables

New TFL solution to replace ICMS providing functionality for:

METASOLV ®S O F T W A R E

Link to GIS (proposed)Link between Metasolv & GIS. New Infrastructure captured in GIS and updated in Metasolv. Daily operational changes will be done in Metasolv and updated in GIS.

Page 27: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

Planners : build new equipment/ infrastructure, that will be installed in the field, in Metasolv.

Initially: Manual All new plant to be captured in GIS (Planning) & also entered/built into Metasolv.

Later: Automatic Planners will be responsible for building new plant in GIS & Metasolv.

All new plant to be entered/built/captured in GIS in proposed state and will automatically be updated into Metasolv from GIS.

Future EndevourInterface and automatic syncing between GIS and Metasolv to be developed.

Page 28: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

PROJECTS PROPOSALS

FIBER OPTIC WORKFLOW MANAGEMENT

GIS for other Utilities etc.

Page 29: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

SUVA EXCHANGE

WALU BAY

SAMABULA EXCHANGE

BAYVIEW

SUV/A

SUV/S

SMB/G

SUV/X

SUV/B

SUV/K

SUV/V

SUV/W

SMB/W

SMB/USMB/V

SMB/T

SMB/R

SMB/A SMB/P

SMB/AA

SMB/H

SMB/S

SMB/J

SMB/N

SMB/AB

Fiji Navy

PAF

Carpenters Forster’s

FMF

Fiji Prisons

Suva Yacht Club

PWDDepot

Govt. Ship Yard

Rokobili

Neptune Ship.

CWM Hosp.

FSM.

Aust. Emb.

EXISTING NETWORK

Page 30: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

Fintel SCC

Civic House

GreenpeacePacific

Vanua House

WesternUnion

JJ’s on thePark

Victoria Corner

- Cyberzone - SkyNET

FAVC -Ministry of Labour -

BP -Korean Embassy -

Quest -

SUKUNA PARK

Page 31: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.
Page 32: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

CONCLUSION

• Greater efficiency resulting in cost savings• Better decision making• Managing geographically

– Better geographic information recordkeeping

.

Page 33: Nacanieli Senibaravi. CONTENTS: 1.Introduction 2.Background 3.Objective 4.Project Phases 5.TFL Network 6.Application 7.OSS/BSS 8.Future Plans 9.Conclusion.

VINAKA


Recommended