+ All Categories
Home > Documents > NACUF Bill Grow JCI - clmsummit.comclmsummit.com/.../2016/10/NACUF_JCI_Bill-Grow.pdf · Microsoft...

NACUF Bill Grow JCI - clmsummit.comclmsummit.com/.../2016/10/NACUF_JCI_Bill-Grow.pdf · Microsoft...

Date post: 28-Jul-2018
Category:
Upload: nguyenthuan
View: 213 times
Download: 0 times
Share this document with a friend
14
SAP Variant Configuration - Process Norman, OK Predator Large Sunline Millennium Split units Small Sunline 1 VC Process
Transcript

SAP Variant Configuration - Process Norman, OK

Predator

Large Sunline

Millennium

Split units

Small Sunline

1 VC Process

Multi-Product, Multi-Brand, Multi-Channel

Agenda

VC Process2

• SAP VC Process

• Vision Scope Requirement (VSR)

• Engineering Change Process

• Unit Control Configuration

Vision, Scope, and Requirements Document

VC Process4

VSR

Characteristics

Characteristic Values

Nomenclature

5 VC Process

VSR

6 VC Process

BOM Development

Items in the BOM are sequential across all KMAT’s

• Line 20 Basic Unit

• Line 50 Heat Exchanger

• Line 350 Compressor Assemblies

• Line 450 Evap. Coils

• Line 500 Cond. Coils

7 VC Process

BOM Development

8 VC Process

BOM Changes

9 VC Process

BOM Changes

10 VC Process

BOM Changes

Super BOM Changes made to match the dates of the original EC.

A VC EC is created to make the appropriate changes to the Super BOM 526_45264

11 VC Process

1212

Thank you

VC Assessment

VC Assessment13

VC Assessment14


Recommended