+ All Categories
Home > Documents > NAHSR Business Plan MNDOT

NAHSR Business Plan MNDOT

Date post: 07-Aug-2018
Category:
Upload: sally-jo-sorensen
View: 219 times
Download: 0 times
Share this document with a friend
36
 
Transcript
Page 1: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 1/36

 

Page 2: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 2/36

 

Introduction 

North American High Speed Rail Group, LLC (“Rail Group”) is a Minnesota company which will develop,

construct, own and operate Electric, High Speed Rail (“HSR”) systems in the United States, with plans

to expand across North America. Rail Group’s first project will connect Minneapolis and Rochester,

MN, and will be funded through a private offering of securities to domestic and foreign investors. The

project will be achieved in four stages. The first two, Stage 1 – Proof of Concept Assessment and

Stage 2 – Company Organization Planning are complete. Stage 3 – HSR Concept Implementation and

First Funding Raise ($50,000,000) is in progress.

In Stage 3, Rail Group will prepare a detailed engineering analysis of construction cost complete

environmental impact studies, refine financial models, confirm its analysis of financial feasibility, dostrategic real estate planning, real estate acquisition, initiate community outreach, and plan the 2nd

Funding Raise. Finally, in Stage 4, Rail Group will prepare for the launch of the Second Funding Raise

anticipated to be up to $4.2 billion in equity and debt, undertake constructing and testing of the

elevated Minneapolis to Rochester HSR line, continue planning and developing Transit Oriented

Development projects (TOD), and launch Transformational Economic Development Projects.1 

1 Transit Oriented Development Projects and Transformational Projects will require separate and additional

financing. 

2 | P a g e  

Page 3: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 3/36

 

Executive SummaryRail Group seeks to develop, construct, own and operate an elevated, electric HSR system along with revenue-

enhancing Transportation Oriented Development Projects and related Transformational Economic Development

Projects. Rail Group will use private financing from domestic and foreign sources to execute this plan.

The first HSR segment, internally identified as the “Velos Project”, will be an 84 mile state-of-the-art elevated

HSR line connecting the Twin Cities (near the Mall of America and MSP International Airport) and the Mayo Clinic

in Rochester, MN. The Velos Project will proceed in four stages intended to prove its HSR project concept,

create a corporate structure and strategy, refine its financial models and cost estimates, construct the HSR

line and begin its strategy for Transit Oriented Development and Transformational projects as outlined below:

Stage 1 – Proof of Concept Assessment: Rail & Real Estate.

Status: Complete 

• 

Technology assessment and selection of Chinese HSR technology – the most advanced HSRtechnology in the world which is supported by long-term US and Chinese business and

technology relationships.

•  Identified domestic engineering and construction firms to collaborate with Chinese counterparts

to “Americanize” Chinese electric HSR technology for construction and operation in the United

States. 

•   Validated the elevated electric HSR system concept rending HSR advantageous, including:

o  Reduced construction cost and compressed construction timeline through the use of

uniform modular construction methods.

Elimination of the intersection of rail, highway and all other motor vehicle traffic, which:

(1) enhances logistical efficiency in construction and operation; (2) increases safety by

mitigating collision risks; and (3) minimizes disruption during construction and

maintenance.

o  Reduction of the impact to private/public property, natural environment and agricultural

industries

•  Planned to utilize State highway right-of ways where possible for elevated rail construction while

minimizing the foot-print impact of the rail line.

•  Privately financed investment plan, thereby requiring no state or federal funding.

•  Obtained acceptance and approval by Federal, State, County and Municipal governments.

•   Advanced the long term vision of a mass transit system utilizing clean, electric powered HSR

technology that will expand transportation options for growing population without expanding

fossil fuel dependency.

•  Initiated the long range vision of an elevated, electric HSR system comprised of multiple

segments in multiple regions.

3 | P a g e  

Page 4: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 4/36

 

•  Identified opportunities for accompanying transit oriented real estate development.

Stage 2 – NAHSR Group Organization Planning.

Status: Complete 

• 

Established a strong corporate structure with a centralized corporate headquarters, professional

staffing, and supporting consulting relationships and engagements.

•  Developed ongoing alliances with Minnesota transportation agencies and key professional

business entities possessing expert transportation, engineering, construction and operation

experience, as well as Minnesota companies interested in promoting Minnesota’s economic

development.

•  Developed relationships with China’s leading HSR technology companies and financial

institutions.

•  Engaged an active expert Advisory Board.

•  Refined the financial model to include the sources and uses of funds and prospective profit

centers. 

Stage 3 – Velos Project HSR Concept Implementation and First Funding Raise $50,000,000.

Status: In Progress  

•  Rail Group will finance Stage 3 of the Velos Project by raising $50 million through the sale of

Series A Convertible Promissory Notes. Rail Group is inviting strategic partners to participate in

this initial targeted raise. Rail Group expects target investors to include:

o  Project Advocate Investors : These investors anticipate they will receive significant

potential benefits from the operation of t h e Rochester-Twin Cities HSR line. These

investors each have specific benefits they hope to gain in increasing the   ease of

transportation between the Twin Cities and Rochester.

o   Added-value Investors : These investors, in addition to their participation financially,

have technical or  human resources to add to the project, whether in engineering,

project management, labor or labor  management, etc. Their participation adds to the

project on both sides. These are strategic partners for their specific project resources.

o  Financial Investors : Investors which seek to participate on a purely financial basis.

•  Rail Group will finalize obtaining formal authorization from state and local government authorities to

transfer control of the “Rochester-Twin Cities Passenger Rail Corridor Project” for feasibility study andfirst right of refusal for development of the corridor. The project be renamed upon transfer. 

4 | P a g e  

Page 5: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 5/36

 

•  Immediately after receiving formal authorization, Rail Group will begin the preconstruction process tobuild an elevated, electric HSR system using the most advanced HSR technology in the world. Thepreconstruction process includes, but is not limited to: 

o  Preparing a detailed engineering analysis of construction costs,

o  Refining financial models,

o   Verifying project cost estimates,

o  Confirming its analysis of financial feasibility,

o  Completing environmental impact studies,

•  Rail Group will continue strategic real estate planning, and possibly begin real estate and/or real

estate rights acquisition,

•  Rail Group will continue coordinating with necessary Federal, State, county and municipal

authorities, and initiate communication with public groups,

•  Rail Group will begin strategic planning and proof of concept analysis of Transit Oriented

Development real estate projects. This may include inquiry and/or acquisition of real estate rightsand properties.

•  Rail Group will also plan and prepare for the Second Funding Raise.

5 | P a g e  

Page 6: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 6/36

 

Stage 4 – Velos Project Construction, Operation, Real Estate Development Strategic Planning and

2nd Funding Raise of up to $4.2 Billion.

Status: Pending com pletion of Stage 3. 

•  Rail Group will commence the Second Funding Raise in which Rail Group intends to raise up to

$4.2 billion dollars. Rail Group anticipates the Second Raise Funding will be comprised of the

following estimated amounts:

o  $1.4 billion dollars will be private institutional equity investment from United States

investors (this amount includes the $50M raised in the First Funding Raise,

o  $1.4 billion dollars will be private institutional equity investment from China investors,

o  Other sources of funds are anticipated to include:

  credit facilities from Chinese and US banks,

 

equipment financing,  EB-5 and other types of debt and investment financing.

•  Rail Group will associate with world-class global engineering and construction firms based in the

US that have the expertise, broad-scope capabilities, technical and financial resources to deliver

major infrastructure projects like the Velos Project.

•  Rail Group’s US affiliates will collaborate with China engineers to integrate China’s electric HSR

technology into the US, thereby leveraging China’s HSR technology and expertise engineering

HSR systems globally while aligning with US companies with proven success completing large

infrastructure projects.

• 

Rail Group’s affiliates will finalize preconstruction efforts including:

o  Completing construction engineering analysis, project construction planning and project

design and drawings, and project management planning.

o  Customizing China HSR technology for construction and operation in the United States,

o  Establishing best practices for HSR construction and operation in the US,

•  Rail Group will obtain lease rights from the State of Minnesota, Department of Transportation, for

use of State right of ways for use as the project right of way.

•  Rail Group will also obtain right of way lease rights from property owners as necessary.

6 | P a g e  

Page 7: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 7/36

 

•  Commence construction of the elevated HSR system between the Twin Cities and Mayo Clinic in

Rochester, MN.

•  Rail Group will leverage its strong relationships with US, Chinese and European specialists to

utilize decades of HSR construction and operations experience to efficiently and rapidly advance

the Velos Project.

•  Rail Group will execute on its Transit Oriented Development strategy including the HSR stations,

retail development, and other real estate initiatives. The Transit Oriented Development projects

will generate revenue prior to the HSR line becoming operational. Transit Oriented Development

Projects will require separate and additional financing.

•  Rail Group intends to negotiate and retain a significant equity position in Transit Oriented

Development for the benefit of its stakeholders.

7 | P a g e  

Page 8: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 8/36

 

Table of ContentsBusiness Opportunity  ................................................................................................................................. 9

Company Overview  .................................................................................................................................... 12

Industry Analysis  ........................................................................................................................................ 15

Market Overview .............................................................................................................................................. 15

Consumer Needs .............................................................................................................................................. 15

Operational Cost Advantages ............................................................................................................................ 15

Consumer Perception ....................................................................................................................................... 16

The Mayo Effect ............................................................................................................................................... 16HSR, Transit Oriented Development & Vision  ................................................................................ 18

Milestones, Timeline, and Critical Functions  ...................................................................................................... 18 

Financial Plan............................................................................................................................................... 19

Transit Oriented Development.  ......................................................................................................................... 19 

Revenue Model  ................................................................................................................................................ 20 

Funding Requirements / Use of Funds............................................................................................................... 20 

Long Term Strategy as an Operating Entity  ....................................................................................................... 21 

Appendix – Supporting Documentation  ............................................................................................... 23 Appendix A: Financial Overview  ........................................................................................................................ 24 

 Appendix B: Management Team  ....................................................................................................................... 27 

 Appendix C: Board of Directors  ......................................................................................................................... 29 

 Appendix D: Advisory Board  .............................................................................................................................. 30 

 Appendix E: Professional Counsel  ..................................................................................................................... 32 

 Appendix F: Key Operational Processes  ............................................................................................................ 34 

8 | P a g e  

Page 9: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 9/36

 

Business Opportunity 

This business opportunity results from the work completed in Stages 1 and 2, which positions Rail Group for its

first funding raise. This $50 million raise will enable Rail Group to validate its proof of concept assessment for

an HSR line in Minnesota. The opportunity combines a HSR system in Minnesota with synergistic real estatedevelopment and business initiatives.

The State of Minnesota and the Minnesota Department of Transportation (“MnDOT”) has a high speed rail project

in their long range development plan, currently named “Minnesota Zip Rail.” In early 2015, the county rail

authority secured project leadership control of the corridor and has been collaboratively working with appointed

MnDOT to begin study the corridor. The Olmsted County Regional Railroad Authority (OCRRA) always planned

for a “hand-off” of the project and corridor to a private entity. After nearly a year of collaboration and legislative

support, OCCRA advised MnDOT that the project’s best chance for success is as a privately funded project

approach by the North American High Speed Rail Group. Rail Group will benefit from the $2.3 million already

invested by the State of Minnesota in preconstruction studies. The result is a unique and significant prospect

for a privately funded infrastructure project in North America representing a long range investment opportunity.

Several projects in North America (including projects in California, Texas, Washington, and Florida) have

accepted Federal funds, thereby slowing their progress, incurring great delays, increasing project costs and

adding inefficiencies. Rail Group will avoid these market barriers and inefficiencies by accepting no formal public

financial support.

Rail Group intends to utilize HSR technology, which is already a proven global transportation system around the

world. Rail Group intends to “Americanize” this global technology and “localize” it to the American environment.

The deep and trusting relationships between Rail Group’s leadership team and China businesses will facilitate

seamless management of the HSR project. Rail Group also has identified global engineering, construction,

technical and management services firms. Supporting the economics of the private investment Rail Group bringsto the table is a business model that includes real estate development as a differentiator from previous

transportation models.

China is positioned to offer cost efficient technology and the required financial support to build a robust

continental network. Rail Group, in addition to being an early market adopter, has a unique market approach

of following the national highway system where possible. By leasing air rights above the current highway

network, the company will provide the necessary ongoing infrastructure funds into State and Regional

Departments of Transportation to benefit other transportation initiatives.

Rail Group’s integral partnership with China is a unique strength. China seeks commercial opportunities in

various world markets to use its expertise and market leading position to win high speed rail projects. China

holds the market advantage due to its combined strength in three areas: technology, cost advantage, and the

ability to finance projects. Rail Group has a significant opportunity to establish an equity investment

opportunity by leveraging its Chinese relationships to secure a favored business position to

commercialize Chinese

HSR technology in North America.  The Velos Project will be the first in the US to leverage a relationship with

9 | P a g e  

Page 10: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 10/36

 

China in the HSR market.

 As part of Stage 3 of the Velos Project, Rail Group is making an offering of Series A Convertible Promissory Notes

totaling up to $50 million ($50,000,000) which will only be available to Accredited Investors. The net proceeds

from this sale of securities will be primarily used for three broad purposes:

●  To fund engineering analysis to validate and refine project cost estimates.

●  To fund pre-project work with the State of Minnesota, the involved counties and federal and state

agencies to complete environmental studies, permitting and related project development.

●  To fund acquisition of land or land rights.

The funds will also be used for items, including but not limited to, legal and financial services, investment

banking services other professional advisory fees, as well as current operating expenses and accrued debt.

Investors participating in this initial offering may be invited to exercise their convertible notes for the next funding

event. Rail Group has prepared offering documents that fully document the offering and its risks. 

 Also during Stage 3 experts from Rail Group’s China investors will review  geological/footing samples, turnradius measurements, conceptual station designs, tunneling and  bridge requirements, and similar data to

determine a more accurate cost estimate. Details of the Use of Funds are in the financial pro forma.

The chart below generally reflects the use of funds: 

Use of Funds : 50 Mill ion Raise

(000's)

$ 15,000 Land and land rights acquisition

14,500 State of MN - environmental, permitting and staffing

5,000 Corridor development, county study and permitting

5,000 Operating costs (rent, people, interest expense, etc.

4,740 Pre-feasibility project management costs

2,500 Legal

1,500 Investment banding costs

1,500 Marketing, communications and public relations

260 Accounting and finance

$ 50,000

10 | P a g e  

Page 11: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 11/36

 

Balance of Funding

When the feasibility studies are completed, Rail Group will begin Stage 4 – Velos Project Construction, Operation,

Real Estate Development Strategy and Planning and 2nd Funding Raise of $4.2 billion. Rail Group estimates the

total construction cost of the Velos Project will be up to $4.2 billion.

Estimated Total Project Cost

000,000's

Construction Costs $3,500Interest Expense 515Overhead Costs 200

$4,215

Rail Group plans to raise up to $2.8 billion in equity in equal amounts of $1.4 billion from China investors and

US investors. Rail Group estimates obtaining financing up to $1 billion from sources including, loans from China

and US Banks, equipment financing, EB-5 and other investments. Rail Group projects real estate projects

completed before the HSR line is operational will add an additional $400 million.

Sources : Estimated Second Raise: up to 4.2 Bill ion

000,000

US Investors (includes $50M from First Raise) $1,400

China Investors 1,400

Loans 700

EB-5 and other investments 300

Revenue: Real Estate projects completed before 400

$4,200

Numerous leaders in Minnesota have already joined Rail Group transformation and regional alignment

conversations including: the Minnesota Department of Transportation, Minneapolis Airport Commission, Metro

Transit Authority, Greater MSP, Mall of America, Mayo Clinic, Expo 2023 Bid Committee, and the University Of

Minnesota Carlson School Of Management.

11 | P a g e  

Page 12: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 12/36

 

Company Overview

Rail Group is a Minnesota limited liability company, which is taxed as a pass-through entity. Under various

circumstances the entity type or tax filing method may change. The company is newly formed in part to

cooperate with specific entities with strong interests in the establishment of HSR transportation for a variety of

specific and strategic reasons. Among those entities are the Mayo Clinic, Destination Medical Center, the City

of Rochester, the Metropolitan Airports Commission, the Mall of America, and the Expo 2023 Bid Committee.

The development of the first truly high speed rail corridor in North America will impact and enhance other MN

initiatives, including Greater MSP, the Mayo Clinic’s Destination Medical Center, the Mall of America’s growth

strategy, Metro Transit’s connectivity plan, the NCAA Final Four (in MN 2017), the Super Bowl (in MN 2018), and

Minnesota’s bid for the 2023 World’s Fair Expo.

China seeks commercialization and investment opportunities in the United States. Rail Group has a significantopportunity to establish an equity investment opportunity by leveraging its Chinese relationships to secure a

favored business position to commercialize Chinese HSR technology in North America.

Rail Group will be responsible for the planning, design, building and operation of a North American high-speed

rail system beginning in Minnesota. Initially, Rail Group intends to focus on high speed “destination” rail projects

beginning with the Velos Project, an 84 mile end-point-to-end-point leg of future regional and national networks.

Rail Group expects the starting point of this project is located in the South Loop of the Twin Cities near the

Minneapolis/St. Paul International Airport (MSP) and Mall of America (MOA). Its southern endpoint is in

Rochester, MN, between The Mayo Clinic and the Rochester International Airport. This section of the Midwest

Corridor serves the passenger needing connectivity between the Mayo Clinic and both international airports. It

also provides the means for the thriving med-tech businesses in the Minneapolis metro area and medical

personnel associated with the Mayo Clinic in Rochester to collaborate and travel efficiently.

12 | P a g e  

Page 13: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 13/36

 

THE MANAGEMENT TEAM

The Rail Group Management Team is widely experienced in infrastructure project management, proficient with

foreign technology and proven leaders of industry.

Leading the  management team is Joseph Sperber, President and CEO, a business developer andentrepreneur who has co-founded and funded numerous businesses through multiple forms of financing

including EB-5 and other foreign investment options. 

Joseph Wang, Chairman of the Board, is an active international business leader with strong personal and

business relationships with various levels of government officials and company executives in China. As but one

example, he played a critical support role as a government consultant during China’s ascension to the World

Trade Organization. 

David Melander, Executive Vice President / International Coordination, is a business strategist

focused on international business development with particular expertise in establishing manufacturing

relationships for US companies in China using proprietary systems for costing, quality, licensing, and production

maturity.

Wendy Meadley, Chief Strategy Officer, is an Executive MBA-credentialed general management strategist

and global communications expert with broad-based experience working with multinational Fortune 500

corporations, including 3M and Microsoft as a consultant on their most innovative global programs.

President - Rail Subsidiary Management, is a seasoned, results-driven, and accomplished transportation

professional with over 30 years of engineering and leadership experience in the transportation industry, security

administration, operations management, travel, and tourism businesses. Has served as a Commissioner of the

Department of Transportation at the State level leading a staff of 5,000 people with a biennial budget of $4.3billion.

THE ADVISORY BOARD

In addition to its impressive Management Team, Rail Group has an equally impressive and active  Advisory Board.

Bill Goins, Advisory Board Chairman, is the Worldwide Account Manager for the Medical Industry at

Federal Express and a member of the State of Minnesota Freight Advisory Board.

Mark Fuhrman is the Deputy Commissioner of the Metro Transit Authority in Minnesota.

Mark Ritchie  is Minnesota's recently-retired Secretary of State and sits on the Minnesota State Board of

Investments, the Minnesota Executive Council of Constitutional Officers, and the Board of Directors of

LifeSource.

Dale Wahlstrom is the past President of Life Science Alley, which is the world’s largest trade group in Medical

Devices, and previously held executive positions at Medtronic.

Chris Terry is the Director of Business Development for Knutson Construction where he manages and  leads

13 | P a g e  

Page 14: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 14/36

 

new commercial construction business opportunities. He is very familiar with construction/development

projects in the Rochester area. Prior to his position with Knutson, he served as Vice Present at Think Mutual

Bank. 

Lynnette Slater Crandall  is a leading expert on economic development tools and public-private

development projects, and a partner at Dorsey & Whitney LLP. Lynnette has served as counsel to the State,County, and private companies on many public/private projects including the Twins Stadium (Target Field), the

 Vikings Stadium, the Regional Rail Authority, and Destination Medical.

David Williams is the Chief Innovation Officer at the University of Minnesota, Carlson School of Management.

Prior to joining the North Star Initiative, he served as one of eight global advisors at the Microsoft Corporation

exploring 5-10 year out advanced technologies.

14 | P a g e  

Page 15: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 15/36

 

Industry Analysis

Market Overview – Benefits of Partnering with China

China seeks commercial opportunities in various world markets to leverage its technology, competitive costs,and financial strengths. It has invested heavily in research and development in high-speed trains with early

designs built on the foundation of collaboration with

Japanese and French partners. Billions of dollars have been

invested by the Chinese in designs exclusively produced in

China to advance Chinese HSR systems. In only ten years

China has built tens of thousands of kilometers of high speed

rail, connecting many of its major cities with fast, safe, low

cost transportation, and now has 800 train sets in operation.

Unlike fossil-fueled solutions (such as Amtrak’s Acela or other

traditional rail), elevated HSR can be powered by clean

electricity from renewable energy sources like wind and

solar. The proposed Velos Project between the Twin Cities and Rochester is planned as an elevated, all electric

system capable of speeds in excess of 230 mph while using existing or adjacent right-of-ways to existing

highways.

China offers the lowest cost option among worldwide HSR technologies, is in a very strong cash position in US

Dollars, and seeks opportunities to convert US cash

reserves into assets. The Twin Cities – Rochester route is

the first opportunity to structure a project that is able to

take full advantage of Chinese HSR technology andfunding, and can be completed in a timely fashion.

Consumer Needs

 An elevated HSR system between the Twin Cities and

Rochester has significant advantages over other available

means of transportation. This will be reinforced as

Rochester adds more jobs, more clinical facilities and

ancillary services as part of its Destination Medical Center.

Considering cost, time and convenience, an HSR system is a remarkably competitive mode of transportation.

Rail Group believes that it can obtain significant transportation market share as bottle necks on highways and

airports over this route cause travelers to turn to alternative modes of transportation.

Operational Cost Advantages

HSR’s electric energy power is a significant cost advantage over fossil fueled aircraft. HSR trains on the HSR

Twin Cities – Rochester route will consume as little as 6% of the total fuel of an aircraft flying the same route

under ideal conditions. HSR also has an additional advantage in that its energy source can be produced by

15 | P a g e  

Page 16: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 16/36

 

alternative methods including solar, wind, and co-generation, further reducing HSR’ s carbon footprint.

Consumer Perception

The speed, convenience and comfort of HSR travel from the Twin Cities to Rochester compared to automobiletravel times and airport lines are primary factors which Rail Group projects will stimulate consumer preference

for alternative transportation via HSR for trips of less than 600 miles.

The Mayo Effect

Every year, more than one million people from all 50 states and nearly 150 countries come to Mayo Clinic forhealth care. International travelers are familiar with HSR trains and expect to see contemporary modes oftransportation associated with the advanced and technological health care in Rochester. Rail Group’scollaboration, communication and alignment with Mayo’s Destination Medical Center’s growth strategy areexamples of its focus on social responsibility within its business model.

The Mayo Clinic’s Destination Medical Center is an innovative economic

development initiative to secure Minnesota's status as a global medicaldestination for health and healing now and in the future.

Today's competitive health care environment is driving a small number of

select medical institutions to emerge as leaders in delivering the highest quality medical care while attracting

patients and visitors from across the world. Mayo Clinic's continued success in Minnesota depends on

Rochester's ability to sustain quality access, development, service, and public infrastructures necessary to

remain competitive with other destination medical centers in the US and abroad.

The Mayo Clinic employs more than 38,000 people and generates more than $9.6 billion in economic impact to

the state. Destination Medical Center represents the largest economic development initiative in Minnesota and

one of the largest in the country. It will result in significant economic benefits for State and local jurisdictionsand create significant job growth and new business opportunities.

Combined with the Mayo Clinic’s projected growth, Destination Medical Center will generate significant

economic and fiscal impact over the next twenty (20) years with the creation of 25,000–30,000 new jobs at the

Mayo Clinic, another 10,000–15,000 new jobs from new economic regional growth, and 1,800–2,200

permanent new jobs from construction. Destination Medical Center will also create new business trades and

 jobs developed through close relationships and collaborations within industry. The hope is that it will establish

16 | P a g e  

Page 17: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 17/36

 

and/or retain new start-up biotech companies and capture business from other regions that are enticed by the

convenience of the HSR between the Twin Cities and Rochester.

17 | P a g e  

Page 18: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 18/36

 

HSR / Transit Oriented Development & Vision

Rail Group uses the word “Transform,” to represent its overall HSR network and encompasses a composite

montage of related and future Transit Oriented Development initiatives and strategies.

 At the heart of its business strategy is an operational business model focused on revenue generation.

Strategically, its execution stages capitalize wherever possible on route extension. This approach creates an

aggregated value to each destination along the network, and adds to the value of any ownership within its

Transit Oriented Development strategies (which in principle will apply to any line extension). The company plans

to build a national HSR system with a second leg from Rochester to Chicago. Representatives from Rail Grouphave had conceptual discussions with representatives from the State of Wisconsin and key public and private

development organizations in Illinois, Ohio, Michigan, Nevada, Washington DC, and Washington who have

strongly welcomed collaboration and encouraged engagement in the HSR project.

Rail Group has been contacted by several other cities hoping to be included in a national HSR system. However,in order to create the most value for the company, Rail Group intends to grow wherever possible by routeextension rather than by building non-connected routes, as each connection from point to point adds to thevalue of any ownership in Transit Oriented Development projects. For example, the rail station in Rochester andany connected real estate holdings held by Rail Group have the potential to significantly appreciate in value uponcompletion of a line connecting Rochester to Chicago.

Milestones, Timeline, and Critical Functions

Rail Group will use a new transportation delivery process dubbed Integrated Environmental Review/Design Build

 Acceleration Model to implement the Twin Cities-Rochester HSR project. This model will provide a solid project

delivery approach consistent with a venture funded entirely by the private sector. Traditional environmental

review processes will be compressed and integrated with design/ build practices to form a seamless model

where numerous activities run in parallel. Selected environmental planners, design engineers, and contractors

will collaboratively work as partners throughout the entire program/project delivery process.

 All stages of the project are designed to overlap thus expediting the construction process. Critical path

schedules will be developed in such a way that completed design elements can be transferred quickly into thebuild process. The design/build teams are planned to be co-located leveraging this robust collaborative project

delivery system.

18 | P a g e  

Page 19: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 19/36

 

Financial Plan

Transit Oriented Development.The current and fast growing trend of recognizing consumer lifestyles and creating desirable, vibrant business

communities is a key consideration of the Transit Oriented Development projects.

Factors driving the trend include:

•  Highway traffic congestion;

•  Renewed interest in community living;

•  Growing desire for quality urban lifestyles;

•  Focus on health and wellness as part of everyday living;

•  Changes in family structures including empty nesters and more single person households;

•  National focus on “Smart Growth” of cities and communities; and

• 

Federal and State policy alignments

Rail Group’s Transit Oriented Development approach is to create and contribute to building business

communities that immediately support Mayo Clinic’s Destination Medical Center in Rochester. The selection of

the Rochester station location is intended to support the Metropolitan Airport Commissions gate-extension goals,

including plans underway by the University of Minnesota to extend their Medical School Campus offering to their

Rochester Campus.

Both the Twin Cities and Rochester endpoint stations will be integrated into vibrant communities with unique

landscapes. The Bloomington endpoint station is immediately adjacent to the Mall of America and the MSP

International Airport and its hotel ecosystem, while the Rochester endpoint station facilities the important multi-modal community transit initiatives surrounding Mayo Clinic’s Destination Medical Center development project.

Key Considerations and Factors for the Bloomington Station TOD Project:

•  Extending the MSP International Airport to Rochester with a seamless/integrated customer   first

experience;

•  Taking into account first and last mile considerations;

•  The planning, policy and regulatory framework of Bloomington, MN and Hennepin County;

•  Traffic and parking considerations;

•  Land acquisition; and

• 

Multiple city, county, business and community stakeholders.

Key Considerations and Factors for the Rochester Station TOD Project:

•  Becoming part of the Mayo Clinic brand experience as a “first touch” point in Minnesota;

•  Extended station development footprint (one mile radius station development);

•  The planning, policy and regulatory framework of Rochester, MN and Olmsted County;

•  Commuter considerations including parking and traffic;

19 | P a g e  

Page 20: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 20/36

 

•  Land acquisition; and

•  Multiple city, county, business and community stakeholders.

Transit Oriented Development is an integral part of Rail Group’s overall financial strategy. The management

team intends to hire persons with extensive backgrounds in similar mixed-use development projects. They will

cooperate closely with partner developers selected based on financial commitments and specific expertiserelevant to the projects. Rail Group has secured cooperation with transportation industry experts already on the

 Advisory Board.

Revenue Model Rail Group’s two primary means of generating revenue are HSR ticket sales and the retained equity positions in

Transit Oriented Development projects and related business initiatives.

Earnings from ticket sales between the Twin Cities and Rochester are reflected in pro forma financials. Estimated

ridership is based on data obtained from the Mayo Clinic’s Destination Medical Center, the Metropolitan Airports

Commission, the Mall of America, and the City of Rochester. Rail Group expects to cover its debt payments and

return a profit to the investors.

In addition, each station location offers prime development for hotel, retail, parking, and other development.

Each station is a “captive” market for travelers. Rail Group intends to negotiate and retain a significant equity

position for each development area, beginning with the area near the Mall of America and the station in

Rochester.

Funding Requirements / Use of Funds

Rail Group seeks funds in the following Stages:

Stage 3: $50 Million

The company seeks funding from three types of investors: Project Advocates, Added-Value, and Financial

Investors.

Project Advocate Investors: These parties have significant potential benefits in the project, particularly in the

successful operation of the Twin Cities-Rochester HSR line and/or the anticipated Rochester - Chicago

extension. These investors have specific benefits they hope to gain in implementing the HSR line

b e t w e e n Twin Cities – Rochester.

 Added-Value Investors: These investors, in addition to their participation financially, have technical or  human

resources skills to add to the project, whether in engineering, project management, labor or labor  

management. Their participation adds to the project on both sides, making them strategic partners for their

specific project resources.

Financial Investors: These investors seek to participate on a purely financial basis.

20 | P a g e  

Page 21: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 21/36

 

Stage 4: Up to $4.2 Billion

In Stage 4, Rail Group intends to raise $2.8 billion equity investment, $1.4 billion from China investors and 

$ 1 . 4 b i l l i o n f r o m U S  investors. (The US amount includes the $50 million from the first raise). In

addition, Rail Group intends to obtain approval for loans of approximately $700 million and  secure EB-5

a n d o t h e r investments up to an additional $300 million. Limitations in EB-5 funding is based on the 

total number of jobs created by the  project, as each EB-5 investor’s investment must result in the creation of

ten (10) new jobs in the United States. Finally, $400 in revenue is anticipated from real estate completed before

the HSR line.

Rail Group and its advisors currently believe the cost to construct the Twin Cities -Rochester line is $4.2

billion. The balance of the financing will be achieved through debt, equity, and equipment financing.

Long Term Strategy as an Operating Entity

Rail Group intends to raise funds for additional operational expansions beginning with an extension to Chicago.The funding for expansions will be raised via a combination of five funding sources: (1) Additional Equity; (2)

 Additional loans from China; (3) New EB-5 investors; (4) Public Markets; and (5) Equipment financing.

Rail Group recognizes that EB-5 investment opportunities are becoming a “crowded marketspace” in China,

but believes that the opportunity to invest in HSR, backed by the Chinese  government and state-owned

contractors, will have special appeal as a secure investment. Rail Group believes  Chinese EB-5 investors will

be particularly attracted to this project as they are very familiar with the nature of HSR projects and a r e

culturally accustomed to investing alongside solid government entities.

There is a strong precedence for this type of fund-raise for projects that have the potential to become  national

“game-changers” in a major field of operation. The successful operation of HSR in Europe, Japan, and Chinapresents a strong indication to investors that HSR has real potent ial in the US.

21 | P a g e  

Page 22: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 22/36

 

The information contained in this Business Plan is for informational purposes only and nothing herein

should be construed as a solicitation, recommendation or an offer to buy or sell any securities.

22 | P a g e  

Page 23: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 23/36

 

 Appendix

Supporting Documentation

 Appendix A: Financial Overview  

 Appendix B: Management Team  

 Appendix C: Board of Directors (Initial)  

 Appendix D: Advisor Board Members

 Appendix E: Professional Counsel

 Appendix F: Key Operational Processes

23 | P a g e  

Page 24: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 24/36

 

Appendix A: Financial Overview

Executive Summary 

The management team and its advisors have prepared financial projections that cover the  following: (1) Stages

1-4 and through 2022, covering the feasibility, construction and  test phases; and (2) 2023-2028, covering the first

five (5) years of operation of the rail line. The  projections assume a total project cost of $4.2 billion, funded

through a combination of equity investors and debt, which will be used to construct and operate  approximately

128 kilometers (“km”) of HSR between the Twin Cities and Rochester, Minnesota. The  purpose of the financial

projection is to provide investors with an estimation of the costs associated with the  construction and operation of

the rail line. B a s e d o n t h e p r o j e c t i o n s , the major costs associated with the construction of the rail line

are environmental studies, design and engineering, land acquisition and testing. The results of studies performed

during the feasibility stage could dramatically change the costs associated with the construction of this HSR

line.

Key Assumptions / Revenue Model 

The following key assumptions were used in financial projections:

Distance :   The financial analysis assumed costs associated with building 128 km of HSR and 2 stations. The

model assumes the use of existing right-of-ways with an elevated trestle. (Right-of-Ways will be confirmed

through the Stage 3 feasibility studies.) Rail Group plans to maximize the use of existing public corridors and

reduce costs associated with right-of-way acquisition; however, the company may be required to lease or

purchase land and/or air rights along the planned route.

Time to Complete:  Construction was assumed to begin in March of 2016 and continue until December of 2022.

The model assumes six (6) months in Stage 3 (feasibility stage) and sixty (60) months in Stage 4 (construction

phase).

Construction Cost per KM :   The model assumes a cost of $33 million per km resulting in a total cost for

construction of $4.2 billion. This cost per km input is the primary driver of the model.

Rolling Stock :   The cost of the rolling stock is estimated at $200 million, and is included in the $4.2 billion cost of

construction.

Revenue Generation :   Rail revenue generation wa s a s s u m e d t o begin in 2023. The financial model

assumed three major sources of revenue: (1) train fare, (2) parking, and (3) income earned from Transit Oriented

Development projects. Given the scope of this project, there are likely other transit-oriented projects that

would coincide with the construction of the rail line.

Ridership:  The estimated ridership is based on data obtained from the Destination Medical Center, the Mayo

Clinic, the Metropolitan Airports Commission, the Mall of America, and the City of Rochester. The model

assumes a 16 car train, with 56 passengers per car, equating to 896 potential passengers. The fare cost was

estimated at an average blended rate between $40 and $45 for a one-way ticket.

Operating expenses :   Operating costs were estimated at $300 million. Major drivers of this include personnel

and professional costs (engineering, contracting, legal, and accounting, finance, etc.) an d employee costs

24 | P a g e  

Page 25: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 25/36

 

(executives, project managers, project staff and office staff).

Debt:  The model includes two major pieces of debt: EB5 and other third-party debt. EB5 debt is estimated at $300

million, with take-down tranches of $60 million per year, beginning in 2016 at an interest rate of 4.5% and with

repayment over 5-years, beginning in 2023. Third-party debt was estimated at $700 million with the first draw of

$200 m illion needed in 2017 and is fully funded in 2021. No principal repayment was assumed on the third-party debt

and interest was assumed at 6%. We also believe that there will be equipment financing available from our technology

partners, however this wasn’t assumed in the model.

25 | P a g e  

Page 26: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 26/36

Page 27: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 27/36

 

Appendix B: Management Team 

Joseph Sperber, President and CEO

 A business developer and entrepreneur, Sperber has co-founded and funded numerous  businesses through

multiple forms of financing including EB-5 and other foreign investment options. Sperber specializes in business

and strategic planning aided by his extensive background in business development and sales management. While

at the Banta Corporation, a Fortune 500 company, he led his business unit. Today, he owns multiple businessesand  helps start-ups with funding, business planning, initial business development and organizational

management. Some of Mr. Sperber’s business ventures include STA, Fusion Sales and Liberty Midwest. A

Wisconsin native, he has his Bachelor of Arts degree from the University of Wisconsin, Madison.

Joseph Wang, Chairman of the Board

 A leading consultant to the Chinese government and a notable businessman, Wang played a critical support role

as a government consultant during China’s ascension to the World Trade Organization as Executive Director of

China Society for WTO Studies. He is an active international business leader with strong personal and business

relationships with various levels of government officials and company executives in China. His business consulting

experience includes arranging high-level meetings involving leaders in government and industry. Mr. Wang’sbroad professional experience includes multi-billion dollar infrastructure project management for the Chinese

government involving international funding organizations such as the World Bank, Asian Development Bank and

International Monetary Fund. These projects include harbors, airports, super-highways, and municipal phone

systems. The businesses Mr. Wang currently leads include Neos Discovery Capital LLC and Infolink International

Group. A published author of international business management, Wang holds a BA and M.E. in Management from

China University of Mining and Technology and attended graduate courses at the University of Nevada, Reno;

University of International Business and Economics, Beijing and from Shaanxi Normal University.

David Melander, Executive Vice President / International Coordination

 A high level business strategist focused on international business development with particular  expertise inestablishing manufacturing for United States companies in China using proprietary systems for costing, quality,

licensing, and production maturity, Melander has worked in Asia   for nearly 30 years, with over 100 entry

stamps to China alone. He worked closely with Governor Rudy Perpich ( after he left government) in establishing

businesses in Eastern Europe. Melander has helped  a n u m b e r o f companies launch in foreign

markets including publishing companies in China a nd a vaccine company in India, and provided public

relations for the government of Indonesia. Additionally, on the basis of Melander’s work, one of   his clients

recently won the prestigious World Economic Forum and Schwab Foundation Social Entrepreneur of the Year

awards (2013). He has co-authored (with Joseph Wang) several Chinese  books including the American

Export Register. A Minnesota native, he has his BA from Bethel   University in Saint Paul, Minnesota.

Wendy Meadley, Chief Strategy Officer

Ms. Meadley is an Executive MBA-credentialed general management strategist and global communications expert

with broad-based experience working with multinational Fortune 500 corporations, including 3M and Microsoft

as a consultant on their most innovative global programs. As agency lead of her own firm, the Social Wendy

Group (SWG), Meadley has lead the communication of brands, innovation and development projects for 3M, Bayer,

Bring Me The News, Best Buy, Citizens League, D’Amico & Partners, Expo 2023, Hospitality Lawyer, Microsoft,

Minnesota Community Foundation, Pohlad Companies, State of Minnesota, Target, and the University of Minnesota

27 | P a g e  

Page 28: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 28/36

 

Carlson School of Management and Arboretum. Her expertise spans numerous industries and technologies. Her

global digital strategy and communications planning includes advertising agencies, public relations firms,

technology and consulting firms and event companies. Meadley holds her project management certification and

is a published author and speaker in the areas of global digital communications and innovation strategy.

Rail Subsidiary ManagementPresident

 A seasoned, results-driven, and accomplished transportation professional with over 30 years of engineering and

leadership experience in the transportation industry, security administration, operations management, travel,

and tourism businesses. Has served as a Commissioner of the Department of Transportation at the State level

leading a staff of 5,000 people with a biennial budget of $4.3 billion.

28 | P a g e  

Page 29: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 29/36

 

Appendix C: Board of Directors – [Initial Board]

Joseph Wang, Chairman of the Board 

Joseph Sperber, Member

David Melander, Member 

See biographies in Appendix A  

 Additional directors will be appointed in cooperation with investors and stakeholders.

29 | P a g e  

Page 30: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 30/36

 

Appendix D: Advisory Board

Bill Goins, Advisory Board Chairman

Bill Goins serves as the Worldwide Account Manager for the Medical Industry at Federal Express and  serves on

the State of Minnesota Freight Advisory Board.

Mark Fuhrman

Mark Fuhrman is the Deputy Commissioner of the Metro Transit Authority in Minnesota. An innovator in the rail

industry, his most recent achievement is leading the Twin Cities (MN) “Green Line” Light Rail project to successful

launch on time and within budget.

Mark Ritchie

Mark Ritchie is Minnesota's recently-retired Secretary of State. He is on the Minnesota State Board of  

Investments, the Minnesota Executive Council of Constitutional Officers and on the Board of Directors of

LifeSource. Mark is an MBA graduate of the University of Minnesota's Humphrey School of Public Affairs and

Iowa State University. He currently chairs the citizen's committee working to bring the E x p o 2023  World's

Fair to Minnesota.

Dale Wahlstrom

Dale Wahlstrom is the past President of Life Science Alley, the world’s largest trade group in Medical Devices.

Prior to this position he held executive positions at Medtronic. Recently he has focused on working with the

Food & Drug Administration, scientists, and the medical device  community to create faster, more rational

processes for the approval of medical devices with tremendous potential for life improvements.

Chris Terry

Chris Terry is the Director of Business Development for Knutson Construction where he manages and  leads new

commercial construction business opportunities for the company. He is highly familiar with projects in the

Rochester area. Prior to his position with Knutson, he served as Vice Present at Think Mutual Bank.

Lynnette Slater Crandall

Lynnette Slater Crandall i s a leading expert on economic development tools and public-private  development

projects. She is a partner at Dorsey & Whitney LLP, where she is the Chair of the Firm's Public-Private Project

Development practice group, a member of the Public Finance and Legislative practice groups, and the Chair  of

the Political Law subgroup. Lynnette’s experience working in the public and private sectors has given herunique insight into spotting the business needs of her clients, and helping to bridge the  communication gap

that often occurs between corporate and governmental entities. Lynnette has served as counsel to the State,

County, and private companies on many public/private projects including the Twins Stadium (Target Field), the

 Vikings Stadium, the Regional Rail Authority, and Destination Medical Center.

David Williams

David Williams is the Chief Innovation Officer at the University of Minnesota, Carlson School of Management. Prior

30 | P a g e  

Page 31: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 31/36

 

to joining the North Star Initiative, he served as one of eight global advisors at the Microsoft Corporation exploring

5-10 year out advanced technologies.

31 | P a g e  

Page 32: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 32/36

 

Appendix E: Professional Counsel

Foley & Mansfield PLLP, Outside General Legal Counsel

 As a national law firm with m o r e t h a n 150 attorneys in offices from coast to coast, Foley & Mansfield

is well  prepared to provide broad expertise, creative solutions, and expert advice to clients across the US. 

Foley & Mansfield’s attorneys are trusted advisors and advocates for their clients, who range from multi- million dollar enterprises to small businesses and their owners. With ten offices across the US and   strategic

alliances abroad, the firm has the geographic and legal resources to resolve most business and legal issues

quickly and efficiently.

Foley & Mansfield has earned a national reputation for exemplary service and legal expertise from the  boardroom

to the courtroom, and ha s repea tedl y been named a “Go-To” Law Firm for Fortune 500 clients.

Leveraging wide-ranging legal expertise and national resources, the firms’ business and securities  attorneys

focus in the areas of corporate formation, corporate finance, securities compliance,   comprehensive business

consultation, mergers and acquisitions, real estate matters, employment issues, and commercial, securities,and employment litigation. The firm’s attorneys work with companies spanning a wide range of industries,

including banking and financial services, business  creative business services, clean technology and

recycling, technology licensing, franchising, manufacturing,  medical and medical technology, real estate,

construction; restaurant and hospitality, technology and  telecom, and transportation and logistics.

Foley & Mansfield’s offices are located in Chicago, Detroit, Grand Rapids, Los Angeles, Miami,   Minneapolis,

New York, Oakland, Seattle, and St. Louis.

AVL Growth Partners LLC, Accounting and Finance Counsel

 AVL Growth Partners (AVL) is a unique professional services firm that delivers finance and accounting  advisoryexpertise to growing businesses, as they need it. Its clients range from early-stage startups to large growing

businesses. Its professionals have all served in key finance and accounting roles in high-growth companies

across many industries. AVL’s professionals have built and led finance and accounting departments, raised

hundreds of Millions of dollars of debt and equity capital, taken  companies through an initial public offering,

and have acquired and sold dozens of businesses. AVL  has 40 professionals across its three offices in

Minneapolis, Denver/Boulder and Chicago.

Insperity, Human Resources Counsel

Insperity, a trusted advisor to America’s best businesses for more than 27 years, provides an array of human

resources and business solutions designed to help improve business performance. Insperity™ BusinessPerformance Advisors offer the most comprehensive suite of products and services available in the marketplace.

Insperity delivers administrative relief, better benefits, reduced liabilities and a systematic way to improve

productivity through its premier Workforce Optimization™ solution. Additional company offerings include Human

Capital Management, Payroll Services, Time and Attendance, Performance Management, Organizational Planning,

Recruiting Services, Employment Screening, Financial Services, Expense Management, Retirement Services and

Insurance Services.

32 | P a g e  

Page 33: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 33/36

 

Tegra, Real Estate Development Project Consulting

Since 1996, organizations have engaged the breadth of backgrounds of Tegra’s expert team for clear thinking

execution of their real estate solutions nationwide. More than their real estate broker and more than their project

manager, Tegra is their objective corporate real estate department. Tegra’s expertise lies in its tailored approach,

creative transaction structuring, and ability to navigate the entire real estate process. Its services include: Strategic

Project Leadership, Strategic Planning for Facility Needs, Site/Building Search and Selection, Lease/Purchase

Negotiations, Negotiation of Public Incentives, Renewal, Expansion, or Contraction Negotiations, Establishment of

Project Team, Leadership of Design & Construction Process, Budget, Schedule, and Project Cost Accounting and

 Vendor, Furniture and Relocation Coordination. Signature projects include Target Field + Target Center, Capella

Corporate Headquarters, Walker Art Center, and Great River Energy.

HGA, Architects

HGA is an integrated architecture, engineering and planning firm that helps prepare its clients for the future. By

understanding their cultural and business needs, they help clients realize their organization's vision and potential

through responsive, innovative and sustainable design. HGA achieves this through multidisciplinary collaboration,

knowledge sharing and design investigation. HGA’s founding principles include collaboration, aesthetic achievement

and client service since our founding in 1953. These criteria still inspire HGA today as architects, engineers, interiordesigners and allied professionals work alongside each other from a building's inception through move-in to develop

solutions uniquely suited to each client.

33 | P a g e  

Page 34: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 34/36

 

Appendix F: Key Operational Processes

Environmental Review

The environmental review is used to predict the environmental impacts of a particular project and  provide

more definition for preliminary and final design. It is based on qualitative and quantitative  information collected

from a variety of sources. Impacts related to social, cultural, and economic resources, as well as naturalresources are investigated as part of this review process. This information is used as a starting point in the

preliminary design process and helps define the ultimate alignment based on the factors that are studied. The

environmental review process for the HSR project will  include detailed assessments of the following areas:

Land Use Geology

Community Change Water Quality/Storm water

Water Resources Fish, Wildlife, Endangered Species

 Visual/Aesthetics Cultural Resources

Noise/Vibration Transportation Integration

Environmental Justice Parks and Recreational Properties

Contamination/Haz Mat Wild and Scenic Rivers

 Air Quality Prime and Unique Farmlands

Floodplains Critical Areas

Utilities Economics/Business Impacts

Construction Impacts Operations/Maintenance Impacts

NOTE

The project delivery team will utilize the initial results of the planned rail project for the Twin Cities to

Rochester MN corridor n a m e d “ Zip Rail” Tier One Environmental Work as a starting point to transition into this new

model. 

Preliminary Engineering 

Preliminary Engineering (“PE”) is analysis and design work to produce construction plans, specifications, and cost

estimates of the preferred alignment. PE typically brings plans to 30 percent complete. PE builds upon the

technical information generated in the Environmental Review Process and is integrated with that process as

more information becomes available. Design issues include track alignment, station locations, Transit Oriented

Development integration, bridge types, park and ride  facilities, and last mile considerations. PE also includes

engineering surveys, roadway impacts,  ridership projections, and refining construction schedules and costs. A

Draft Conceptual Design Report, which is a narrative and visual description of major elements such as stations,

track location, and bridge types and locations, will be developed. During PE, a preliminary approach about how

to phase the project into smaller manageable pieces will also be developed.

34 | P a g e  

Page 35: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 35/36

 

The following areas will be addressed during PE:

Geometric Design Typical Sections

Grading Drainage

Structural Roadways/ITS

Signing LightingUtilities 30% Plans

Right of Way Acquisition

Right of Way (“ROW”) refers to a strip of land that is used as a transportation corridor. The land is acquired

as an easement or in fee, either by agreement or condemnation. It may also refer to temporary rights needed to

construct a transportation facility. Once the preferred alignment is identified for HSR and the end points

determined through the Environmental Review Process and PE work, the ROW process can begin in parallel with

other engineering-related activities. The following activities are key elements of the ROW acquisition process:

ROW Mapping ROW Engineering

 Appraisals Purchase Offers

Counter Offers Haz Mat Clearing

Relocation Condemnation (if necessary)

Demolition (if necessary) Easements (if necessary)

Because nearly all the rail corridor will be elevated above existing State highway right-of-ways, Rail

Group anticipates a much quicker and much less expensive right-of-way acquisition process than most

transportation projects usually encounter.

Design / Build Delivery

Design/Build (“DB”) is a project delivery system used in the construction industry. It is a method to deliver a project

in which the design and construction services are contracted by a single entity known as the design–builder or

design–build contractor. In contrast to "design–bid–build" DB relies on a single point of responsibility contract and

is used to minimize risks for the project owner, while reducing the delivery schedule by overlapping the design and

construction phases of a project. DB with its single point responsibility carries the clearest contractual remedies for

the owner because the DB contractor will be responsible for all work on the project, regardless of the nature of the

fault. In the HSR project delivery model, DB work will commence at the conclusion of the environmental review

process but will overlap with preliminary design work and ROW work as appropriate.

Key activities of the design build process will include:

100% Final Design Plans Final Engineer’s Estimate

Final Schedule Environmental Monitoring

Permitting HSR Construction

35 | P a g e  

Page 36: NAHSR Business Plan MNDOT

8/20/2019 NAHSR Business Plan MNDOT

http://slidepdf.com/reader/full/nahsr-business-plan-mndot 36/36

 

Final Project Management Plan Roadway/Bridge Construction

Quality Assurance/Quality Control Safety/Security

Traffic Management Project Documentation

Project Controls Value Engineering/Constructability

Testing / Deployment

Prior to operation, a detailed HSR testing program will be developed and implemented. Testing will  begin after

the DB process is complete. The project will then move into an operations phase. Testing will be overseen by an

independent consultant to assure that all aspects of the HSR are   safe and secure for the traveling public.

 After testing is complete, HSR will be deployed and HSR  passenger rail service will officially begin.

Other Related Activities

There will be many ongoing activities occurring during all phases of the project delivery process. These activities

will support the overall project and individual elements of each phase. The following activities will support coreproject components: government relations, public engagement, media  relations, strategic planning, marketing,

organizational development, emerging business consulting/contracting inclusion, technology/innovation capture,

and risk management. In addition, dedicated resources will be committed to the development of the Transit

Oriented Development integration, HSR Operations Center, Maintenance Practices/Agreements, and train set 

purchase/delivery.


Recommended