  • Foundation Fieldbus Devices & NAMUR NE 107NE 107

    Name : Hemal DesaiJob Title : Head TechnologyCompany : Endress+Hauser India

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • Agendag Drivers for NE 107 Challenges faced by Operators TodayChallenges faced by Operators Today Foundation Fieldbus & NAMUR Benefits of NAMUR NE 107 Summarized NE 107

    2011FieldbusFoundation

  • Dark Agesg

    Must be rightTx says so ?????????

    A l Si l

    16mA

    Analogue Signal

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • The Middle Agesg

    What are

    Endress+HauserDeltabar S

    What would you liketo know ??

    you ????

    Communication requestusing Hand held deviceusing Hand held device

    Master Slave

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • TodayyThe Here and Now

    Endress+HauserDeltabar S

    Your Pump may soon need some maintenance!maintenance!

    Foundation FieldbusPeer to Peer

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • Diagnostic Information from DevicesgTravel DeviationCycle CounterValve Signature

    Electronics FailureSensor FailureProcess ConditionValve Signature

    Step ResponseDynamic Error BandDrive SignalOutput Signal

    Process ConditionConfiguration WarningRTD DriftRTD Life Estimationetc...

    Electronics FailureSensor Failure

    Output Signaletc...

    etc...

    Electronics FailureS F ilSensor Failure

    Process ConditionConfiguration WarningPlugged Impulse Linesetc

    Sensor FailureReverse FlowEmpty PipeCalibration ErrorProcess Conditionetc...

    pH Electrode AgingGlass Electrode FailureReference Electrode Failure

    Process ConditionConfiguration Warningetc...

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

    Reference Electrode FailureReference Electrode CoatingReference Electrode Poisoningetc...

  • ResultOver range Reverse Flow

    Sensor Fail

    Electrode coated

    OverwhelmedIgnoreSuppress

    Empty Tube Sensor disconnect

    Sensor failureLeakage Valve stuck

    Travel Deviation

    FrictionRTD failure

    Coil openPl d li

    High Temperature

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

    Plugged lines

  • The Status Todayy Large part of the Production & Quality losses are

    primarily result of operator error which can beprimarily result of operator error which can be prevented by ensuring that right information is available to the right person at right time.g p g

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • Challenges Faced by Operators Todayg y p y Difficult to get overview status of the process. Operators are bombarded with Nuisance alarmsOperators are bombarded with Nuisance alarms Inconsistencies in diagnostics information from

    different vendors & product classes.p Different applications, terminals, interfaces with

    unsynchronized dataO i l f l l d Operators are integral part of control loops and need to take decisions in critical situations.

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • Foundation Fieldbus and NAMUR

    May 2006 Foundation Fieldbus announced co operation with NAMUR Working Group 2.6 Fieldbus for development of device diagnostic profiles to further enhance FF technologyprofiles to further enhance FF technology.

    Sept 2008 Foundation Fieldbus released final Diganostic Profile specification based onDiganostic Profile specification based on NAMUR Working Group 2.6

    Adopted NAMUR NE 107 recommendation for Self Monitoring & Diagnostics of Field Devices

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • NAMUR Organizationg

    2011FieldbusFoundation

  • What is NAMUR? NAMUR is an international association of users

    of automation in process industriesof automation in process industries. manufacturers of chemical or pharmaceutical

    products users of process plants providers of services to chemical/pharmaceutical

    f tmanufacturers organizations with a technical or scientific purpose,

    e.g. scientific bodies, associations, universities etc.e.g. scientific bodies, associations, universities etc.

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • NAMUR Organizationg

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • What does NAMUR do? NAMUR promotes the interests of the process

    industry (users) in the field of automation e gindustry (users) in the field of automation e.g. instrumentation with sensors and actuators, electrical engineering communication between process control equipment, batch control, advanced process control, plant and process

    monitoring, DCS, MES process management, plant asset management Logistic systems and Supply Chain ManagementLogistic systems and Supply Chain Management

    NAMUR Recommendations NE NAMUR Worksheets NA

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • Objective of NAMUR NE 107j It is Standardization of diagnostics information

    form field devices integrated via e g Foundationform field devices integrated via e.g. Foundation Fieldbus

    Improved Operator Efficiencyp p y Improve Productivity Reduce cost

    M k i ffi i Make maintenance more efficient.

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • What are NAMUR 107 Benefits What does NAMUR 107 implementation do?

    Bring Reliable & Viewable status diagnostics fromBring Reliable & Viewable status diagnostics from field devices

    Status will be forwarded to the right person at right Status will be forwarded to the right person at right time (fewer spurious alarms)

    Actionable Diagnostics

    Allocation of status signals in field devices.Allocation of status signals in field devices. Independent of DCS!

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • Summarized NAMUR - NE 107 NE107:Self-Monitoring and Diagnosis of Field

    DevicesDevices Diagnosis results must be reliable Internal diagnosis categorized into 5 standard status signals Configuration should be flexible depending on the user's

    requirements The plant operator should only see these status signals The diagnosis results must always be viewed in the context

    of the application Detailed information available for device specialistp

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • NAMUR Recommendation NE 107 NE107:Self-Monitoring and Diagnosis of Field

    DevicesDevices Diagnosis results must be reliable Internal diagnosis categorized into 5 standard status signals Configuration should be flexible depending on the user's

    requirements The plant operator should only see these status signals The diagnosis results must always be viewed in the context

    of the application Detailed information available for device specialistp

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • NAMUR Recommendation NE 107 NE107:Self-Monitoring and Diagnosis of Field

    DevicesDevices Diagnosis results must be reliable Internal diagnosis categorized into 5 standard status signals Configuration should be flexible depending on the user's

    requirements The plant operator should only see these status signals The diagnosis results must always be viewed in the context

    of the application Detailed information available for device specialistp

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • 5 Categories of Status signalsg g

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • NAMUR Recommendation NE 107 NE107:Self-Monitoring and Diagnosis of Field

    DevicesDevices Diagnosis results must be reliable Internal diagnosis categorized into 5 standard status signals Configuration should be flexible depending on the user's

    requirements The plant operator should only see these status signals The diagnosis results must always be viewed in the context

    of the application Detailed information available for device specialistp

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • NAMUR Recommendation NE 107 NE107:Self-Monitoring and Diagnosis of Field

    DevicesDevices Diagnosis results must be reliable Internal diagnosis categorized into 5 standard status signals Configuration should be flexible depending on the user's

    requirements The plant operator should only see these status signals The diagnosis results must always be viewed in the context

    of the application Detailed information available for device specialistp

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • Status to Operatorsp

    M i R i dMaintenance Required.Leakage??

    PCV -101

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

    PCV 101

  • NAMUR Recommendation NE 107 NE107:Self-Monitoring and Diagnosis of Field

    DevicesDevices Diagnosis results must be reliable Internal diagnosis categorized into 5 standard status signals Configuration should be flexible depending on the user's

    requirements The plant operator should only see these status signals The diagnosis results must always be viewed in the context

    of the application Detailed information available for device specialistp

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • Context of Applicationpp

    MaintenanceConsole

    OperatorsConsole

    SD_MAINT_ALM

    ActiveActive

    SD_MAINT_ACTIVE

    Clogged Pressure Sensor

    H1

    SD_RECOMMENDED_ACTION

    Clean Sensor

    2011FieldbusFoundationFFIC:Automation2011 Mumbai

  • Context of ApplicationppMaintenance

    ConsoleOperators

    Console

    SD_FAIL_ALM

    Active

    SD RECOMMENDED ACTION

    SD_FAIL_ACTIVE

    Pressure sensor failure

    H1

    SD_RECOMMENDED_ACTION

    Change Sensor

    2011FieldbusFoundation

  • NAMUR Recommendation NE 107 NE107:Self-Monitoring and Diagnosis of Field

    DevicesDevices Diagnosis results must be reliable Internal diagnosis categorized into 5 standard status signals Configuration should be flexible depending on the user's

    requirements The plant operator should only see these status signals The diagnosis results must always be viewed in the context

    of the application Detailed information available for device specialistp

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • Details to Expertsp

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • FF 912 Specificationp FF 912 - Field Diagnostic Profile The technical specification which describes the The technical specification which describes the

    implementation of the NE 107 into Foundation Fieldbus Endress+Hauser was part of the specialist team which defined the FF 912

    Failure FunctionCh kFailure Check

    OutofSpecification

    MaintenanceRequired

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • FF 912 ExplanationpMust be implemented in the Resource Block since ITK 6.0

    The same parameters are available for The same parameters are available for all manufacturer. The parameterization for the FMCS categorization is similar for all vendors.

    Can be implemented if additional diagnostic bit are needed

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

    Manufacturer specific

  • Endress+Hauser Committed to NE107E+H Group

    Wide Advanced Diagnostic

    Hardware-

    Software Wide Standard for

    g-

    Testing

    Logistic

    Products Platform With NE 107;FMP 5x GWR*;TMT 82*;E 200 - Coriollis *;E 200 - Coriollis * Presently Released with HART Only, Ff expected

    DCS / PLC Integration

    DTMs

    2011FieldbusFoundation

    DTMs

  • Example E200 Coriolisp

    2 Event page

    Icon/text according NE 107(F,M,C,S)

    1. Measurement page with warning

    2. Event page

    3. Info page

    An event occurred. Depending on event status the status symbol for the event level is shown

    2011FieldbusFoundation

    Diagnostic event page. Maintenance instructions

  • Challengesg Time by which device & host vendors will

    become compliantbecome compliant. Vendors having products manufactured at

    different production centers (acquired p ( qcompanies)

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • Summaryy

    Clear Harmonized information Independent ofClear Harmonized information Independent of source of data

    Good overview of Process & Status

    All l i f i il bl i All relevant information available in easy to use environment.

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

  • Thank You

    FieldbusFoundationIndiaCommittee

    21st September,2011

    2011FieldbusFoundation

    FFIC:Automation2011 Mumbai

    www.fieldbus.org


Recommended