NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation
Transcript
Page 1: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

Environmental Management System Implementation

Page 2: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

NAS JRB Willow Grove

The Base: 1,000 Acres 7,500 Reserve

Personnel Navy, Air

Force, Army, Marines

Page 3: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

Already Accomplished

• Gap Analysis

• Cross Functional Team

• Training

• EMS Procedures

• Environmental Aspect Assessment

• Software application for managing EMS

• Integration/streamlining

Page 4: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

I SO 14001 Gap Analysis - NAS J RB Willow Grove

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

90.00%

100.00%

Section 4.2 - EnvironmentalPolicy

Section 4.3 - Planning Section 4.4 - Implementationand Operation

Section 4.5 - Checking andCorrective Action

Section 4.6 - ManagementReview

Component of the ISO 14001 Standard

Conf

orm

ance

to IS

O 1

4001

Page 5: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

Web-Based EMS Management

Page 6: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

Approach to Project

• Pre-site preparation

• Pre-site visit questionnaire

• Site visit

• Data analysis

• Follow-up

• Develop EQA

• Automate data collection

Page 7: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

Worksheet Summary

• Mission Specific Metrics• 5090.1B/Media-Baseline Inventory Summary

– EPCRA Tier II Rpt– Solid Waste– Hazardous Waste Generation– Air Emissions

• Funding Summary (EPR data)• Environmental • Environmental Aspects• Safety• Social• Economic• Process (Utility and process specific data)• Objectives/DoD measures of Merit

Page 8: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

Installation Population*

Installation Population

0100020003000400050006000700080009000

1997 1998 1999 2000 2001 2002

Calendar Year

# o

f P

erso

nn

el Military Residents

Military Non-Residents

Civilian Residents

Civilian Non-Residents

Total

*Installation population numbers were taken from the annual P2ADS Reports.

Page 9: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

Solid Waste

Solid Waste Recycled (tons)

0

50

100

150

200

250

300

350

1996 1997 1998 1999 2000 2001 2002

Financial Year

Tons

Other Non-food

Metals

Paper and Paperboard

Plastic

Glass

Total Tons Recycled

0

100

200

300

400

500

600

1997 1998 1999 2000 2001 2002

Total Tons Recycled

Page 10: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

Hazardous Waste Management Costs vs. Total Hazardous Wastes Disposed of Offsite

*Installation population numbers were taken from the annual P2ADS Reports.

0

20000

40000

60000

80000

100000

120000

140000

160000

1996 1997 1998 1999 2000 2001 2002

Calendar Year (CY)

Qu

anti

ty i

n l

bs

and

Co

st i

n $

Total HWManagementcostTotal Disposedoffsite

Page 11: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

Total Air Emissions

0

2

4

6

8

10

12

14

16

To

tals

in t

on

s p

er

ye

ar

2000 2001 2002Calendar Year (CY)

NOx

SOx

CO

PM

VOC

*Air Emission Data were pulled from the annual AIMS Reports.

Page 12: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

Total Number of Spills

38

33

38

28

117

15 1511

610

12

00

5

10

15

20

25

30

35

40

Nu

mb

er

of

Sp

ills

1991

1993

1995

1997

1999

2001

2003*

Calendar Year (CY)

Page 13: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

Hangar 80 - 9 Spills

VR-52 - 8 Spills

VP-66 - 5 Spills

MAG Ramp - 5 Spills

Bldg 680 - 5 Spills

Bldg 6 - 3 Spills

1139 Viking Drive, Airforce Ramp, Echo Throat, LOX Farm, T-

Line, & Bldgs 119, 127, 166, 170, 171, 175, 2, 24, 601, 609,

780, 81 - 1 Spill Each

Breakdown of Spills by Location from CY 1998 - 2002

Page 14: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

Site Visit/Data Analysis

• Media Manager filing methods

• Numerical data was in hardcopy format

• Inconsistent use of technology tools

• 3 years of historical data

• Some data collected by other departments

• Spill record issues: Type and units

• Data correlation

Page 15: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

Action Items

• Amend ROICC contracts and develop procedure• Develop methodology for tracking waste in each area• Track costs avoided by implementation of

environmental programs• Establish solid waste costs to justify recycling of glass

and plastic• Develop methodology for ensuring that the numbers are

automatically entered into EnviroManager• Affirmative Procurement• Reclassification of waste stream: Lamps managed as a

universal wastes.

Page 16: NAS JRB Willow Grove EMS Metrics Environmental Management System Implementation.

NAS JRB Willow Grove EMS Metrics

Next Steps

• Data Management

• EQA Report

• Refine system

• Automate data collection

• Audit scheduled for last week of May