MADHYA PRADESH URBAN ADMINISTRATION AND DEVELOPMENT
DEPARTMENT
Report on “City Vision, Sector Goals, Strategies,
Projects and Priorities”
City Development Plan for Shahganj
January 2012
Submitted to
Commissioner
Urban Administration and Development Department, “Palika Bhawan”, Nr. 6 No. Stop, Shivaji Nagar, Bhopal
Phone: +91-755-2552356 Fax: +91-755-2552591
ICRA Management Consulting Services Limited
Logix Park, First Floor
Plot A4 & A5, Sector – 16
Noida – 201301
Urban Administration and Development Department Government of Madhya Pradesh
DRAFT CITY DEVELOPMENT PLAN OF
NASRULLAHGANJ NAGAR PARISHAD
DISTRICT – SEHORE, MADHYA PRADESH
Project Co-ordination:
City Managers Association Madhya Pradesh
Prepared by:
ICRA Management Consulting Services Limited
2012
City Development plan for Nasrullahganj ii
ABBREVIATIONS AND ACRONYMS
BPL Below Poverty Line
BT Bitumen Top
CAGR Cumulative Average Growth Rate
CC Cement Concrete
CDP City Development Plan
CIP City Investment Plan
CPHEEO Central Public Health and Environmental Engineering Organization
CUR Capital Utilization Ratio
DCB Demand Collection Balance
DSCR Debt-Service Coverage Ratio
EPC Engineering Procurement and Construction
EWS Economically Weaker Section
FOP Financial Operating Plan
FY Financial Year
GIS Geographic Information System
GoI Government of India
GoMP Government of Madhya Pradesh
IHSDP Integrated Housing and Slum Development Programme
IMaCS ICRA Management Consulting Services Limited
INR Indian Rupee
ISWM Integrated Solid Waste Management
JNNURM Jawaharlal Nehru National Urban Renewal Mission
LIG Low Income Group
LPCD Litres Per Capita Daily
MC Municipal Council
MIS Management Information System
ML Million Litres
MLA Member of Legislative Assembly
MLD Million Litres per Day
MP Member of Parliament
MPHB Madhya Pradesh Housing Board
MPPCB Madhya Pradesh Pollution Control Board
MPSEB Madhya Pradesh State Electricity Board
MSW Municipal Solid Waste
NGO Non-Governmental Organization
NP Nagar Parishad
NUIS National Urban Information System
O&M Operation & maintenance
OHT Over Head Tank
PHED Public Health Engineering Department
PHFW Department of Public Health and Family Welfare
City Development plan for Nasrullahganj iii
PSC Public Sanitary Conveniences
PWD Public Works Department
ROB Road Over Bridge
SADA Special Area Development Authority
SC/ST Scheduled Caste/ Scheduled Tribe
SFC State Finance Commission
SH State Highway
SJSRY Swarnjayanti Shahri Rojgaar Yojna
STP Sewage Treatment Plant
SWDS Storm Water Drainage System
SWMS Solid Waste Management System
SWOT Strengths, Weaknesses, Opportunities and Threats
TCPD Town and Country Planning Department
TFC Twelfth Finance Commission
UADD Urban Administration and Development Department
UDPFI Urban Development and Plan Formulation and Implementation
UGD Under Ground Drainage
UIDSSMT Urban Infrastructure Development Scheme for Small and Medium Towns
ULB Urban Local Body
ULCRA Urban Land Ceiling and Regulation Act
City Development plan for Nasrullahganj iv
EXECUTIVE SUMMARY
The Urban Administration and Development Department (UADD) of Government of Madhya Pradesh
(GoMP) retained ICRA Management Consulting Services Limited (IMaCS) for assistance in the
preparation of City Development Plan for Nasrullahganj town.
The objectives of the exercise are three-fold: a) to assess existing demand-supply gaps in service
delivery and derive a comprehensive infrastructure improvement plan (including a Capital Investment
Plan) required, b) to identify revenue enhancement and financial improvement measures and c) to
develop a Financial and Operating Plan to implement a sustainable infrastructure improvement plan.
City profile and Growth Potential
Nasrullahganj is located in the Sehore District of Madhya Pradesh State. Before the constitution of
Madhya Pradesh as a state, it was ruled by Bhopal Nawabi Town and nearby region has high
Agriculture importance. It stands in the foothills of Vindhyachal range in the middle of Malwa region.
Nasrullahganj town is located at a distance of 73 Km from the district headquarter Sehore. Sehore is
surrounded by seven districts i.e. Bhopal, Raisen, Hoshangabad, Dewas, Shajapur, Raigarh and
Harda. Lying between the north latitude 22º31' to 23º40' and east longitude 76º22' to 78º08', the
district's headquarters is situated at the Sehore city.
Nasrullahganj town lies on the road which connects National Highway 86. It can be reached from
Bhopal through SH-22. It is 92 kms from Bhopal City.
A SWOT Analysis of the town is presented below:
Strengths Weaknesses
The town has high production of Wheat, Pulses
and Soybean with the presence of Krishi Upaj
Mandi of Class „A‟.
Good connectivity via Road and Rail.
Poor Infrastructure system in the town
Opportunities Threats
Agro–based industries would create much needed
employment and boost economy of the town.
Lack of basic infrastructure, giving rise to poor
living conditions, hampering socio-economic
condition of the town.
As of 2011 (Provisional Data – Census 2011), Nasrullahganj has a population of 23,738. Although the
details for 2011 are not available, but referring to Census details of 2001, the work participation rate
was 27% (2001) which was very low as compared to national rate of 39% and state rate of 42.7%.
Currently, the sex ratio of the town is 964, which is far above than national level of sex ratio of 940
and higher than state‟s sex ratio of 887. Literacy rate is 73 % which is very high as compared to
National Literacy Rate of 64.84% and state‟s literacy rate of 63.74%.
Nasrullahganj‟s inhabitants are primarily agriculturalists. Soybean and pulse production is very high
in the region. The total area of the town is 14.88 sq. Town has been delineated into 15 wards.
Municipal Services – Status assessment and Gaps
The Table shown below presents a summary of service levels and status with respect to selected
indicators in Water Supply, Sanitation, Transportation, Street lights and Solid Waste Management.
City Development plan for Nasrullahganj v
Summary of prevailing service levels – Key Indicators, Issues and Gaps
Sl.
no
Service Level Benchmarks
Name of the Indicator
Value Comments
Water Supply
1 Daily Per Capita Supply (LPCD) 60 Current supply on a per capita basis
is significantly below UDPFI
Need for significant augmentation of
water supply at source, storage and
distribution.
2 Elevated Storage Capacity / Daily Supply (% of
amount of daily water supplied)
57
3 Distribution Network / Road Length (%) 28
Sewerage, Sanitation and Storm Drains
6 Presence of UGD network (Yes / No) No No Coverage of UG network
approximately 13% population –
resort to open defecation due to lack
of individual or community sanitation
facilities in their area
7 UG connections / assessed properties (%) No
8 Slum Pop/Public convenience (nos.) 102
9 Storm Drain Length / road network (%) 197
Roads and Street Lights
10 BT roads / Total (%) 0 Municipal roads would require
comprehensive upgradation
following water supply and UGD
implementation.
11 Road length per Street Light (m) 83
Solid Waste Management
11 Waste generation per capita (gms) 250 Need for a comprehensive program
for SWM
Presently, waste is thrown in an
open ground near water tube wells
Composing, Source segregation and
Door-to-door collection needs
implementation in a phased manner.
12 Collection efficiency (% of waste generated) 42.1
14 Landfill Area (Acres) 4.3
15 Average vehicle trips 1
16 Source Segregation and Composting (Yes/No) No
Analysis of Financial Performance
The table shown below provides a summary of the income and expenditure of Nasrullahganj Nagar
Parishad.
Financial Status at a Glance
Actuals in Rs. Lakhs
Items
2007-08 2008-09 2009-10 2010-11 CAGR
Revenue Account
Income
94.87 139.45 149.36 239.48 36.16
Expenditure
62.75 75.42 92.28 175.31 40.84
Surplus/ Deficit
32.12 64.03 57.08 64.18
Capital Account
Receipts
93.62 108.05 194.82 380.58 59.60
Payments
125.76 155.55 261.84 105.55 -5.67
City Development plan for Nasrullahganj vi
Actuals in Rs. Lakhs
Items
2007-08 2008-09 2009-10 2010-11 CAGR
Surplus/ Deficit
-32.15 -47.50 -67.02 275.04
Overall Status incl. O.B.
2.12 29.15 29.94 367.71
Observations on Municipal Accounts
CUR: Capital Utilization ratio: Average Capital utilization ratio of Nasrullahganj Nagar
Parishad is 1.10 which is more than 1, indicating that Nasrullagunj‟s capital expenditure is
more than its income. It also means that they are utilizing their revenue income for capital
purposes.
Operating Ratio: The average operating ratio of the Nasrullahganj Nagar Parishad is 0.64
which is less than 1, indicating that Nasrullagunj‟s revenue expenditure levels are lower than
the revenue income generated. This might also indicate that the revenue income is being
utilized for paying off capital expenditure since capital utilization ratio is more than one in 3
years .
Salaries expenditure to revenue income: If we look at this ratio we can observe that
approximately 34% of the revenue income is utilized for paying the staff employed by Nagar
parishad. After paying off the salary not much revenue income is left to be utilized for other
productive revenue purposes.
Vision for Nasrullahganj Town
To take the town ahead, a vision statement for Nasrullahganj town has been finalized after
consultations with Municipality officials, elected representatives and other stakeholders:
“A sustainable city that provides adequate and equitable access of urban services for all its
citizens along with employment opportunities for everyone”
To achieve the desired vision, Sector goals and detailed strategies have been formulated for 1)
Physical Infrastructure, 2) Social Infrastructure, 3) Economic Development, 4) Environment, 5) Urban
Poor and 6) Urban Governance and Institutional Development.
Action Plans – List of Identified Projects
It is realised that there is significant project level intervention required for Nasrullahganj to provide its
citizens with the desired services. For this, sector strategies have been formulated for the critical
sectors and a list of actual projects for each of the sector has been identified with consultations with
stakeholders of the city. The lists of the sector wise identified projects are:
Water Supply
1. Source Augmentation: Currently, the extraction of water is done through tube wells at various
places with increasing population and economic development there would be more requirement of
water. Thus, there is a need to encourage additional sources of water. This project needs to be
developed completely by 2015. The additional water requirement can be met by adopting either of
the following options:
Drawing additional water from Narmada River.
Sourcing water from the rain water harvesting
City Development plan for Nasrullahganj vii
2. Water treatment facility: As there is no treatment facility available in the town, there is a need to
install treatment infrastructure with a capacity of 5.6 MLD by 2035. By 2015 treatment
infrastructure needs to be developed for 3.68 MLD water.
3. Distribution Network: The proposed water supply scheme includes the construction of additional
24.98 km of distribution network by 2015 and 39.63 km of distribution network by 2035.
4. Elevated Storage Capacity: In future with the increasing demand there would be need to
increase the capacity of elevated reservoirs upto 1.23 MLD by 2015 and 2.19 MLD by 2035.
5. Metering System: 100% properties need to be assessed and water meters need to be installed
in all the properties with water connection, so that revenue income of the Nagar Parishad can be
increased.
Sewerage
DEWAT System: As the population of Nasrullahganj town lives in a very small area, and all areas are
not contiguous and are fragmented, it would be very beneficial for the town (both financially and for
operations & maintenance) to implement Decentralized Waste Water Treatment System (DEWATS)
to dispose of its 5.26 MLD (by 2035) of generated sewage.
Sanitation
Public Convenience Systems: To provide safe and sufficient sanitation facilities to the citizens,
mainly slum dwellers, around 37 more public toilet seats need to be added to the existing
infrastructure in Nasrullahganj by 2035.
Solid Waste Management
1. Collection Infrastructure:
Primary Collection: Augmentation of primary collection involves capacity addition in the area
of equipments used in the waste collection including community bins. As per the demand
assessment, on a priority need, additional 13 handcarts would be needed for short term span
and additional 33 handcarts would be needed for long term span. Also currently, the practice
being followed includes a majority of residents dumping waste outside their houses, or in
drains/ vacant land or at the designated collection point/ dustbin. This results in scattering of
waste which results in poor collection. To achieve an effective waste collection, practice of
door-to-door collection should be initiated which needs to be supported by necessary
awareness generation programmes and capacity building of the staff.
Secondary Collection: Secondary collection involves transportation of waste from collection
points to the disposal site. At present, secondary collection is carried out by 2 tractors. These
tractors are unable to collect the waste from the internal narrow streets. On a priority,
secondary collection system should be strengthened to carry out waste transportation in an
effective manner. All the waste transportation vehicles should be covered to avoid the spilling
of waste. By 2015, 2 more tractors would be required if one tractor is making one trip a day
and by 2035, total 6 tractors would be required.
2. Development and augmentation of the landfill site: The demand-gap assessment reveals the
generation of 12.18 MT of waste in the town by 2035. The current available disposal site has 4.3
acres area which is sufficient till 2035. The collected waste is just dumped at the site without any
treatment or segregation. The dumping site would have to be well-equipped to ensure proper
waste segregation and composting facilities.
City Development plan for Nasrullahganj viii
3. Development of Vermi-Compost Plant: It is proposed to dispose the waste generated through
Vermi composting which involves the stabilization of organic solid waste through earthworm
consumption which converts the material into worm castings. The composting and segregation
would help in some revenue generation for Nagar Parishad and it will also reduce waste amount
to be dumped in the landfill site.
Drainage
1. Cleaning / Desilting of existing drains: As an immediate measure, Nagar Parishad should aim
at timely cleaning and maintenance of existing drainage network. Under this project, major natural
drains should be given proper attention as they are flowing in the Nagar Parishad area.
2. Construction of storm water drains: The Nagar Parishad should undertake the construction of
Pucca Open and Pucca closed drains in phased manner. This construction may be done in
tandem to the construction/up-gradation of roads. These construction activities would have to be
carried out on an immediate basis to address the existing and future demand-supply gap. . In
short-term, 3.20 km of new drains need to be developed and addition of 12 km of network needs
to be done beyond 2035.
3. Upgradation of existing drains: The Nagar Parishad is also required to undertake drain up-
gradation works for the existing drains in town. In the short term, 24 km of existing Kutcha open
drains should be upgraded to Pucca open or closed drains.
4. Development of Root Zone Treatment System (RZTS): It is observed that the sewage flowing
through nallahs joins Rivers in untreated condition and creates heavy risk of river pollution. Storm
water can be treated as well with RZTS after removal of settleable substances. It is a low-cost
and maintenance free option that uses the capacity of plants (especially certain reeds – hence
also called reedbed technology) to absorb contaminants and structurally modify them for treating
water.
Traffic and Transportation
1. Road Construction: To address the current gap of per capita road length and the future demand,
the Nagar Parishad new road formation of 8.51 upto 2015, and would need to construct around
16 km of additional road by 2035. The Nagar Parishad should on a priority basis identify the
stretches and areas where roads at present do not exist and or have poor connectivity. Also the
areas where future residential growth is anticipated or planned, road construction can be
undertaken.
2. Road Up gradation: The Nagar Parishad would have to upgrade the internal roads from their
existing type to CC or BT category. The road upgradation may be taken up on the priority basis.
In short-term there is a need to upgrade 15 km of road stretch and beyond 2015 only 0.62 km of
road would be required to upgrade.
3. Signalization and Signage: The arterial road passes through the town connecting National
Highway with many villages. This may increase the flow of vehicles on the road in the future. This
endangers the pedestrians crossing the road. Thus there is need for signalization and proper
signage at few points.
4. Parking Spaces: With the growing number of vehicles and increasing commercial activities in the
town, issue of lack of parking spaces becomes much more relevant. The consultations with
stakeholders have concluded that parking spaces can be developed near the key commercial
area of the town.
City Development plan for Nasrullahganj ix
Street Lighting and Fire Fighting
1. Additionn of Streetlights: The Nagar Parishad needs to install a total of 980 street lights by
2015 and 1554 street lights to match the demand of 2035.
2. Energy Saving: Nasrullahganj Nagar Parishad should replace all the tube lights with CFLs. A
small exercise was conducted to evaluate the benefits of the replacement of tube lights with CFLs
in the town. It was observed that Nasrullahganj Nagar Parishad would save around Rs. 2.6 lakh
annum in electricity bill.
3. Fire Fighting: Parishad has two fire fighting vehicle. To ensure a safety against the fire, Nagar
Parishad should also undertake the construction of fully equipped fire stations.
Health
1. Primary Health Centre: As per the UDPFI guidelines, the city need bed capacity of 54 by year
2015 and 75 by 2025 and 97 by 2035. At present, city has 50 beds. There are only five doctors.
2. Nursing Home: According to the estimates, a nursing home with bed capacity of 32 is required
for the town in 2035. At present the town lacks a government or private Nursing Home.
3. Dispensary: Currently eight dispensaries are present in the town which is sufficient till 2035.
Education
1. Primary Schools: The overarching goal in this sector is to achieve 100% literacy rate in the city.
Nasrullahganj requires one more number of schools by 2015; by 2035 it would require Nine
primary schools. The infrastructure provision within the schools is in very poor condition and this
has to be upgraded.
2. Senior Secondary Schools: Three Middle schools are present now and Three more would be
required by 2035.
Socio-Cultural Facilities
Currently there is one community hall and one playground. By 2035 there will be requirement of two
more community hall and playground each.
Urban Poor
Interventions needed have to be completed by 2015. These interventions are:
1. Prepare a Slum Free City plan
2. Comprehensive slum mapping and need for housing
Environment
1. Air Quality: Periodic monitoring and review is essential to check air quality. Suitable plantations
or green cover should be provided on major routes to supplement better air quality. This would
partially be addressed by the development of Parks in the town and a massive tree plantation
drive.
2. Water Pollution: Efforts/schemes should be designed to check the diversion of sewage flow into
Nevaj River through appropriately located sewage treatment plants. This aspect would be
addressed by the development and upgradation of Sewerage & Sanitation facilities, Storm water
drainage infrastructure and strengthening of solid waste collection/transportation system.
3. Water Bodies Conservation: For water body conservation and rejuvenation, proper attention
should be given to the local pond. Also river front development needs to be brought in to improve
the situation of the Navej River.
City Development plan for Nasrullahganj x
4. Green Spaces: A critical issue that needs to be addressed on the priority basis is the
development of green spaces within the town limits to enhance the overall quality of the
environment.
Economic Development
Development of Small scale industries: Focus should be on the agro-based industries. A land
should be identified either within the municipal limits or near to the city boundary and proposal should
be sent to the appropriate authorities for the same. This would thrust to the employment generation
activities result into the overall up-liftmen of the society. Since, agricultural production of Soy Bean
and Pulses is high in the town and these are exported from here to other towns and state for
processing. Agro-Based Industries based on Pulses and Soya bean should be increased.
Urban Governance
1. Capacity Building: There is a need for training of the existing staff and new staff to increase the
productivity of the work. Workshops and awareness programmes can be conducted.
2. Computerization: Nasrullahganj Nagar Parishad should initiate the process of computerization in
its administration. Computerization will benefit most of its functions ranging from municipal
accounting to tax management. The introduction of E-Governance will help in smoothening the
processes and improvement in the efficiency.
3. GIS Mapping: A GIS mapping of the city properties will be very helpful in the provision of efficient
services to the citizens. This would also help in keeping a tab on tax evaders.
Capital Investment Plan (CIP) and Priority Projects
Given below is a summary of the CIP for Nasrullahganj town. The CIP has been prepared based on
normative gaps in infrastructure services given existing status and norms for service delivery. Status
and progress on projects are identified as part of the Vision Plan.
Summary of Capital Investments
Items
Investment by 2015 Total Investment
% of Investment
till 2015 w.r.t 2035 (Rs.
lakhs)
% w.r.t.
total till
2015
(Rs. lakhs) % w.r.t. total
till 2035
1 Water Supply 987.29 26.70% 1,227.96 16.11% 80%
2 Sewerage & Sanitation 400.71 10.84% 501.62 6.58% 80%
3 Roads & Urban Transport 560.17 15.15% 1,495.16 19.61% 37%
4 Storm Water Drains 481.91 13.03% 1,164.42 15.27% 41%
5 Street Lights 99.75 2.70% 192.2 2.52% 52%
6 Solid Waste Management 37.98 1.03% 199.60 2.62% 19%
7 Urban Poor/ Slums 621.25 16.80% 621.25 8.15% 100%
8 Health Infrastructure 244.00 6.60% 1,079.50 14.16% 23%
9 Education 195.00 5.27% 975.00 12.79% 20%
10 Socio-Cultural Facilities 22 0.60% 88 1.15% 25%
11 Urban Environment 35.00 0.95% 60.00 0.79% 58%
12 Urban Governance 12 0.32% 20 0.26% 60%
Total Investment 3,697.06 100.0% 7,624.71 100.00% 48%
City Development plan for Nasrullahganj xi
Technical assistance requirements
A list of project level / sector specific technical assistance requirements are summarised below:
1. Comprehensive GIS for the town with updated information on all urban assets including roads,
water supply, sanitation etc.
2. Support for digitization of layout records and town planning information
3. Roadmap for 135 LPCD water for the citizens of the town
4. DPR for Traffic and Transportation improvement plan for the town.
5. DPR for solid waste management with focus on scientific disposal and mechanized handling of
waste with private sector participation
Broad Actions to achieve the City Vision and Sector Goals
Nasrullahganj‟s ability to improve on its financial performance hinges primarily on its ability to sustain
and improve on the revenue growth noticeable in recent years. Some of the actions needed in this
regard are:
1. Conduct a zero-base assessment of skill gaps and manpower needs of ULBs to ascertain the
appropriate manpower plan in terms of skill sets and experience/seniority. This is particularly
relevant given the recent developments, specifically in urban planning and GIS, municipal
accounting and systems, e-governance and modern practices in infrastructure service delivery.
2. Address critical operational areas through focused training and capacity building interventions,
particularly in the areas of a) Engineering and project development, b) Accounting and Finance
and c) Use of CAD/GIS applications in Town Planning and Engineering functions.
3. Develop / enforce technical standards with specific applicability to development of municipal
projects.
4. Nasrullahganj can increase its own income by FY ending 2015 through focused interventions in
the following areas.
Property tax: – through revision in ARV, widening assessee base and closer scrutiny.
User charges – through increased penetration of water connections and new sewerage
connections could potentially triple user charges income from the current levels.
Financial Operating Plan and Investment Capacity
Given the existing financial position of Nasrullahganj Nagar Parishad, the revenue and capital
accounts are projected against the growth scenario and assumptions presented above. The City
Investment Plan (CIP) prepared in the previous chapter shows that the total investment required to
develop Nasrullahganj City is Rs. 32.74 crore at constant prices till 2015 (of the total Rs. 76.24 crore
investment identified for funding till 2035). It includes about Rs. 4.39 crore towards Education and
Health sector, which are not provided by Nagar Parishad. Hence for FOP is generated from the
sustainable investment point of view in line with current growth trends against the identified
investment for Nagar Parishad of Rs. 14.74 crore at constant prices till 2015, which excludes
investment required for Health and Education sector.
Base Investment Capacity
Base Investment Capacity is estimated considering business as usual case, where Nasrullahganj
Nagar Parishad has not taken any grant under UIDSSMT scheme and has not done any reforms to
increase their revenue income. At this scenario Nagar Parishad will be able to sustain only 6.6 % of
City Development plan for Nasrullahganj xii
the total investment identified for year 2015, which is about Rs. 1.74 crore at constant price and Rs.
2.08 crore at current price.
Impact of different scenario’s to assess investment sustainability
With reforms in Property Tax, Water Charges and Sewerage charges
This case assumes the reforms in property tax, Water and Sewerage have been implemented and
accordingly the investment capacity has increased by Rs. 0.79 crore above the base investment
capacity. These reforms will increase the total sustainable capacity to 9.6%.
Reforms and State Grants, without debt Funding
This case assumes that all the reforms suggested above are being implemented and UIDSSMT
grants are also availed. In this scenario Nagar Parishad‟s sustainable capacity will increase to 39.6 %,
which is 30% in addition to scenario 1. Now Nagar Parishad will be able to sustain investment of
about Rs. 10.44 crore at constant price and Rs. 10.48 crore at current price.
Reforms and UIDSSMT grants along with debt Funding
This case assumes that Nagar Parishad can increase their sustainable capacity by taking debt from
any financial institution or private banks in addition to the implementation of reforms suggested above
and grants under with UIDSSMT grants. In this scenario can sustain up to 50.50 % of the total
investment identified, which is 11 % more than without debt funding scenario. Now Nagar Parishad
will be able to sustain investment of about Rs. 13.32 crore at constant price and Rs. 15.91 crore at
current price.
From the above analysis, it is very clear that ULB alone even with the grant support under various
schemes and reforms will not be able to implement 100% of the projects identified under the City
Investment Plan (CIP). But they can substantially increase their sustainable capacity with these
reforms. So, it is recommended that ULB along with the support from UADD, GoMP should try to
develop few projects (like SWM and street light CFL conversion) on PPP model and additional grant
support from GoMP.
It is also recommended that on the same lines of the National Urban Information System (NUIS)
programme for strengthening of information system at Municipal Corporation level, GoMP should also
provide support to all the local bodies in Madhya Pradesh, which are not covered in the mentioned
programme.
City Development plan for Nasrullahganj xiii
CONTENTS
1. Introduction .................................................................................................................................................... 1 1.1. Background ........................................................................................................................................... 1 1.2. Objectives and Scope of Work .............................................................................................................. 1 1.3. Description of Tasks (as outlined in RFP) .............................................................................................. 2
1.3.1. Inception ........................................................................................................................................... 2 1.3.2. Development of strategies and priority actions ............................................................................... 4 1.3.3. Preparing a City Investment Plan (CIP) and a financing strategy ...................................................... 4 1.3.4. Draft CDP .......................................................................................................................................... 4 1.3.5. Final CDP document .......................................................................................................................... 5
1.4. Approach ............................................................................................................................................... 5 1.4.1. Guiding Principle ............................................................................................................................... 5 1.4.2. Approach and Methodology ............................................................................................................. 6 1.4.3. Module I: Inception and Kick off ....................................................................................................... 6 1.4.4. Module II: Consultations and Analysis .............................................................................................. 8 1.4.5. Module III: Finalisation ................................................................................................................... 10
1.5. Stakeholders Interaction ..................................................................................................................... 11 1.5.1. Interacting with Municipal Body ..................................................................................................... 11 1.5.2. Interaction with other Stakeholders ............................................................................................... 11 1.5.3. Formation of Steering Group .......................................................................................................... 12 1.5.4. Workshops ...................................................................................................................................... 12
1.6. Report contents .................................................................................................................................. 13 1.7. Limitations and Caveats ...................................................................................................................... 13
2. Physical features of the Town ...................................................................................................................... 14 2.1. Introduction ........................................................................................................................................ 14 2.2. District information ............................................................................................................................. 14 2.3. Location (Linkages and connectivity) .................................................................................................. 14 2.4. Physiography and landform ................................................................................................................ 14
2.4.1. Topography ..................................................................................................................................... 14 2.4.2. Drainage .......................................................................................................................................... 15 2.4.3. Climate ............................................................................................................................................ 15
2.5. Municipal area and planning area ....................................................................................................... 15 2.6. Conclusion ........................................................................................................................................... 15
3. Demographic Profile of the Town ................................................................................................................. 16 3.1. Introduction ........................................................................................................................................ 16 3.2. Population growth and density ........................................................................................................... 16 3.3. Population projection ......................................................................................................................... 16 3.4. Ward-wise demographic details ......................................................................................................... 17 3.5. Issues ................................................................................................................................................... 18 3.6. Conclusion ........................................................................................................................................... 18
4. Socio Economic Profile of the Town ............................................................................................................. 19 4.1. Introduction ........................................................................................................................................ 19 4.2. Indicators ............................................................................................................................................ 19
4.2.1. Sex ratio and Literacy rate .............................................................................................................. 19 4.2.2. Average household size .................................................................................................................. 21 4.2.3. Workforce participation (Primary, Secondary and Tertiary occupation and income levels) .......... 22
4.3. Economic Base .................................................................................................................................... 22 4.3.1. Industrial activities .......................................................................................................................... 22 4.3.2. Trade and commerce ...................................................................................................................... 23
4.4. Issues ................................................................................................................................................... 23 5. Spatial Planning and Growth Management .................................................................................................. 24
5.1. Spatial growth trends .......................................................................................................................... 24 5.2. Spatial distribution of population ....................................................................................................... 24
City Development plan for Nasrullahganj xiv
5.2.1. Municipal level mapping (to the scale) ........................................................................................... 25 5.2.2. Ward delineation map .................................................................................................................... 25
5.3. Land-use analysis ................................................................................................................................ 25 5.4. Housing scenario ................................................................................................................................. 25
5.4.1. Present and future Housing demand .............................................................................................. 25 5.4.2. Illegal colonies ................................................................................................................................ 26 5.4.3. Future growth possibilities ............................................................................................................. 26
5.5. Issues ................................................................................................................................................... 26 5.6. Conclusion ........................................................................................................................................... 26
6. City’s Infrastructure – Existing Status, Gaps, Issues, SWOT, Goals and Strategies ....................................... 27 6.1. Water supply ....................................................................................................................................... 27
6.1.1. Source, Supply, Distribution Systems and Treatment Facilities ...................................................... 27 6.1.2. Connections and User Charges ....................................................................................................... 28 6.1.3. Present and Future Demand and Supply Gaps ............................................................................... 29 6.1.4. Water supply projects ..................................................................................................................... 29 6.1.5. SWOT analysis ................................................................................................................................. 30 6.1.6. Issues .............................................................................................................................................. 30
6.2. Sewerage ............................................................................................................................................. 31 6.2.1. Existing sewerage system ............................................................................................................... 31 6.2.2. Means of sewage disposal .............................................................................................................. 31 6.2.3. Household toilets (Dry Latrines and Flush latrines) ........................................................................ 31 6.2.4. Open defecation ............................................................................................................................. 31 6.2.5. Maintenance of septic tanks ........................................................................................................... 31 6.2.6. Present and Future Demand and Supply Gaps ............................................................................... 32 6.2.7. Sewerage projects .......................................................................................................................... 32 6.2.8. SWOT analysis ................................................................................................................................. 32 6.2.9. Issues .............................................................................................................................................. 33
6.3. Sanitation ............................................................................................................................................ 34 6.3.1. Private toilets .................................................................................................................................. 34 6.3.2. Community toilets .......................................................................................................................... 34 6.3.3. Present and Future Demand and Supply Gaps ............................................................................... 35 6.3.4. Sanitation projects .......................................................................................................................... 35 6.3.5. SWOT Analysis ................................................................................................................................ 35 6.3.6. Issues .............................................................................................................................................. 35
6.4. Solid waste management .................................................................................................................... 36 6.4.1. Generation, Collection, Transportation and disposal of Solid Waste ............................................. 36 6.4.2. Present and Future Demand and Supply Gaps ............................................................................... 37 6.4.3. SWOT analysis ................................................................................................................................. 38 6.4.4. Issues .............................................................................................................................................. 38
6.5. Drainage .............................................................................................................................................. 39 6.5.1. Existing drainage system................................................................................................................. 39 6.5.2. Present and Future Demand and Supply Gaps ............................................................................... 39 6.5.3. SWOT analysis ................................................................................................................................. 40 6.5.4. Issues .............................................................................................................................................. 40
6.6. Traffic and transportation ................................................................................................................... 40 6.6.1. Existing traffic and transportation scenario ................................................................................... 40 6.6.2. Travel characteristics ...................................................................................................................... 41 6.6.3. Parking – Current arrangements and requirements ....................................................................... 41 6.6.4. Present and Future Demand and Supply Gaps ............................................................................... 42 6.6.5. SWOT analysis ................................................................................................................................. 42 6.6.6. Issues .............................................................................................................................................. 42
6.7. Street lighting and Fire fighting ........................................................................................................... 43 6.7.1. Existing situation of Street lights and Fire Services ........................................................................ 43 6.7.2. Present and Future Demand and Supply Gaps ............................................................................... 43
City Development plan for Nasrullahganj xv
6.7.3. SWOT analysis ................................................................................................................................. 44 6.7.4. Issues .............................................................................................................................................. 44
6.8. Urban poor and their accessibility to basic Services ........................................................................... 45 6.8.1. Poverty in the town ........................................................................................................................ 45 6.8.2. Slums in the town ........................................................................................................................... 45 6.8.3. Urban basic services in slums (In line with JNNURM’s 7 point charter) ......................................... 46 6.8.4. Social security schemes and beneficiaries and other schemes ...................................................... 46 6.8.5. Present and future Housing demand .............................................................................................. 47 6.8.6. SWOT analysis ................................................................................................................................. 48 6.8.7. Issues .............................................................................................................................................. 48
6.9. Social infrastructure ............................................................................................................................ 48 6.9.1. Health Infrastructure ...................................................................................................................... 48 6.9.2. Education ........................................................................................................................................ 49 6.9.3. Recreational facilities (Parks, Playgrounds etc) .............................................................................. 50 6.9.4. SWOT analysis ................................................................................................................................. 50 6.9.5. Issues .............................................................................................................................................. 50
6.10. Environment ........................................................................................................................................ 50 6.10.1. Pollution levels (Air, Water and Soil) .......................................................................................... 50 6.10.2. City green spaces (gardens and recreation – total coverage ratio) ............................................ 51 6.10.3. Water front development and conservation .............................................................................. 51 6.10.4. Existing environmental regulations ............................................................................................ 51 6.10.5. SWOT analysis ............................................................................................................................ 52 6.10.6. Issues .......................................................................................................................................... 52
6.11. Heritage, Conservation and Tourism .................................................................................................. 52 6.11.1. Issues .......................................................................................................................................... 52
6.12. Existing Institutional Structure for development ................................................................................ 53 6.12.1. Urban Local body structure ........................................................................................................ 53 6.12.2. Town and Country planning department ................................................................................... 54 6.12.3. Public health engineering department ....................................................................................... 54 6.12.4. Madhya Pradesh housing board ................................................................................................. 54 6.12.5. Madhya Pradesh pollution control board .................................................................................. 54 6.12.6. Issues .......................................................................................................................................... 55
7. Municipal Financial Assessment ................................................................................................................... 56 7.1. Financial Status at a Glance ................................................................................................................ 56 7.2. Revenue account ................................................................................................................................. 57
7.2.1. Revenue income ............................................................................................................................. 57 7.2.2. Own Sources ................................................................................................................................... 57 7.2.3. Revenue expenditure ...................................................................................................................... 59
7.3. Capital account .................................................................................................................................... 59 7.4. Key financial indicators ....................................................................................................................... 61 7.5. Issues ................................................................................................................................................... 61 7.6. Conclusion ........................................................................................................................................... 61
8. City Vision, Sector Goals, Strategies, Action Plan, Projects and Prioritization ............................................. 62 8.1. Formulation of City Vision ................................................................................................................... 62
8.1.1. Vision for the Town ......................................................................................................................... 62 8.1.2. Mission Statements ........................................................................................................................ 63
8.2. Sector Goals, Strategies, Action Plan and Projects ............................................................................. 64 8.2.1. Water supply ................................................................................................................................... 64 8.2.2. Sewerage and Sanitation ................................................................................................................ 66 8.2.3. Solid Waste Management ............................................................................................................... 69 8.2.4. Storm Water Drainage .................................................................................................................... 71 8.2.5. Traffic and transportation ............................................................................................................... 74 8.2.6. Street lighting and Fire fighting ...................................................................................................... 76 8.2.7. Urban poor and their accessibility to basic Services ....................................................................... 77
City Development plan for Nasrullahganj xvi
8.2.8. Health ............................................................................................................................................. 77 8.2.9. Education ........................................................................................................................................ 79 8.2.10. Other Social Infrastructure – Recreation .................................................................................... 80 8.2.11. Environment ............................................................................................................................... 81 8.2.12. Economic Development ............................................................................................................. 82 8.2.13. Urban Governance ..................................................................................................................... 83
8.3. Prioritisation of Projects based on Questionnaire Survey Result ....................................................... 84 8.3.1. Methodology for Questionnaire Survey ......................................................................................... 84 8.3.2. Ranking of the town requirement .................................................................................................. 85
8.4. Conclusion ........................................................................................................................................... 87 9. City Investment Plan ..................................................................................................................................... 88
9.1. City Investment Plan (CIP) ................................................................................................................... 88 9.2. Institutionalizing the CIP Process ........................................................................................................ 88 9.3. Summary of Investments .................................................................................................................... 89 9.4. Capital needs/ investments – Physical Infrastructure ......................................................................... 90
9.4.1. Water Supply .................................................................................................................................. 90 9.4.2. Sewerage and Sanitation ................................................................................................................ 92 9.4.3. Solid Waste Management System .................................................................................................. 93 9.4.4. Drainage .......................................................................................................................................... 95 9.4.5. Traffic and Transportation .............................................................................................................. 97 9.4.6. Street Lighting and Fire Fighting ..................................................................................................... 98
9.5. Capital needs/ investments – Social Infrastructure ............................................................................ 99 9.5.1. Health Infrastructure ...................................................................................................................... 99 9.5.2. Education Infrastructure ............................................................................................................... 101 9.5.3. Other Social Infrastructure – Recreational ................................................................................... 102
9.6. Capital needs/ investments – Environment and Tourism ................................................................. 103 9.6.1. Urban Environment ...................................................................................................................... 103
9.7. Capital needs/ investments – Urban Poor and their accessibility to Basic Services ......................... 104 9.8. Capital needs/ investments – Urban Governance ............................................................................ 105 9.9. Summary of the Capital Investment Plan .......................................................................................... 106
10. Financial and Operating Plan ................................................................................................................. 107 10.1. Introduction ...................................................................................................................................... 107 10.2. Financing Strategies for the CIP ........................................................................................................ 107 10.3. Finance Projections ........................................................................................................................... 108
10.3.1. Municipal Account – Growth Projections and Assumptions .................................................... 108 10.3.2. Investment Capacity / Sustenance ........................................................................................... 109
10.4. Fund Requirement ............................................................................................................................ 111 10.5. Financial Operating plan ................................................................................................................... 111 10.6. Conclusion ......................................................................................................................................... 112
11. Urban Reforms ...................................................................................................................................... 113 11.1. Introduction ...................................................................................................................................... 113 11.2. Mandatory Reforms at the level of the State Government .............................................................. 113
11.2.1. Implementation of the 74th Constitutional Amendment Act .................................................. 113 11.2.2. Public Disclosure Law ............................................................................................................... 114 11.2.3. Rationalization of Stamp Duty .................................................................................................. 114 11.2.4. Repeal of Urban Land Ceiling and Regulation Act .................................................................... 114 11.2.5. Rent Control ............................................................................................................................. 115 11.2.6. Community Participation Law .................................................................................................. 115 11.2.7. City Planning Functions ............................................................................................................ 116
11.3. Mandatory Reforms at the level of the Urban Local Body ................................................................ 116 11.3.1. Municipal Accounting ............................................................................................................... 116 11.3.2. E-Governance ........................................................................................................................... 117 11.3.3. User Charges............................................................................................................................. 117 11.3.4. Basic Services to the Urban Poor .............................................................................................. 118
City Development plan for Nasrullahganj xvii
11.3.5. Internal earmarking for basic services for poor ....................................................................... 119 11.3.6. Property Tax ............................................................................................................................. 120
11.4. Optional Reforms at level of the State Government/Urban Local Body ........................................... 120 11.5. Conclusion ......................................................................................................................................... 121
Annexures 1: Workshop Proceedings ................................................................................................................. 122 Annexure 2: Questionnaire................................................................................................................................. 131 Annexure 3: Financial Projections ...................................................................................................................... 138 Annexure 4: Maps ............................................................................................................................................... 142 Annexure 5: Presentation Of Final Workshop .................................................................................................... 143
City Development plan for Nasrullahganj xviii
LIST OF MAPS
Map 1 - Location map with respect to country/ state/ district
Map 2 - District map showing Railway and road network
Map 3 - Base Map of the town
Map 4A) - Ward
Map 4B) - Population Density
Map 5 - Existing Land-use map
Map 6 - Existing Road network map
Map 7 - Drainage system map
Map 8A - Water supply
Map 8B - Solid Waste
Map 9A - Solid waste (garbage dumping areas, existing location of landfill site)
Map 9B - Physical Infrastructure
Map 10 - Social infrastructure
Map 11 - Slum location map
Map 12 - Proposed land-use map (Broad overview)
Map 13 - Proposed Road network map
Map 14 - Proposed Drainage system map
Map 15 - Proposed Sewerage system map
Map 16 - Proposed Water supply map
Map 17 - Proposed Solid waste management
City Development plan for Nasrullahganj xix
EXHIBITS
Exhibit 1-1 Approach and Methodology ................................................................................................................. 7 Exhibit 1-2 Developing a City Vision (Source: JnNURM Toolkit) ............................................................................. 9 Exhibit 1-3 List of Members of Steering Group .................................................................................................... 12 Exhibit 3-1 Population & Decadal Growth ............................................................................................................ 16 Exhibit 3-2 Population Projection ......................................................................................................................... 16 Exhibit 3-3 Projected Population .......................................................................................................................... 17 Exhibit 3-4 Ward wise Demographic details ......................................................................................................... 17 Exhibit 4-1 Total quantity of commodities exported in 2010-11 .......................................................................... 19 Exhibit 4-2 Literacy rate and Sex ratio .................................................................................................................. 20 Exhibit 4-3 Demographically Critical Wards ......................................................................................................... 20 Exhibit 4-4 Classification of Wards as per their Literacy Rate .............................................................................. 20 Exhibit 4-5 Ward Level Gendered Analysis of Literacy Rate ................................................................................. 21 Exhibit 4-6 Average Household Size ..................................................................................................................... 21 Exhibit 4-7 Workforce details ............................................................................................................................... 22 Exhibit 5-1 Population Density ............................................................................................................................. 24 Exhibit 5-2 Land Use pattern ................................................................................................................................ 25 Exhibit 5-3 Present and future demand for housing ............................................................................................ 25 Exhibit 6-1 Location of Hand pumps, Tube wells and Well .................................................................................. 27 Exhibit 6-2 Present Water Tariff Structure ........................................................................................................... 28 Exhibit 6-3 Water Supply - Service Level Indicators ............................................................................................. 29 Exhibit 6-4 Present and Future demand and Supply Gaps: Water Supply............................................................ 29 Exhibit 6-5 Present and Future demand and Supply Gaps: Sewerage .................................................................. 32 Exhibit 6-6 Percentage of HH having individual toilet .......................................................................................... 34 Exhibit 6-7 Present and Future demand and Supply Gaps ................................................................................... 35 Exhibit 6-8 Solid Waste Management - Service Level Indicators .......................................................................... 36 Exhibit 6-9 Solid Waste Management - Service Level Indicators .......................................................................... 37 Exhibit 6-10 Present and Future Demand and Supply Gaps: Solid Waste Management ..................................... 37 Exhibit 6-11 Present and Future Demand and Supply Gaps: Drainage ................................................................ 39 Exhibit 6-12 Present and Future Demand and Supply Gaps: Traffic and Transportation ..................................... 42 Exhibit 6-13 Details of Street Lighting .................................................................................................................. 43 Exhibit 6-14 Present and Future Demand and Supply gaps: Street Lights and Fire Services................................ 44 Exhibit 6-15 SWOT Analysis: Street lighting and fire services .............................................................................. 44 Exhibit 6-16 Ward wise slum population of Nasrullahganj ................................................................................... 45 Exhibit 6-17 Percentage coverage of existing infrastructure in Slums ................................................................. 46 Exhibit 6-18 Project Construction Components: IHSDP ........................................................................................ 47 Exhibit 6-19 Present and Future Demand and Supply Gaps: Health .................................................................... 49 Exhibit 6-20 Details of government educational institutions ............................................................................... 49 Exhibit 6-21 Present and Future Demand and Supply Gaps: Education ............................................................... 49 Exhibit 6-22 SWOT Analysis: Social Infrastructure ................................................................................................ 50 Exhibit 6-23 SWOT Analysis: Environment ........................................................................................................... 52 Exhibit 6-24 Institutional Structure of Nasrullahganj nagar Parishad .................................................................. 53 Exhibit 7-1 Financial status at a glance ................................................................................................................. 56 Exhibit 7-2 Source wise Revenue Income ............................................................................................................. 57 Exhibit 7-3 Tax Revenue ....................................................................................................................................... 57 Exhibit 7-4 Non-tax revenue ................................................................................................................................. 58 Exhibit 7-5 Assigned Revenue ............................................................................................................................... 58 Exhibit 7-6 Revenue from Grants/ Contributions ................................................................................................. 59 Exhibit 7-7 Capital Account ................................................................................................................................... 60 Exhibit 7-8 Performance Indicators ...................................................................................................................... 61 Exhibit 8-1 Water Supply: Achievement Targets .................................................................................................. 64 Exhibit 8-2 Water Supply Long Term and Short Term Interventions .................................................................... 65 Exhibit 8-3 Projects Identified by ULB and Consultant for Water Sector ............................................................. 65
City Development plan for Nasrullahganj xx
Exhibit 8-4 Water Supply Projects in a phased manner ....................................................................................... 66 Exhibit 8-5 Water Supply Projects: Responsible Agencies .................................................................................... 66 Exhibit 8-6 Sewerage and Sanitation: Achievement Targets ................................................................................ 66 Exhibit 8-7 Sewerage & Sanitation Long Term and Short Term Interventions ..................................................... 67 Exhibit 8-8 Projects identified by ULB and Consultant for Sewerage & Sanitation Sector ................................... 68 Exhibit 8-9 Sewerage and Sanitation Projects in a phased manner ..................................................................... 68 Exhibit 8-10 Sewerage and Sanitation Projects: Responsible Agencies ............................................................... 69 Exhibit 8-11 SWM: Achievement Targets ............................................................................................................. 69 Exhibit 8-12 Solid Waste Management Long Term and Short Term Interventions .............................................. 70 Exhibit 8-13 Projects Identified by ULB and Consultant for SWM Sector ............................................................. 70 Exhibit 8-14 Solid Waste Management Projects in a phased manner .................................................................. 70 Exhibit 8-15 SWM Projects: Responsible Agencies ............................................................................................... 71 Exhibit 8-16 Storm Water Drainage: Achievement Targets .................................................................................. 71 Exhibit 8-17 Storm Water Drainage Long Term and Short Term Interventions ................................................... 72 Exhibit 8-18 Projects identified by ULB and Consultant for Storm Water Drainage ............................................ 73 Exhibit 8-19 Storm Water Drainage Projects in a phased manner ....................................................................... 73 Exhibit 8-20 Storm Water Drainage Projects: Responsible Agencies ................................................................... 73 Exhibit 8-21 Traffic and Transportation: Achievement Targets ............................................................................ 74 Exhibit 8-22 Traffic and Transportation Long Term and Short Term Interventions ............................................. 75 Exhibit 8-23 Projects identified by ULB and Consultant for Traffic & Transportation Section ............................. 75 Exhibit 8-24 Traffic & Transportation Sector Projects .......................................................................................... 75 Exhibit 8-25 Project Development Initiatives to be taken up by Nagar Parishad ................................................. 76 Exhibit 8-26 Street Light and Fire fighting Projects .............................................................................................. 76 Exhibit 8-27 Street Light and Fire Fighting Projects: Responsible Agencies ......................................................... 77 Exhibit 8-28 Projects for Urban Poor .................................................................................................................... 77 Exhibit 8-29 Health: Achievement Targets ........................................................................................................... 78 Exhibit 8-30 Health Sector Long Term and Short Term Interventions .................................................................. 78 Exhibit 8-31 Health Sector Projects ...................................................................................................................... 79 Exhibit 8-32 Health Sector Projects: Responsible Agencies .................................................................................. 79 Exhibit 8-33 Education Sector: Achievement Targets ........................................................................................... 79 Exhibit 8-34 Education Sector Long Term and Short Term Interventions ............................................................ 80 Exhibit 8-35 Education Sector Projects ................................................................................................................. 80 Exhibit 8-36 Education Sector: Responsible Agencies .......................................................................................... 80 Exhibit 8-37 Other Social Infrastructures: Achievement Targets ......................................................................... 80 Exhibit 8-38 Other Social Infrastructure Long Term and Short Term Interventions ............................................. 81 Exhibit 8-39 Other Social Infrastructure: Responsible Agencies .......................................................................... 81 Exhibit 8-40 Economic Development Long Term and Short Term Interventions ................................................. 83 Exhibit 8-41 Economic Development: Implementation Agencies ........................................................................ 83 Exhibit 8-42 Urban Governance: Achievement Targets ....................................................................................... 84 Exhibit 8-43 Sector Priorities of Nasrullahganj ..................................................................................................... 85 Exhibit 8-44 Rank-wise Issues in Water Supply .................................................................................................... 85 Exhibit 8-45 Rank-wise Issues in Storm Water Drainage ...................................................................................... 86 Exhibit 8-46 Rank-wise Issues in Transportation .................................................................................................. 86 Exhibit 8-47 Rank-wise Issues in Solid Waste Management................................................................................. 86 Exhibit 8-48 Rank-wise Issues in Educational Facilities ........................................................................................ 86 Exhibit 8-49 Rank-wise Issues in Health Facilities ................................................................................................. 86 Exhibit 8-50 Rank-wise Issues in Social Infrastructure.......................................................................................... 87 Exhibit 9-1 Summary of Investments required ..................................................................................................... 89 Exhibit 9-2 Investment Snapshot: Water Supply .................................................................................................. 90 Exhibit 9-3 Action Plan for Implementation: Water Supply ................................................................................. 91 Exhibit 9-4 Investment Snapshot: Sewerage & Sanitation ................................................................................... 92 Exhibit 9-5 Action Plan for Implementation: Sewerage and Sanitation ............................................................... 93 Exhibit 9-6 Investment Snapshot: Solid Waste Management .............................................................................. 93 Exhibit 9-7 Action Plan for Implementation: Solid Waste Management .............................................................. 94
City Development plan for Nasrullahganj xxi
Exhibit 9-8 Investment Snapshot: Storm Water Drainage .................................................................................... 95 Exhibit 9-9 Action Plan for Implementation: Storm Water Drainage ................................................................... 96 Exhibit 9-10 Investment Snapshot: Traffic & Transportation ............................................................................... 97 Exhibit 9-11 Action Plan for Implementation: Traffic & Transportation .............................................................. 98 Exhibit 9-12 Investment Snapshot: Street Lighting & Fire Fighting ...................................................................... 98 Exhibit 9-13 Action Plan for Implementation: Street Lighting & Fire Fighting ..................................................... 99 Exhibit 9-14 Investment Snapshot: Health Infrastructure .................................................................................. 100 Exhibit 9-15 Action Plan for Implementation: Health Infrastructure ................................................................. 100 Exhibit 9-16 Investment Snapshot: Education Infrastructure ............................................................................ 101 Exhibit 9-17 Action Plan for Implementation: Education Infrastructure ............................................................ 102 Exhibit 9-18 Investment Snapshot: Other Social Infrastructure ......................................................................... 102 Exhibit 9-19 Action Plan for Implementation: Socio-Cultural Infrastructure ..................................................... 103 Exhibit 9-20 Investment Snapshot: Urban Environment .................................................................................... 103 Exhibit 9-21 Action Plan for Implementation: Urban Environment ................................................................... 104 Exhibit 9-22 Investment Snapshot: Urban Poor ................................................................................................. 104 Exhibit 9-23 Action Plan for Implementation: Urban Poor ................................................................................. 105 Exhibit 9-24 Investment Snapshot: Urban Governance ..................................................................................... 105 Exhibit 9-25 Action Plan for Implementation: Urban Governance ..................................................................... 106 Exhibit 10-1 Important assumptions made in the projections ........................................................................... 108 Exhibit 10-2 Different scenario’s to assess investment sustainability ................................................................ 110 Exhibit 10-3 Impact of reforms and grants on investment capacity ................................................................... 111 Exhibit 10-4 CIP Funding Pattern ........................................................................................................................ 111 Exhibit 10-5 Financial Operating Plan ................................................................................................................. 112 Exhibit 11-1 Municipal Accounting: Reform Action Plan .................................................................................... 116 Exhibit 11-2 E-Governance: Reform Action Plan ................................................................................................ 117 Exhibit 11-3 User Charges: Reform Action Plan .................................................................................................. 118 Exhibit 11-4 Internal Earmarking for Poor: Reform Action Plan ......................................................................... 119 Exhibit 11-5 Property Tax: Reform Action Plan .................................................................................................. 120 Exhibit 11-6 Optional Reforms: Status ................................................................................................................ 120
City Development plan for Nasrullahganj xxii
FIGURES
Figure 4-1 Krishi Upaj Mandi ................................................................................................................................ 19 Figure 6-1 Sewage from the households .............................................................................................................. 31 Figure 6-2 Nallah carrying waste-water ................................................................................................................ 39 Figure 6-3 State Highway ...................................................................................................................................... 41 Figure 6-4 Bus Stand ............................................................................................................................................. 41 Figure 6-5 General Health Centre ......................................................................................................................... 48
City Development plan for Nasrullahganj 1
1. INTRODUCTION
1.1. Background
Madhya Pradesh is urbanizing at a fast rate and the Urban Local Bodies (ULBs) in the state are
facing the challenge of meeting the requirements of the growing population with limited technical and
financial resources. The Government of India (GoI) and Government of Madhya Pradesh (GoMP)
have initiated a number of programmes to meet the growing demands of infrastructure and service
delivery. These include both GoI schemes [including Urban Infrastructure Development Scheme for
Small and Medium Towns (UIDSSMT) and Integrated Housing and Slum Development Programme
(IHSDP)] and GoMP initiated schemes; such as the Madhya Pradesh Urban Services for the Poor
(MPUSP), a DFID assisted program, which links reform with investment in infrastructure for the poor.
After the assessment of the performance of the ULBs and their capacity for exploiting the above said
resources it was felt that such a plan is essential, not only for accessing GoI/GoMP funding but also
for providing a strategic framework for converging and co-ordinating various development inputs
towards positioning the city on a development path.
Therefore, the Urban Administration and Development Department (UADD) of Government of
Madhya Pradesh (GoMP) has launched an initiative to support 5 Municipal councils, 245 Nagar
Parishads and 30 urban centres in the state in preparing City Development Plans (CDPs). This
initiative aims to provide a comprehensive Medium Term Strategy (25 years) and a City Investment
Plan (CIP) for each Urban Local Body, based on which the concerned ULB will be able to access
funds under schemes of Government of India (GoI) and GoMP as well as from its own sources for
implementation of priority actions and projects, identified from this exercise. The document was also
envisaged to provide a Financial Operating Plan (FOP) to direct the ULBs for mobilising various
financial resources to implement the identified projects, adhering to the JNNURM‟s CDP preparation
toolkit and keeping in view the Master Plan (wherever exists) provisions as prepared by Town and
Country Planning Department. The preparation of the CDP will take advantage of the Revised CDP
preparation toolkit/Heritage cities toolkit prepared under JNNURM and UADD/CMAMP guidelines. It is
also expected that the CDP would provide Urban Reform Action Plan for the ULBs as envisaged
under JNNURM.
In this regard, MPUADD retained ICRA Management Consulting Services Limited (IMaCS) for
assistance in preparation of City Development Plan for Nasrullahganj town.
1.2. Objectives and Scope of Work
This exercise is centred on the following broad objectives:
The CDP will scale up existing urban development and poverty alleviation schemes within a
comprehensive and coherent strategic planning framework in order to ensure optimal benefit
from available resources for the citizens of the ULBs.
The CDP should aim to catalyse new thinking and provoke debate through a consultative
stakeholder driven process. The vision and strategic thrusts of the CDP will be built around
the lessons and findings of a comprehensive and rigorous stakeholder consultation and
documentation process.
The CDP will generate specific priority actions and projects that can be the basis for
mobilizing funding from diverse sources.
City Development plan for Nasrullahganj 2
1.3. Description of Tasks (as outlined in RFP)
The list of tasks followed for the preparation of the CDP of Nasrullahganj (as outlined by MPUADD)
are detailed below:
1.3.1. Inception
This stage includes a preliminary analysis of the town including strengths and weaknesses of the city
and finalization of the approach and methodology for the preparation of CDP for the town. This stage
also gives an understanding of what impedes service delivery and management within the existing
set-up and what contributes to better service provision. This stage consists of the following tasks:
Reconnaissance
During the first week of the assignment a reconnaissance exercise has been conducted, which
included the following activities:
1. Introductory meetings with the Mayor/President, Municipal Commissioner/Chief Municipal Officer,
Heads of Departments, Councillors, representatives of on-going urban programmes, etc.
2. Determination of the feasibility and composition of a city level Steering Group (comprising of
Citizen forum) for the CDP
3. Formation of Citizen Forum comprising of 15 eminent persons from different walks of life.
4. Obtain base maps, and available secondary data on the city‟s demographics, master plan, reports
prepared under past and current urban development programmes, ULB‟s annual budget reports,
other reports giving status of service delivery, and other relevant documents on heritage listing,
data on slums and urban poor, government policy documents, etc.
5. Identification of the line departments and key stakeholders for urban service delivery and
development such as PHED, Town and Country Planning Department, Development Authority,
SADA, local chamber of commerce, NGOs, CBOs, religious organizations, financial institutions,
commerce and industry etc.
6. Field reconnaissance to determine growth patterns of the city, characteristics of slums and
environmentally sensitive areas etc.
7. Identification of economic opportunities and blocks in tapping these (eg. Tourism, industry etc.)
8. Mapping: Preparation of City level base maps using Auto-CAD/GIS.
Workshop-I: “Kick-off workshop”
A one day kick-off workshop has been organized to familiarize the stakeholders with the purpose,
process, and expected outcomes of the CDP, and build enthusiasm, understanding and commitment
to the CDP. This kick off workshop also helped in deriving a consensus among the stakeholders in
firming the process and agreeing upon a structured programme to take the CDP forward. The
formation of the Steering Group is also announced as along with the key sectors for which detailed
analysis has been carried out.
An indicative list of the stakeholders to be invited for the kick off workshop has been discussed, which
may include:
Elected representatives, Mayor/President, Municipal Commissioner/Chief Municipal Officer
etc.
City level planning and service providing agencies viz., ULB, Town and Country Planning
Department, Development Authority, SADA etc.
City Development plan for Nasrullahganj 3
Line Departments of the state government such as pollution control board, health department,
tourism department, PHED, PWD, Traffic and Transportation etc
Private sector agencies such as chambers of commerce and industry,
Non-governmental and community based organizations
Representatives of the poor communities
Representatives of on-going urban development programmes
Representatives of media, academic institutions, etc.
Inception report
At the completion of this phase, an inception report consisting of a preliminary analysis of the town
and final approach and methodology for CDP preparation has been submitted to the ULB. Further to
which a presentation on the same report has been undertaken with the stakeholders to seek their
inputs on the approach and methodology suggested in the inception report.
Sector analysis
Based on the interactions with various stakeholder groups (meetings, workshops, focus group
discussions, etc.) and review of relevant documents (publications, reports, GOs, resolutions,
procedures, laws etc.) an analysis of the current situation in all the identified sectors has been
undertaken. This sector analysis has been carried out in the consultation with local counterparts and
further a methodology for the sector analysis has been developed, which includes the following:
Study of economic opportunity and potential for Local/regional economic development, with
special reference to the poor
Physical infrastructure demand and gap assessment (considering service level
benchmarking)
Transport study with emphasis on low cost public transport and livelihoods
Heritage conservation and tourism
Environmental sustainability
Access to housing, employment and social and environmental services by the poor
Health and Education services gap in the town
Sectoral Issues addressed under the Master Plan (as prepared by the TCPD)
City profile
The findings from the sector analysis are used to prepare the City Profile consisting of the
assessment of the existing situation in all identified sectors, emerging issues, SWOT analysis and
projection of the present gaps and future requirements. Development of city vision and sector goals
and strategies
Discussion on strategies, priorities and major actions that may be required in the next five years to
move towards the vision 2035 have been discussed to develop city vision, sector strategies and
strategies.
Sector strategies
After reviewing relevant cases from national and international best practices, learning are identified to
explore if the same can be applied in relevant sectors to bring in improved and efficient ways of
working.
City Development plan for Nasrullahganj 4
This stages also includes consultations with the local counterparts to develop sector strategies in
consonance with the city vision and sector goals.
Vision, Goal and Strategies
The output expected in the second phase is city vision, sector goals and possible alternate strategies
and some actions and projects.
1.3.2. Development of strategies and priority actions Evaluation of strategies
The strategies are evaluated from the perspective of their contribution to achieving the vision and
sector goals. Criteria for prioritising the strategies, programmes and projects have been developed in
consultations with the Steering Group.
Analyse governance framework and reform action plans
Based on the consultations with the ULB officials, representatives of reform programmes and local
counterparts an examination of the reforms at state and local levels has been carried out to
understand whether these reforms are sufficient to support the vision and strategic plan and to sustain
the planned interventions.
Sector Analysis, Vision, Strategies and Projects Report
The output of this phase is outlining the goals, strategies, priority actions and projects with an
estimate of preliminary funding requirements in each sector.
Workshop-II: “ULB level workshop”
At the completion of this phase a 2nd ULB level workshop has been organized (supported by a
presentation to the stakeholders).
1.3.3. Preparing a City Investment Plan (CIP) and a financing strategy Project costing and determination of funding sources
Consultations with the different stakeholders has determined the types and sources of financing to be
adopted for priority projects from internal resources, state and central governments, local financial
institutions, donors, and through public-private partnerships.
Scheduling of priority actions and developing a City Investment Plan (CIP)
Based on the availability of resources, logical sequencing of actions and potential for immediate
implementation, a City Investment Plan (CIP) has been prepared in consultation with ULB to lays out
the cost and revenue estimates of all priority projects in the next five years. The preparation of the
CIP is a reiterative process requiring adjustments to individual projects as well as changes in
scheduling to make the whole package work financially. The City Investment plan is supported with a
Financial Operating Plan (FOP).
1.3.4. Draft CDP
After feedback from stakeholders a draft CDP for the town including the CIP and FOP will be finalize.
City Development plan for Nasrullahganj 5
Workshop-III: “Workshop on Draft CDP”
This Draft Report has been presented to the stakeholders of the town in third workshop. The objective
of this workshop was to seek an endorsement of the City Development Plan from the stakeholder
group present and agree on procedures for performance monitoring.
Performance Monitoring
Performance- monitoring/sustainability indicators have been identified to assist ULB in review the
progress and outcomes of the CDP on an annual basis and to enable them in setting the agenda for
the future.
1.3.5. Final CDP document
Further to this, a CDP document has to be finalized after incorporating the feedbacks from the
workshop and the inputs from the 2nd Stage State Level discussion. This document would be given to
ULB, along with a summary of the CDP for publication and wider dissemination by the ULB.
1.4. Approach
The City Development Plan (CDP) is the Nagar Parishad‟s strategy that presents both a vision of a
desired future perspective for the town and the Parishad‟s organization, and mission statements on
how the Nagar Parishad, together with other stakeholders, intends to work towards achieving the
short term and long-term vision. CDP should be very comprehensive and should cover all the aspects
where town needs intervention. To achieve a comprehensive CDP, we have adopted few guiding
principles as discussed below.
1.4.1. Guiding Principle
We outline below the guiding principles underlying our approach for this exercise. These are drawn
based on our experience in working on City Development Strategies/Plans and from the expectations
outlined by MPUADD.
Sharp focus on the need and expected outcomes
We see the CDP as a critical intervention to provide a strategic framework for converging and co-
ordinating various development inputs in a holistic manner to facilitate engaging the town
administration and stakeholders towards crystallising vision, strategy, actions for taking the town on a
development path and as a means to enable access to funds from GoI (Government of India) under
various government schemes / funding programs of GoI and Government of Madhya Pradesh
(GoMP).
JNNURM Toolkit(s) as a guiding framework
As advised by MPUADD, the preparation of the CDP will take advantage of the Revised CDP
preparation toolkit/Heritage cities toolkit prepared by GoI under JNNURM and UADD/CMAMP
guidelines in terms of the structure and process outlined in the toolkit along with integration with
current initiatives for developing a strategic framework for development agenda in the next 25 year
time horizon.
Capture insights from and Build on existing / ongoing initiatives
We would draw on initiatives underway and build on initiatives being undertaken including the overall
spatial planning and policy framework of the existing Master Plan, planning for reform and
participatory slum improvement process put in place under MPUADD, annual plans and proposals in
District Plan for BRGF / Urban Renewal Action Plans.
City Development plan for Nasrullahganj 6
Enable Participation through a structured Multi-stakeholder Consultative Process
We shall follow a structured consultative process through creation of appropriate institutional
structures (including nomination of a Nodal Officer and the Steering Group as suggested by
MPUADD). We see participation of key stakeholders including elected representatives, staff of Nagar
Parishad, parastatal agencies and other institutions, policy makers and the citizens to participate and
plan for spatial, social and economic development of the town as a critical requirement.
Action orientation and resource mobilization
We also see the CDP as a means to prepare the ground for identification of projects and time-bound
interventions along with evaluation of financial resources requirements, gaps and potential sources for
mobilising funding beyond existing programmes. The scope for private sector development and
participation and access to external resources shall be explored. Further as indicated linkages of
these actions with annual plans and budget cycles of the municipal corporation will also be
incorporated.
1.4.2. Approach and Methodology
With an Aim of developing ownership of the plan amongst the stakeholders, the Nasrullahganj CDP
has been developed in close consultation with all stakeholders. In this way, Nasrullahganj Nagar
Parishad and others are responsible for development of town accountable for their mission
statements, actions and expected outcomes. We have conducted this exercise in 3 Modules as
shown in Exhibit 1-1 and detailed below.
1.4.3. Module I: Inception and Kick off
The expected outcomes of this module from a process stand point include the following:
1. To put in place institutional mechanisms including the formation of Steering Group for conduct of
the assignment in a structured consultative manner as envisaged
2. To engage with stakeholders and arrive at a shared understanding of the objectives and expected
outcomes of the study
3. Apart from this, our team have used this as a preparatory stage to
a. Review and analyse the current status and unique features of the city with regard to the state
of its development, systems and procedures, as equally its institutional and financial context.
b. Identify the strengths and weaknesses in the city‟s development and to develop an
understanding of what impedes infrastructure provision and service delivery and
management within the existing set-up and what contributes to better service provision.
c. Do a rapid assessment through interactions with stakeholders and initial data collection to
capture previous and on-going development initiatives to factor the same in the
Consultations and Analysis module.
The broad activities and tasks outlined under the Inception stage by MPUADD including the following:
1. Introductory meetings with the Mayor/President, Municipal Commissioner/Chief Municipal Officer,
Heads of Departments, Councillors, representatives of on-going urban programmes, etc.
2. Determine feasibility and composition of a city level Steering Group (comprising of Citizen forum)
for the CDP
3. Citizen forum has been formed comprising of 15 eminent persons from different walks of life.
4. Obtain base maps, and available secondary data on the city‟s demographics, master plan, reports
prepared under past and current urban development programmes, ULB‟s annual budget reports,
City Development plan for Nasrullahganj 7
other reports giving status of service delivery, and other relevant documents on heritage listing,
data on slums and urban poor, government policy documents, etc.
5. Identify the line departments and key stakeholders for urban service delivery and development
such as PHED, Town and Country Planning Department, Development Authority, SADA, local
chamber of commerce, NGOs, CBOs, religious organizations, financial institutions, commerce
and industry etc.
6. Field reconnaissance to determine growth patterns of the city, characteristics of slums and
environmentally sensitive areas etc.
7. Identify economic opportunities and blocks in tapping these (eg. Tourism, industry etc.)
8. Mapping : Preparation of City level base maps using Auto-CAD/GIS
This module has culminated in conduct of a one-day kick off workshop with stakeholders. The
purpose of the kick-off workshop was to build participative energy and commitment of stakeholders for
the study through articulation of the purpose, process, and expected outcomes of the CDP, and
achieving a shared understanding of the same. The kick off workshop has helped in deriving a
consensus along with the stakeholders firming the process and agreeing upon a structured
programme to take the CDP forward. Further the institutional structures including the Steering Group
for the consultative process has also been spelt out during this workshop. Following the workshop, we
had submitted an Inception Report, which was followed with a presentation to MPUADD and the ULB.
Exhibit 1-1 Approach and Methodology
City Development plan for Nasrullahganj 8
1.4.4. Module II: Consultations and Analysis
Module II includes a Situation assessment followed by a) crystallizing a Vision for the City and sector
level goals and strategies and b) evaluation of strategies and finalizing priority actions at a sector
level.
This module starts with the Situation assessment covering Sector level analysis and development of
the Town profile, moving on to formulation of a Vision for the town and translating them into
Strategies, Priority Projects and Reform Actions. While there are self-contained sub-modules within
this step, we have clubbed them into Module II, given the highly consultative as well as data
collection/reconnaissance intensive nature of these steps and the iterative linkages between these
steps.
Given the multiple and heterogeneous set of stakeholders involved, we have use a range of
instruments to capture diverse inputs for the exercise as indicated below:
Workshops – As suggested by MPUADD
Brainstorming Sessions – For discussions with Elected Body, Residential/Trade associations.
One-on-One meetings/interviews – Town officials, Government Departments, Chief Municipal
Officer, Elected representatives, MLA/MPs, and other important opinion makers.
Limited quantitative surveys – To get a pulse of wider perceptions and priorities of the general
public.
In addition, we had a significant on-the-ground interaction effort through our research and support
staff to compile data and information from the cities. From our experience in handling such studies,
very often it is critical to spend substantial time with ULB staff/do sample based field visits given the
data and information availability related limitations. Such interactions enabled us capture qualitative
insights and served in providing surrogate inputs to validate and overcome the generally faced
limitations of data availability. For instance, we have collected budget documents at the beginning at
the study and do the analysis of financials in parallel. A time period wise analysis of revenue and
costs along with their drivers enabled us to spot data discrepancies in the initial stages and helped us
to identify areas where greater time is required for data collection/scrutiny. Similarly in the area of
service levels benchmarking, we have done a physical reconnaissance of municipal assets to validate
reports made available to us.
We concurred the activities and steps identified by MPUADD in the Terms of Reference in moving
from a Situation Assessment to formulate the City Vision and translating that to Sector strategies and
priority projects. Some specifics of our approach along each of these steps are described below:
Sector Analysis
We have chosen the specific sectors/issues for preparing detailed sectoral papers, based on the
criticality of the sector (as viewed by the stakeholders) and the baseline status of the prevailing
service levels in that city. While the exact list of sectors has been finalized during consultations, an
indicative list of sectors that came out as critical areas include the following:
a. Water Supply
b. Sanitation and Sewerage
c. Solid Waste Management
d. Urban Housing
e. Public Transportation
f. Social amenities and infrastructure including Schools, Hospitals, Markets
City Development plan for Nasrullahganj 9
g. Heritage & Tourism
The sector level analysis covered the following steps.
a. Review the baseline status of the sector in terms of operational service level and financial
indicators vis-a-vis benchmarks/norms and desired levels of service to arrive at the
normative gaps.
b. Identification of the possible alternatives for improving service levels, policy
changes/implications and the magnitude of investment required to improve service levels in a
time-bound manner.
c. Developing a sector strategy, targets for service level improvement and a list of potential
priority projects to be undertaken along with an expected level of improvement in service
levels through implementation of these projects.
These steps has been undertaken in consultation with local counterparts. While carrying out the
sector level analysis, aspects relating to the need for provisioning for urban poor, broad review of
cost-benefits including social and environmental impacts were factored.
City Profile
In profiling the City and crystallizing its SWOT (Strength, Weakness, Opportunity, Threat), we looked
at slightly wider issues beyond sectoral dimensions to cover the following:
1. Spatial growth patterns and drivers
2. Economic growth drivers - intrinsic and potential
3. Infrastructure - Physical and Social
4. Issues relating to Environment sustainability
5. Extent of Urban Poor and their requirements
6. Institutional Capacity gaps and requirements.
The city profiles has been drawn from the Sector analysis and assessment of the existing situation in
all the sectors identified, emerging issues, analysis and projection of the present gaps and future
requirements.
City Vision
Exhibit 1-2 presents an extract from the JNNURM Toolkit considered for developing a City‟s Vision
which we believed summarizes the key contours of a City level Vision formulation quite succinctly.
The City Profile has been presented to the stakeholders and Steering Group followed with a
discussion on city perspective and city priorities as perceived by the stakeholders. With the
background of city profile, perspective and priorities, the participants contributed to the development a
collective and shared vision for the city. Discussion were initiated on strategies, priorities and major
actions that may be required in the next fifteen years to move towards the vision.
Exhibit 1-2 Developing a City Vision (Source: JnNURM Toolkit)
Developing a vision for the city is central to the preparation of a CDP. A vision is a statement of where the city wishes to go,
within a given timeframe, and is often expressed in terms of clear expectations. It defines the potential of the city and
reflects its unique attributes in terms of comparative and competitive advantages, values and preferences of the city’s
residents, relationship of the city to the state, national and global economies, and of course, the history and physical
characteristics of the city. A vision aligns stakeholders’ energies to work cohesively for the development of the city. Cities
need to systematically consider the future, and design strategies to accordingly shape the future. All objectives, strategies,
programmes and projects must be aligned with the vision of the city.
City Development plan for Nasrullahganj 10
Developing a common vision requires a significant effort of consensus building in order to balance the competing demands
arising from different economic infrastructure sectors, as also from different interest groups within the city. In order to
achieve an understanding on a common vision, it is useful to choose “milestones” and targets such as provision of a
minimum level of services to all; public disclosure and transparency in the formulation of budget proposals; introduction of
a single window in matters of service delivery and management and the like. In developing the vision, cities must choose a
set of criteria that are directly relevant to the JNNURM components. It is important that when cities define outcomes and
milestones on the vision, they ensure that these are measurable and have a time frame.
Sector Strategy and Goals
The formulation of key themes underlying the City Vision was a critical part of the exercise along with
the translation of broader vision into specific sector level strategies and goals. In formulating sector
level strategies and actionable goals, it was critical to ensure a link between the strategies and the
desired service level outcomes and consistency with the overall goal.
While the Vision captured a broader perspective of the citizen/stakeholder view on where the city
needs to go, strategies articulate what needs to be done.
For instance, an overall vision to provide universal coverage of water supply to all its citizens may
require strategies to a) Augment water availability, b) Reduce Distribution Losses and c) Differentiated
Tariff with subsidized lifeline supply for cost recovery.
Sector wise service level targets and reform actions
We tied to translate broader sector level goals into tangible service delivery targets and reform
actions, which enabled identification of priority projects that need to be implemented to achieve these
service level targets.
1.4.5. Module III: Finalisation
This module covered translating the consultative and analytical inputs to develop an actionable City
Investment Plan backed by an effective financing strategy leading to formulation of the City
Development Plan.
Preparing the City Investment Plan (CIP) and a Financing Strategy
The CIP and financing strategy are inseparable. An credible and actionable Investment Plan has been
developed based on the analysis of financing capacity and a strategy to overcome the limitations of
the financials of the ULB. We observed that ULB have limited investment capacity to undertake all
capital investment programs. Apart from evaluating the potential financing from schemes like
JNNURM and other capital grant schemes of GoMP, we have also evaluated ULB‟s potential to a)
Improve its Revenue surplus through revenue enhancement related reforms and rationalization of
costs and b) leverage and access to external capital through borrowings and Public Private
Partnerships.
Our approach involved the following steps:
Estimation of unconstrained sector wise Investment requirements given normative gaps in
service levels (5 year, 10 year and 15 year horizons), sector wise service level improvement
targets and identified priority projects for the first five years
Preparation of Financial and Operating Plan and Estimation of borrowing capacity with
operating revenue surplus improvements and revenue reforms
City Development plan for Nasrullahganj 11
Developing a realistic and actionable Investment Plan and a Financial and Operating Plan
within borrowing capacity limitations with a 5-year action plan and 15-20 year financial
projections.
Developing 5 year action plan is an iterative process and factored inputs from consultations with
stakeholders on priority projects to be taken up in consonance with the City Vision, Sector wise
strategy and service level targets.
Submission of City Development Plan, Consultations and Finalization
Following the finalization of the CIP, we had integrated the deliverables presented in Module I and II
along with the CIP and financing strategy to prepare and submit the City Development Plan.
Further to this a workshop with stakeholders will be conducted to summarize the process and the
building blocks around which the CDP has been evolved and seek an endorsement from them. We
would also work with the stakeholders to develop procedures for performance monitoring and
implementation of the actions recommended in the CDP.
This would be followed by a presentation to MPUADD and the ULB. Based on the inputs we would
submit the final CDP to MPUADD and the ULB along with a summary of the CDP for publication and
wider dissemination by the NP.
1.5. Stakeholders Interaction
The CDP process involved several stakeholder consultations during the course of the project to make
the process inclusive and CDP comprehensive. The team visited Nasrullahganj in the month of
November and December and had interactions and discussions with the city officials and the political
representatives to get information on the city strengths, existing scenario of infrastructure services,
on-going projects, ULB setup, area of concerns, lacunas etc. And also the demand, gaps, vision,
goals, strategies, priorities, financial situation etc. Apart from individual consultations, three
stakeholder workshops were conducted at different stages of the study with the objectives of
apprising stakeholders with the status of the study and obtaining feedbacks on CDP process and
intermediate findings. The feedbacks from stakeholders were carefully evaluated and incorporated in
the process.
1.5.1. Interacting with Municipal Body
During the first visit to the town, we interacted with the officials of Nasrullahganj Nagar Parishad,
wherein we discussed the necessity of a CDP for the town and the support that we sought in order to
accomplish the task assigned by the State. We also discussed the approach and methodology for the
assignment and the support that was required from the ULB in terms of data support, city
understanding and conduction of the workshops. In the subsequent meetings the team had a detailed
discussion on the organization structure of the ULB, type & level of service provided by them, financial
aspects of respective services, existing capacity & gaps in various sectors and their perspective &
suggestions on improving the quality of services provided by municipality and data on existing on-
going projects if any. These interactions also included collection of data pertaining to services offered
by ULB. During second visit the detailed demand and gaps were discussed with local body and Nagar
Parishad supported in identifying the potential areas of development and potentials in every sector.
During third visit final investment plans were discussed with local people.
1.5.2. Interaction with other Stakeholders
City Development plan for Nasrullahganj 12
Apart from meeting the ULB officials the team has also interacted with other stakeholders mainly
Adhyaksha and the elected ward members and other eminent personalities of the town. Team has
also met with revenue department‟s representative (Patvari), sub-engineer etc.
1.5.3. Formation of Steering Group
Town Level Steering Group is a group of eminent persons of the area who can play a key role in the
successful completion of this study. This group is envisaged to be entrusted with the duty of reviewing
all the reports and primary consultations for all purposes. The following officials/political leaders/other
eminent persons are part of steering group as given in Exhibit 1-3.
Exhibit 1-3 List of Members of Steering Group
S. No. Designation / Department Name
1 Adhyaksha Mrs. Anita Parihar
2 Upadhyaksha Mr. Aslam Qureshi
3 Mandal Upadhyaksha Mr. Sanjay Ajep
4 Parshad Mr. Yogender Bhavsar
5 Parshad Mr. Babu Khan
6 Chief Municipal Officer Mr. Rajendar Joshi
7 Sub-engineer Mr. Vishwakarma
8 Citizen Mr. Kailash Rathore
9 Citizen Mr. Karan Singh Jamidar
10 Citizen Mr. Lokender Thakur
1.5.4. Workshops
The objectives and outcomes of various stakeholders are:
1. Kick-off Workshop – Inception Workshop
A workshop was organized to familiarize the stakeholders with the purpose, process, and expected
outcomes of the CDP, and build enthusiasm, understanding and commitment to the CDP. The kick off
workshop helped in deriving a consensus along with the stakeholders firming the process and
agreeing upon a structured programme to take the CDP forward. It happened during first workshop
i.e. “Kick-off Stakeholder Consultation Workshop,” on November 2nd, 2011. Presentation was
followed by a participative session on “discussion & suggestions.” Outcomes of this workshop were;
familiarization of stakeholders with the purpose, methodology & expected outcomes of the study,
improvisation in our understanding of city & its problems, innovative approaches to counter existing
problems and building of enthusiasm, understanding and commitment for the successful completion
of a comprehensive and ambitious but implementable, City Development Plan.
2. Second Workshop – City Vision, Sector Goals, Strategies and Prioritization
Second formal meeting addressing all stakeholders happened during second workshop on December
3rd
, 2011. Presentation was followed by a participative session and questionnaire round, which helped
in finalizing the city vision, sector goals, strategies and priority actions for the development of the
town. This workshop culminated in the consolidation of strategies, priority actions and projects.
3. Third Workshop – Draft CDP Workshop
The third workshop was conducted on 27th August, 2012 at Nasrullahganj.
City Development plan for Nasrullahganj 13
In this workshop, findings and recommendations to achieve the vision has been presented to the city.
Detailed list of proposed projects with broad cost estimates have been shared along with the
sustenance capacity of ULB. This workshop also discussed about the reform process to make ULB
more efficient. This workshop culminated in the consolidation of draft CDP, comments to improve
sectoral issues have been suggested by stakeholders.
The detailed proceedings of various stakeholder workshops are provided as Annexure 1. The second
workshop also included a questionnaire survey to elicit stakeholders‟ responses on key issues faced
by city and extent of their severity. The details pertaining to questionnaire survey, viz. objective,
methodology, questionnaire, analysis and findings, are provided in chapter 8 and questionnaire is
attached as Annexure 2.
1.6. Report contents
This report covers “City Vision & Goals” along with “Strategies & Priority Actions” required for the
study and is organized as follows:
Section 1: “Introduction” (this section) provides the background to the study and outlines the
study progress till date along with proceedings of 1st and 2nd Workshops.
Section 2: “Physical Features of the Town” covers location, physiography and landform of the
town.
Section 3: “Demographic Profile of the Town” provides various demographic indicators of the
town like population growth, population projection etc.
Section 4: “Socio-Economic Profile of the Town” provides information on socio-economic
indicators of the town like workforce details etc.
Section 5:“Spatial Planning and Growth Management” gives the details about the growth
pattern of the town along with information on housing scenario present in the town.
Section 6: “City‟s Infrastructure – Existing Status, Gaps, Issues, SWOT, Goals and
Strategies” covers physical and social infrastructure sectors of the town.
Section 7: “Municipal Financial Assessment” provides the financial status of the town.
Section 8: “City Vision, Sector Goals, Strategies, Action Plan, Projects and Prioritization”
describes the vision of the town. This section also covers the strategies to be made, action to
be taken for achieving sector goals.
Section 9: “City Investment Plan”
Section 10: “Financial Operating Plan”
Section 11: “Urban Reforms” outlines the reforms that should to be undertaken by ULB.
1.7. Limitations and Caveats
The limitation faced during the preparation of the city development plan is the unavailability of
complete data, as IMaCS did not conduct any field survey for the data collection, only secondary data
was used which was provided by Nagar Parishad. Since „To the Scale‟ Ward boundary maps are not
available with the town, the digitized maps prepared by IMaCS show the tentative ward and town
boundaries which are marked by the officials of Nasrullahganj Nagar Parishad and Revenue
Department.
City Development plan for Nasrullahganj 14
2. PHYSICAL FEATURES OF THE TOWN
2.1. Introduction
Nasrullahganj is a small town and a tehsil in Sehore District of the state of Madhya Pradesh. As
Sehore district stands in the foothills of Vindhyachal range in the middle of Malwa region,
Nasrullahganj is located in the Narmada basin. Nasrullahganj lies on SH22 which connects to NH -12
towards Bhopal in the east, Indore in the west and Sehore in the north. There is one major economic
centre i.e. Krishi Upaj Mandi from where commodities are exported out of the state.
2.2. District information
Nasrullahganj town is located in the Southern part of the Sehore District. Sehore is surrounded by
seven districts i.e. Bhopal, Raisen, Hoshangabad, Dewas, Shajapur, Raigarh and Harda. Lying
between the north latitude 22º31' to 23º40' and east longitude 76º22' to 78º08', the district's
headquarters is situated at the Sehore city (Refer Map-1 in Annexure 4). The lacquer bangles of the
district are coveted adornment of the Gond and Bhialaand Korku tribes of the region. Bhavai, the
traditional dance of these tribes is an excellent example of their artistic proclivities. In tribal area of
Sehore the Bagoria dance, with its vigorous drum beating, is still performed around the Holi Festival.
Sehore stands in the foothills of Vindhyachal range in the middle of Malwa Region. After formation of
Madhya Pradesh, the state capital Bhopal was a part of the Sehore District. It was bifurcated in 1972
and a new district Bhopal was formed. Big and small rivers abound the landscape of Sehore District.
Narmada, Parwati, Dudhi, Newaj, Kolar, Papnas, Kulans, Seewan, Lotia and other rivers are found
passing through the district.
2.3. Location (Linkages and connectivity)
Geographically Nasrullahganj lies at 23°20´ N latitude and 76°20´ E Longitude and located in Sehore
district, the town is surrounded by Vindhyachal range of mountains and Narmada River which flows
just 8 kms from the town (Refer Map-2 in Annexure 4). Nasrullahganj‟s connectivity with other towns
of State and Country through various mode of transportation is given below.
Road: Nasrullahganj is a major town and is connected to Bhopal with SH 22 in the east at a distance
of 92 kms and to Indore with NH 58A in the west at a distance of 164 kms. It is connected to the
district headquarters Sehore with SH 22 in the north at a distance of 73 kms.
Railway: Nearest railway station to Nasrullahganj is located in Budni which is at a distance of 50 kms
from Nasrullahganj.
Air: Nearest airport is at Bhopal which is at distance of 92 Km from Nasrullahganj.
2.4. Physiography and landform
2.4.1. Topography
Nasrullahganj stands in the foothills of Vindhyachal Range in the middle of Malwa region. The most of
the area is made of undulating plateau surface and is covered with black soils of different grades. Due
to this it has got good productive soil.
City Development plan for Nasrullahganj 15
2.4.2. Drainage
Babbar River flows in the northern part of the town and Narmada River flows in the southern side of
the city. The town falls under Narmada Basin and its catchment area. A nallah flowing in North-South
direction bisects the town.
2.4.3. Climate
Nasrullahganj is placed at 440 m above mean sea level. The climate of the town is relatively
temperate with an average maximum and minimum temperatures at 32.30°C and 18.40°C
respectively. The average rainfall reported in the town is about 1100 mm.
2.5. Municipal area and planning area
Total municipal area under Nasrullahganj Nagar Parishad is 8.08 sq. Km, which consists of developed
and undeveloped land. The existing municipal area includes both built-up area and agricultural area,
which has been discussed in detail in fifth chapter.
The master plan for the town has not been prepared, thus the town does not have any planning area
for future growth. It has been observed that a large component of the existing municipal area is
undeveloped, thus it creates space for the spatial development of the town.
2.6. Conclusion
This chapter dealt with the physical features of the town which included topography, natural drainage,
climate, and rainfall. It also provided information on its location and connectivity. The next chapter
discusses the demographic profile of the town.
City Development plan for Nasrullahganj 16
3. DEMOGRAPHIC PROFILE OF THE TOWN
3.1. Introduction
Demographic characteristics of a town provides an overview of its population size, composition,
territorial distribution and changes therein. This section on demographic indicators includes indicators
that measure the population size, sex ratio, density and dependency ratio. These indicators for the
region will help in identifying areas that need policy and programmed interventions, setting short and
long-term goals, and deciding priorities, besides understanding them in an integrated structure. Data
in this section has been taken mainly from the “Census of India” and “Nasrullahganj Nagar Parishad”.
The demographic characteristics have been analysed in terms of decadal growth and spatial
distribution of density in the town.
As per 2001 census the total population of Nasrullahganj is 17,240 and provisional population for the
year 2011 is 23,738 which shows a decadal growth rate of 38%. Refer Exhibit 3-1. The work
participation rate is 26.7% which is low as compared to national growth rate (39.1%) and state growth
rate (42.7%). Sex ratio is 887 which is also low as compared to the national level (933) and state level
(920). Literacy rate in the town is 73 %, which is higher to National literacy (64.84%) and state literacy
(63.74%).
3.2. Population growth and density
As per the Census of 2011, the population of the town is 23,738 and town is categorized as Class IV
towns. Exhibit 3-1 provides a snapshot of the population growth over the last few decades. The town
has experienced very high population growth rate during 1981-91 at 104%, which was reduced to
decadal growth rate of 17% during 1991-2001 then again increased to 38% in last decade (2001-11).
Exhibit 3-1 Population & Decadal Growth
S. No Year Total Population Decadal Population Growth rate (%)
1 1981 7,212
-
2 1991 14,688
104
3 2001 17,240
17
4 2011* 23,738
38
Source – Census of India (*Provisional population as per Census 2011)
Population density (P.D.) is calculated as population of the city divided by the municipal area of the
town. It is generally represented in terms of No. per square km (No. /sq. km). The current density of
Nasrullahganj is 2,938.
3.3. Population projection
With a precedence of past and current trends of population growth in Nasrullahganj, an analysis has
been carried out with an objective of estimating population for the next three decades using various
methods which includes Arithmetic increase method, Incremental increase method, Geometric
progression method exponential methods. Result of this analysis is presented in Exhibit 3-2.
Exhibit 3-2 Population Projection
S. No Method Population Projections
2011 2021 2031 2041
1 Arithmetic Increase Method 23,738 29,247
34,755
40,264
City Development plan for Nasrullahganj 17
S. No Method Population Projections
2011 2021 2031 2041
2 Incremental Increase Method 28,758
33,288
37,330
3 Geometrical Progression Method 33,422
47,055
66,251
4 Exponential Method 36,698
53,310
77,441
Source: IMaCS Analysis
Given the fact that decadal population growth rate of the Nasrullahganj town is highly irregular, taking
any of the above method for projection will not yield correct projections, so to project future population
last decade‟s growth rate has been considered for population growth during 2011-21 at a CAGR of
3.25%, then factoring the increase in population density the CAGR of 3% and 2% has been assumed
for 2021-31 and 2031-41 respectively.
Exhibit 3-3 Projected Population
2015 2025 2035
Projected Population 27,240 37,687 48,710
Source: IMaCS Analysis
3.4. Ward-wise demographic details
Nasrullahganj Municipality has 15 wards and the ward-wise population has been shown in Exhibit 3-4.
It is clearly visible that ward number 15 has the highest proportion of population. Literacy rate of ward
number 10 and ward number 15 are highest, whereas of ward no. one and four is amongst the lowest.
Sex ratio of Ward Eight and Nine are amongst the least, whereas of Ward Ten has highest.
Exhibit 3-4 Ward wise Demographic details
Ward
No
.
To
tal
Ho
useh
old
Population
Sex R
ati
o Literates
Lit
era
cy
rate
To
tal
Male
Fem
ale
Oth
ers
To
tal
Male
Fem
ale
Oth
ers
1 445 2245 1179 1066 0 904 1409 814 595 0 63
2 266 1281 669 612 0 915 912 529 383 0 71
3 144 807 422 385 0 912 559 327 232 0 69
4 448 2466 1300 1166 0 897 1584 923 661 0 64
5 117 623 320 303 0 947 482 266 216 0 77
6 168 971 512 459 0 896 717 410 307 0 74
7 176 916 465 448 3 963 682 366 316 0 74
8 149 761 415 346 0 834 601 338 263 0 79
9 253 1272 699 573 0 820 972 571 401 0 76
10 150 759 402 357 0 888 616 342 274 0 81
11 323 1480 788 692 0 878 1182 666 516 0 80
12 212 1131 598 533 0 891 861 490 371 0 76
13 555 2852 1514 1338 0 884 1853 1084 769 0 65
14 335 1728 912 816 0 895 1264 698 566 0 73
15 911 4491 2404 2087 0 868 3573 2024 1549 0 80
Total 4652 23783 12599 11181 3 887 17267 9848 7419 0 73
Source: Census of India 2011 - Provisional data
City Development plan for Nasrullahganj 18
3.5. Issues
1. A high population growth rate has caused several problems in the recent times as existing
physical infrastructure and level of service has been restrained by several factors such as lack of
funds, lack of proper planning, etc.
2. Sex ratio is alarmingly low
3. A higher proportion of female among the illiterates indicate lower attention paid to female
education.
3.6. Conclusion
This chapter discussed population growth trend and population density of the town. It was followed by
ward-wise population details and includes population projections for next 25 years. The next chapter
deals with the socio-economic profile of the town.
City Development plan for Nasrullahganj 19
4. SOCIO ECONOMIC PROFILE OF THE TOWN
4.1. Introduction
Socio-Economic profile of a town provides an overview of its social indicators and economy. The
section on Social Indicators includes Sex Ratio, Literacy Rate and Average Household size. This is
supported by the detailing of occupations of population. The economic profile of a town provides an
understanding of its economic base and trade and commerce activities. These indicators for the
region will help in identifying areas that need policy and programmed interventions, setting near and
far-term goals, and deciding priorities, besides having an integrated development structure. Data in
this section has been taken mainly from the “Census of India” and “Nasrullahganj Nagar Parishad”.
The major occupation of the people in
Nasrullahganj is agriculture; hence Krishi Upaj
Mandi (Figure 4.1) is one of the major activity
which accounts for a significant socio economic
activity in the town. The major commodities
exported from the town are Wheat, Pulses and
Soyabean. The Mandi is connected to the nearest
major railway station at a distance of 60 kms in
Hoshangabad (though Budni is the nearest railway
station but it is not a major station, and all the
trains don‟t halt at Budni). The produce from the
Mandi is sent to the nearby cities including Itarsi,
Indore, Obdullaganj, and Mandideep etc. Wheat is
mainly exported to the Maharashtra, Soya is sent
for processing in the Indore plants. Pulses are exported to Indore, Itarsi and Maharashtra. Chana is
not processed in the town as the quantity required is not enough for the functioning of processing
plant. There are six private and two government owned warehouse for the storage. Though the Mandi
is “A” class but as per the officials it‟s smaller in size. Area under Krishi Upaj Mandi is seven acres. It
is seen that average daily dispatch to outside markets during the seasons is 7000 quintals.
Exhibit 4-1 Total quantity of commodities exported in 2010-11
S/No. Commodities Export (in tones)
1 Wheat 68,835
2 Pulses 18,345
3 Soya bean 57,188
Total 144,368
Source: Krishi Upaj Mandi
4.2. Indicators
4.2.1. Sex ratio and Literacy rate
Exhibit 4 2 gives the details of literates and of sex ratio w.r.t the State‟s and National numbers.
Figure 4-1 Krishi Upaj Mandi
City Development plan for Nasrullahganj 20
Exhibit 4-2 Literacy rate and Sex ratio
Particular Male Female Total Region Sex Ratio
No. of Literates 9848 7419 17267 Nasrullahganj 887
Literacy Rate (%) 78 66 73
M.P. state 80.53 60.02 70.63
M.P. state 930
National 82.14 65.46 74.04 National 940
Source: Provisional Population Census of India, 2011
Nasrullahganj Nagar Parishad has an over-all sex ratio of 887 and literacy rate of 73%. Exhibit 4-2
shows Nasrullahganj‟s literacy rate is comparatively higher than that of the state. Turning our attention
to sex ratio, Nasrullahganj‟s overall sex ratio is lower than that of State and National.
Sex-ratio and the literacy rate has been reorganized Exhibit 4-3 to identify the wards having sex-ratio
and Literacy-rate less than town average and more than town average.
Exhibit 4-3 Demographically Critical Wards
Parameter Wards with Less than Town Average Wards with More than Town Average
Sex-Ratio 8,9,10,11,12,13 and 15 1,2,3,4,5,6,7 and 14
Literacy Rate 1,2,3,4,13 and 14 5,6,7,8,9,10,11,12 and 15
Source: IMaCS’ Analysis
Madhya Pradesh‟s sex ratio has increased from 920 in 2001 to 930 in 2011. It is still lower than the
national levels. India‟s sex ratio was 933 in 2001 and has increased to 940 in 2011. If we look at the
sex ratio at district level in last two decades, the encouraging figures are noticeable. The sex ratio has
increased from 898 to 908 and then to 918 in 1991, 2001 and 2011 respectively in Sehore District.
Government of Madhya Pradesh had started some effective schemes and interventions for the
welfare of women which is improving the situation in the state. The schemes that focus on sex-ratio
sensitivity is „Ladli Laxmi Scheme‟, which is handled by Department of Women and Child
Development, Madhya Pradesh for betterment of sex ratio, education and health status of girl child. It
is a very effective scheme which has been playing important role in improving declining sex ratio in
the state.
Literacy rate is one of the most important demographic indicators which sum up the existing literacy
level and capacity to actualize the developmental potential. All the wards are classified in three
different categories as per their existing level of literacy. This Classification is given in Exhibit 4-4.
Exhibit 4-4 Classification of Wards as per their Literacy Rate
Category Status Criteria (Literacy Rate) Ward Numbers
I 80 and above Average 15, 11 and 10
II 75-80 Poor 12, 9, 5 and 8
III Less than 75 Very Poor 1, 4, 13, 3, 2, 14, 6 and 7
Source: IMaCS Analysis
Exhibit 4-5 shows the ward-wise literacy rates in the town. It can be seen that most of the peripheral
wards have lower literacy rate whereas the wards in the central area (ward no. 5, 6, 8,9,10 and 11) of
the town have high literacy rates. It can also be seen that the wards having low literacy rate are
mostly the slum wards. In addition, a detailed gendered analysis of literacy has also been carried out
for all the wards of Nasrullahganj town.
City Development plan for Nasrullahganj 21
Exhibit 4-5 Ward Level Gendered Analysis of Literacy Rate
Ward No.
Male Literacy Rate Female Literacy Rate
Percentage Status Percentage Status
1 69 Very Poor 56 Very Poor
2 79 Poor 63 Very Poor
3 77 Poor 60 Very Poor
4 71 Very Poor 57 Very Poor
5 83 Average 71 Very Poor
6 80 Average 67 Very Poor
7 79 Poor 71 Very Poor
8 81 Average 76 Poor
9 82 Average 70 Very Poor
10 85 Average 77 Poor
11 85 Average 75 Very Poor
12 82 Average 70 Very Poor
13 72 Very Poor 57 Very Poor
14 77 Poor 69 Very Poor
15 84 Average 74 Very Poor
Source: IMaCS’ Analysis
The total literate population is 73%. With the initiation of centrally sponsored schemes in Education
such as District Primary Education Programme, Sarv Shiksha Abhiyaan and Education Guarantee
Scheme at school level had contributed in the increased level of literacy in the state in last two
decades; but the most effective scheme had been „Padhana-Badhana‟ Movement for literacy by
Government of Madhya Pradesh, started in 1996-97. As per 53rd round of National Sample Survey
(NSS), it was established that there was nearly 11.8% increase in the rate of literacy of the state from
1991 to 1997, which to some extent was due to Padhana-Badhana Movement. According to
provisional Figures of census 2001 the rate of Literacy had increased 44.20% to 64.11% which
reflected 19.19% increase in literacy rate within a decade. Other schemes which attributed to
increasing literacy rate in last two decades includes upgradation of Madarsa‟s scheme, „Free of cost
Distribution scheme of text books‟, „Book –Bank Scheme‟, „ Free of Cost School Uniform Scheme‟,
etc.
4.2.2. Average household size
Average Household size acts as a key factor in estimation of development programmes. Exhibit below
presents the Average Household size for year 2011 and 2001.
Exhibit 4-6 Average Household Size Region Year Population No. of Households Avg. HH Size
Nasrullahganj Nagar Parishad 2011 23738 4652 5.1
2001 17,240 3101 5.6
Source: Provisional Population, Census of India, 2011 (3) and Nasrullahganj Nagar Parishad
The Average Household Size in Nasrullahganj Nagar Parishad was 5.6 in the year 2001 and has
decreased to 5.1 in 2011.
City Development plan for Nasrullahganj 22
4.2.3. Workforce participation (Primary, Secondary and Tertiary occupation and income levels)
Work is defined as participation in any economically productive activity with or without compensation,
wages or profit. Such participation may be physical and/or mental in nature. Work involves not only
actual work but also includes effective supervision and direction of work. It even includes part time
help or unpaid work on farm, family enterprise or in any other economic activity. All persons engaged
in 'work' as defined above are workers. As per “Census of India,” Workers have been classified as
Main workers, Marginal workers and Non workers depending on duration of their work months.
Main Workers: Those workers who had worked for the major part of the reference period (i.e. 6
months or more).
Marginal Workers: Those workers who had not worked for the major point of the reference period
(i.e. less than 6 months) are termed as Marginal Workers.
As a sub-classification, “Main and Marginal Workers” are again classified on the basis of nature of
work performed; Cultivators, Agricultural Labours, Household Industry Labours and Other Workers.
Cultivators: A person is classified as cultivator if he or she is engaged in cultivation of land owned or
held from Government or held from private persons or institutions for payment in money, kind or
share. Cultivation includes effective supervision or direction in cultivation.
Agricultural Labours: A person who works on another person's land for wages in money or kind or
share is regarded as an agricultural labourer. (S)he has no risk in the cultivation, but merely works on
another person's land for wages. An agricultural labourer has no right of lease or contract on land on
which (s) he works.
Household Industry: Household Industry is defined as an industry conducted by one or more
members of the household at home or within the village in rural areas and only within the precincts of
the house where the household lives in urban areas.
Other Workers: This includes all government servants, municipal employees, teachers, factory
workers, plantation workers, those engaged in trade, commerce, business, transport banking, mining,
construction, political or social work, priests, entertainment artists, etc.
The details of the workforce for 2001 have been shown in Exhibit below. The details of the workforce
for 2011 are in the process of conduction in the towns.
Exhibit 4-7 Workforce details
Particulars Nasrullahganj town (% of Population)
Main Worker 23.89
Marginal Worker 2.76
Non Worker 73.35
Workforce Participation Rate (WFPR) 27
Source – Census of India, 2001
The workforce participation rate of the town is very low (27%). There is a need to provide employment
opportunities and reduce dependent population in the town.
4.3. Economic Base
4.3.1. Industrial activities
City Development plan for Nasrullahganj 23
The population of the town is not involved in industrial activities. It does not have any big industry to
boost the economy of the town.
4.3.2. Trade and commerce
The town acts as a trading centre and commercial market for Agricultural produces. This place is
known for one of the highest Soybean productions in the region as well as in Madhya Pradesh. The
major crops grown over here are Wheat, Chana and Soybean. Nasrullahganj town serves as a
regional wholesale crop market centre (Krishi Upaj Mandi) and is an A-Class Mandi of the state. Total
area of the Mandi is 25 acre. 2010-11 exports from the Mandi of Wheat, Chana and Soya bean were
68,835 tonnes 18,345 tonnes and 57,188 tonnes respectively. Wheat is exported to the Maharashtra,
Soya bean is exported to the Obdullaganj, Mandideep and Indore plants. Chana is exported to Indore,
Itarsi and Maharashtra for processing. A Gud Mandi and a Sabji Mandi is located in the ward No. 10.
4.4. Issues
A significant number of male and female illiterates are a serious issue which impedes the
overall development of the city. This can be attributed to less awareness, poverty and lack of
sufficient accessible education.
A high percentage of non-workers suggest that a significant proportion of population remains
unemployed for a substantial part of the year. This needs to be address for realise economic
upliftment of the society at large.
Nasrullahganj‟s economy is highly depending on agriculture. Whereas this potential can
further be actualized, this dependence is also a possible threat to the Nasrullahganj‟s
economy. To achieve a sustainable growth rate, a more diversified economic base is of
utmost importance.
City Development plan for Nasrullahganj 24
5. SPATIAL PLANNING AND GROWTH MANAGEMENT
5.1. Spatial growth trends
The origin of town is older than Independence. The town is named after the name of the Nawab
Nasrullah Khan. He was an expert hunter and was one of the few hunters in India who had achieved
the distinction of becoming „Nausherwan‟ – a hunter who bags nine tigers in a 24-hours span. He did
hunting in surrounding forest areas of present day Nasrullahganj. State Highway 22 known as Indore-
Bhopal road, passes through the town. The growth of the town is largely along the state highway. The
older settlement are mainly on the southern part of the town. But over the period of time, the intensive
development has been observed along the state highway in an unplanned manner.
5.2. Spatial distribution of population
The town‟s old areas (i.e. in Ward four and three) are more dense and populated. A close look at the
Nasrullahganj‟s map reveals (Refer Map-4B enclosed in Annexure 4) that the central region has
comparatively higher population densities. Detail of population density is given in Exhibit 5-1 central
areas have high density (above 200 PPH), whereas other parts of the town has density lesser than 50
pph.
Exhibit 5-1 Population Density
Ward No. Population Area (Sq. Km) Density (P/Sq.Km) Density (PPh)
1 2245 1.36 1653 17
2 1281 0.18 7176 72
3 807 0.04 21463 215
4 2466 1.02 2417 24
5 623 0.03 21190 212
6 971 0.23 4222 42
7 916 0.46 1991 20
8 761 0.13 5955 60
9 1272 0.13 9891 99
10 759 0.30 2516 25
11 1480 0.12 12364 124
12 1131 0.14 8160 82
13 2852 1.07 2670 27
14 1728 0.14 12343 123
15 4491 2.74 1638 16
Total 23783 8.08
In the map population density has been categorized into four types. Ward no. five and three have
higher density and are shown in the dark brown colour. Wards 11 and 14, are in the density range of
50-100 PPH and are shown in the light brown colour. The wards 1,4,6,7,10,13 and 15 are the ones
with least density and shown in the light yellow colour. Rest of the wards have medium density in the
range 100-150 PPH and are shown in the dark yellow colour.
City Development plan for Nasrullahganj 25
5.2.1. Municipal level mapping (to the scale)
The municipal area covers 8.08 sq. Kms of land. Map-3 enclosed in annexure 4 shows the municipal
level map and a base map with major landmarks of Nasrullahganj.
5.2.2. Ward delineation map
The town has 15 wards. The delineation of wards has been shown in Map-4A enclosed in annexure 4.
5.3. Land-use analysis
Nasrullahganj Nagar Parishad is spread over about 8.08 sq. km. In absence of the Master Plan for the
towns, it is difficult to estimate the exact land use breakup but from the preliminary visit it is clear that
major part of the town is under agriculture use. Exhibit below shows the land-use pattern of the town
based on the information provided by Land records and revenue department, 2011.
Exhibit 5-2 Land Use pattern S. No Land use category Area (Ha) Percentage
1 Residential (Abadi) 113.12 14
2 Amenities (Public-Semi Public) 32.32 4
3 Roads 24.24 3
4 Water Bodies 20.2 2.5
5 Agriculture/ Green Space 589.84 73
6 Commercial 28.28 3.5
Total 808.00 100
Source: Land records and revenue department, 2011
As discussed above Agriculture accounts for 73% of the total land in town and the developed land is
only 24.5%, which consists of 14% of residential use, while institutional, commercial and roads
accounts for 4, 3.5 and 3% respectively. The broad tentative land use of the town has been
represented in Map-5 enclosed in Annexure 4. The broad land use pattern shows that, institutional
area is located along state highway. Residential area is divided in the two parts, one in North –
Western part and other in the south-eastern part of the town.
5.4. Housing scenario
Housing is a very critical component of city‟s development. Some of critical aspects of Housing in any
city consists of the number of households, average household size, type of building and provision of
basic services e.g. water supply, electricity, sewerage, drainage, solid waste disposal etc. To analyse
the housing scenario of the city, factors such as density of residential areas, household size, nature of
built form and housing shortage have been considered.
5.4.1. Present and future Housing demand
At present the town has 4,652 households. Many houses in the town are in dilapidated condition.
Some are kutcha in nature, so these all houses are also needed to be taken care of for future
improvement. In 2036, minimum of 894 houses would be needed to support the population of the
town. Exhibit 5-3 future total need of houses.
Exhibit 5-3 Present and future demand for housing S. No Description 2011 2016 2026 2036
1 Total population 23,738 28,193 38,818 49,684
2 Future demand / Number of Houses - 507 699 894
Source: IMaCS Analysis
City Development plan for Nasrullahganj 26
5.4.2. Illegal colonies
The development of unauthorised colonies has been observed in the town. Agricultural cultivators are
sub-dividing their agricultural land and selling them for construction of houses. Since there are no
permissions from the local body to commence this construction and change the use of the land, the
basic facilities and urban services are negligible in these areas leading to degraded condition of the
colonies. This phenomenon is increasing over the period of time along state highway.
5.4.3. Future growth possibilities
At present, Nasrullahganj faces a number of problems with water being the most scarce resource
which the citizens are deprived of. Apart from problems related to Road infrastructure, Water Supply,
Sewerage & Sanitation, Drainage, Solid Waste Management, Health and Education, Nasrullahganj
Nagar Parishad faces the problem of slums in the town. The town has suffered the insufficient
employment opportunities. It had expended along state highway.
As the population grows in the town it is expected that the process of sub-divisions and selling plots
would increase due to rising land values, and more residential development would take place in
peripheral part of the town. These areas are good for habitation but it needs support of infrastructure
for good quality of life.
Map-4B enclosed in Annexure 4 clearly depicts wards with lower population densities. The wards,
with lower densities, offer some possible locations for future development in the town. A critical
observation reveals that growth could also be directed to the low density wards, namely Ward No. 15,
1, 7, 4, 10 and 13. acts a site for potential future development.
5.5. Issues
1. The population densities in internal wards, which are in the core area are substantially high and
are near to the permissible limits as prescribed in the UDPFI guidelines as compared to other
wards. Initiatives should be taken to decongest these wards in order to reduce infrastructural
pressure from the overcrowded wards.
2. The haphazard development and formulation of illegal colonies in the town has increased and
leads to degraded quality of life. There is a need to prepare a master plan for regulated land
development and proper management and development of the town.
5.6. Conclusion
This chapter dealt with the spatial growth trend and how did Nasrullahganj expanded into the town it
is now. The ward maps and land use pattern and housing scenario have also been discussed in
detail. The chapter ended with a brief note about the growth possibilities and city specific strategies
and action plan.
City Development plan for Nasrullahganj 27
6. CITY’S INFRASTRUCTURE – EXISTING STATUS, GAPS, ISSUES, SWOT, GOALS AND STRATEGIES
The chapter deals with the current status of various components of city infrastructure and services
provided by the Nasrullahganj Nagar Parishad. Various sectors/services have been analysed in
accordance with the methodology mentioned earlier. Sectors / Services identified for the analysis
include: Water Supply, Sewerage & Sanitation, Solid Waste Management, Drainage, Traffic &
Transportation, Street Lighting & Fire Fighting, Urban Poor and their Accessibility to Basic Services,
Social Infrastructure, Environment and Existing Institutional Framework for Development. Sector-wise
analysis is presented in subsequent sub-sections. Demand-Supply Gap Analysis for various sectors
has been done for short, medium and long term, i.e. 5 years, 15 years and 25 years.
6.1. Water supply
Water Supply facility in the town is provided by Nasrullahganj Nagar Parishad which undertakes
sourcing, establishing networks, maintenance and collection of user charges for domestic as well as
commercial purposes.
6.1.1. Source, Supply, Distribution Systems and Treatment Facilities
Nasrullahganj lies in Narmada basin and tube wells have been drilled with the yield of 450 lph to 500
lph fitted with submersible pumps. In Nasrullahganj, the available water supply statistics show that
average yield from various sources for water which is supplied to the town is about 1.42 MLD, which
translates into about 60 lpcd availability for the citizens. Narmada River is proposed to be used for
augmentation of existing system i.e. for supply of additional 5.6 MLD raw water situated 6 kms
(approx.) from Nasrullahganj in the south eastern direction.
Main source of water supply in Nasrullahganj town is through ground water. The water from 17 tube
wells is pumped to two over-head tanks of capacity of 2.7 lakhs and 2.3 lakhs litres and one sump
well with the capacity of 0.5 lakhs litres. The overhead tanks are filled once in a day whereas sump
well is filled four times in a day. Consequentially, the capacity of all the reservoirs in a day is 0.7 MLD.
There is no treatment facility or filtration plant in the town at present. The town has eleven hand
pumps, fourteen tube wells and four wells, which are under private ownership. Location of different
sources of water is provided in Exhibit 6-1. (Refer Map 8A in annexure 4).
Exhibit 6-1 Location of Hand pumps, Tube wells and Well
Ward No. Hand Pump Tube Wells Wells
1 2 2 0
2 2 1 0
3 0 1 1
4 0 1 0
5 1 0 0
6 0 1 0
7 0 0 1
8 0 0 0
9 1 1 1
10 0 0 0
11 0 1 0
City Development plan for Nasrullahganj 28
Ward No. Hand Pump Tube Wells Wells
12 2 1 0
13 2 1 1
14 1 1 0
15 0 3 0
Total 11 14 4
Source: DPR of Swaksch-Swasth Nasrullahganj for 2020.
Water Supply from tube wells in longer time may become a problem in this area, as the ground water
level has gone down up-to 300 ft below the ground and the water supply at present is much below the
prescribed standards and with the increase in population would result into increase in demand for
water. The quality of ground water in the district has been assessed by central ground water board by
analyzing ground water samples in the district. From the samples it is observed that PH values of all
water samples ranges from 7.27 to 8.07, which shows alkaline nature of the water in the district.
Nitrate level in Sehore district varies from 5.6 to 358 mg/l. The excessive concentration of nitrate
levels may be due to localized pollution or percolation of fertilizers used for agriculture. The hardness
of ground water in the district has been found safe. No arsenic content has been detected in the
ground water of the district. But as the Sehore district‟s ground water has iron and fluorine, usage of
ground water needs to be reassessed for safe drinking (Water Aid, 2005, Water and Sanitation in
Madhya Pradesh).
In India, water supply projects are usually designed keeping 20 Hours per day pumping & treatment
infrastructure‟s „live‟ availability; however, the efficacy of the entire system is disadvantaged when
continuous power is not available at various stages of pumping/treatment. Another statistics on power
availability reveal that average per day power availability is for about 8 hours. A perspective look into
the above available information would reveal that power cut acts as a major impediment in the
provision of ample amount of per capita water availability in the town vis-a-vis existing infrastructure
available. Thus, in the proposed strategy, in order to utilize the designed infrastructure at its optimum
efficiency, and while tackling the power availability impediment, it would be worthwhile to have a direct
power feeder for the proposed treatment plant and pump house.
6.1.2. Connections and User Charges
At present there are 1,205 domestic connections and 18 non-domestic connections. Existing water
tariff is Rs.40 per month for domestic and Rs.75 per month for non- domestic as shown table below.
Exhibit 6-2 Present Water Tariff Structure
S. No Type of Consumer Water Chargers (Rs)
1 Domestic 40
2 Commercial/ Industrial 75
New Connections Connection Fees (Rs)
1 Domestic 705
2 Commercial/ Industrial 705
Source: Nasrullahganj Nagar Parishad
For new connections Rs 705 includes connection fee, Rs 5 as application fee, road cutting charges is
at the rate Rs 100/ft, Rs 105 as tap connection fee.
City Development plan for Nasrullahganj 29
Exhibit 6-3 Water Supply - Service Level Indicators S. No Service Level Indicator Values UDPFI/ CPHEEO
Norms
Unit
1 Gross Daily Per Capita Supply-Year 2011 60 135 lpcd
2 % Roads Covered with Distribution Network 28 85 %
3 % Elevated Storage capacity w.r.t Supply 57 33 %
4 % Total Storage capacity w.r.t Supply 57.5 %
5 % Treatment capacity available (Primary @ ESR) 0 100 %
6 % Non-Domestic Connections 1.4 %
7 Slum Population per Public Stand Post/ Hand pump 11 Persons
Source: IMaCS Analysis
6.1.3. Present and Future Demand and Supply Gaps
Exhibit 6-4 Present and Future demand and Supply Gaps: Water Supply
Service head
Existing / Desired level
Service Levels, Demand and Gaps
Un
it
Exis
tin
g (
2011)
By Year
2015
By Year
2025
By Year
2035
Ind
icato
r
Un
it
Cu
rren
t le
vel
Desir
ed
level
Dem
an
d
Gap
Dem
an
d
Gap
Dem
an
d
Gap
1 Daily Supply Per-capita
supply Lpcd 60 135 MLD 1.42 3.68 2.26 5.09 1.41 6.58 1.49
2 Treatment
Treatment
capacity against
supply
% 0 100 MLD - 3.68 3.68 5.09 1.41 6.58 1.49
3 Distribution
Network
Percentage of
Road Length % 28 85 Km 10 24.98 14.98 31.7 6.81 39.63 7.84
4 Elevated Storage
capacity
Elevated
Storage capacity
w.r.t Supply
% 57 33 ML .82 1.23 0.41 1.70 0.47 2.19 0.50
Source: IMaCS Analysis
It is evident from the Exhibit 6-4 that Nasrullahganj needs a major revamping in “Water Supply” sector
as current level of service, 60 lpcd, is substantially lower than the prescribed norm of 135 lpcd. The
huge gap in the water supply area at the end of year 2015 well underscores the above point. By the
end of year 2035, Nasrullahganj city would require 6.58 MLD of water for daily consumption. No
treatment of water happens in the town. In the area of Elevated Storage Capacity, Nasrullahganj city,
at present, as per the UDPFI standards there is a gap of 0.41 ML in short term and additional 0.50 ML
in long term will have to be addressed. An additional of 24.98 kms, 31.7 and 39.63 kms will be
required in the area of distribution network by the year 2015, 2025 and 2035 respectively.
6.1.4. Water supply projects
Under the UIDSSMT scheme, a new water supply system for Nasrullahganj based on Narmada River
is designed for water demands of the year 2040. The new scheme is designed for enhanced per
capita supply of 135 litres per day as per CPHEEO guidelines. As per this scheme, water requirement
for the population of Nasrullahganj for the year 2040 shall be 5.6 MLD. The scheme considers
construction of intake works at Narmada River, 5.6 MLD conventional water treatment plant, pumping
City Development plan for Nasrullahganj 30
mains, 2 new overhead reservoirs and distribution system in the town. The new scheme is approved
and the works are under construction.
6.1.5. SWOT analysis
Strengths Opportunities
Water Sources in the reachable distance.
With the completion of ongoing project, gaps
assessed in the various will be addressed.
People are well aware of the need to adopt
best practices.
Metered connections could bring
accountability in the water consumption and
can also increase the revenue of the Nagar
Parishad.
Service Levels could be improved by
augmenting daily supply of water and storage
capacity.
Water quality can be improved by increasing
the water treatment capacity.
Possibility of Private Participation can be
explored to address the capacity constraints
of Municipal Corporation.
Rationalization of water charges.
Weaknesses Threats
Current Service levels of water supply are
lower than level desired under the UDPFI
guidelines.
Lack of adequate water treatment capacity.
Unmetered water connections.
Poor collection efficiency of water tariffs.
Excessive exploitation of Ground Water by
Tube-wells could have long term implications
on the Environment
Failure of timely completion of ongoing
“Nasrullahganj Water Supply Scheme” could
lead to the worsening of the situation.
Failure to extend the distribution network to
the uncovered parts of the city can have
serious socio-economic impacts
6.1.6. Issues 1. A substantial part of population receives untreated water as the treatment facility does not exist
for the supplied water;
2. Critical shortage of water during summer season due to lowering of water level in the
Nasrullahganj;
3. Dependence on Hand-pumps and wells for daily water supply;
4. Complete absence of metering system and
5. Upstream pollution of River.
City Development plan for Nasrullahganj 31
6.2. Sewerage
As envisaged in the 12th schedule of 74th
Amendment to the Constitution of India,
responsibility of providing services pertaining to
sewerage within the city limits lie with the ULBs.
The same responsibility is with Nasrullahganj
Nagar Parishad.
6.2.1. Existing sewerage system
Currently there is no sewerage system existing in
Nasrullahganj. The sewage from the households
flows gets mixed into road side storm water drains
that flows in main nallahs and rivers. In the
absence of sewerage system, people depend upon individual septic tanks.
6.2.2. Means of sewage disposal
The sewage from households and other commercial establishments gets mixed into road side storm
water drains that flow in main nallahs and rivers. It is found that the sewage flows into various nallahs
or accumulates into the low lying areas creating unhygienic living conditions for the local residents. In
the absence of sewerage system, people depend upon individual septic tanks.
6.2.3. Household toilets (Dry Latrines and Flush latrines)
Out of 4,652 households, approximately 82 % have individual toilets. In this 16% have pit latrines and
rest have toilets with septic tanks. As already discussed there is no sewerage system in Nasrullahganj
and therefore, wastewater from septic tanks is generally left out in open drains or in a nearby nallah
except in few cases where soak pits are used to dispose the wastewater.
6.2.4. Open defecation
The household level survey conducted by AIILSG (All India Institute of local self-Government) in 2008
reveals that approximately 13% population – mostly from economic weaker sections and living in
slums and newly developing areas resort to open defecation due to lack of individual or community
sanitation facilities in their area. The baseline survey indicated that such population exists in almost in
all municipal wards in varying degree but it is more in Wards no 1, 13 and 15 followed by wards 4 and
2. Incidentally, these wards also represent higher proportion of population staying on rental basis in
these wards which may not have access to individual toilets in their homes.
Large proportion of children also defecates in open. It is a common practice to dispose infants‟
excreta in open. Baseline survey indicated that over 12% of households reported that children
defecate in open fields and over 17% of the households throw infant‟s excreta in open field in unsafe
manner. Overall situation causes unhygienic conditions in the city area and also poses risks for
spread of diseases through flies and ground water contamination.
6.2.5. Maintenance of septic tanks
Septage from septic tanks and pit latrines is collected by the Nagar Parishad using two suction
tractors available with them and disposed-off in the landfill site used for dumping solid waste from the
city. Rs 1000 per cleaning are charged within the Nagar Parishad limits for individual households.
Septic tanks are cleaned once in a year based on the request from households. Generally, about only
Figure 6-1 Sewage from the households
City Development plan for Nasrullahganj 32
2-3% of the septic tanks are cleaned per year as per the baseline survey. This indicates that many of
the households do not clean their septic tanks on annual basis but may be on bi-annual or tri-annual
basis.
6.2.6. Present and Future Demand and Supply Gaps
The Exhibit 6-5 presents the existing situation, future demand and the gap which needs to be filled.
As presently there is no sewerage system, thus there is no population covered by underground
drainage, whereas the desired level is 100%. As at present the sewer network is missing in the town,
the length of the sewer network required by year 2035 is around 41.97 km. As there is no network,
there is no waste water treatment plant, thus unchecked disposal of wastewater in natural drains
causes significant harm to the environment.
Exhibit 6-5 Present and Future demand and Supply Gaps: Sewerage
Service head
Existing/ desired level Service Levels, Demand and Gaps
Indicator Current
level
Desired
level Unit
Existing
(2011)
By Year 2015 By Year 2025 By Year 2035
Dem
an
d
Gap
Dem
an
d
Gap
Dem
an
d
Gap
Under Ground
Drainage
(UGD)
% Population
covered by
UGD
0 100 Persons 0 27,240 27,240 37,687 10,448 48,710 11,023
% Sewer to
Road Length 0 90 Km 0 26.45 26.45 33.66 7.21 41.97 8.31
% Treatment
Capacity 0 100 ML 0 2.94 2.94 4.07 1.13 5.26 1.19
Source: IMaCS Analysis
As shown in above Exhibit Nasrullahganj would require a sewerage system to cater the population of
year 2035. According to norms mentioned under the UDPFI, the sewerage system would need to
cover 90% of the road length during year 2035. A comprehensive sewerage system needs an
integrated treatment plant which can be developed in a phased manner. A treatment plant with an
initial capacity of 2.94 MLD should be developed to cater to the requirements of 2035 at 5.26 MLD.
6.2.7. Sewerage projects
Sewerage Project “Providing and laying of sewer network of Nasrullahganj” for a design period of 30
years, till 2038 is in pipeline. Proposed project will enable municipal Parishad to collect the sewerage
and storm water and carry it other suitable place for providing desired treatment before the waste
water being finally disposed-off to river or rushed for any other purposes. Project includes providing
and laying of sewer network within town, providing of pumping facility if necessary for cleansing
facility along with treatment facility. Total network length will be 20,280 m. Two stabilisation ponds for
4 MLD capacities will be constructed.
6.2.8. SWOT analysis Strengths Opportunities
Project of “Providing and laying of sewerage
System of Nasrullahganj” is already in
pipeline.
Increased awareness among the stakeholders
for the improvement of sanitation facilities.
Tertiary treatment of the sewage water and
re-using for the municipal purposes can be
explored.
City Development plan for Nasrullahganj 33
Weaknesses Threats
Lack of maintenance and absence of timely
cleaning of free public conveniences renders
them unusable for significant amount of time.
Improper usage of public conveniences would
leave these facilities unusable and would
require more maintenance.
Wastewater from Houses and overflow from
the individual septic tanks mix with storm
water drainage system resulting in water
pollution.
6.2.9. Issues
Many of the households do not clean their septic tanks on annual basis but on bi-annual or tri-
annual basis because of high cost
Lack of space availability, affordability, dense housing structures, and rental accommodation
affects the construction of toilets and septic tanks.
Absence of UGD system: All the wards are to be covered with UGD system. The disposal of
sewage through either open drainage or septic tanks is leading to the pollution of ground
water and surface water. An integrated UG system covering the entire town is critical, given
the expected growth of the town.
Treatment: Sewage water flowing through open drains without any treatment is the major
cause of concern regarding surface water pollution. Thus, it poses a potential health hazard
for the citizens.
Uncovered Population: While the absence of UGD itself exposes the entire town population to
the hazards of unsanitary conditions, almost complete population of the town remains
uncovered by safe sanitary disposal systems.
Need for greater coverage and better maintenance of Public conveniences: Absence of UGD
itself exposes the entire town to the hazards of unsanitary conditions.
Poor coverage, overflows and blockages of Storm water drains: With the growth in population
of the town, the poor coverage of road networks by storm water drains without adequate
linkages to main channels requires immediate attention. The drains also face the overflow
and blockage problems due to the plastic waste thrown in the drains.
City Development plan for Nasrullahganj 34
6.3. Sanitation
Like sewerage, in the 12th schedule of 74th Amendment to the Constitution of India the responsibility
of providing services pertaining to sanitation within the city limits lie with the ULBs.
6.3.1. Private toilets
Nasrullahganj Nagar Parishad conducted Cleanliness Survey in 2008 and assessed availability of
household level sanitation facilities. Exhibit 6-6 percentage of households having individual toilets in
each ward.
Exhibit 6-6 Percentage of HH having individual toilet
Ward Total No. of
HH
% HH having of Individual
Toilets
No. of HHs having
Individual Toilets
1 445 53 236
2 266 79 210
3 144 77 111
4 448 84 376
5 117 83 97
6 168 89 150
7 176 91 160
8 149 82 122
9 253 84 213
10 150 88 132
11 323 93 300
12 212 80 170
13 555 67 372
14 335 86 288
15 911 91 829
Total 4652 82 3815
Source: Nagar Parishad, Baseline survey, 2008
As per the survey 82% households have individual toilets. Amongst all the wards ward 1, 13, 3 and 2
has low percentage of households having individual toilet.
6.3.2. Community toilets
There are three public toilets in the town: one at the Nasrullahganj bus stand, one at Sehore Naka
and third one at Bajrang Colony. Out of these, the toilet at Bajrang Colony is now abandoned and not
in use.
Both the toilets at Nasrullahganj bus stand and Sehore Naka are maintained by Sulabh Souchalaya
on pay and use basis. The toilet at bus stand has facility of 12 seats, 6 for gents and 6 for ladies.
Users are charged Rs. 3 per use for both men and women. Tourists and few local residents use the
toilet facility. The public toilet is at Sehore Naka with 7 seats for men and 3 for women. Men are
charged Rs 3 and women are charged Rs. 2 per use. This toilet facility is mostly used by tourists and
truck drivers. There is bathing facility also available for which users are charged Rs. 5.
City Development plan for Nasrullahganj 35
6.3.3. Present and Future Demand and Supply Gaps
Public toilets are also short at an existing per seat 102 people, against 60 people as standard. The
exhibit also provides a snapshot of comparative analysis of existing level of service with level of
service desired under the Urban Development Plans Formulation & Implementation (UDPFI)
guidelines. By year 2035 public convenience having 37 seats would be required as shown in the
Exhibit 6-7.
Exhibit 6-7 Present and Future demand and Supply Gaps
Service head
Existing/ desired level Service Levels, Demand and Gaps
Indicator Current
level
Desired
level Unit
Existing
(2011)
By Year 2015 By Year 2025 By Year 2035
Dem
an
d
Ga
p
Dem
an
d
Ga
p
Dem
an
d
Ga
p
Public
Conveniences
Slum
Population per
Seat of Pub.
Convenience
102 60 Seat 22 37 15 37 0 37 0
Source: IMaCS Analysis
6.3.4. Sanitation projects
The task for preparing City Sanitation Plan for Nasrullahganj is part of the initiative of Government of
Madhya Pradesh to implement the National Urban Sanitation Policy in the State. The preparation of
this plan is a joint effort of Government of Madhya Pradesh, UN-Habitat, Nasrullahganj Nagar
Parishad and AIILSG. Funding support has been provided by UN-Habitat for preparation of this plan.
The aim is to achieve sanitation infrastructure development along with developing awareness in the
community and encourages public private partnerships in the sector.
6.3.5. SWOT Analysis
Strengths Opportunities
The public toilets with pay and use model
exists and are being run with the private
sector involvement.
Provision of better services to slum and
floating population by improving the sanitation
facilities of the city.
PPP mode can be utilized for the
improvement of sanitation facilities of the city.
Weaknesses Threats
The use of public toilets is considerably low
probably due to the user charges.
Public places, being heavily crowded and not
having any kind of sanitation facilities
showcase filthy and unhygienic environment,
especially on the days when weekly bazzars
are conducted on Thursday.
6.3.6. Issues
The public toilets with pay and use model exists and are being run with the private sector
involvement. However, the use of these toilets is considerably low probably due to the user
charges. Further, such public toilets are not generally accessed by children –on account of
user fees as well as non-child friendly designs of such toilets.
City Development plan for Nasrullahganj 36
Non-availability of municipal water supply in the vicinity has also affected the use of individual
toilets.
Overall availability of public toilets in the city is inadequate as the crowded areas like market
place like Royal market and JP market and commercial establishments mainly observed in
ward no. 10 and 12 are still lacking such facilities. The existing market place brings in
considerable floating population from the surrounding region which does not have any kind of
sanitation facility. Women, especially, get suffered severely due to absence of such facilities.
Such public places, in turn being heavily crowded, showcase filthy and unhygienic
environment, especially on the days when weekly bazzars are conducted on Thursday.
The city does not have sufficient facilities of sanitation at the public places. There is need to
provide sanitation facilities at the market places (Royal market, J.P.market and Chhota bazzar
and major commercial establishment along Indore road. (SH-22).
Public level sanitation facilities for women are grossly lacking in the city.
approximately 13% population – resort to open defecation due to lack of individual or
community sanitation facilities in their area
6.4. Solid waste management
Waste is the unwanted material left over from places of human and animal habitation. Solid waste
comprises unwanted and discarded materials from houses, street sweeping, and commercial and
industrial operations. Increase in urban population and changing life styles lead to the generation of
solid waste.
Generally, solid waste is heterogeneous in nature and a mixture of vegetables, food items, paper,
plastics, rags, glass etc. If solid waste is disposed-off in open areas without any treatment, it will
cause a negative impact on the environment and ground water.
6.4.1. Generation, Collection, Transportation and disposal of Solid Waste
Nasrullahganj Nagar Parishad is responsible for all kinds of collection i.e. primary, secondary and
tertiary which include street sweeping, collection, transportation and disposal of all solid wastes
generated in the town. The total Solid waste generated is 5.93 tones approximately per day.
There is no door to door collection in the town. The town has 14 collection points. The collection
frequency is once daily. The identified trenching ground admeasures 4.3 acres and is at a distance of
one km from the town. Solid waste management exists in the town and needs to be improved upon.
There are two tractors and two trolleys to transport the waste from collection points to trenching
ground. Total number of small hand carts is fifteen.
Exhibit 6-8 Solid Waste Management - Service Level Indicators
S. No Service Level Indicator Values
1 Waste generated per Day (Tonnes) 5.93
2 Waste Collected per day (Tonnes) 5.93
3 Number of Dustbins in the town 15
4 Number of collection points 14
5 Average Capacity per bin (Tonnes) 0.5
6 Frequency of waste Collection
a) Domestic Once daily
b) Commercial Twice daily
Source: Nasrullahganj Nagar Parishad
City Development plan for Nasrullahganj 37
Exhibit 6-9 Solid Waste Management - Service Level Indicators
S. No Service Level Indicator Values Unit
1 Waste Generated per capita (2011) 250 Grams
2 % Waste Collected as per LBs Estimate NA %
3 % Waste Collected as per available capacity 42.1 %
4 % Households covered by Door-to-Door Collection 0 %
5 Road length per Conservancy Staff 771.7 Meters
6 Total Rated Capacity of Vehicles 5 Tonnes
7 No. of Trips per Vehicle/day 1/2 Nos.
8 Average Spacing Between Dustbins 2366.7 Meters
9 Mode of Disposal Dumping
Source: IMaCS Analysis
The current practices of the solid waste management shows that there is no primary collection of the
waste, but there is primary level and secondary level storage of waste. There is no segregation of
wastes at source or at the disposal point. There is no processing or reusing or recycling of this waste
at present in the town.
6.4.2. Present and Future Demand and Supply Gaps
Exhibit 6-10 summarizes the current status and demand-supply gap analysis for Solid Waste
Management service provided by Nasrullahganj Nagar Parishad. It also provides a snapshot of
comparative analysis of existing level of service with level of service desired under the Urban
Development Plans Formulation & Implementation (UDPFI) guidelines. By 2035 an additional 4.04
acres of land would be required for the land fill site. Additional requirement of push-carts and
community bin would be 46 and 50 by 2035.
Exhibit 6-10 Present and Future Demand and Supply Gaps: Solid Waste Management
Service
head
Existing / Desired level Service Levels, Demand and Gaps
Indicator Current
level
Desired
level Unit
Existing
(2011)
By Year 2015 By Year 2025 By Year 2035
Demand Gap Demand Gap Demand Gap
Waste
Generated
Waste Generated
in gms/person 228 250 Tonnes 5.93 6.81
9.42
12.18 0
Primary
collection
Push Carts/
Trolleys 15
No. 15 28 13 36 8 46 10
Community Bins 15
No./Km 15 50 35 50 - 50 -
Secondary
collection Tractors 2
No. 2 4 2 5 2 6 2
Disposal Landfill site 4.3 - Acres 4.30 0.57 - 2.06 - 4.04 -
Source: IMaCS Analysis
City Development plan for Nasrullahganj 38
6.4.3. SWOT analysis Strengths Opportunities
Awareness among stakeholders to improve
the SWM infrastructure of the City (DPR has
already been prepared for same).
Availability of land for proper waste disposal.
A sound foundation for effective SWMS is
already in place.
Existing infrastructure can be utilized in an
effective manner.
Private participation could be explored for
revenue generation and best usage of waste
Potential for income generation through
processing of solid waste.
Weaknesses Threats
No Door-to Door Collection.
Inadequate primary and secondary collection
infrastructure.
Lack of safety measures for the workers.
Proximity of disposal sites to the residential
areas gives rise to several health related
problems.
Failure of maintenance of extra capacity can
result in loss of capacity.
Negligence from citizens can prove all efforts
of Nagar Parishad futile.
Health hazards for the people due to
insufficient collection and open incineration.
Lack of safety procedures while handling the
waste is a potential health hazard.
6.4.4. Issues
No Segregation Practice at Source;
Lack of proper Primary Collection System – There is no door-to-door collection system
established in the city;
Secondary Storage of waste is unorganized: Mostly open dumps are available for secondary
storage of solid waste;
Transportation of solid waste to the Trenching ground in open vehicles;
No Separate collection and disposal of construction waste;
Lack of proper management of biomedical waste;
Manual handling of solid waste: Lack of safety measures and
Lack of awareness among the town residents.
City Development plan for Nasrullahganj 39
6.5. Drainage
Currently, there is no separate storm water management system in Nasrullahganj but the storm water
is carried away in drains constructed for sullage water.
6.5.1. Existing drainage system
The length of drains in Nasrullahganj is
approximately 35 kms. The current drainage
system covers about 30% of the city roads.
There are no drains in ward no. 1, 4, 5 and
15. There are three major nallahas flowing
across the city which are being used to
dispose storm as well as sullage water
collected through the drains (Refer Map-7
enclosed in annexure 4). These nallahas are
Seval Pani Nala of 3.5 Kms, Muslim-Mohalla
Kisan Colony Nala of 3 Kms and Colar
Colony Nala of 1.5 Kms. These all natural
drains carry waste water from houses, which comes from storm water drains in the town. Existing
drains are also used to carry sewage from septic tanks which leads to blockage of drains and the
nallahs.
6.5.2. Present and Future Demand and Supply Gaps
Exhibit 6-11 summarizes the current status and Demand-Supply Gap analysis for Drainage network
present in Nasrullahganj town. It also provides a snapshot of comparative analysis of existing level of
service with level of service desired under the Urban Development Plans Formulation and
Implementation (UDPFI) guidelines.
Exhibit 6-11 Present and Future Demand and Supply Gaps: Drainage
Service head
Existing/ desired level Service Levels, Demand and Gaps
Indicator Current
level
Desired
level Unit
Existing
(2011)
By Year 2015 By Year 2025 By Year 2035
Demand Gap Demand Gap Demand Gap
Network reach
% Road
length
covered
with drains
99 130 Km 35.00 38.20 3.20 48.62 10.42 60.62 12.00
Network type
Kutcha
open (%) NA 0 Km
24.50
- - - - - -
Pucca
open (%) NA 33 Km 10.50 12.61 2.11 16.04 3.44 20.00 3.96
Pucca
closed (%) NA 67 Km
25.59 25.59 32.58 6.98 40.61 8.04
New Pucca Open Drains Km 3.20 3.44 3.96
New Pucca Closed Drains Km - 6.98 8.04
Source: IMaCS Analysis
Figure 6-2 Nallah carrying waste-water
City Development plan for Nasrullahganj 40
6.5.3. SWOT analysis
Strengths Opportunities
Presence of a strong network of natural
drains.
Sound network coverage of man-made
drains.
Development of an integrated Drainage Network.
Strengthening of natural drains.
Up-gradation of existing system to fully Pucca
system.
Weaknesses Threats
High percentage of Kutcha drains.
Encroachments of natural drains.
Mixing of Waste water and Storm Water.
Improper and untimely de-silting of natural drains
can weaken the city‟s drainage system.
Negligent practices by citizens towards disposal
of Waste water and dumping of Solid waste into
Storm water drains.
6.5.4. Issues
Lack of drainage network system in the city which would collect convey and dispose the storm
water efficiently.
City is vulnerable to stagnation of water due to lack of an integrated drainage system and
proper disposal mechanism of storm water.
Lack of design considerations and absence topographical analysis results in choking of
existing drains and frequent incidences of water logging. Clogging of existing drains due to
negligent practices of some of the citizens related to the dumping of waste in the drains.
Field surveys and public consultations have revealed that that the silting of natural drains is a
major problem and leads to the improper disposal of storm water which often leads to the
overflowing of storm water.
Encroachment on the open drains is a major cause of concern.
6.6. Traffic and transportation
This section reviews the existing situation in terms of their current level of service, coverage and key
issues towards services provided by Nasrullahganj Nagar Parishad. Nasrullahganj Nagar Parishad is
the primary agency responsible for the construction of new roads within the municipal limits. Its role
with regard to road infrastructure in the town includes the construction and maintenance of all roads in
its jurisdiction, except the roads belonging to the Public Works Department (State Highway) or
National highways. The construction of internal roads, in the case of a private colony development is
the responsibility of the developer or individuals who are selling the land after sub-divisions of their
plots. However it has to verify the adequacy of proposals in these areas, at the time of sanction.
6.6.1. Existing traffic and transportation scenario
The Nagar Parishad‟s area is spread over 15 wards. The State Highway connecting Indore and
Bhopal is the spine of all road networks in the town. The old core area is on the South-West part of
the road whereas the new developed area is on the North-East part of the state highway. All major
roads start and end at state highway. The town is also connected with Sehore via road in the North.
The general street pattern is observed to be narrow with width varies from 6 m to the major arterial
roads to 3 m internal roads, with 1 to 1.5 meter wide earthen roads. The road density comes out to be
1.5 per persons in the town. The total length of the roads in the town is equivalent to 35.5 kms. The
town‟s main spine is state highway, along which the town has started growing now. It is acting as
City Development plan for Nasrullahganj 41
main road for all institutional and commercial activities. The length of the state highway in the Nagar
Parishad is almost around 4 kms. There are
also few roads under PWD which connects
other villages to the town. Total road length
under PWD is about 1.5 Kms.
Due to rapid development in economic and
commercial activities, there has been an
increase in traffic plying on the state
highway. Also, due to absence of the
bypass road, the state highway remains
busy in the day time and the area around
Mandi and Bus Stand gets congested some
times (Refer Map-6 enclosed in annexure 4). As this traffic is just related to state highway, it does not
affect the roads under Nagar Parishad but as town is growing the increasing traffic flowing through the
town will create many problems in future. So, there would be a need for an alternative to reduce
through traffic from the town after 25 years.
6.6.2. Travel characteristics
While the preferred mode of travel (motorized) in the town is Two-Wheeler, the predominant number
of short trips undertaken in the city is understood to be pedestrian in nature. The major flow of traffic
is on the state highway, which comprises of trucks/ tractors and four wheelers. Other than this, private
buses, jeeps act as inter-city transport. Total number of estimated vehicles is approximately 15,00.
(Total number of vehicles in the urban areas in Sehore district is 2,48,371 as per RTO, Sehore) The
number of two-wheelers is very high in the town as compared to number of four-wheelers. In the
internal streets, people travel in the two-wheelers only, as the streets are very narrow.
6.6.3. Parking – Current arrangements and requirements
Presently, there are no separate places for parking four wheelers or two-wheelers near commercial
areas and weekly markets. Though the parking of trucks for Mandi is within the Mandi area and the
Bus stand has sufficient capacity at present. The requirement for the parking is near the market areas
only in the future.
Figure 6-4 Bus Stand
Figure 6-3 State Highway
City Development plan for Nasrullahganj 42
6.6.4. Present and Future Demand and Supply Gaps
Exhibit 6-12 summarizes the current status and Demand-Supply Gap analysis for Traffic and
Transportation provided by Nasrullahganj Nagar Parishad. It also provides a snapshot of comparative
analysis of existing level of service with level of service desired under the Urban Development Plans
Formulation & Implementation (UDPFI) guidelines.
Exhibit 6-12 Present and Future Demand and Supply Gaps: Traffic and Transportation
Service
head
Existing/ desired level Service Levels, Demand and Gaps
Indicator Current
level
Desired
level Unit
Existing
(2011)
By Year 2015 By Year
2025
By Year
2035
Demand Gap Demand Gap Demand Gap
Road
Surface
Type
Concrete (%)
50 Km 15.00 5.88 - 7.48 1.60 9.33 1.85
BT (%) 76 50 Km - 23.51 23.51 29.92 6.41 37.30 7.38
WBM (%)
0 Km 6.00 - - - - - -
Cut Stone/ Earthen/
Others (%) 24 0 Km 9.00 - - - - - -
Upgradation BT to Concrete Km - 0.53 3.21
WBM to Black Top Km 6.00 - -
Earthen to Black Top Km 9.00 - -
New
Formation
Concrete Km - 1.07 1.23
Black Top Km 8.51 6.95 8.00
Source: IMaCS Analysis
6.6.5. SWOT analysis Strengths Opportunities
Passage of state highway connecting Bhopal
and Indore in the town
Strict regulations over the polluting vehicles to
mitigate the health risk faced by citizens.
Introduction of Public Transport by Nagar
Parishad for future could be revenue
generative source.
Weaknesses Threats
Huge gap in the existing level of service of
roads.
Several incidences of encroachments have
reduced the effective width of town internal
roads.
Severe traffic jams due to narrow roads.
Parallel parking on the internal roads causing
problems.
Unregulated growth of encroachments.
Accidents.
Increase in the flow of through traffic due to
widening of state highway.
6.6.6. Issues Road Infrastructure: Internal town roads are very narrow, thus are very inconvenient for
vehicular movement. With the demand estimations it is evident that there is a high
requirement of the concrete and black top roads in the town for proper movement of vehicles
and people.
Encroachments along the roads: Presence of informal activities along the road margins
illegal encroachments of pedestrian areas and internal roads are the other causes for traffic
City Development plan for Nasrullahganj 43
congestion in the town. There is considerable commercial activity on the main centre road in
the town.
State Highway as a barrier or as a source of economic development: It is anticipated that
the traffic flow will increase on this road as it connects to Bhopal to Industrial city Indore. Also
town has regional Mandi, Bus Stand etc, thus it may as a stoppage place for traffic. This will
help the town to raise the economic activities along the highway, acting as a boon for the
town. But it has been observed that the schools and few other institutional buildings are
present on the western part of the state highway. So, state highway will act as a barrier for
children and working people who need to cross the road from residential areas to their work
areas. So there would be a need to have foot over bridges or grade separators or by-pass as
a long term strategy.
6.7. Street lighting and Fire fighting
6.7.1. Existing situation of Street lights and Fire Services
Nasrullahganj has a decent coverage of the roads with street lights. Presently, the town has 430
street lights. These street lights have been placed at many important places and streets in the town.
The various types of street lights includes Tube lights, Sodium vapour lamps ranging from 70 watt to
150 watt and High mast lamps Details of street lighting are given in Exhibit 6-13.
Exhibit 6-13 Details of Street Lighting S.No. Type Number Percentage (%)
1 Tube Lights 150 35
2 High Power Lamps 275 64
3 High Mast Lamps 5 1
Average Spacing between Street Lights 83 Meters
Source: Nasrullahganj Nagar Parishad
6.7.2. Present and Future Demand and Supply Gaps
Exhibit 6-14 summarizes the current status and Demand-Supply Gap analysis for Street lighting
services and fire services provided by Nasrullahganj Nagar Parishad. It also provides a snapshot of
comparative analysis of existing level of service with level of service desired under the Urban
Development Plans Formulation & Implementation (UDPFI) guidelines.
City Development plan for Nasrullahganj 44
Exhibit 6-14 Present and Future Demand and Supply gaps: Street Lights and Fire Services
Service
head
Existing/ desired level Service Levels, Demand and Gaps
Indicator Current
level
Desired
level Unit
Existing
(2011)
By Year 2015 By Year 2025 By Year 2035
Demand Gap Demand Gap Demand Gap
Street
lighting
Spacing
between
lamp poles
(m)
83 30 No. 430 980 550 1,247 232 1,554 302
Tube lights
(%) 35 75 No. 150 735 585 935 200 1,166 231
High Power
(%) 64 25 No. 275 245 - 312 37 389 77
High Mast
lamps (%) 1 - No. 5 - - - - - -
New
Installation
Tube lights
No.
585.00 200.00 231.00
High Power
No.
- 37.00 77.00
Under Ground Cabling
(Replacement and New) 77 Km
16.50 6.96 6.96
Source: Nasrullahganj Nagar Parishad
The present condition of street lights is not very good in the town as the average spacing between
lamp poles is more than the desired as visible in exhibit above. Also, by replacing 150 existing tube
lights with T-5 (28 W) and 275 High Power lamps with CFL (4X36) ULB can save energy of 61228.75
KWh and energy cost saving of Rs 2.6 lakhs per year
6.7.3. SWOT analysis
Exhibit 6-15 SWOT Analysis: Street lighting and fire services Strengths Opportunities
A diversified base of Street Lighting
infrastructure
High power lamps can be replaced by CFL‟s to
reduce the electricity consumption as
percentage of high power lamps is very high in
the town.
New installations can be supported by
underground cabling to improve the skyline of
the city and to avoid electricity theft.
Weaknesses Threats
Lack of vigilance resulting illegal domestic and
commercial connections from street lights.
Lack of maintenance can degrade the existing
infrastructure.
Illegal connections would result high
percentage of power bills to the Nagar Parishad
and can crumble down the complete system.
6.7.4. Issues
At present a proportion of the street lights comprise of tube lights and halogen lamps which
consumes lot of electricity, there is a need to replace these lamps with CFLs. This would help
cut down on expenses on longer term.
City Development plan for Nasrullahganj 45
Presently, the cabling for lampposts is not underground. Due to this the cases of illegal
connections and theft are observed. Thus, there is a need to have underground cabling to
avoid such cases.
6.8. Urban poor and their accessibility to basic Services
6.8.1. Poverty in the town
Rising levels of urban poverty is becoming a crucial issue in the increasing urbanization. In an
environment where the people are exploited and ignored rather than supported, there is an urgent
need to develop the living standards of this section of people by providing basic services such as
water supply, health, education, sanitation, legal protection, employment etc.
Absolute poverty as per the general definition, i.e. not enough to eat, is not prevalent in the city,
except amongst a small section of people living in the slums; these people lack even housing and
other amenities and can be categorized as urban poor.
Various estimates of poverty in Nasrullahganj have converged to between 16% and 25% of the urban
population. Apart from this, the town also has a population of pavement dwellers or homeless
population, who are among the poorest in the town, but there is no available estimate of the size of
this population.
6.8.2. Slums in the town
A total of nearly 2,236 persons (Detailed Project report, IHSDP, 2008) in Nasrullahganj have been
identified as those living in slum which is equivalent to 16 % of the total population, while State‟s
average is 15.16%. The Nagar Parishad of Nasrullahganj has identified five slum pockets in the town
(Refer Map-10 in annexure 4). The ward wise slum population of Nasrullahganj has been shown in
Exhibit 6-16.
Exhibit 6-16 Ward wise slum population of Nasrullahganj
Ward No. Name of Slum Slum Population
1 Subhash colony and Idgaha 885
2
3 Pakka Kua Kshetra and Jin colony 238
4
6 Muslim Mohalla 508
7 Sabji Mandi Mohalla 309
12 Ayodhya Basti, Bajranj colony and Sarvahra
colony 296 13
14
Source: Detailed Project Report, Integrated Housing and Slum Development Programme (2008)
Location of slums on town map
Map-10 in annexure 4 provides the locations of all the slums present in the town. There are five
identified slums in the town. There are 15 wards in the town and ward no. 1, 2, 3, 4, 6, 7, 12, 13 and
14 has slum.
City Development plan for Nasrullahganj 46
General characteristics of slum
Slums in Nasrullahganj are in miserable and unhealthy living conditions. Mostly the houses are in
Kutcha state and have shabby structures. The absence of development works like roads, sewer,
water line and proper sanitation in most of the slum areas. Community facilities and social
infrastructure is also missing in the slum pockets. Average built-up area of a unit slum is
approximately 20 sq. m.
6.8.3. Urban basic services in slums (In line with JNNURM‟s 7 point charter)
Access to basic services is now deemed as a criterion for identification of the poor and poor areas in
a city (essentially slums). The responsibility for service provision in an adequate manner lies with the
local body, which becomes a difficult job for increasing urban poor population. The basic services
which are needed to be provided under seven point charter includes security of tenure at affordable
prices, improved housing, water supply, sanitation and ensuring convergence of existing universal
services for education, health and social security. Slums within the town do not have adequate
infrastructure facilities. Exhibit 6-17 gives the coverage of existing infrastructure in the slums.
Exhibit 6-17 Percentage coverage of existing infrastructure in Slums
Ward No. Name of Slum
Wate
r su
pp
ly
Sew
era
ge
San
itati
on
Ro
ad
s
Ho
usin
g
Ele
ctr
icit
y
Op
en
sp
aces
1 & 2 Subhash colony and
Idgaha 20 0 20 20 25 55 30
3 & 4 Pakka Kua Kshetra
and Jin colony 15 0 20 25 25 60 25
6 Muslim Mohalla 40 0 35 40 35 75 35
7 Sabji Mandi Mohalla 40 0 40 35 40 75 35
12, 13 & 14
Ayodhya Basti,
Bajranj colony and
Sarvahra colony
20 0 15 25 20 65 25
Source: Detailed Project Report, Integrated Housing and Slum Development Programme (2008)
The detailed study under IHSDP shows that majority of slum dwellers live in temporary shelters and
most of the houses are entirely made of make shift materials such as wood, bamboo and
plastic/tarpaulin sheets. Most of the slum residents obtain their water from well or bore well, or from
Nagar Parishad‟s piped supply system. Some bore wells are fitted with individual hand pumps for
local supply, others are fitted with electrically operated submersible pump which pumps water to an
overhead tank from which it is distributed through distribution pipes to a number of stand posts. The
current sanitation alternatives in some of the slum areas of Nasrullahganj comprise an individual pour-
flush latrine. If residents do not have access to one of these sanitation facilities, then the common
practice is defecation in an open space or along a drainage nallah. Solid waste management in the
slums is handled in the same manner as in the rest of the areas by the local body. As a result of open
defecation, lack of drainage system along the roads and improper sanitation facilities, unhygienic
conditions prevails over there. Other facilities are also lacking in the slums in the town.
6.8.4. Social security schemes and beneficiaries and other schemes
At present, some programmes are going on for poverty reduction/ slum improvement in the town.
These include programmes for provision of infrastructure/ shelter and programmes for slum
City Development plan for Nasrullahganj 47
improvement/ provision of basic urban services. The Integrated Housing and Slum Development
Programme, is a step towards strengthening of housing and infrastructure projects in the interests of
the urban poor. This programme is also under implementation in the town. The detailed project report
for understanding the existing conditions and suggesting strategies was put forward in 2008. The
project cost is equivalent to Rs. 3.79 crores. The proposed components under IHSDP are:
Housing
Looking at the scarcity of pucca housing in the slum pockets, it has been proposed to construct 228
dwelling units. It was suggested that the land, if obtained after the proper planning of houses, will be
used for commercial use and the revenue generated from this would be used for operation and
maintenance.
Water
It is proposed to improve the water supply system in slums by laying water supply pipe lines.
Sanitation
Need of proper sanitation system and construction of drains as per need.
Roads
The new roads and existing kutcha roads will require entirely new construction.
Social Amenities
It has been proposed to provide Anganwadi for the slums. Other than this, the town has sufficient
educational and health facilities which cater to the slums also.
Financial Arrangement
The town of Nasrullahganj has been included in the IHSDP scheme under the JnNURM. The sharing
of funds would be in the ratio of 80:20 between central government and state Government/ULB.
Exhibit 6-18 shows the components of project under IHSDP.
Exhibit 6-18 Project Construction Components: IHSDP S.No. Name of Work Quantity Project Cost (in Lacs)
1 C.C. Road 931 mts 25.37
2 Storm Water Drains 931 mts 19.23
3 Sewerage line 870 mts 5.73
4 EWS houses 228 units 228 291.87
5 Playground development 9390 Sq m 1.41
6 Community Hall 1 14.63
7 Livelihood center 1 8.19
8 Street Lighting 28 9.38
9 Septic tank 1 3.67
Total 379.47
Source: Detailed Project Report, Integrated Housing and Slum Development Programme (2008)
6.8.5. Present and future Housing demand
Based on the IHSDP detailed report, it has been assumed that 75% of the Slum houses need major
renovation work or rehabilitation work. Hence, a Housing demand has been estimated considering the
above assumption. Total number of housing demand in 2015 would be 437.
City Development plan for Nasrullahganj 48
6.8.6. SWOT analysis
In the slums, the level of service for various services is similar to that in the rest of the city. SWOT
analysis of services in the slums would be similar to the individual SWOT analysis carried out under
the sections various sections this chapter.
6.8.7. Issues
Higher proportion of Slum Population: The town has 5 slums, one slum in each ward. The
slum population is about 16 per cent of the total population. These slums are spread all over
the town. This dense concentration of slum dwellers along such environmentally and
developmentally sensitive locations has only resulted in the complete lack of access to basic
services, causing unhygienic living conditions.
Land ownership: Slums have encroached private or government land and reside over these
areas. Many slum dwellers do not have tenure security for their land and house.
Lack of awareness on slum development programs: There is a general paucity of awareness
of the various slum development schemes and programs announced from time to time by the
central and state governments. This leads to long delays in the implementation of the
programmes and overall dissatisfying results, apart from the factor of the benefits of the
programs not reaching the intended beneficiaries.
6.9. Social infrastructure
The social infrastructure has been classified into Health, Education and Recreational infrastructure.
The geographical locations of various components of Social Infrastructure are shown in Map-9
enclosed in annexure 4. The facilities shown in figure include schools, colleges, administrative office,
railway station, bus stand/terminal, police station, hospital, religious buildings, and military ground. It
can be easily seen that most of these services are present either on the state highway or on the main
connecting road inside the core area. The concentration of these facilities along the major roads
improves their connectivity.
6.9.1. Health Infrastructure
The town has one general health centre, which has 50 beds capacity. At present, in emergency and
serious situation the cases are referred further to Sehore and Bhopal hospitals. This hospital caters to
surrounding villages also. There are eight dispensaries, but no nursing home . Other than this there
are 13 clinic and pathologies in the town.
Figure 6-5 General Health Centre
City Development plan for Nasrullahganj 49
Exhibit 6-19 summarizes the current status and Demand-Supply Gap analysis for Health Sector
present in Nasrullahganj town. It also provides a snapshot of comparative analysis of existing level of
service with level of service desired under the Urban Development Plans Formulation &
Implementation (UDPFI) guidelines.
Exhibit 6-19 Present and Future Demand and Supply Gaps: Health
Service head
Existing/ desired level Service Levels, Demand and Gaps
Indicator Current
level
Desired
level Unit
Existing
(2011)
By Year 2015 By Year 2025 By Year 2035
Demand Gap Demand Gap Demand Gap
Government
Hospital
No. of Beds/
25000 pop. 50 50 No. 50 54 54 75 21 97 22
Nursing
Home
No. of Beds/
4500 pop. 0 3 No. 0 18 18 25 7 32 7
Dispensary Number/
15000 pop. 8 1 No. 8 2 - 3 1 3 -
Source: IMaCS Analysis
The present condition of Health sector in Nasrullahganj town shows that there is an immediate need
of Nursing Home in the town. There are total six doctors in the town.
6.9.2. Education
The town has two colleges one in ward-11 and another in ward-15. The town has three higher
secondary schools 10 primary schools The town has 14 nursery schools and 11 Anganwadi schools.
The details of the education facility are visible in Exhibit 6-20.
Exhibit 6-20 Details of government educational institutions
Institution Numbers Students Teacher
College 2 NA NA
Higher Secondary Schools 3 NA NA
Primary Schools 10 NA NA
Source: Nasrullahganj Nagar Parishad
Exhibit 6-21 summarizes the current status and Demand-Supply Gap analysis for Education Sector
present in Nasrullahganj town. It also provides a snapshot of comparative analysis of existing level of
service with level of service desired under the Urban Development Plans Formulation &
Implementation (UDPFI) guidelines.
Exhibit 6-21 Present and Future Demand and Supply Gaps: Education
Service head
Existing/ desired level Service Levels, Demand and Gaps
Indicator Current
level
Desired
level Unit
Existing
(2011)
By Year 2015 By Year 2025 By Year 2035
Demand Gap Demand Gap Demand Gap
Primary
School
Per
population 1826 2500 No. 10 11 1 15 4 19 4
Middle School Per
population 5934 5000 No. 3 4 1 5 1 6 1
College Per
population 11869 100000 No. 2 - - - - - -
Source: IMaCS Analysis
City Development plan for Nasrullahganj 50
The existing service levels in education sector show a good status. Existing schools are sufficient in
number. The existing schools taken into consideration are just government schools. The problem
faced in the education sector is the lack of basic facilities in the schools.
6.9.3. Recreational facilities (Parks, Playgrounds etc)
The town has one community hall, one sub-complex, one neighbourhood park named after Dr.
Ambedkar Park, one children‟s park, one passenger waiting hall as Immovable property under the
Nagar Parishad. The town has one playground, which is also used for celebrating Dussera.
6.9.4. SWOT analysis Exhibit 6-22 SWOT Analysis: Social Infrastructure
Strengths Opportunities
Good service level of educational institutions
in the town.
Substantial awareness for the improvement of
these facilities.
Development of new health facilities
supported by an upgradation/ improvement of
existing health facilities will help in an overall
development of the area.
Weaknesses Threats
Lack of boundaries to the schools.
Lack of Intermediate hospitals and Poly-
Clinics.
Lack of integrated schools and schools for
handicapped.
Quality of physical infrastructure of this
Sector demands major revamping.
Lack of maintenance can degrade the existing
infrastructure.
Lack of boundaries to the schools could result
in encroachments.
Poor connectivity to the schools could result
of accidents.
6.9.5. Issues
Existing level of service in the health infrastructure demands a major revamping as these fall
among factors which would guide future development of the area.
Government Hospital which receives maximum number of patients from the town and nearby
areas suffers from lack of infrastructure and poor maintenance of buildings and other assets;
also it requires the permanent doctors, at present the doctor‟s travel from other towns to
Nasrullahganj.
A continuous flow of funds needs to be ensured for development of new infrastructure and up-
gradation of existing infrastructure.
Most of the schools of the town lack necessary infrastructure and hence, initiatives should be
taken in equipping existing educational institutions with necessary infrastructure.
6.10. Environment
A town‟s environment is dependent on several factors which impact air quality, water quality, land
quality, noise levels, etc. Each of these aspects gets affected by individual factors or a combination of
two or more factors. Some of these factors are: Shortcomings in Solid Waste Collection, Under-
developed Storm Water Drainage system, Undeveloped Waste water disposal system, Dust and
particulate matters from vehicular traffic and industries, etc.
6.10.1. Pollution levels (Air, Water and Soil)
Due to incomplete collection of waste sometimes leads to scattering of waste which ultimately find its
way to drains, open lands and other sources of water. This leads to the pollution of land by improper
City Development plan for Nasrullahganj 51
disposal of harmful waste, ground water pollution by leachate and surface water pollution by mixing of
waste with water. In addition to these, solid waste clogging the drains leads to stagnation of water
which ultimately leads to the unhygienic milieu.
Under-developed drainage network and undeveloped waste water conveyance system leads to the
stagnation of storm water and waste water in various parts of the city leading to unhygienic conditions
which poses severe threat to the health of the citizens.
It is anticipated that vehicular traffic on state highway will increase over the up-coming years, it will
become a constant source of dust and other particulate matters which pollutes urban space and
causes various kinds of respiratory problems to the citizens.
6.10.2. City green spaces (gardens and recreation – total coverage ratio)
The city has no dedicated Green Spaces. Tree Plantation could be found along the few roads. As per
UDPFI guidelines the recreational area should be around 8 to 10 per cent of the town‟s developed
area, which is not there at present. As per the guidelines there should be 10 to 12 sq.m of green
space per person. 31.5 ha of the green space requirement has been estimated to be added by 2036,
as per the guidelines.
6.10.3. Water front development and conservation
There is a Nallah in the town under the jurisdiction of Nagar Parishad. It bisects the town by passing
in North-South direction. It ends up in river Narmada. Project of Nallah Channelisation and site
development is going on. The total project cost is Rs 787 lakh. The project includes construction of
retaining walls, construction of R.C.C nala, steel hand rail and plantation of protection with tree guard.
This project will help in beautification and conservation.
6.10.4. Existing environmental regulations
Various aspects of regulating the environment are covered under various Legislations. Most important
of these are provided below:
Policies 1. The National Water Policy, 1990
2. Indian National Policy Statement for Abatement of Pollution, 1992
3. National Conservation Strategy and Statement on Environment and Development, 1992
Legal 1. The Motor Vehicles Act, 1939, amended in 1988
2. The M P Public Health Act, 1949
3. The M P Control of Music & Noise Act, 1951
4. The Water (Prevention and Control of Pollution) Act, 1974, amended in 1988
5. The M P Slum Area (Improvement & Clearance) Act, 1976
6. The Water (Prevention and Control of Pollution) Cess Act, 1977, amended in 1991
7. The Air (Conservation) Act, 1980, amended in 1988
8. The Air (Prevention and Control of Pollution) Act, 1981, amended in 1987
9. The Environment (Protection) Act, 1986
10. The Public Liability Insurance Act, 1991, amended in 1992
11. National Environmental Tribunal Act, 1995.
City Development plan for Nasrullahganj 52
6.10.5. SWOT analysis
Exhibit 6-23 SWOT Analysis: Environment Strengths Opportunities
Lower composition of harmful waste.
Awareness among the citizens towards the
need of better environment and more green
spaces.
Development of infrastructure related to the
handling of solid waste, waste water and
storm water can improve the city‟s
environment.
Conservation of Ground water.
Weaknesses Threats
Less land for green areas and other
environment improvement works.
Almost extinct pond and sole dependence on
ground water leading to depletion of ground
water table
Failure to integrate the issue of urban
environment with infrastructure development
projects.
Failure to conserve pond and ground water
table can have severe impact on the town‟s
environment.
6.10.6. Issues 1. Leakages in Solid Waste Collection System leading to water and land pollution.
2. Clogging of drains and poor waste water handling system leading to threatening environmental
situation.
3. Lack of adequate green cover in the city.
4. Open defecation.
6.11. Heritage, Conservation and Tourism
Nasrullahganj is a very old town but it does not have any building or built-form of historical
importance. So, at present there is no heritage conservation or built conservation.
Famous Salkanpur temple is just 20 kms from the town. The temple is situated on an 800-ft high
hillock. The temple here is of Ma Durga Beejasan, an incarnation of Goddess Durga.
Salkanpur Temple is in Sehore district near Budni (formally known as 'Buuddha Nivasini'). The temple
have more than 1000 stairs and road is also available to reach the top at temple. About four and half
kilometre Cement Concrete Road facilitate the pilgrims to drive up to the top. Thousands of devotees
come here and climbs up these stairs to get the darshan of Durga Maa.
6.11.1. Issues
Neglect faced by this area leading to underdeveloped infrastructure.
City Development plan for Nasrullahganj 53
6.12. Existing Institutional Structure for development
6.12.1. Urban Local body structure
The local body works on the principle of constitutional dichotomy of its two sides i.e. elected body and
executive wings. The legislative wing is headed by a President (Adhyaksha) and the overall
functioning of the local body is governed by a Council. The Executive wing is headed by the Chief
Municipal Officer (CMO) and is responsible for all the management and executive functions and
assists elected members in decision making process.
Nasrullahganj Nagar Parishad is the main governing body which operates within the municipal limits
of Nasrullahganj town. It is responsible for the provision of basic infrastructure services to the citizens.
This includes development and operation & maintenance of infrastructure like Water Supply, Solid
Waste Management, Transportation, etc. Most of the Nagar Parishad‟s responsibilities and duties are
governed by MP Municipalities Act. Apart from the provision of basic services, under its purview, to
the citizens, it also coordinates with other departments such as UADD, TCPD, MPHB, Dept. of School
Education, Dept. of Health Education, MPSEB, MPPCB, etc. Nagar Parishad‟s responsibilities include
coordination with other departments in formulating their plans for municipal area and assist them in
the implementation of their plans and schemes. Nagar Parishad translates its responsibilities into
service delivery by means of various sub departments such as General Administration, Water Supply,
Sanitation, Solid Waste Management, Street Lighting, Fire Fighting, Roads, Drainage, Revenue,
Taxation, etc.
The Nagar Parishad is headed by a Chief Municipal Officer, who is appointed by UADD and is
entrusted with the responsibility of all municipal affairs. The elected council headed by Adhyaksha,
leads elected body of 15 elected members from 15 administrative wards. Overall, the executive wing
of the Nagar Parishad has 107 staff. The institutional structure of the Nagar Parishad is visible in
Exhibit 6-24.
Exhibit 6-24 Institutional Structure of Nasrullahganj nagar Parishad
Source: Nasrullahganj Nagar Parishad
City Development plan for Nasrullahganj 54
6.12.2. Town and Country planning department
The activities of Town and Country Planning Department (TCPD) are guided by the provisions of the
Madhya Pradesh Nagar Tatha Nivesh Niyam, 1973 (the Rules). The Rules provide for the
appointment of a Director to head this department. There are other officers like Additional Director,
Joint Director, Deputy Director and Assistant Director of TCPD to assist him.
The State Government, as per provisions of the Rules declares a region including major urban areas
and its surrounding settlements as a planning area, and orders the preparation of a development plan
for the region. Presently, no development plan has been prepared by TCPD for Nasrullahganj town.
6.12.3. Public health engineering department
The main responsibility of providing water supply and sanitation services remains with PHED in rural
areas. As Nasrullahganj is in transition from rural to urban, the co-ordination of Nasrullahganj Nagar
Parishad with PHED becomes very important to find new potential sources etc.
6.12.4. Madhya Pradesh housing board
Madhya Pradesh Housing Board (MPHB) falls under the administrative and functional control of the
Housing and Environment Department of GoMP. The operations of the Board are governed by the
provisions of the Madhya Pradesh Housing Board Act, 1972, and rules formulated therein, amended
from time to time. The key functions of MPHB, as per its governing Act and rules include; to acquire
land from the Government, private parties and/or other departments for construction of properties; to
design, plan, construct, supervise and sell residential flats and commercial complexes; to undertake
deposit works for Government departments like Education; Welfare, Tribal Welfare Departments, etc.
for construction of schools, hostels, etc.; and to undertake repair and reconstruction work of old
structures.
6.12.5. Madhya Pradesh pollution control board
Implementation, supervision and monitoring activities pertaining to Central Pollution Control Acts and
Rules vests with the Central Pollution Control Board (CPCB), Government of India, and the respective
State Pollution Control Boards formed/constituted under its rules. Madhya Pradesh State Pollution
Control Board (MPPCB) headquartered in the state capital, Bhopal, carries out its operations through
seven regional offices, each located at the divisional headquarters.
The main function of the regional offices is to monitor the implementation of provisions of various Acts
governing pollution control and prevention and the Rules framed under such Acts. The pollution
prevention and control Acts include:
The Water (Prevention and Control of Pollution) Act 1974;
The Water (Prevention and Control of Pollution) Cess Act 1977;
The Air (Prevention and Control of Pollution) Act 1981;
The Environment (Protection) Act, 1986; and
The Public Liability Insurance Act 1991.
MPPCB is also responsible for implementation of the Municipal Solid Waste (Management and
Handling) Rules, 2000 of CPCB, which spell out responsibilities of the state pollution control boards
and the urban local bodies. MPPCB is the monitoring authority with respect to ground water, ambient
air, and compost quality in urban areas. The Board is also required to monitor processing and
disposal facilities for municipal waste, with the approval of the State Urban Development Department,
Town and Country Planning Department, and Ground Water Board. According to the Rules, the ULB
City Development plan for Nasrullahganj 55
is responsible for implementation of the provisions and infrastructure development for collection,
storage, segregation, transport and processing of solid waste in the town. The major areas of concern
of MPPCB with regards to ULB functions are:
Management of solid and liquid waste disposal;
Waste water management;
Improvement of roads and plantation of trees;
Traffic management to control vehicular pollution; and
Proper planning of the city.
6.12.6. Issues
Though roles of different organizations in the provisioning of urban services are clearly
defined, plans formulated by different organizations suffer because of lack of coordination
among various organizations.
Since Nasrullahganj is in transition phase and the large proportion of area under its
jurisdiction is agriculture, various departments who involved in provision of services to rural
areas are still in the process of transferring the roles and responsibilities to respective
departments.
In case of street lighting, responsibility of installation of electricity poles and their electrification
lies with MPSEB. Any failure in the coordination between Nagar Parishad and MPSEB results
in poor urban governance.
MPPCB should be regularly contacted to keep a check on urban environment and curb
pollution.
Nagar Parishad should maintain a healthy interaction for effective and comprehensive city
planning.
Meetings at regular intervals should be organized between various governing organizations
for effective urban governance.
City Development plan for Nasrullahganj 56
7. MUNICIPAL FINANCIAL ASSESSMENT
7.1. Financial Status at a Glance
The financial analysis of Nasrullahganj has
been carried out to understand the current
status. The Financial statements of
Nasrullahganj has been reviewed for the 4
years ranging from 2007-08 to 2010-11 .
Revenue account comprises of revenue
income and expenditure As we can observe
that revenue income exceeds revenue
expenditure in all four years.
Revenue income of Nasrullahganj has grown at a CAGR of 36.2% from Rs 94.9 lakhs for FY 2007-08
to 239.5 lakhs for FY 2010-11.However revenue expenditure has grown at a CAGR of 40.8% from Rs
62.7 lakhs for FY 2007-08 to 175.3 lakhs for FY 2010-11.
Capital income of Nasrullahganj Nagar
Parishad comprises of own sources and
from Grants and Contributions from Central
Government or State government. The
Capital income has increased at a CAGR of
59.6% from 93.6 lakhs for FY 2007-08 to
380.6 lakhs for FY 2010-11. We can
observe that capital expenditure has
decreased at a faster pace and has a
negative CAGR of 5.7 % from 125.8 lakhs
for FY 2007-08 to 105.5 lakhs for FY 2010-11. This shows that initially it was spending more on
capital intensive projects but this had decreased in the last 4 years. We need to delve into the
reasons for the same .
Exhibit 7-1 Financial status at a glance
Actuals in Rs. Lakhs
Items 2007-08 2008-09 2009-10 2010-11 CAGR
Revenue Account
Income 94.87 139.45 149.36 239.48 36.16
Expenditure 62.75 75.42 92.28 175.31 40.84
Surplus/ Deficit 32.12 64.03 57.08 64.18
Capital Account
Receipts 93.62 108.05 194.82 380.58 59.60
Payments 125.76 155.55 261.84 105.55 -5.67
Surplus/ Deficit -32.15 -47.50 -67.02 275.04
Overall Status incl. O.B. 2.12 29.15 29.94 367.71
Source: Annual Accounts, Nasrullahganj Nagar Parishad
City Development plan for Nasrullahganj 57
7.2. Revenue account
The following section provides an in-depth review of the revenue account, in order to assess the
municipal fiscal status. The revenue account comprises of two components - revenue income and
revenue expenditure.
7.2.1. Revenue income
57% of the total revenue income comes from
assigned revenue while if we look at the
composition of assigned revenue octroi and
passenger tax is the major source of revenue
while the second biggest source of revenue is
from Non-tax revenue accounting for 19% (refer
Exhibit 7-2).
We will deal with each of the source of revenue in detail in the following section.
Exhibit 7-2 Source wise Revenue Income
Items 2007-08 2008-09 2009-10 2010-11 Share CAGR
Actuals in Rs. Lakhs % %
Own Sources 18.17 43.66 47.63 47.70 25.57 37.94
a) Tax Revenue 7.58 7.09 10.33 11.14 6.16 13.68
b) Non Tax Revenue 10.59 36.57 37.29 36.56 19.41 51.14
Assigned Rev 70.80 69.87 81.67 113.83 56.73 17.15
Revenue Grants 5.90 25.92 20.07 77.95 17.70 136.41
Total 94.87 139.45 149.36 239.48 100.00 36.16
7.2.2. Own Sources
Own source revenue includes tax and non-tax revenue. Our own source of income has grown at a
CAGR of 37.94% while having a share of 25.57%
Tax Revenue
Tax revenue comprises of property tax, integrated tax, education cess, export tax, advertisement tax
and other taxes. We can see that property tax and integrated tax constitute more than 50% of the Tax
Revenue except for 2010-11 where export tax has contributed about 40% of the tax revenue (Exhibit
7-3).
Exhibit 7-3 Tax Revenue
S.No Items 2007-08 2008-09 2009-10 2010-11
Actuals in Rs. Lakhs
1 Property Tax 2.71 1.98 2.79 2.25
2 Integrated tax 2.86 1.80 2.86 3.04
3 Education cess 0.00 0.00 0.02 0.50
4 Export tax 0.37 2.28 3.80 4.44
6 Advertisement Tax 1.25 0.12 0.02 0.00
7 Other Taxes 0.40 0.90 0.85 0.91
Subtotal ( Tax Revenue ) 7.58 7.09 10.33 11.14
Source: Annual Accounts, Nasrullahganj Nagar Parishad
City Development plan for Nasrullahganj 58
Key Observation:
The share of export tax has increased considerably over the last 4 years from around 5% in FY 2007-
08 to approx. 40% in FY 2010-11. If this trend continues then we can expect the share of tax revenue
to total revenue to increase from 6 % to double figures in the coming years and dependence on
external funds would be reduced.
Non Tax Revenue
Non Tax revenue was one of the major source of revenue from own sources which accounted for
19.41% of the total revenue income. Non tax revenue consists of rental income from municipal
properties, water charges, license and fees, development charges, building permission etc.
We can observe that other non-tax revenue except listed in the table below accounts for the
maximum share of non-tax revenue in all the four years . Others consists of income from water taxes ,
charges for water tankers etc.
While rental income from municipal properties happens to be the second highest among the non-tax
revenue source .
Exhibit 7-4 Non-tax revenue
S.No Items 2007-08 2008-09 2009-10 2010-11
Actuals in Rs. Lakhs
1 Rental Income from Municipal Properties 3.39 2.56 3.30 3.83
2 Water Charges 0.84 0.94 0.69 0.71
3 License and Fees 1.45 2.42 1.21 1.89
4 Development charges 0.00 0.00 0.00 0.00
5 Building permission 0.00 0.00 0.00 0.00
6 Others 4.91 30.66 32.10 30.13
Sub Total (Non-Tax) 10.59 36.57 37.29 36.56
Source: Annual Accounts, Nasrullahganj Nagar Parishad
Assigned revenue and Compensations
Assigned revenues and Compensations accounts for 56.73% (refer Exhibit 7 5) of the total revenue
income, it include taxes and duties collected by others and compensation in lieu of Taxes and duties
like Octroi compensation, stamp duty etc. Revenue from this source depends on the devolution from
GoMP.
We can observe that in all of the years octroi compensation accounts for the maximum of the income
from assigned revenue and compensation. The details of the revenue from this source are shown in
table below.
Exhibit 7-5 Assigned Revenue
S.No Items 2007-08 2008-09 2009-10 2010-11
Actuals in Rs. Lakhs
1 Octroi compensation 41.06 40.36 50.58 96.11
2 Stamp duty 0 0 0 0
3 Passenger tax compensation 10.77 11.57 13.25 13.55
4 Income under special acts 1.31 1.32 1.51 1.51
Source: Annual Accounts, Nasrullahganj Nagar Parishad
City Development plan for Nasrullahganj 59
Revenue grants, contributions and subsidies
Income from Grants and contribution accounts for about 18% of the total revenue income.
Nasrullahganj Nagar Parishad is majorly getting the revenue grants from GoMP for Road
Maintenance and from State finance commission . A point to be noted is that they did not get a single
rupee grant for Mid-day meal in all the 4 years from 2007-08 to 2010-11.
Exhibit 7-6 Revenue from Grants/ Contributions
S.No Items 2007-08 2008-09 2009-10 2010-11
Actuals in Rs. Lakhs
1 Road maintenance 5.90 12.64 7.34 50.00
2 Mid-day meal 0.00 0.00 0.00 0.00
3 State finance commission (S.F.C) 0.00 13.28 12.74 27.95
4 Other grants 0.00 0.00 0.00 0.00
Subtotal (Grants & contribution) 5.90 25.92 20.07 77.95
Source: Annual Accounts, Nasrullahganj Nagar Parishad
7.2.3. Revenue expenditure
Salaries/wages and allowances”
expense constitutes the highest
among the revenue expenses. It
accounts for 54% of the total
revenue expenditure and has
been increasing at a CAGR of
38.3%. Salary comprises of
payment to Nasrullahganj Nagar
Parishad employees, Wages to
the temporary staff, pension to
staff etc.
As we can observe from the pie chart below that O&M is the second highest revenue expense
accounting for 32% of the total. In case of O&M cost, major expenditure is towards water works. O&M
expenditure has increased and has a positive CAGR of 15.5% over the last 4 years.
Administrative expenses includes stationary, printing expenses, furniture, advertisement, photo copy
and other expenses which are accounting for 2 % of the total. Programme expenses include mid-day
meal, donations and etc., where mid-day meal accounts the prominence in each year of the study.
Program expenses accounts for less than 1% of total revenue expenditure .
7.3. Capital account
The Capital account comprises of capital income and capital expenditure. What distinguishes a capital
income from revenue income is the purpose for which it is used. Capital expenditures are those
expenditures which will accrue benefits to Nasrullahganj Nagar Parishad over many years.
City Development plan for Nasrullahganj 60
Capital account of the Nasrullahganj Nagar Parishad
was in deficit in 3 years except for 2010-11. Their
capital expenditure exceeded their income in 3 of the
4 years . This is a good thing to notice since capital
expenditure will generate returns in terms of better
standard of living for the residents.
In general the Capital Income of Nasrullahganj Nagar
Parishad comprises of grants and contributions from
centre and state governments. Major source of
income is Capital grants from GoI and GoMP .
Exhibit 7-7 displays the capital income and
expenditure during last 4 years i.e. from 2007-08 to
2010-11 .
We can observe from Exhibit 7-7 that approximately
98% of the capital expenditure went into capital WIP,
2% were spend on purchasing assets.
Exhibit 7-7 Capital Account
S.No. Capital Income 2007-08 2008-09 2009-10 2010-11 Share
Actuals in Rs. Lakhs
a Sale of asset 9.71 2.73 3.02 4.09 3.88
b Loans 0.83 2.42 1.00 0.96 0.97
c Grants & Contributions
i Special Projects 0.00 0.00 90 301.61 31.36
ii Basic services 71.79 85.68 0.02 9.07 39.59
iii UIDSSMT 0.00 0.00 0.00 21.00 1.38
iv IHSDP 0.00 0.00 0.00 2.00 0.13
v Flood relief & NRCP 0.00 5.77 0.00 0.00 1.34
vi State finance commission (S.F.C) 0.00 13.28 12.74 27.95 6.54
vii T.F.C 0.00 10.99 10.99 0.00 3.95
viii Other Grants 10.99 0.00 79.78 41.73 15.91
Total Grants & Contributions 82.78 102.44 180.79 375.41 93.67
d Public Contribution 0.00 0.00 0.00 0.00 0.00
e Other Capital income 0.30 0.45 10.02 0.13 1.48
Total Capital Income 93.62 108.05 194.82 380.58 100.00
Capital Expenditure 2007-08 2008-09 2009-10 2010-11 Share
Capital Work in Progress 125.02 155.55 256.84 98.30 97.66
Purchase of fixed assets 0.74 0.00 0.00 7.25 1.86
Other Capital Expenditure 0.00 0.00 0.00 0.00 0.00
Reserve Fund 0.00 0.00 5.00 0.00 0.48
Total Capital Expenditure 125.76 155.55 261.84 105.55 100
Source: Annual Accounts, Nasrullahganj Nagar Parishad
City Development plan for Nasrullahganj 61
7.4. Key financial indicators
Exhibit 7-8 Performance Indicators
S. No Ratios 2007-08 2008-09 2009-10 2010-11 Average
I Operating Ratio 0.66 0.54 0.62 0.73 0.64
Ii Salaries' Expenditure to Revenue
Income 0.32 0.33 0.38 0.34 0.34
Iii Salaries' Expenditure to Revenue
Expenditure 0.49 0.61 0.61 0.46 0.54
Iv Capital Utilisation Ratio 1.34 1.44 1.34 0.28 1.10
Source: Annual Accounts, Nasrullahganj Nagar Parishad
Observations
Operating Ratio: The average operating ratio of the Nasrullahganj Nagar Parishad is 0.64 which is
less than 1, indicating that Nasrullahganj revenue expenditure levels are lower than the revenue
income generated. This might also indicate that the revenue income is being utilized for paying off
capital expenditure since capital utilization ratio is more than one in 3 years .
Capital Utilization ratio: Average Capital utilization ratio of Nasrullahganj Nagar Parishad is 1.10
which is more than 1, indicating that Nasrullagunj‟s capital expenditure is more than it‟s income . It
also means that they are utilizing their revenue income for capital purposes . This kind of capital
expenditure is good for the Nagar Parishad in the long term and will accrue benefits to the people
residing in the village .
Salaries expenditure to revenue income: approximately 34% of the revenue income is utilized for
paying the staff employed by Nagar Parishad.
7.5. Issues
Capital Utilization ratio is more than one, indicating that expenditure is more than the capital
income. This indicates shortage of capital funds under various schemes.
Tax revenue accounts for only 6.16 % of the total income, which is very less. There seems to
be a need for rationalization of different types of taxes.
7.6. Conclusion
This chapter dealt with the analysis of municipal finance and the financial health of Nasrullahganj
Nagar Parishad. The next chapter deals with City Vision, Sector Goals, Strategies, Action Plan,
Projects and Prioritization.
City Development plan for Nasrullahganj 62
8. CITY VISION, SECTOR GOALS, STRATEGIES, ACTION PLAN, PROJECTS AND PRIORITIZATION
The vision for Nasrullahganj was formulated by stakeholders and IMaCS through a consensus
approach and continued consultations with the community. The consultations revolved around the
city‟s strengths, current issues, concerns, problems and the areas that need to be focused on to
achieve the desired results.
8.1. Formulation of City Vision
After completing a rapid assessment of the city‟s infrastructure, physical and environmental aspects,
and institutional and financial status, a consultative process was started with Nasrullahganj Nagar
Parishad.
The “City Vision and Sector Goals” workshop was held to explain the purpose of the CDP, the
ownership of the plan, and the need for establishing or strengthening partnerships to leverage Nagar
Parishad‟s role in facilitating economic growth and improving quality of life. The officials of other
government departments such as Health, Education, etc who have a stake in the development of the
city were also involved in this workshop. This workshop focused on highlighting the current status of
all the services provided by various Nasrullahganj Nagar Parishad departments and the key issues
confronting each department.
The consultations held so far were concluded with a visioning workshop with stakeholders. Nagar
Parishad officials and other stakeholders together carried out the visioning exercise at this workshop.
The workshop started with a plenary session in which the current status and gaps in various services
were presented to the stakeholders. It was followed by the mission statements and the perceived
needs of the stakeholders. The comparison also served to identify additional priorities not mentioned
by the Nagar Parishad officials as well as discrepancies between the services provided by Nagar
Parishad and the stakeholders‟ perception of such services.
The Presentation by IMaCS team was followed by a questionnaire survey which aimed at eliciting
stakeholders‟ perception of city, city‟s infrastructure, major issues and where they want their city to be
in the future. This was followed by the ward-wise detailing of ward-specific problems and potentials
that can be harnessed for the development of ward and city.
8.1.1. Vision for the Town
For developing a vision for Nasrullahganj, IMaCS team presented three vision statements for the town
based on the discussions with various stakeholders individually.
After having discussions with stakeholders during the workshop and consultations with Nagar
Parishad officials, the vision for Nasrullahganj Nagar Parishad emerged as follows:
“A sustainable city that provides adequate and equitable access of urban services for all its citizens
along with employment opportunities for everyone”
In addition to the outlining of a vision for the city, discussions were also carried out on the
identification of major themes which would serve as the watchwords for initiatives and actions to
achieve the vision. Some of the major themes that came out of workshop and consultations with
stakeholders are as follows:
1. The city should attain a key position in small scale and Agro-based industries.
City Development plan for Nasrullahganj 63
2. City should be clean and beautiful with employment opportunity for everyone including women.
3. Industries both small and large scale should be encouraged in town so that employment
opportunity can be developed.
4. Promote education, health institutions and a safe environment for the citizens. There should be
good supply of water in the town.
8.1.2. Mission Statements
To achieve the vision, certain Mission Statements are formulated on the basis of identified themes
which would be the various lines on which development should be concentrated. Based on
consultations with stakeholders and review of development plans of other cities, following Mission
Statements are being adopted to achieve the vision.
1. To provide citizens of Nasrullahganj with sustainable and basic infrastructure facilities.
All basic infrastructure facilities, viz. Water Supply, Sewerage & Sanitation, Storm Water Drainage,
Solid Waste Management, Roads & Transportation and Street Lighting & Fire Fighting, and social
infrastructure facilities, viz. Health and Education, should be developed / upgraded to support the
economic and social development of the city.
2. To actualize the city’s existing economic potential and generate new opportunities for the
prosperity in all sections of the community.
An economic development plan should be devised for the harnessing of city‟s economic potential. It
should concentrate on the diversification of economic base of the city so as to reduce dependence on
any particular factor.
3. To develop & promote special economic activity and training centres for women.
Special training centres should be developed for women so that all the women can get trained in
various economic activities irrespective of their literacy level. Special community based economic
activities should be designed such as handicraft activities, household food products etc so that every
women should be part of gainful economic activity.
4. To uplift the urban poor and bring them at par with other sections of the community.
A comprehensive upliftment plan, comprising of employment generation, provisioning of basic
infrastructure and equal access to social infrastructure, for urban poor should be prepared to address
the existing disparity among the various sections of the community.
5. Institutional Strengthening and Capacity Building.
Preparation of an institutional action plan defines roles and responsibilities of various stakeholder
agencies. It would also target at the capacity of various stakeholder agencies in terms of adequacy of
staff and competitiveness for an efficient delivery. The issue of “Motivation to work” should be an
integral part of this plan.
6. Preparation of Resource Mobilization Plan.
Preparation of a financial and operating plan that addresses the resource requirement for
implementation and maintenance of the “City Development Plan” and “Master Plan” proposals.
7. Development of New areas through Town Planning Schemes.
City Development plan for Nasrullahganj 64
Development of new areas should be undertaken through implementation of Town Planning
Schemes. Detailed development plan has to be prepared for the selected new areas with the
guidance of master plan /land use plan for the city.
8. Conserve Nasrullahganj Environment
Conservation of major Nallah and the natural environment of Nasrullahganj Nagar Parishad. These
Mission Statements would serve the purposes of aligning/initiating development works with the
formulated vision, guidance during the policy formulations to achieve the goal and framework for the
coordination among the various stakeholder agencies.
8.2. Sector Goals, Strategies, Action Plan and Projects
8.2.1. Water supply Sector Goals
“All households should be provided with piped water with defined service levels.”
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-1.
Exhibit 8-1 Water Supply: Achievement Targets
Sector Components 2015 2025 2035
WATER SUPPLY
Network coverage to households
100% of the properties
assessed under property tax
100% of the properties
assessed under property tax
100% of the properties
assessed under property tax
Per capita supply as per norms 135 135 135
24/7 water supply no no yes
Quality of water good good good
Non-revenue water 15% 15% 15%
Consumer metering
80% 80%
Roof water harvesting no yes yes
Private sector participation no If O&M is
contracted to a private developer
If O&M is contracted to a
private developer
Strategies to achieve the Sector Goals
Unlike the approach adopted for sectors such as roads, SWM etc, the planning for water supply
source augmentation has been done considering the demand arising in year 2035. The systems and
infrastructure would therefore have to be designed such that the long term needs are addressed and
planned for by 2025. Therefore, the broad strategy would be to identify the projects addressing the
future demand and plan for the necessary. In addition to the improvements in infrastructure, the
stakeholders have also suggested that the municipal manpower dealing exclusively with the water
supply should be strengthened. Table given below lists the broad strategies required to achieve the
given targets in water sector.
City Development plan for Nasrullahganj 65
Broad Strategies required to achieve the target:
1. Augmentation of water supply
2. Minimize water losses in transmission and distribution and enhance overall management of
distribution
3. Promotion of efficiency in service delivery and strengthening of cost recovery mechanisms
4. Conservation of Rain Water
5. Improving Efficiency, Accountability and Transparency in the system
6. Exploring possibility of Private sector participation to contract out the O&M part of the project
Action Plan following the Strategies
The table below presents the broad action plans being proposed to address the gaps identified in the
existing levels:
Exhibit 8-2 Water Supply Long Term and Short Term Interventions
Sector
Interventions
Required
Water supply source requires to be augmented to 6.58 MLD in 2035.
The water storage capacity would also have to be increased keeping in perspective
the long-term requirements.
Number of ESRs should be increased to cater the demand of the population.
Refurbishment of the old dilapidated distribution network has to be planned to reduce
the loss in transmission and distribution.
Treatment plant technology has to be upgraded.
To improve the revenue from water charges, complete metering has to be executed.
Expected
Outcome
Assured 135 lpcd water supply.
Improvement in water quality .
Improvement in the revenue from water charges, enhanced service delivery.
Details of Projects Envisaged
For meeting the demands arising in 2035, the following sub projects are being recommended and
would have to be executed by the ULB.
Exhibit 8-3 Projects Identified by ULB and Consultant for Water Sector
ULB’s Suggestion Project’s Proposed
Scheme to increase the per capita supply of
water.
Integrated Water supply Scheme for the town
of Nasrullahganj.
Project Rationale Sub- Projects
Water Supply in the town not adequate to
meet the existing and future demand.
Current treatments were restricted only to
chlorination.
Revenues from water charges are not
adequate, and the installation of water meters
becomes important both from the perspective
raising revenues and checking water
consumption.
Water Supply source augmentation to 6.58
MLD by 2035.
Development of water treatment facility of
6.58 MLD by 2035 which can be taken up in a
phased manner.
Increasing distribution network to 72.46 km by
year 2035 which can be taken up in a phased
manner.
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-4. The
list of identified projects recommended under CDP, is preceded by a list of on-going Projects. In
addition to the estimated Gaps (Demand-Supply), the contribution of on-going Projects in addressing
City Development plan for Nasrullahganj 66
the expected demand has also been considered while identifying the projects for Horizon-1 (Short
term) and Horizon-2 (Long term).
Exhibit 8-4 Water Supply Projects in a phased manner
A On-going Projects (as of 2011)
Nasrullahganj Water Supply Project (Under UIDSSMT)
Status: Under Construction
Implementing Agency: Nasrullahganj Nagar parishad
Being designed for year 2040. Aimed at increasing the daily water supply to 5.6 MLD
Project Components:
Construction of an Intake Well to draw water from Narmada River
Treatment Plant of 5.6 MLD Capacit0y
Distribution Network: 5 Km
Elevated Water Storage Tanks (2 numbers): Capacity of 350 KL each.
B Components Projects Under Horizon-1 Projects Under Horizon-2
Source Augmentation (MLD) 3.68 6.58
Distribution Network (km) 24.98 39.63
Treatment Capacity (MLD) 3.68 6.58
OHT Capacity (ML) 1.23 2.19
Source: Nasrullahganj Nagar Parishad and IMaCS Analysis
Exhibit 8-5 Water Supply Projects: Responsible Agencies
Immediate measures to be taken Authorities/Agencies responsible
Finalising the sub projects to be undertaken Nasrullahganj Nagar Parishad
Preparation of DPRs for finalised projects Nasrullahganj Nagar Parishad
Submission of DPR to funding agency for approvals Nasrullahganj Nagar Parishad
Undertake measures for compulsory installation of water meters:
Create awareness among the ward councillors and citizens on the
need for installation of water meters
Nasrullahganj Nagar Parishad
8.2.2. Sewerage and Sanitation Sector Goals
“All households should be provided with sewerage and safe sanitation facilities”
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-6.
Exhibit 8-6 Sewerage and Sanitation: Achievement Targets
Sector Components 2015 2025 2035
SEWERAGE
&
SANITATION
Sewer network coverage to
households 70% 85% 90%
Sewage Treatment and
disposal arrangements 100% 100% 100%
Sewage Recycling and
reuse
Treated water could
be used for
agricultural process,
not for drinking use.
Treated water could
be used for
agricultural process,
not for drinking use.
Treated water
could be used for
agricultural
process, not for
drinking use.
City Development plan for Nasrullahganj 67
Sector Components 2015 2025 2035
Safe sanitation facilities
(with focus on Urban poor) 70% of households 85% of households
85% of
households
In addition to above area, a constant effort should be devoted towards “Community participation and
awareness campaign for the proper maintenance of Public Toilets” and “Cost Recovery through
collecting the user charges.”
Strategies to achieve the Sector Goals
The lack of a sewerage network in town necessitates the development of a sewerage network which
would efficiently manage the existing and future demand. Similar to planning and designing for water
supply network, the planning for development of sewerage network would have to consider the
demand arising in 2035 and make necessary provisions for the same by 2025. The systems and
infrastructure would therefore have to be designed such that the long term needs are addressed and
planned for by 2025. The broad strategy therefore should be to identify the projects addressing the
future demand in the areas of sewerage and sanitation which the Nagar Parishad would have to take
up in the short run for which necessary investments will also have to be planned for. Table below
presents the broad strategies to achieve the given targets for sewerage and sanitation sector.
Broad Strategies to achieve the targets:
1. Effective Waste Water collection and treatment
2. Provision of safe Sanitation facilities to population and households that lack in-house sanitation
facilities.
3. Make the system Cost effective - Cover the whole area with sewerage network.
Action Plan following the Strategies
Exhibit 8-7 lists the long term and short term interventions required in sewerage and sanitation sector.
Exhibit 8-7 Sewerage & Sanitation Long Term and Short Term Interventions
Sector
Interventions
Required
Laying of underground drainage system of 41.97 km by 2035.
Construction of a sewerage system (DEWAT System) which can handle a treatment
capacity of 5.26 MLD.
Addition of around 37 Public Toilet seats.
Expected
Outcome
Synchronisation with water supply capacity, ability to meet service level targets and
disposal norms.
Table given below shows broad action plan needed in sewerage and sanitation sector.
Broad Action Plan for Sewerage and Sanitation Sector:
1. Development of a Sewerage System covering:
a. Waste Water collection network / Septic Tanks
b. Augmentation of Sewerage treatment capacity
2. Recycle waste water for non-potable use
3. Development of Community Toilets (covering households that lack in-house sanitation facilities)
and Public Toilets (for floating population).
City Development plan for Nasrullahganj 68
Details of Projects Envisaged
For meeting the demand arising in 2035, the following sub projects are being recommended and
would have to be executed by the ULB.
Nasrullahganj has less than 25% area as development land but the settlements in the town are
spread over the entire area and are not concentrated together at one place, therefore it would be
beneficial for the town both financially and for operations and maintenance to implement
Decentralized Waste Water Treatment System (DEWATS) for comprehensive sewerage system, and
dispose-off generated sewage. This DEWAT system take into care the demand generated in the year
2035. The advantages of DEWAT system are that; it requires minimum space and hence be
accommodated easily under paved pathways and parking lots etc. or small available spaces; It
requires lesser energy and operation cost; This system promotes the reuse of water for non-potable
purposes; It can be easily blended with the landscape; It cannot be switched off so it ensures efficient
working irrespective of external factors and it can treat waste water with high fat, suspended solids
and BOD. Since this system is decentralized, the zones would be defined as per population and
location for DEWATS and the treatment system would be developed to safely dispose-off the sewage.
The treated water can be used for agricultural use.
Exhibit 8-8 Projects identified by ULB and Consultant for Sewerage & Sanitation Sector ULB’s Suggestion Project’s Proposed
Scheme for laying of sewerage network for the town. Comprehensive Sewerage Scheme for the
town of Nasrullahganj.
Project Rationale Sub- Projects
The sewerage system in the town consists of septic tanks, soaks
pits, open surface drainages and finally disposes into the natural
drains and later into major Nallah. The city will consume about 6.58
MLD of water by the year 2035. About 80 percent of water supply
as per CPHEEO norms is estimated to be generated in the town.
There is no underground drainage network in the city. The waste
water flowing in open drain results in unhygienic milieu and
pollution of water bodies and the conditions are severe during
monsoon when the sewerage overflows on the road.
Construction of sewerage network
with a total capacity of 5.26 MLD.
Construction of sewage pumping
stations.
Addition of around 37 public toilet
seats.
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-9. The
list of identified projects recommended under CDP, is preceded by a list of on-going Projects. In
addition to the estimated Gaps (Demand-Supply), the contribution of on-going Projects in addressing
the expected demand has also been considered while identifying the projects for Horizon-1 (Short
term) and Horizon-2 (Long term).
Exhibit 8-9 Sewerage and Sanitation Projects in a phased manner
A Ongoing Projects (as of 2011)
Sanitation Project: City Sanitation Plan for Nasrullahganj
Status: Under preparation
Initiative of Government of Madhya Pradesh to implement the National Urban Sanitation Policy in the
State.
A joint effort of Government of Madhya Pradesh, UN-Habitat, Nasrullahganj Nagar Parishad and
AIILSG. Funding support has been provided by UN-Habitat for preparation of this plan.
Aims at achieving sanitation infrastructure development along with developing awareness in the
community and encourages public private partnerships in the sector.
City Development plan for Nasrullahganj 69
Sewerage Project: Providing and laying of sewer network of Nasrullahganj
Status: Under Construction
Design period of 30 years, till 2038,
it will enable municipal Parishad to collect the sewerage and storm water and carry it other suitable
place for providing desired treatment before the waste water being finally disposed off to river or rushed
for any other purposes.
Providing and laying of sewer network within town .
Total network length will be 20.28 Km. Two stabilisation ponds for 4 MLD capacities will be constructed.
B Components Projects Under Horizon-1 Projects Under Horizon-2
Underground Drainage Network (km) 26.45 41.97
Sewage Treatment Plant Capacity (MLD) 2.94 5.26
Public Convenience Seats (Nos.) 37 37
Source: Nasrullahganj Nagar Parishad and IMaCS Analysis
Exhibit 8-10 Sewerage and Sanitation Projects: Responsible Agencies Immediate measures to be taken Authorities/Agencies responsible
Finalising the sub projects to be undertaken Nasrullahganj Nagar Parishad in consultation
with Councillors and other stakeholders
Preparation of DPR(s) for finalised projects Nasrullahganj Nagar Parishad
Submission of DPR(s) to funding agency Nasrullahganj Nagar Parishad
8.2.3. Solid Waste Management Sector Goals
“To achieve 100% collection and disposal of solid wastes in the town”
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-11.
Exhibit 8-11 SWM: Achievement Targets Sector Components 2015 2025 2035
Solid Waste
Management
Door-to-door collection system door to door
collection
door to door
collection
door to door
collection
Source segregation yes yes yes
Improve waste collection efficiency 100% 100% 100%
Mechanized waste handling yes yes yes
Scientific waste disposal yes yes yes
Landfill site adequacy yes yes yes
Cost recovery of O&M No 60 % 80 %
Private sector participation To be explored To be explored Yes
Strategies to achieve the Sector Goals
In order to facilitate improved solid waste management, the Nagar Parishad would have to focus on
various aspects – adoption of better practices to ensure proper collection, segregation and disposal of
waste and the second being augmenting the existing infrastructure. The current status of the
infrastructure needs to be improved by increasing the equipment required for effectively handling the
waste, and most importantly developing an adequate sized landfill site. Apart from the focus on
augmenting the resources, the Nagar Parishad would be required to train its conservancy staff to
carry out the tasks effectively. Immediate priority needs to be placed on improving the skills of the
conservancy staff and also to increase.
City Development plan for Nasrullahganj 70
Action Plan following the Strategies
The broad sector interventions to address both the short and long term requirements are listed below:
Exhibit 8-12 Solid Waste Management Long Term and Short Term Interventions
Sector
Interventions
Required
Promoting door-to-door collection
Up-gradation of the infrastructure required for effective collection and disposal of waste
Adoption of scientific technology for disposal of waste
Improve the skills of the conservancy staff
Expected
Outcome
Hygienic conditions and a clean city
Waste segregation at source
Suitable treatment for different kinds of waste
Details of Projects Envisaged
Following are the projects proposed during the stakeholder consultation and also based on the rapid
urban assessment carried out by the Consultant.
Exhibit 8-13 Projects Identified by ULB and Consultant for SWM Sector ULB’s Suggestion Project’s Proposed
Effective collection of waste
Proper disposal of collected waste Solid Waste Management system for Nasrullahganj
Project Rationale Sub- Projects
As per the demand assessment, in 2025,
Nasrullahganj would generate 9.42MT of waste daily.
To effectively handle the generated waste, a pre-
emptive action of developing a proper Solid Waste
Management system is inevitable.
Promoting door-to-door collection
Augmenting Collection Infrastructure
Development and augmentation of landfill site
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-14. The
list of identified projects recommended under CDP, is preceded by a list of on-going Projects. In
addition to the estimated Gaps (Demand-Supply), the contribution of on-going Projects in addressing
the expected demand has also been considered while identifying the projects for Horizon-1 (Short
term), and Horizon-2 (Long term).
Exhibit 8-14 Solid Waste Management Projects in a phased manner
A Ongoing Projects (as of 2011)
On-going project: “ clean-Green and healthy journey towards vision 2020”
Components of project are followings:
Awareness programme for the people of Nasrullahganj;
Workshops for the municipal employee;
Compost Production Centre;
Buying of new Instruments
B Components Projects Under Horizon-1 Projects Under Horizon-2
Wheel Barrow/ Hand Carts (Nos.) 28 46
Community Bins/ Dustbins (Nos.) 50 50
Collection Points (Nos.) 14 -
Vehicle Carrying Capacity (Tonnes) 2.93 4.02
Tractor Trolley (Nos.) 0.57 6
Land Fill Infrastructure (Tonnes/day) 1.42 4.04
Composting Plant (Tonnes/day) 0.70 1.82
Source: Nasrullahganj Nagar Parishad and IMaCS Analysis
City Development plan for Nasrullahganj 71
Exhibit 8-15 SWM Projects: Responsible Agencies Immediate measures to be taken Authorities/Agencies responsible
Augmenting the size of the conservancy staff Nasrullahganj Nagar Parishad in consultation
with Councilors and other stakeholders
Purchase of additional equipment Nasrullahganj Nagar Parishad
Identification of areas for construction of public conveniences Nasrullahganj Nagar Parishad
Development of Vermi-Composting Plant
Vermicomposting involves the stabilisation of organic solid waste through earthworm consumption
which converts the material into worm castings. Vermi technology, a tripartite system which involves
biomass, microbes and earthworms is influenced by the abiotic factors such as temperature,
moisture, aeration etc. Conditions unfavourable to aerobic decomposition result in mortality of
earthworms and subsequently no vermicomposting occurs. Hence, pre-processing of the waste as
well as providing favourable environmental condition is necessary for vermicomposting. It is relatively
more stabilised and harmonises with soil system without any ill effects. Unfavourable conditions such
as particle size of biomass and extent of its decomposition, very large temperature increase,
anaerobic condition, toxicity of decomposition products etc. influence activity of worms. Tests in India
have shown that vermin compost application can double wheat yields and quadruple yields of fodder.
Method to prepare Vermi-Compost: The MSW is segregated i.e all the dry wastes such as clothes,
carry bags and other dry wastes are segregated from wet waste. A thatched roof shed preferably
open from all sides with unpaved (Kutcha) floor is erected in East West direction length wise to
protect the site from direct sunlight. A shed area of 12‟X12‟ is sufficient to accommodate three vermin
beds of 10‟X3‟ each having 1‟ space in between for treatment of 9-12 quintals of waste in a cycle of
40-45 days. The length of shed can be increased/decreased depending upon the quantity of waste to
be treated and availability of space. The height of thatched roof is kept at 8 feet from the centre and 6
feet from the sides. The base of the site is raised at least 6 inches above ground to protect it from
flooding during the rains. The wet waste is pulverized and arranged in the form of vermin bed over the
raised ground. The loaded waste is finally covered with a Jute Mat to protect earthworms from birds
and insects. Water is sprinkled on the vermin beds daily according to requirement and season to keep
them moist. The waste is turned upside down fortnightly without disturbing the basal layer (vermin
bed).The appearance of black granular crumbly powder on top of vermin beds indicate harvest stage
of the compost. The earthworms go down and the compost is collected from the top without disturbing
the lower layers (vermin bed). The first lot of Vermi compost is ready for harvesting after 22 ½ months
and the subsequent lots can be harvested after every 6 weeks of loading. The vermin bed is loaded
for the next treatment cycle.
8.2.4. Storm Water Drainage Sector Goals
“To develop an efficient drainage system to ensure cleanliness of city”
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-16.
Exhibit 8-16 Storm Water Drainage: Achievement Targets Sector Components 2015 2025 2035
DRAINAGE Storm water drainage
network coverage (as a % 130% 130% 130%
City Development plan for Nasrullahganj 72
Sector Components 2015 2025 2035
of road length)
Pucca drains
New Formations:
Pucca Open 3.20
km
New Formations:
Pucca Open 3.44
km, Pucca closed
6.38 km
New Formations:
Pucca Open 3.96
km, Pucca Closed
8.04 km
Rehabilitation of existing
primary nallahs and water
bodies
Desilting of drains
to increase their
capacity
100% 100%
Flood prone areas None None None
Strategies to achieve the Sector Goals
The existing gaps and the future requirements would be addressed in terms of two categories of
priority or short term needs and long term needs. The existing gaps and the demand arising for the
year 2015 may be taken up as priority projects. The suggestions which had been put forth in the
stakeholder consultation would have been clubbed under the category of short term requirements and
the long term requirements (2035) should be addressed by the Nagar Parishad in the second phase.
Action Plan following the Strategies
The broad sector interventions to address both the short and long term requirements have been
enlisted below:
Exhibit 8-17 Storm Water Drainage Long Term and Short Term Interventions
Sector
Interventions
Required
Cleaning/ Desilting of the existing natural drains, this will also include the removal of
encroachments.
Construction of new storm water drains and upgradation of existing drains.
Expected
Outcome Universal coverage and disposal capacity
Details of Projects Envisaged
Following are the projects proposed during the stakeholder consultation and also based on the rapid
urban assessment carried out by the Consultant.
Development of Root Zone Treatment System (RZTS): It is observed that the sewage flowing
through nallahs joins Rivers in untreated condition and creates heavy risk of river pollution. Storm
water can be treated as well with RZTS after removal of settleable substances. It is a low-cost and
maintenance free option that uses the capacity of plants (especially certain reeds – hence also called
reedbed technology) to absorb contaminants and structurally modify them for treating water. It is
based on the principle of attached growth biological reactors similar to conventional trickling filters
with combination of aerobic and anaerobic zones. The contaminants present in the wastewater are
treated as they seep through the root-zone of the plants by a combination of plants, soil bacteria and
hydraulic flow systems resulting in physical, chemical, and microbiological processes. Oxygen present
in the zone facilitates the degradation of wastewater. A wide variety of microorganisms present in the
root-zone of the plants results in efficient removal. There is efficient reduction of pathogens also by
percolation through the bed material. Thus, it can be developed in Nasrullahganj along storm water
drains.
City Development plan for Nasrullahganj 73
Exhibit 8-18 Projects identified by ULB and Consultant for Storm Water Drainage ULB’s Suggestion Project’s Proposed
Scheme for augmenting storm water drainage network
for the town
Storm Water Drainage network for the town of
Nasrullahganj
Project Rationale Sub- Projects
According to normative standards, the length of the
drains are assumed at 130% of road length
considering all divided roads to have drains on either
side and undivided roads on at least one side. Further
the drains in the initial phase shall be open and
subsequently be made closed; hence the investment is
towards up-gradation annually and for construction of
new closed drains. All existing open drains shall be first
upgraded to closed drains and subsequently new
drains shall be constructed.
Prominently, all the road and storm water projects are
to be taken up simultaneously to match the levels of
the roads with the drains and allow draining of rain
water from the city.
Cleaning/Desilting of natural drains such as nallah
flowing from west to east part of the city.
Construction of 8.04 km of Pucca closed drains
and 3.96 km of Pucca open drains by 2035
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-19. The
list of identified projects recommended under CDP, is preceded by a list of on-going Projects. In
addition to the estimated Gaps (Demand-Supply), the contribution of on-going Projects in addressing
the expected demand has also been considered while identifying the projects for Horizon-1 (Short
term) and Horizon-2 (Long term).
Exhibit 8-19 Storm Water Drainage Projects in a phased manner
A Ongoing Projects (as of 2011)
There is no project ongoing in this sector.
B Components Projects Under Horizon-1 Projects Under Horizon-2
Desilting and strengthening of primary drains (km) 35 35
Upgradation from Kutcha to Pucca Open (km) 2.11 -
Upgradation from Kutcha to Pucca Closed (km) 22.39 -
Upgradation from Pucca open to Pucca closed (km) 3.20 -
Construction of new Pucca open drains (km) 3.20 3.96
Construction of New Pucca closed drains (km) - 8.04
Source: Nasrullahganj Nagar Parishad and IMaCS Analysis
Exhibit 8-20 Storm Water Drainage Projects: Responsible Agencies
Immediate measures to be taken Authorities/Agencies responsible
Finalising the sub projects to be undertaken Nasrullahganj Nagar Parishad in consultation with
Councilors and other stakeholders
Preparation of DPR for finalised projects Nasrullahganj Nagar Parishad
Submission of DPR to funding agency Nasrullahganj Nagar Parishad
City Development plan for Nasrullahganj 74
8.2.5. Traffic and transportation Sector Goals
“To link each and every part of the city with efficient transportation system”
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-21.
Exhibit 8-21 Traffic and Transportation: Achievement Targets Sector Components 2015 2025 2035
TRAFFIC &
TRANSPORTATION
Town Area under
circulation 11% 11.5% 12%
Development of bus and
truck terminus
Development of bus
stand none
Upgradation to
accommodate
capacity
Junctions and traffic
signal improvements
Regulating traffic
through better
management
Regulating
traffic through
better
management
Regulating traffic
through better
management
Parking facilities
Parking lots to be
provided at strategic
locations
Upgradation of
Parking Lots
Strategies to achieve the Sector Goals
Following is the list of strategies to achieve given sector goal.
Ensure free flow of traffic through junction improvement, signalization, and traffic control and
management measures.
Efficient use of existing infrastructure – removal of impediments – including enhancement of road
infrastructure and provision of efficient parking facilities
Awareness generation and enforcement of traffic rules
Better connectivity within the city
Action Plan following the Strategies
In the case of the road sector, the broad strategy which the Nagar Parishad should follow is one
wherein the existing gaps in this sector and the future requirements would be addressed in terms of
two categories of priority or short term needs and long term needs. The overall plan in this sector
should be based on two principles:
Medium term action plan aimed at development of transport infrastructure for a period of 5-10
years to bring about coordinated development among different components. These measures
typically will include various infrastructure projects, which will be directed at network
improvements such as parallel roads, link roads, slip roads, etc.
Long-term action plan aimed at development of structure plan for the Urban Area with Transit as
one of the lead components, which will direct the urban growth so as to bring about a structural fit
between transit infrastructure and Urban Growth.
The broad sector interventions to address both the short and long term requirements have been
enlisted below:
City Development plan for Nasrullahganj 75
Exhibit 8-22 Traffic and Transportation Long Term and Short Term Interventions
Sector Interventions Required
Construction of new roads in areas which are at present earthen.
New roads to cater to missing links and developing areas
Development of Parking Spaces
Improved bus stand and related amenities
Outcome Improved connectivity, Hassle-free travel on roads, safe driving during nights
Details of Projects Envisaged
Following are the projects proposed during the stakeholder consultation and also based on the rapid
urban assessment carried out by the Consultant.
Exhibit 8-23 Projects identified by ULB and Consultant for Traffic & Transportation Section
ULB’s Suggestion Project Rationale Project’s Proposed
Upgradation of roads to CC in
a few identified wards
Development of Parking
spaces
The current road length per
capita is much lesser than the
norms; keeping in view the
growth of the town, the total
road length needs to be
extended and the quality of
roads needs to be improved.
Construction of 8.51 km of
additional roads by 2015 and
further 9.23 km by 2035
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-24. The
list of identified projects recommended under CDP, is preceded by a list of on-going Projects. In
addition to the estimated Gaps (Demand-Supply), the contribution of on-going Projects in addressing
the expected demand has also been considered while identifying the projects for Horizon-1 (Short
term) and Horizon-2 (Long term).
Exhibit 8-24 Traffic & Transportation Sector Projects
A Ongoing Projects (as of 2011)
Ongoing project is “Upgradation of Existing Road Network of Nasrullahganj”.
Total project cost 120.68 lakhs.
Components of projects are following
Site clearance and Dismantling;
Granular-base course and Sub-base;
Excavation and earthworks;
Bituminous Course and
Traffic sign board.
B Components Projects Under Horizon-1 Projects Under Horizon-2
Upgradation of Roads (km) 15 -
Construction of New CC Roads (km) - 1.23
Construction of New BT Roads (km) 8.51 8
Widening/ Strengthening of Roads (km) 1.58 0.65
Development of Parking Areas (LS) 1.21 1.92
Development of Bus or Truck Terminus (LS) 2.42 3.84
Source: Nasrullahganj Nagar Parishad and IMaCS Analysis
City Development plan for Nasrullahganj 76
Exhibit 8-25 Project Development Initiatives to be taken up by Nagar Parishad
Immediate measures to be taken Authorities/Agencies responsible
Finalising the sub projects to be undertaken Nasrullahganj Nagar Parishad in consultation with
Councillors and other stakeholders
Preparation of DPR for finalised projects Nasrullahganj Nagar Parishad
Submission of DPR to funding agency Nasrullahganj Nagar Parishad
8.2.6. Street lighting and Fire fighting Sector Goals
“To provide adequate coverage of streetlights, fire fighting instruments”
Strategies to achieve the Sector Goals
Strategies for Street Lighting:
To augment the street light coverage of city roads with special focus on backward and slum
areas.
To reduce the Operation & Maintenance expenses by using energy efficient lights – CFL
Feasibility of solar panels to replace the existing street lights setup throughout the city
Strategy for Fire Fighting:
Get equipped for major fire accident
Action Plan following the Strategies
Action Plan for Street Lighting:
To install new street lights
Shifting to energy efficient lights in a phased manner
Action Plan for Fire Fighting:
To develop Fire Stations equipped with necessary vehicles, equipment etc.
To procure safety items for crew members
Details of Projects Envisaged
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-26 as
projects for Horizon-1 and Horizon-2, i.e. short term and long term.
Exhibit 8-26 Street Light and Fire fighting Projects
A Ongoing Projects (as of 2011)
There is no project ongoing in this sector.
B Components Projects Under Horizon-1 Projects Under Horizon-2
New Installation of Tube lights (Nos.) 585 231
Underground Cabling (km) 16.50 9.06
Source: Nasrullahganj Nagar Parishad and IMaCS Analysis
City Development plan for Nasrullahganj 77
Exhibit 8-27 Street Light and Fire Fighting Projects: Responsible Agencies
Immediate measures to be taken Authorities/Agencies responsible
Finalising the sub projects to be undertaken Nasrullahganj Nagar Parishad in consultation with
Councillors and other stakeholders
Preparation of DPR for finalised projects Nasrullahganj Nagar Parishad
Submission of DPR to funding agency Nasrullahganj Nagar Parishad
8.2.7. Urban poor and their accessibility to basic Services Sector Goals
“To achieve hygienic environment in slums, access to basic services and quality housing for all slum
households with the ultimate aim of a slum-free city”
Strategies to achieve the Sector Goals
Up gradation of slums through Provision of basic services in slum area and improving the
overall housing scenario
Curbing the slums and improving the quality of life
Employment generation for increasing the family income – Indirectly by Industrial expansion –
New Industrial Policy has a provision of hiring 90% of workers from the city in which industry
would be set up.
Awareness generation about hygiene and education
Action Plan following the Strategies
Abiding by the reform agenda
Ensuring urban services in the slum areas with pre-defined service levels
Skill development programmes for urban poor
Improve housing conditions by financial assistance or other schemes
Community Organization and Community Participation
Details of Projects Envisaged
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-28 as
projects for Horizon-1 and Horizon-2, i.e. short term and long term.
Exhibit 8-28 Projects for Urban Poor A Components Projects Under Horizon-1 Projects Under Horizon-2
Preparation of Slum Free City Plan Yes -
Slum Mapping Yes -
Housing Requirement (housing units) 437 -
Source: Nasrullahganj Nagar Parishad and IMaCS Analysis
8.2.8. Health Sector Goal
“To equip Nasrullahganj with state-of-art health infrastructure including manpower so as to
reduce the dependence on other cities”
City Development plan for Nasrullahganj 78
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-29.
Exhibit 8-29 Health: Achievement Targets Sector Components 2015 2025 2035
Health
Doctors per 1000 population 2 2 3
Effective implementation of health
programmes and related services
in the slum areas of the city
To be carried in
coordination of
Dept. of Health,
GoMP
To be carried in
coordination of
Dept. of Health,
GoMP
To be carried in
coordination of
Dept. of Health,
GoMP
Regular checks for water
contamination in all water bodies
of the city
Yes (Provision to
be made for
necessary
infrastructure)
Yes Yes
Strategies to achieve the Sector Goal
For the provision of medical infrastructure, Nasrullahganj Nagar Parishad‟s role is limited to primary
level services and in even the Government Hospital not much facility is found. To promote medical
facilities, Nasrullahganj Nagar Parishad must provide a conducive environment for other government
agencies and private developers in the form of support infrastructure, incentives, etc.
Future steps towards improvement in health care facilities should be based on certain principles.
There needs to be an emphasis on participatory planning in medical care, quality health care and
client satisfaction and preventive health care measures. Nasrullahganj Nagar Parishad should target
the eradication of preventable diseases by 2015. This may be helped by the supply of good quality
drinking water and sanitation facilities and strict control and supervision of hotels and roadside food
vendors. A resolution of the mosquito menace will eradicate the slew of health issues. Total
vaccination of the population as per WHO schedules should also be completed by 2015.
To ensure quality medical care to the under-privileged, Nasrullahganj Nagar Parishad should make
plans for involving private doctors by providing them with free space in existing Parishad
dispensaries. To achieve the goals by finalized strategies, we have estimated the number of hospitals
and other medical institutions that would be required in the city. These estimations have been done in
accordance to the UDPFI guidelines.
Action Plan following the Strategies
Exhibit 8-30 presents the broad action plans being proposed to address the gaps identified in the
existing levels.
Exhibit 8-30 Health Sector Long Term and Short Term Interventions
Sector
Interventions
Required
Increase in number of doctors and bed capacity of town
Development of necessary infrastructure
Primary focus on primary healthcare and control on the preventable diseases
Expected
Outcome
Development of health infrastructure to ensure the 100 % coverage of patients
Provision of health facilities so as to reduce the dependence on the other cities
City Development plan for Nasrullahganj 79
Details of Projects Envisaged
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-31 as
projects for Horizon-1 and Horizon-2, i.e. short term and long term.
Exhibit 8-31 Health Sector Projects A Ongoing Projects (as of 2011)
There is no project ongoing in this sector.
B Components Projects Under Horizon-1 Projects Under Horizon-2
Government Hospital (No. of beds) 54 97
Dispensary (Nos.) 2 3
Source: Nasrullahganj Nagar Parishad and IMaCS Analysis
Exhibit 8-32 Health Sector Projects: Responsible Agencies Immediate measures to be taken Authorities/Agencies responsible
Finalising the sub projects to be undertaken Nasrullahganj Nagar Parishad and Dept of Health, GoMP
Preparation of DPR for finalised projects Nasrullahganj Nagar Parishad and Dept of Health, GoMP
Submission of DPR to funding agency Nasrullahganj Nagar Parishad and Dept of Health, GoMP
8.2.9. Education Sector Goals
“To achieve a 100% literacy rate with student-friendly educational institutions”
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-33.
Exhibit 8-33 Education Sector: Achievement Targets Sector Components 2015 2025 2035
Education
Literacy Rate 85% 95% 100%
Enrollment in primary
schools 90% 100% 100%
Teacher Student Ratio 60% of prescribed
Teacher Student ratio
80% of prescribed
Teacher Student ratio
100% of prescribed
Teacher Student ratio
Institutions for Higher
Education No Yes No
Strategies to achieve the Sector Goals
For the provision of educational infrastructure, Nasrullahganj Nagar Parishad‟s role is limited to
primary level services. To promote higher-level education, Nagar Parishad must provide a conducive
environment for other government agencies and private developers in the form of support
infrastructure, incentives, etc.
Nagar Parishad should take strong steps to ensure the quality of education in schools through
standardization and performance incentives. To achieve the goals by finalized strategies, we have
estimated the number of schools and other educational institutions that would be required to achieve
a 100% literacy rate. These estimations have been done in accordance to the UDPFI guidelines.
Action Plan following the Strategies
Exhibit 8-34 presents the broad action plans being proposed to address the gaps identified in the
existing levels.
City Development plan for Nasrullahganj 80
Exhibit 8-34 Education Sector Long Term and Short Term Interventions Sector
Interventions
Required
Development of necessary infrastructure
Awareness generation
Enforcement of regulations on private schools
Expected
Outcome
100% enrolment in primary schools
Achievement of prescribed teacher-student ratio
100 % literacy rate
Details of Projects Envisaged
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-35 as
projects for Horizon-1 and Horizon-2, i.e. short term and long term.
Exhibit 8-35 Education Sector Projects
A Ongoing Projects (as of 2011)
There is no project ongoing in this sector.
B Components Projects Under Horizon-1 Projects Under Horizon-2
Primary School 11 19
Middle School 4 6
College - -
Source: Nasrullahganj Nagar Parishad and IMaCS Analysis
As discussed earlier, Nagar Parishad‟s role in this sector is limited to the provision of providing basic
services and catalysing involvement of other departments. Availability of land is a necessity in this
sector for which Tehsil office should be consulted.
Exhibit 8-36 Education Sector: Responsible Agencies Immediate measures to be taken Authorities/Agencies responsible
Finalising the sub projects to be undertaken Nasrullahganj Nagar Parishad and Dept of Education, GoMP
Preparation of DPR for finalised projects Nasrullahganj Nagar Parishad and Dept of Education, GoMP
Submission of DPR to funding agency Nasrullahganj Nagar Parishad and Dept of Education, GoMP
8.2.10. Other Social Infrastructure – Recreation Sector Goal
“To provide a universal access to quality recreational infrastructure to improve the overall
quality of life in Nasrullahganj”
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-37.
Exhibit 8-37 Other Social Infrastructures: Achievement Targets Sector Components 2015 2025 2035
Other Social
Infrastructure
– Recreation
Developed existing parks Yes Yes Yes
Area coverage under
recreational facilities
15% of town area
(as per UDPFI)
15% of town area
(as per UDPFI)
15% of town area
(as per UDPFI)
Playing facilities Play grounds Play grounds Play grounds
Provision for green-belts in
future development plans Yes Yes Yes
Sufficient infrastructure at
mela /exhibition ground Yes Yes Yes
City Development plan for Nasrullahganj 81
Strategies to achieve the Sector Goals
The core strategy adopted in this sector focuses on the development of socio-cultural facilities which
help in elevating overall quality of life in Nasrullahganj Nagar Parishad. Some of the key facilities
considered under this approach are community rooms, community hall, library, recreational club,
parks, sport complex. Nagar Parishad may also encourage public private partnership in this area for
maintenance of buildings and infrastructure.
Action Plan following the Strategies and Projects Envisaged
Exhibit 8-38 presents the broad action plans being proposed to address the gaps identified in the
existing levels
Exhibit 8-38 Other Social Infrastructure Long Term and Short Term Interventions Sector
Interventions
Required
Allocation and Identification of land
Land acquisition
Upgradation of existing facilities
Expected
Outcome
Improved quality of life
Improved access to the recreational facilities
Considering the stakeholders view and standard guidelines, following projects have been proposed in
the town:
1. Community Rooms: At present Nasrullahganj has one community hall but the infrastructure
provision of the same has to be revamped.
2. Parks: The vacant land in the city should be identified and developed as parks to serve the dual
purpose of increasing the green cover in the city and provide citizens with open spaces for
recreation.
Exhibit 8-39 Other Social Infrastructure: Responsible Agencies Immediate measures to be taken Authorities/Agencies responsible
Finalising the sub projects to be undertaken Nasrullahganj Nagar Parishad
Preparation of DPR for finalised projects Nasrullahganj Nagar Parishad
Submission of DPR to funding agency Nasrullahganj Nagar Parishad
8.2.11. Environment Sector Goals
“To accomplish clean, green and safe living environment for all citizens”
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided below. These areas have been identified on the basis of workshops, consultations and
review of best practices in the sector.
Pollution Sources; Air, Water, Soil and Noise
Demand / Supply side control
Strategies to achieve the Sector Goals
For retaining the healthy status of Nasrullahganj‟s urban environment, several planning and
conservation initiatives need to be taken. This could be achieved through the proper zoning of
activities, provision for sufficient breathing space in new development and adoption of proper
landscape design practices at the city level. It is also important to promote conservation in the region
City Development plan for Nasrullahganj 82
consciously. There should be a clear-cut strategy to conserve and protect the physical environment,
including rivers and natural drains in and around Nasrullahganj Nagar Parishad. It is important to
weigh the environmental impact of the new programs or development schemes. Lately, a large
number of unauthorized layouts have come up in the city, near to the city‟s fringes or in fringe areas. It
is important to devise a plan, which can check the growth of these unauthorized developments,
especially within the city‟s precincts. Lake and River conservation should also be explored with the
possibilities of reviving lakes as water sources or points of interest in the city.
Action Plan following the Strategies and Projects Envisaged
This section discusses various aspects of urban environment and their addressing by the projects
proposed in other urban services. In addition to this, some projects are also proposed with specific
focus on improving the quality of environment.
1. Air Quality: Periodic monitoring and review is essential to check air quality. To create awareness
amongst user groups, the status of air pollution may be revealed through display systems
instituted at major locations in the city. Suitable plantations or green cover should be provided on
major routes to supplement better air quality. This would partially be addressed by the
development of Parks in the town and a massive tree plantation drive.
2. Water Pollution: Efforts/schemes should be designed to check the diversion of sewage flow into
major Nallah through appropriately located sewage treatment plants. Considering the issues
related to the demand for treating large amounts of sewage generated in Nasrullahganj,
decentralized sewage treatment is recommended. This aspect would be addressed by the
development and upgradation of Sewerage & Sanitation facilities, Storm water drainage
infrastructure and strengthening of solid waste collection/transportation system.
3. Development of a Regional Plan: To ensure sustainable development with optimum resource
utilization, it may be necessary to develop a Nasrullahganj Regional Plan or Master Plan. For
maintenance of open space, the planning authority at the regional level should prepare a detailed
inventory of the space and explore its probable multiple uses or forms for recreation and visual
pleasure. Possibilities to include the private sector for maintenance of these areas should be
explored.
8.2.12. Economic Development Sector Goals
“Sustainable economic development on the basis of inherent strengths of the city through
promotion of health, education, tourism and industrial sectors – focus on local employment
opportunities”
Strategies to achieve the Sector Goals
The town economy is predominantly agrarian in nature with majority of the workers engaged in
primary sector activities and educated youths migrate out of city for employment opportunity. The
town lacks a sound economic activity base. The weak town economy has also resulted in the brain-
drain which in turn affects the town‟s economy. Resources should be mobilised to provide support to
boost the local economy. Measures should be taken to establish small and medium scale industries.
Special care needs to be taken for women employment and education. In a nutshell, following
strategies need to be adopted for sustainable economic development:
Incentivizing agriculture,
City Development plan for Nasrullahganj 83
Strengthening the markets,
Improving transportation infrastructure,
Bringing Nasrullahganj on Railways Map of India,
Promoting small & medium scale industries.
Action Plan following the Strategies
Exhibit 8-40 presents the broad action plans being proposed to address the gaps identified in the
existing levels.
Exhibit 8-40 Economic Development Long Term and Short Term Interventions
Sector
Interventions
Required
Rejuvenation of trade and commerce
Development of an industrial area
Promotional activities to showcase Nasrullahganj‟s potential
Expected
Outcome
New employment opportunities
Improved average income and access to better facilities
Projects Envisaged
For promoting economic development of the town, following projects have been envisaged for
Nasrullahganj.
1. Development of Commercial Areas: This can further be achieved by development of new
commercial areas and up gradation of existing commercial areas. New commercial areas can
include dedicated markets for important commodities or general markets. In addition to the
development of new markets, existing markets can be upgraded to increase their capacity and
provide better services to the users and customers.
2. Development of Industrial Area for Small & Medium scale industries: With the objective of
diversifying the economic base of Nasrullahganj Town, an industrial park for small & medium
scale industries should be developed. A land should be identified either within the municipal limits
or near to the city boundary and proposal should be sent to the appropriate authorities for the
same. This would thrust to the employment generation activities result into the overall upliftment
of the society.
3. Redevelopment of Hawkers Zone: The hawker‟s zone in city is not organized. The Hawkers
zone would dedicate space to the hawkers and hence reducing congestion on the city roads,
making waste collection easier and making it easier for customers to shop.
Exhibit 8-41 Economic Development: Implementation Agencies
Immediate measures to be taken Authorities/Agencies responsible
Finalising the sub projects to be undertaken Nasrullahganj Nagar Parishad
Preparation of DPR for finalised projects Nasrullahganj Nagar Parishad
Submission of DPR to funding agency Nasrullahganj Nagar Parishad
8.2.13. Urban Governance Sector Goals
“Well managed city with proactive and proficient staff”
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are:
City Development plan for Nasrullahganj 84
Exhibit 8-42 Urban Governance: Achievement Targets
Achievement Target 2015 2025 2035
Decentralization of urban functions to local bodies 100% 100% 100%
Establish clarity of roles and responsibilities. 100% 100% 100%
Training to enhance capacity building. 100% 100% 100%
People‟s Participation in Governance 50% 80% 100%
Strategies to achieve the Sector Goals
The decentralization of urban functions to local bodies has increased their responsibilities manifold.
For the prescribed level of service delivery, Nasrullahganj Nagar Parishad should take concerted
actions to augment the capacity, wherever necessary, and enable existing staff to perform efficiently
by providing them with necessary training. E-governance will be very helpful in smoothening various
process & procedures. It will also lead to an expeditious service delivery.
Action Plan following the Strategies and Projects Envisaged
Following is the list of the projects that Nasrullahganj Nagar Parishad should take to improve urban
governance in Nasrullahganj.
1. Computerization: Nasrullahganj Nagar Parishad should initiate the process of computerization in
its administration. Computerization will benefit most of its functions ranging from municipal
accounting to tax management. The introduction of E-Governance will help in smoothening the
processes and improvement in the efficiency.
2. Capacity Building: The procurement of computers should be supplemented by providing training
to the staff.
3. GIS Mapping: A GIS mapping of the city properties will be very helpful in the provision of efficient
services to the citizens. This would also help in keeping a tab on tax evaders.
8.3. Prioritisation of Projects based on Questionnaire Survey Result
In the second workshop conducted on December 23rd, 2011, questionnaire survey was carried out for
the formulation of city vision and sector strategies. The discussion took place with around 25
stakeholders who included, CMO, Adshyakha and other eminent people of the city. The questionnaire
consisted questions pertaining to the level of city infrastructure such as water supply, road, sewerage,
college, hospitals, mode for economic development, overall quality of life in city, vision in their opinion
for the city. Each sector status was discussed in detail and their view on sector development was
taken.
8.3.1. Methodology for Questionnaire Survey Sample Set for the Interview
Around 25 stakeholders participated in the workshop and care was taken that representation from
various sector be present during the survey. Stakeholders consisted of senior Government officials
like CMO of Nagar Parishad, Elected Body head – Adhyaksha and Parshads (Ward Councilors),
citizens, reporters, Nagar Parishad staffs. During the town survey, verbal survey of questionnaire was
already carried out from Schools and Hospitals.
Questions for the Interview
The interview questionnaire consisted of 12 questions pertaining to sectors like main problem of the
town, sector specific questions on water supply, drainage, social infrastructure, roads, solid waste
City Development plan for Nasrullahganj 85
disposal, schools, health facility, and economic development options. Similarly 14 questions were
given ward specific. Detailed questionnaire is attached in Annexure II.
Analysis of the response
The respondents were asked to rate the problems and then answers across the respondent were
added to get the number of respondents rating a particular problem as high, medium or low. A score
was calculated for the each of the subsectors by having weighted average calculation; the most
important bucket was given the highest weight. The scores thus obtained were rank ordered in
descending order to identify the sub sectors in order of priority.
8.3.2. Ranking of the town requirement
Ranking of the town requirements and priorities as per outcome of the questionnaire survey is
presented in the exhibits below. As can be seen in the exhibits below that Sewerage, Storm Water
Drainage and Solid waste Management takes the top most priorities when it comes to need of
infrastructure development in the town. Water supply in the town comes lowest in the priority list as
there is an on-going project under construction and it is assumed that water supply infrastructure in
the town would be adequately addressed once the supply from the new project commissions.
If we talk of priorities within particular sectors, currently within social infrastructure, Government
hospital facilities need to be enhanced followed with development of new markets. It is felt that
blocked drains are a major cause for non-performing drainage infrastructure which is also
complimented by road encroachment which is a major traffic concern. Talking of water supply in the
town, currently, insufficient water supply and poor quality of water are priority concerns, though it is
believed that the project in pipeline would address these to satisfaction.
Exhibit 8-43 Sector Priorities of Nasrullahganj
Main Problems RANK
Sewerage facility 1
Storm Water Drainage facility 2
Solid Waste 3
Health Facility 4
Road surface Condition 5
Parks 6
Education Facility 6
Road Network 8
Availability of water 9
Source: IMaCS Analysis
Exhibit 8-44 Rank-wise Issues in Water Supply
Water related problems RANK
Supply Hours 1
Water quality 2
Availability of water 3
Cost 4
others 5
Source: IMaCS Analysis
City Development plan for Nasrullahganj 86
Exhibit 8-45 Rank-wise Issues in Storm Water Drainage
Storm Water Drainage related problems RANK
Blocked Drains 1
Encroachments 2
Open Drains 3
Coverage 4
others 5
Source: IMaCS Analysis
Exhibit 8-46 Rank-wise Issues in Transportation
Transportation related problems RANK
Encroachments 1
Road Width 2
Parking 3
Coverage 4
others 5
Source: IMaCS Analysis
Exhibit 8-47 Rank-wise Issues in Solid Waste Management
SWM related problems RANK
Shortage of Collection Vehicles 1
Shortage of Landfill Site 2
Collection 3
Cleanliness of Roads 4
Others 5
Source: IMaCS Analysis
Exhibit 8-48 Rank-wise Issues in Educational Facilities
Educational Facilities related problems RANK
Basic Facility in schools 1
Girls‟ Schools 2
Degree college 3
High school 4
Shortage of Preliminary schools 5
Source: IMaCS Analysis
Exhibit 8-49 Rank-wise Issues in Health Facilities
Health Facilities related problems RANK
Government Hospitals 1
Dispensaries 2
City Development plan for Nasrullahganj 87
Health Facilities related problems RANK
Primary Health Centre 3
Others 4
Source: IMaCS Analysis
Exhibit 8-50 Rank-wise Issues in Social Infrastructure
Social Infrastructure related problems RANK
Market 1
Hotel/Restaurants 2
Parks 3
Street Shops 4
Movie Hall 5
Playground/Stadium 6
Source: IMaCS Analysis
8.4. Conclusion
This chapter dealt with the city vision, sector goals and sector strategies to achieve sector goals. The
discussion on sector strategies was followed by the identification of interventions required in every
sector. This was followed by the identification of projects and project implementation agencies.
City Development plan for Nasrullahganj 88
9. CITY INVESTMENT PLAN
To achieve the formulated vision of Nasrullahganj, a City Investment Plan (CIP) has been prepared
through a comprehensive process of assessment of gaps in physical and social infrastructure sectors,
which includes with the various rounds of the public consultations. This assessment has led to the
identification of sector specific strategies, implementation actions and associated reforms with specific
inputs from stakeholders.
The strategies adopted primarily have three dimensions; improving the service delivery by efficiency
measures, improving service delivery by creating infrastructure assets and improving the governance
aspects of Nasrullahganj Nagar Parishad. This section summarizes the capital investments required
for creating infrastructure assets and various strategic interventions required in the implementation of
such projects; these strategies are both investments oriented and administrative oriented.
9.1. City Investment Plan (CIP)
The City Investment Plan is a multi-year scheduling of identified and prioritized investments. The
scheduling or phasing of the plan is based on the assessment of fiscal resources‟ availability (for new
investments and O&M), technical capacity for construction and O&M, and the choice of specific
improvements to be carried out by 2015.
The need for the CIP is on account of:
City growth and infrastructure needs (to be carried out once every five years);
Scheduling of investments of ongoing projects due to cost and/ or time overruns;
Assigning of priorities within the constraints of available financial resources.
9.2. Institutionalizing the CIP Process
The City Investment Plan is an important element and is significant in terms of the city‟s management
process and sustainability with regard to the delivery of basic services. The CIP will also provide a
framework for the annual budget cycle of Nasrullahganj Nagar Parishad for the next five years. As a
part of Nasrullahganj CDP, CIP includes the following:
The desired service levels/ standards for infrastructure provision;
Identified the roles and responsibilities of various stakeholders in the implementation of
identified projects;
Project phasing and strategies for implementation.
In Nasrullahganj, Nasrullahganj Nagar Parishad has the primary responsibility of delivering municipal
services. So the CDP proposals will have to be implemented by the Nagar Parishad. The projects,
prioritization, investment phasing, strategies and action plan are framed accordingly.
The CIP involved the identification of public facilities to cater demand of the city populace in the years
2015, 2025 and 2035. The projects have been identified through a demand-gap analysis for various
urban services. Identification of projects was followed by their prioritization based on the stakeholder‟s
consultation. The projects identified are aimed at ensuring the optimal and efficient utilization of
existing infrastructure systems and enhancing the capacity of the systems/services to cater to the
demands of future population. In addition to the projects which are related to major urban services,
CIP also includes developmental projects like greenery development, parking spaces, system
modernization etc.
City Development plan for Nasrullahganj 89
The CIP and forecasted future needs for provision of capital facilities under each identified sector is
presented below. These assets will help Nasrullahganj in improving the quality and coverage of
service for the current population as well as accommodate the expected increase in population. In
some of the sectors like source augmentation for water supply, development of landfill site etc, a
planning horizon of 25 years has been considered.
9.3. Summary of Investments
The total estimated capital investment required for providing efficient services to the present
population and future population of Nasrullahganj by the year 2035 is Rs. 76.24 crores at constant
prices. Of the total identified investment a total of Rs. 32.74 crores of investment has been proposed
till year 2015.
The planning horizon for the projects has been considered on the basis of demand generation in
various decades and degree of initial capital investment. Hence, some of the sectors have been
planned for the short term as well as the long term whereas some sectors have been divided into
various sub-parts in which some of the sub-parts have been planned for the long term only whereas
rest of the sub-parts have been planned for short term and long term.
The phasing of the identified projects and investments is based on the following principles.
Priority needs, with developed areas receiving priority over future development area;
Inter and intra-service linkages, viz. water supply investments shall be complemented by
corresponding sewerage/ sanitation improvements;
Size and duration of the requirements, including preparation and implementation period.
Exhibit 9-1 presents the summary of sector-wise total investment need, investments up to 2015-16,
proportions of investments required in various sectors w.r.t total investments in different horizons.
Exhibit 9-1 Summary of Investments required
Sectors
Investment by 2015 Total Investment % of
Investment
till 2015
w.r.t 2035
(Rs. lakhs)
% w.r.t.
total till
2015
(Rs. lakhs)
% w.r.t.
total till
2035
1 Water Supply 987.29 26.70% 1,227.96 16.11% 80%
2 Sewerage & Sanitation 400.71 10.84% 501.62 6.58% 80%
3 Roads & Urban Transport 560.17 15.15% 1,495.16 19.61% 37%
4 Storm Water Drains 481.91 13.03% 1,164.42 15.27% 41%
5 Street Lights 99.75 2.70% 192.2 2.52% 52%
6 Solid Waste Management 37.98 1.03% 199.60 2.62% 19%
7 Urban Poor/ Slums 621.25 16.80% 621.25 8.15% 100%
8 Health Infrastructure 244.00 6.60% 1,079.50 14.16% 23%
9 Education 195.00 5.27% 975.00 12.79% 20%
10 Socio-Cultural Facilities 22 0.60% 88 1.15% 25%
11 Urban Environment 35.00 0.95% 60.00 0.79% 58%
12 Urban Governance 12 0.32% 20 0.26% 60%
Total Investment 3,697.06 100.00% 7,624.71 100.00% 48%
Source: IMaCS Analysis
City Development plan for Nasrullahganj 90
As can be observed from Exhibit 9-1, a total 48% of the total identified investment need is proposed
for funding by 2015 Within the total investment proposed by 2015 for Nasrullahganj Nagar Parishad,
maximum share has been taken by the Water Supply at more than 26 % . Roads and Transport and
storm water drains at 15% and 13% respectively. Health sector envisaged the investment at 6.6 %.
Housing for Urban Poor accounts for 16.8 % of the total investment, while Sewerage and sanitation
accounts for 10.84 % of the investment.
Subsequent sections provide an investment snapshot for each of the sectors followed by the detailing
for Priority needs and Long Term needs. Discussion on Investment is followed by an Action plan for
the implementation of projects in the short term i.e. for a period of five years from year 2011 to 2015
Investments in different time-periods for various sectors are provided in subsequent sections. The
investments have been estimated for three terms, namely:
1. Short Term (Year 2011 to Year 2015)
2. Medium Term (Year 2016 to Year 2025)
3. Long Term (Year 2026 to Year 2035)
9.4. Capital needs/ investments – Physical Infrastructure
9.4.1. Water Supply
To meet the formulated sector goal with satisfactory level of service indicators, the sector would
require an investment of Rs 1227.96 Lakhs i.e. around 16.11 % of total investment estimated under
City Investment Plan as shown in Exhibit 9-1.
Investment Snapshot
A sector wise investment plan was devised for the Water Supply considering the demand arising in
the short, medium and long terms. The short term is being defined as a planning horizon of 5 years
from year 2011 to 2015 whereas medium term and long term are being considered as 10 years from
year 2015 to 2025 and year 2025 to 2035 respectively. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-2.
Exhibit 9-2 Investment Snapshot: Water Supply
Nasrullahganj Nagar Parishad
Costing
Short
Term
Long
Term
Total
Term
Component
w.r.t sector
Investment
Rs. Lakhs Rs. Lakhs Rs. Lakhs
Water Supply 987.31 240.67 1,227.96
1 Source Augmentation 180.46 - 180.46 14.70%
2 Treatment capacity 487.37 111.61 598.97 48.78%
3 Distribution Network 217.90 78.44 296.34 24.13%
4 Elevated Storage capacity w.r.t Supply 61.60 34.72 96.32 7.84%
5 Refurbishment of Old Distribution Network 39.98 15.90 55.87 4.55%
Source: IMaCS Analysis
Water sector needs a total investment of Rs 1227.96 Lakhs in three phases by year 2035. In the
short term, this sector would require an investment of Rs 987.31 Lakhs whereas in the long term,
investments of Rs 240.67 Lakhs would be required.
City Development plan for Nasrullahganj 91
Long term needs (2035)
The total investment need for water sector by year 2035 is estimated at Rs. 1227.96 lakhs. However,
the gaps in the system are to be filled in phases in line with the quantum of population addition. The
investment requirement in the various components of Water Supply infrastructure and its proportion
with respect to the investment required in the sector is being presented in Exhibit 9-2. The laying of
distribution in the town accounts for the maximum share in the investment identified.
Priority Needs (2015)
As evident from the Exhibit 9-2, Nasrullahganj requires an investment of Rs 987.31 Lakhs in the short
term which is around 80 % of the total investment identified in this sector. In the short term,
investment in the components like Source Augmentation, Raw Water Main pipeline and Clear Water
Main component has been proposed considering demand arising in the longer term. The investment
requirement in the various components of Water Supply infrastructure in the short term is being
presented in Exhibit 9-2.
Action Plan for Implementation (2011-12 to 2015-16)
This section discusses a yearly action plan for the capital investment proposed in the short term.
Action plan has been devised considering the phasing of short term investment over a period of 5
years.
The Action Plan, as shown in Exhibit 9-3, also discusses about various Support & System
Sustenance measures, Action Measures, Sector Notes and Performance Monitoring Indicators.
Exhibit 9-3 Action Plan for Implementation: Water Supply Water Supply 12-13 13-14 14-15 15-16
Consolidated Yearly Investment (Rs Lakhs) 190.35 296.19 405.60 95.16
Capital
Facilities
Source Augmentation
Treatment capacity
Distribution Network
Elevated Storage capacity
Improve collections to reach 85%
collection efficiency by 2015-16
Rationalization of Water Charges
Action
Measures
The Nagar Parishad would have to develop a comprehensive watershed
management plan for the city including details of groundwater availability, use,
potential for increasing the water drawn from the available ground water source of the
town.
Identify the areas hitherto not covered by water distribution network and develop a
comprehensive plan for providing water supply to these areas.
Increase the number of domestic connections
Reserve land for zones that are good for water recharge and water conservation
Sector Notes Capital investments on system refurbishment and replacement shall happen only
after conducting water audit and identification of Non-Revenue Water (NRW) sources
Improvement of collection efficiency is applicable to both arrears and current demand
Performance
Monitoring
Indicators
Daily per capita water supply (min of 135 lpcd)
Elevated storage capacity w.r.t supply (33%)
Distribution network reach as % of road length (min 85%)
City Development plan for Nasrullahganj 92
Water Supply 12-13 13-14 14-15 15-16
System coverage – % of PT assessments (min 85%)
Cost recovery through user charges (100% O&M expenses)
9.4.2. Sewerage and Sanitation
To meet the formulated sector goal with satisfactory level of service indicators, the sector would
require an investment of Rs 501.62 Lakhs i.e. around 6.58 % of total investment estimated under City
Investment Plan as shown in Exhibit 9-1.
Investment Snapshot
A sector wise investment plan was devised for the Sewerage & Sanitation considering the demand
arising in the short, medium and long terms. The infrastructural requirements of a sector have been
classified into various components for which cost estimates are provided in Exhibit 9-4.
Exhibit 9-4 Investment Snapshot: Sewerage & Sanitation
Nasrullahganj Nagar Parishad
Costing
Short
Term
Long
Term
Total
Term
Component
w.r.t sector
Investment
Sewerage and Sanitation Rs. Lakhs Rs. Lakhs Rs. Lakhs
400.7 100.92 501.62
1 Under Ground Drainage Network 336.60 83.06 419.66 83.66%
2 Treatment Capacity 61.05 17.86 78.91 15.73%
3 Pub. Convenience for Floating Pop Sanitation Facilities 3.05 - 3.05 0.61%
Source: IMaCS Analysis
Sewerage & Sanitation sector needs a total investment of Rs 501.62 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 400.70 Lakhs whereas in the
long term Rs 100.92 Lakhs would be required.
Long term needs (2035)
The total investment need for Sewerage & Sanitation sector by year 2035 is estimated at Rs. 501.62
lakhs. However, the gaps in the system are to be filled in phases in line with the quantum of
population addition. The investment requirement in the various components of Sewerage & Sanitation
infrastructure and its proportion with respect to the investment required in the sector is being
presented in Exhibit 9-4.
Priority Needs (2015)
As evident from the Error! Reference source not found., Nasrullahganj requires an investment of
Rs 400.71 Lakhs in the short term which is around 80% of the total investment identified in this sector.
In the short term, investment in building the treatment capacity component has been proposed
considering demand arising in the medium term. The investment requirement in the various
components of Sewerage & Sanitation infrastructure in the short term is being presented in Exhibit
9-4.
Action Plan for Implementation (2012 to 2015)
This section discusses a yearly action plan for the capital investment proposed in the short term.
Action plan has been devised considering the phasing of short term investment over a period of 5
City Development plan for Nasrullahganj 93
years. The Action Plan, as shown in Exhibit 9-5, also discusses about various Support & System
Sustenance measures, Action Measures, Sector Notes and Performance Monitoring Indicators.
Exhibit 9-5 Action Plan for Implementation: Sewerage and Sanitation Sewerage System/ UGD 12-13 13-14 14-15 15-16
Consolidated Yearly Investment (Rs Lakhs) 140.25 140.25 120.21
Capital
Facilities
UGD Network
Treatment Capacity
Public Convenience Seats
Support &
System
Sustenance
Measures
Ensure every house tax assessment &
water connection is also connected to
the UGD
Improve collections to reach 85%
collection efficiency by 2015
Action
Measures
Development of a DPR for laying of UGD system in the town
Eradicate the conditions which give rise to conditions of malaria and other water borne
diseases.
Ensure access of sanitary facilities to the slum dwellers
Isolate sewerage system from storm water and drinking water channels
9.4.3. Solid Waste Management System
To meet the formulated sector goal with satisfactory level of service indicators, the sector would
require an investment of Rs 37.98 Lakhs i.e. around 1.03 % of total investment estimated under City
Investment Plan as shown in Exhibit 9-1.
Investment Snapshot
A sector wise investment plan was devised for the Solid Waste Management sector considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-6.
Exhibit 9-6 Investment Snapshot: Solid Waste Management
Nasrullahganj Nagar Parishad
Costing
Short Term Medium
Term Long Term
Total
Term
Component
w.r.t sector
Investment
Solid Waste Management Rs. Lakhs Rs. Lakhs Rs. Lakhs Rs. Lakhs
37.98 91.72 69.90 199.60
1 Primary Collection
1 Wheel Barrow/Hand Carts 0.50 0.31 0.38 1.19 0.60%
2 Tricycles
3 Community Bins (Dust bins) 1.97 - - 1.97 0.99%
2 Vehicles
Tractor Trolley 10.00 10.00 10.00 30.00 15.03%
3 Disposal Site
4 Land Fill Infrastructure (as per
CPHEEO Standards) 22.72 72.49 52.99 148.19 74.24%
5 Composting Plant 2.80 8.93 6.52 18.25 9.14%
Source: IMaCS Analysis
City Development plan for Nasrullahganj 94
Solid Waste Management sector needs a total investment of Rs 199 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 37.98 Lakhs whereas in the
medium term and long term Rs 91.72 Lakhs and Rs 69.90 Lakhs would be required respectively.
Long term needs (2035)
The total investment need for Solid Waste Management sector by year 2035 is estimated at Rs. 69.90
lakhs. However, the gaps in the system are to be filled in phases in line with the quantum of
population addition. The investment requirement in the various components of Solid Waste
Management infrastructure and its proportion with respect to the investment required in the sector is
being presented in Exhibit 9-6.
Priority Needs (2015)
As evident from the Error! Reference source not found., Nasrullahganj requires an investment of
Rs 37.98 Lakhs in the short term which is around 19 % of the total investment identified in this sector.
In the short term, strengthening of Loading & Transportation infrastructure and Landfill site
infrastructure should be dealt properly to achieve the desired service levels. The investment
requirement in the various components of Solid Waste Management in the short term is being
presented in Exhibit 9-6.
Action Plan for Implementation (2011-12 to 2015-16)
This section discusses a yearly action plan for the capital investment proposed in the short term.
Action plan has been devised considering the phasing of short term investment over a period of 5
years. The Action Plan, as shown in Exhibit 9-7, also discusses about various Support & System
Sustenance measures, Action Measures, Sector Notes and Performance Monitoring Indicators.
Exhibit 9-7 Action Plan for Implementation: Solid Waste Management Solid Waste Management 12-13 13-14 14-15 15-16
Consolidated Yearly Investment (Rs Lakhs) 9.50 12.02 12.64 3.83
Capital
Facilities
Acquisition of new vehicles for primary
collection
Community and Container Bins
Land fill infrastructure and composting
facility development at disposal site
Support &
System
Sustenance
Measures
Implementation of complete door -to-
door collection
Awareness campaign on source
segregation
Other actions/
Measures
Increase the ambit of Solid Waste Management to include “recycling” and to
facilitate and regulate the sector accordingly.
Ensure optimum utilization of existing fleet
I-E-C campaigns to be initiated for awareness among the urban poor and slum
dwellers towards better SWM practices
Initiate steps towards sharing the responsibility of primary collection of segregated
garbage with citizens
Develop transfer stations in a scientific, eco-friendly manner – processing waste at
these sites, for different types of material
Develop decentralized waste processing sites at each zone- appropriate
City Development plan for Nasrullahganj 95
Solid Waste Management 12-13 13-14 14-15 15-16
technologies
Improve and ensure access to sanitary facilities for the urban poor and slum
dwellers.
Sector Notes
Nasrullahganj Nagar Parishad shall be the prime implementing agency for the sector
For establishment of Intermediate Transfer Stations to reduce cost of transportation,
identify sites which are cost effective
Identify localized/ decentralised locations for processing/ disposal/ reuse of bio-
degradable and plastic waste
Performance
Monitoring
Indicators
Source segregation – reduction of waste to be collected (min 70 % of waste
generated)
Door-to-door collection as % of households covered (min 80%)
Optimum fleet utilisation (No. of trips/ vehicle/ day - average minimum of 2.5)
Vehicle capacity as % of rated capacity to waste generated (minimum 100%)
9.4.4. Drainage
To meet the formulated sector goal with satisfactory level of service indicators, the sector would
require an investment of Rs1,164.2 Lakhs i.e. around 37% of total investment estimated under City
Investment Plan as shown in Exhibit 9-1.
Investment Snapshot
A sector wise investment plan was devised for the Storm Water Drainage sector considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-8.
Exhibit 9-8 Investment Snapshot: Storm Water Drainage
Nasrullahganj Nagar
Parishad
Costing
Short Term Medium
Term Long Term Total Term
Component
w.r.t sector
Investment
Storm Water Drains Rs. Lakhs Rs. Lakhs Rs. Lakhs Rs. Lakhs
481.91 329.55 352.96 1,164.42
1 Strengthening of
Natural Drains 175.00 175.00 175.00 525.00 45.09 %
2 Upgradation
i Kutcha to Pucca
Open 18.96 - - 18.96 1.63 %
ii Kutcha to Pucca
Closed 237.10 - - 237.10 20.36 %
iii
Pucca Open to
Pucca Closed 10.17 - - 10.17 0.87 %
3 New Constructions
i Pucca Open
Drains 40.68 43.68 50.30 134.66 11.56 %
ii Pucca Closed
Drains - 110.86 127.66 238.53 20.48 %
Source: IMaCS Analysis
City Development plan for Nasrullahganj 96
Storm Water Drainage sector needs a total investment of Rs 1,164.42 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 481.91 Lakhs whereas in the
medium term and long term Rs 329.55 Lakhs and Rs 352.96 Lakhs would be required respectively.
Long term needs (2035)
The total investment need for Storm Water Drainage sector by year 2035 is estimated at Rs. 1,164.42
lakhs. However, the gaps in the system are to be filled in phases in line with augmentation of Road
network. The investment requirement in the various components of Storm Water Drainage
infrastructure and its proportion with respect to the investment required in the sector is being
presented in Exhibit 9-8.
Priority Needs (2015)
As evident from the Exhibit 9-8, Nasrullahganj requires an investment of Rs 481.91 Lakhs in the short
term which is around 41 % of the total investment identified in this sector. In the short term, Kutcha
drains should be upgraded and new drains should be constructed with a special focus on the desilting
of natural drains. The investment requirement in the various components of Storm Water Drainage in
the short term is being presented in Exhibit 9-8.
Action Plan for Implementation (2012 to 2015)
This section discusses a yearly action plan for the capital investment proposed in the short term.
Action plan has been devised considering the phasing of short term investment over a period of 5
years. The Action Plan, as shown in Exhibit 9-9, also discusses about various Support & System
Sustenance measures, Action Measures, Sector Notes and Performance Monitoring Indicators.
Exhibit 9-9 Action Plan for Implementation: Storm Water Drainage Storm Water Drainage 12-13 13-14 14-15 15-16
Consolidated Yearly Investment (Rs Lakhs) 43.75 107.29 159.92 170.95
Capital
Facilities
Drains Upgradation
Drains New Formation
Desilting & Strengthening of Primary
Drains
Support &
System
Sustenance
Measures
Ensure that every divided road to have
closed drains on either side and
undivided roads have drains on at
least one side
Action
Measures
Preparation of DPR for augmentation of storm water system in the town
Isolate sewerage system from drinking water and storm water lines
Identify, delineate, sanitize and protect the natural drainage system of the city
Sector Notes Improve drainage network on a priority basis in flood prone areas
All new roads to be designed shall have adequate provision for storm water drains.
Constructing new drains shall be integrated with the new roads development
Performance
Monitoring
Indicators
Drainage network should 130% of road length
All divided roads to have drains on either side and undivided roads on at least one
side
Drains to be cleaned before and after monsoon for better functioning
City Development plan for Nasrullahganj 97
9.4.5. Traffic and Transportation
To meet the formulated sector goal with satisfactory level of service indicators, the sector would
require an investment of Rs. 1,495 Lakhs i.e. around 19.61 % of total investment estimated under City
Investment Plan as shown in Exhibit 9-1.
Investment Snapshot
A sector wise investment plan was devised for the Solid Waste Management sector considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-10.
Exhibit 9-10 Investment Snapshot: Traffic & Transportation
Nasrullahganj Nagar Parishad
Costing
Short
Term
Medium
Term Long Term Total Term
Component
w.r.t sector
Investment
Urban Roads, Transport & Traffic Rs. Lakhs Rs. Lakhs Rs. Lakhs Rs. Lakhs
560.17 448.64 486.34 1,495.16
1 Upgradation (Kutcha to Pucca) 195.00 16.03 18.46 229.49 15.35%
2 New Formation (Pucca Roads) 170.17 192.34 221.49 584.00 39.06%
3 Widening/ Strengthening 90.00 58.77 37.40 186.17 12.45%
4 Development of Bus & Truck
Terminus 25.00 16.50 19.00 60.50 4.05%
5 Land Acquisition 80.00 165.00 190.00 435.00 29.09%
Source: IMaCS Analysis
Traffic & Transportation sector needs a total investment of Rs 1,495 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 560 Lakhs whereas in the
medium term and long term Rs 4,48 Lakhs and Rs 486 Lakhs would be required respectively.
Long term needs (2035)
The total investment need for Traffic & Transportation sector by year 2035 is estimated at Rs. 1,495
lakhs. However, the gaps in the system are to be filled in phases in line with the quantum of
population addition. The investment requirement in the various components of Traffic &
Transportation infrastructure and its proportion with respect to the investment required in the sector is
being presented in Exhibit 9-10.
Priority Needs (2015)
As evident from the Exhibit 9-10, Nasrullahganj requires an investment of Rs. 560 Lakhs in the short
term which is around 37% of the total investment identified in this sector. In the short term, apart from
carrying out the usual tasks related to roads construction and upgradation, construction of flyovers in
the town at various locations and development of Bus and truck terminus is also to be carried out. The
investment requirement in the various components of Traffic & Transportation in the short term is
being presented in Exhibit 9-10.
Action Plan for Implementation (2012 to 2015)
This section discusses a yearly action plan for the capital investment proposed in the short term.
Action plan has been devised considering the phasing of short term investment over a period of 5
years.
City Development plan for Nasrullahganj 98
The Action Plan, as shown in Exhibit 9-11, also discusses about various Support & System
Sustenance measures, Action Measures, Sector Notes and Performance Monitoring Indicators.
Exhibit 9-11 Action Plan for Implementation: Traffic & Transportation Traffic and Transportation 12-13 13-14 14-15 15-16
Consolidated Yearly Investment (Rs Lakhs) 72.03 81.03 141.05 176.06
Capital Facilities Roads Upgradation
Roads New Formation
Development of Bus &
Truck Terminus
Action Measures Identification of earthen roads which need to be upgraded to BT/CC
Improve connectivity within the Municipal area
Provide parking lots and introduce parking fee
Provide for footpaths on the existing and yet to be developed roads
Construction of flyovers at various locations in town
Development of Parking space
Development of Bus and Truck Terminals
Sector Notes The design of the new roads should have provision for shoulder, foot paths,
utility ducts and storm water drains under the foot paths.
New roads development shall be integrated with the drain construction (i.e. for
any new road drainage facility to be planned and constructed alongside)
Performance
Monitoring
Indicators
Road condition - % municipal roads surfaced (100% - CC/ BT surfacing)
9.4.6. Street Lighting and Fire Fighting
To meet the formulated sector goal with satisfactory level of service indicators, the sector would
require an investment of Rs 199.60 Lakhs i.e. around 2.62% of total investment estimated under City
Investment Plan as shown in Exhibit 9-1.
Investment Snapshot
A sector wise investment plan was devised for the Street Lighting sector considering the demand
arising in the short, medium and long terms. The infrastructural requirements of a sector have been
classified into various components for which cost estimates are provided in Exhibit 9-12.
Exhibit 9-12 Investment Snapshot: Street Lighting & Fire Fighting
Nasrullahganj Nagar Parishad
Costing
Short Term Medium
Term Long Term
Total
Term
Component
w.r.t sector
Investment
Street Lighting Rs. Lakhs Rs. Lakhs Rs. Lakhs Rs. Lakhs
99.75 40.42 52.04 192.21
1 New Installation
i Tube Light 58.50 20.00 23.10 101.60 52.86%
ii High Power - 3.02 6.29 9.31 4.84%
2 Underground Cabling
(Replacement and new) 41.25 17.40 22.65 81.30 42.30%
City Development plan for Nasrullahganj 99
Source: IMaCS Analysis
Street Lighting & Fire Fighting sector needs a total investment of Rs 192.21 Lakhs in three phases by
year 2035. In the short term, this sector would require an investment of Rs 99.75 Lakhs whereas in
the medium term and long term, investments totaling to Rs 40.42 Lakhs and Rs 52.04 Lakhs would be
required.
Long term needs (2035)
The total investment need for Street Lighting & Fire Fighting sector by year 2035 is estimated at Rs.
192.21 lakhs. However, the gaps in the system are proposed to be filled in phases in line with the
area being developed and quantum of population addition. The investment requirement in the various
components of Street Lighting & Fire Fighting infrastructure and its proportion with respect to the
investment required in the sector is being presented in Exhibit 9-12.
Priority Needs (2015)
As evident from the Exhibit 9-12, Nasrullahganj requires an investment of Rs 99.75 Lakhs in the short
term which is around 52 % of the total investment identified in this sector. The investment requirement
in the various components of Street Lighting & Fire Fighting in the short term is being presented in
Exhibit 9-12.
Action Plan for Implementation (2011-12 to 2015-16)
This section discusses a yearly action plan for the capital investment proposed in the short term.
Action plan has been devised considering the phasing of short term investment over a period of 5
years. The Action Plan, as shown in Exhibit 9-13, also discusses about various Support & System
Sustenance measures, Action Measures, Sector Notes and Performance Monitoring Indicators.
Exhibit 9-13 Action Plan for Implementation: Street Lighting & Fire Fighting Street Lighting & Fire Fighting 12-13 13-14 14-15 15-16
Consolidated Yearly Investment (Rs Lakhs) 88.66 221.66 176.66 80.66
Capital Facilities New Installations
Underground Cabling
Fire Fighting
Action Measures Identification of roads uncovered with street lights
Equipping new roads with Street lights
Undergrounding of new and existing cables
Procurement of new fire fighting equipment
Sector Notes Cable should be laid underground
New instalments should be energy efficient
Utilization of Fire fighting equipment‟s should be properly documented
Performance
Monitoring
Indicators
Street Lighting – Average spacing between consecutive poles ( 30-35 m)
Street Lighting – Operations and Maintenance cost
Fire Fighting – Average Time taken to reach the affected site
9.5. Capital needs/ investments – Social Infrastructure
9.5.1. Health Infrastructure
To meet the formulated sector goal with satisfactory level of service indicators, the sector would
require an investment of Rs 244 Lakhs i.e. around 23 % of total investment estimated under City
Investment Plan as shown in Exhibit 9-1.
City Development plan for Nasrullahganj 100
Investment Snapshot
A sector wise investment plan was devised for the Health Infrastructure sector considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-14.
Exhibit 9-14 Investment Snapshot: Health Infrastructure
Nasrullahganj Nagar Parishad
Costing
Short Term Medium
Term Long Term Total Term
Component
w.r.t sector
Investment
Health Infrastructure Rs. Lakhs Rs. Lakhs Rs. Lakhs Rs. Lakhs
244.00 413.50 422.00 1,079.50
1 General Hospital 64.00 336.00 352.00 752.00 69.66%
2 Nursing Home 180.00 70.00 70.00 320.00 29.64%
3 Dispensary - 7.50 - 7.50 0.69%
Source: IMaCS Analysis
Health Infrastructure sectors needs a total investment of Rs 1079.50 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 244 Lakhs whereas in the
medium term and long term Rs 413.50 Lakhs and Rs 422 Lakhs would be required respectively.
Long term needs (2035)
The total investment need for Health Infrastructure sector by year 2035 is estimated at Rs. 1079
lakhs. However, the gaps in the system are proposed to be filled in phases in line with the area being
developed and quantum of population addition. The investment requirement in the various
components of Health infrastructure and its proportion with respect to the investment required in the
sector is being presented in Exhibit 9-14.
Priority Needs (2015)
As evident from the Exhibit 9-14, Nasrullahganj requires an investment of Rs 244 Lakhs in the short
term which is around 23% of the total investment identified in this sector. The investment requirement
in the various components of Health Infrastructure in the short term is being presented in Exhibit 9-14.
Action Plan for Implementation (2011-12 to 2015-16)
This section discusses a yearly action plan for the capital investment proposed in the short term.
Action plan has been devised considering the phasing of short term investment over a period of 5
years. The Action Plan, as shown in Exhibit 9-15, also discusses about various Support & System
Sustenance measures, Action Measures, Sector Notes and Performance Monitoring Indicators.
Exhibit 9-15 Action Plan for Implementation: Health Infrastructure Health Infrastructure 12-13 13-14 14-15 15-16
Consolidated Yearly Investment (Rs Lakhs) -
Capital
Facilities
General Hospital
Nursing Home
Dispensary
Action
Measures
Augmentation of Bed Capacity of the city by either developing new facilities or
upgrading the existing ones
Development of Nursing home and Dispensaries
City Development plan for Nasrullahganj 101
Health Infrastructure 12-13 13-14 14-15 15-16
Generating awareness about safe sanitation
Sector Notes Provisions should be made for the optimal utilization of health infrastructure by
tackling obstacles like shortage of power, medical staff, etc
Primary care should be given due importance
Hospital waste should be properly disposed
9.5.2. Education Infrastructure
To meet the formulated sector goal with satisfactory level of service indicators, the sector would
require an investment of Rs 975 Lakhs i.e. around 20% of total investment estimated under City
Investment Plan as shown in Exhibit 9-1.
Investment Snapshot
A sector wise investment plan was devised for the Education Infrastructure sector considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-16.
Exhibit 9-16 Investment Snapshot: Education Infrastructure
Nasrullahganj Nagar Parishad
Costing
Short
Term
Medium
Term
Long
Term
Total
Term
Component
w.r.t sector
Investment
Education Infrastructure Rs. Lakhs Rs. Lakhs Rs. Lakhs Rs. Lakhs
195.00 390.00 390.00 975.00
1 Primary 65.00 260.00 260.00 585.00 60.00%
2 Secondary 130.00 130.00 130.00 390.00 40.00%
Source: IMaCS Analysis
Education Infrastructure sectors needs a total investment of Rs 975 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 195 Lakhs whereas in the
medium term and long term, investments Rs 390 Lakhs and Rs 390 Lakhs would be required
respectively.
Long term needs (2035)
The total investment need for Education Infrastructure sector by year 2035 is estimated at Rs. 975
lakhs. However, the gaps in the system are proposed to be filled in phases in line with the area being
developed and quantum of population addition. The investment requirement in the various
components of Education infrastructure and its proportion with respect to the investment required in
the sector is being presented in Exhibit 9-16.
Priority Needs (2015)
As evident from the Exhibit 9-16, Nasrullahganj requires an investment of Rs 195 Lakhs in the short
term which is around 20% of the total investment identified in this sector. The investment requirement
in the various components of Education Infrastructure in the short term is being presented in Exhibit
9-16.
City Development plan for Nasrullahganj 102
Action Plan for Implementation (2012 to 2015)
This section discusses an yearly action plan for the capital investment proposed in the short term.
Action plan has been devised considering the phasing of short term investment over a period of 5
years. The Action Plan, as shown in Exhibit 9-17, also discusses about various Support & System
Sustenance measures, Action Measures, Sector Notes and Performance Monitoring Indicators.
Exhibit 9-17 Action Plan for Implementation: Education Infrastructure Education Infrastructure 12-13 13-14 14-15 15-16
Consolidated Yearly Investment (Rs Lakhs) 29.25 48.75 48.75 68.25
Capital
Facilities
Primary
Secondary
Action
Measures
Development of New Schools at all level
Equipping Schools with necessary Infrastructure
Complementing Education with employment opportunities
Generating awareness about education
Sector
Notes
Provisions should be made for the optimal utilization of education infrastructure by tackling
obstacles like shortage of power, staff, etc
Primary education should be given its due importance
9.5.3. Other Social Infrastructure – Recreational
To meet the formulated sector goal with satisfactory level of service indicators, the sector would
require an investment of Rs 88 Lakhs i.e. around 1.15 % of total investment estimated under City
Investment Plan as shown in Exhibit 9-1.
Investment Snapshot
A sector wise investment plan was devised for the Socio-Cultural Infrastructure considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-18.
Exhibit 9-18 Investment Snapshot: Other Social Infrastructure
Nasrullahganj Nagar Parishad
Costing
Short
Term
Medium
Term
Long
Term
Total
Term
Component w.r.t
sector Investment
Socio-Cultural Facilities Rs. Lakhs Rs. Lakhs Rs. Lakhs Rs. Lakhs
22.00 22.00 44.00 88.00 100.0%
1 Community hall And Library 10.00 10.00 20.00 40.00 54.55%
2 Recreational Club 12.00 12.00 24.00 48.00 45.45%
Source: IMaCS Analysis
Socio-Cultural Infrastructure needs a total investment of Rs 88 Lakhs in three phases by year 2035.
In the short term, this sector would require an investment of Rs 22 Lakhs whereas in the medium
term and long term Rs 22 Lakhs and Rs 44 Lakhs would be required respectively.
Long term needs (2035)
The total investment need for Socio-Cultural Infrastructure sector by year 2035 is estimated at Rs. 88
lakhs. However, the gaps in the system are proposed to be filled in phases in line with the area being
developed and quantum of population addition. The investment requirement in the various
City Development plan for Nasrullahganj 103
components of Socio-Cultural infrastructure and its proportion with respect to the investment required
in the sector is being presented in Exhibit 9-18.
Priority Needs (2015)
As evident from the Exhibit 9-18, Nasrullahganj requires an investment of Rs 22 Lakhs in the short
term which is around 63 % of the total investment identified in this sector. The investment requirement
in the various components of Socio-Cultural Infrastructure in the short term is being presented in
Exhibit 9-18.
Action Plan for Implementation (2012 to 2015)
This section discusses an yearly action plan for the capital investment proposed in the short term.
Action plan has been devised considering the phasing of short term investment over a period of 5
years. The Action Plan, as shown in Exhibit 9-19, also discusses about various Support & System
Sustenance measures, Action Measures, Sector Notes and Performance Monitoring Indicators.
Exhibit 9-19 Action Plan for Implementation: Socio-Cultural Infrastructure Socio-Cultural Infrastructure 12-13 13-14 14-15 15-16
Consolidated Yearly Investment (Rs Lakhs) 5.00 7.00 7.00 3.00
Capital
Facilities
Community hall
Playgrounds
Action
Measures
Development of Community Rooms, Community hall and a Public Library
Development of Green Spaces
Development of a Recreational Club, a Sports Complex and a Swimming Pool
Sector Notes Maintenance of these public facilities plays a crucial role in preserving the assets
A healthy socio-cultural atmosphere fosters a healthy environment for growth
Land for these facilities can be acquired under the Public Purpose
9.6. Capital needs/ investments – Environment and Tourism
9.6.1. Urban Environment
To meet the formulated sector goal, an investment of about Rs 60 Lakhs i.e. around 0.79% of total
investment estimated under City Investment Plan as shown in Exhibit 9-1.
Investment Snapshot
An investment plan was devised for the improvement of urban environment considering the future
threats in the short, medium and long terms. The initiatives have been classified under various tasks
as shown in Exhibit 9-20.
Exhibit 9-20 Investment Snapshot: Urban Environment
Nasrullahganj Nagar Parishad
Costing
Short
Term
Medium
Term)
Long
Term
Total
Term
Component
w.r.t sector
Investment
Urban Environment Rs. Lakhs Rs. Lakhs Rs. Lakhs Rs. Lakhs
35.00 17.50 7.50 60.00 100.0%
1 Preservation of Water Bodies 30.00 15.00 5.00 50.00 83.33%
2 Tree Plantation 5.00 2.50 2.50 10.00 16.67%
Source: IMaCS Analysis
City Development plan for Nasrullahganj 104
This sector needs a total investment of Rs 60 Lakhs in three phases by year 2035. In the short term,
this sector would require an investment of Rs 35 Lakhs whereas in the medium term and long term
Rs 17.50 Lakhs and Rs 7.50 Lakhs would be required respectively.
Long term needs (2035)
The total investment need for the improvement and conservation of environment by year 2035 is
estimated at Rs. 60 lakhs. The investment requirement in the various tasks shortlisted for the Urban
Environment and its proportion with respect to the investment required in the sector is being
presented in Exhibit 9-20.
Priority Needs (2015)
As evident from the Exhibit 9-20, Nasrullahganj requires an investment of Rs 35 Lakhs in the short
term which is around 58 % of the total investment identified in this sector. The investment requirement
in in the short term is being presented in Exhibit 9-20.
Action Plan for Implementation (2012 to 2015)
This section discusses a yearly action plan, as shown in Exhibit 9-21, for the capital investment
proposed in the short term. Action plan has been devised considering the phasing of short term
investment over a period of 5 years.
Exhibit 9-21 Action Plan for Implementation: Urban Environment Urban Environment 12-13 13-14 14-15 15-16
Consolidated Yearly Investment (Rs Lakhs) 10.50 10.50 10.50 3.50
Tasks
Identified
Preservation of Water Bodies
Tree Plantation
Action
Measures
Strengthening of Waste Collection and Disposal Mechanism and Waste Water
Conveyance System
Development of green spaces and tree plantation
Preservation of water bodies
9.7. Capital needs/ investments – Urban Poor and their accessibility to Basic
Services
To meet the formulated sector goal, an investment of about Rs 621.25 Lakhs i.e. 8.15 % of total
investment estimated under City Investment Plan as shown in Exhibit 9-1.
Investment Snapshot
An investment plan was devised in line with the IHSDP scheme for the provision of basic services to
the urban poor. The investment anticipated for various tasks is shown in Exhibit 9-22.
Exhibit 9-22 Investment Snapshot: Urban Poor
Nasrullahganj Nagar Parishad
Costing
Short Term Long Term Total Term Component w.r.t
sector Investment
Urban Poor/ Slums' Improvement Rs. Lakhs Rs. Lakhs Rs. Lakhs
621.25 - 621.25 100.0%
1 Slum Improvement - Rehabilitation/ Housing 546.25 - 546.25 87.93 %
a Slum Improvement- Infrastructure 75.00
75.00 12.07 %
Source: IMaCS Analysis
City Development plan for Nasrullahganj 105
Provision of basic services to the Urban Poor needs a total investment of Rs 621.25 Lakhs. It has
been assumed that identified projects will be carried out in the short term with the aim of providing
quick respite to the urban poor.
Priority Needs (2015)
As evident from the Exhibit 9-22, Nasrullahganj requires an investment of Rs 621.25 Lakhs for
construction of housing units and provision of infrastructure.
Action Plan for Implementation (2012 to 2015)
This section discusses a yearly action plan, as shown in Exhibit 9-23, for the capital investment
proposed in the short term. Action plan has been devised considering the phasing of short term
investment over a period of 5 years.
Exhibit 9-23 Action Plan for Implementation: Urban Poor Urban Poor 12-13 13-14 14-15 15-16
Consolidated Yearly Investment (Rs Lakhs) 84.63 181.56 163.88 191.19
Tasks
Identified
To be constructed under IHSDP -
under Construction
To be constructed under other
schemes
Action
Measures
Construction of housing units and other infrastructure for urban poor
Ensuring that new developmental schemes/projects have a city wide coverage with a
special focus on urban poors
9.8. Capital needs/ investments – Urban Governance
To meet the formulated sector goal with satisfactory level of service indicators, the sector would
require an investment of Rs 20 Lakhs i.e. around 0.26 % of total investment estimated under City
Investment Plan as shown in Exhibit 9-1.
Investment Snapshot
A sector wise investment plan was devised for the Urban Infrastructure considering the demand
arising in the short, medium and long terms. The infrastructural requirements of a sector have been
classified into various components for which cost estimates are provided in Exhibit 9-24.
Exhibit 9-24 Investment Snapshot: Urban Governance
Nasrullahganj Nagar Parishad
Costing
Short
Term
Medium
Term
Long
Term
Total
Term
Component w.r.t
sector Investment
Urban Governance Rs. Lakhs Rs. Lakhs Rs. Lakhs Rs. Lakhs
12.00 4.00 4.00 20.00 100.0%
1 Electronic Items for Computerization 3.00 1.00 1.00 5.00 25.00%
2 Training Modules 3.00 1.00 1.00 5.00 25.00%
3 GIS Mapping 6.00 2.00 2.00 10.00 50.00%
Source: IMaCS Analysis
Urban Infrastructure needs a total investment of Rs 20 Lakhs in three phases by year 2035. In the
short term, this sector would require an investment of Rs 12 Lakhs whereas in the medium term and
long term Rs 4 Lakhs and Rs 4 Lakhs would be required respectively.
City Development plan for Nasrullahganj 106
Long term needs (2035)
The total investment need for Urban Infrastructure sector by year 2035 is estimated at Rs. 20 lakhs.
The investment requirement in the various components of urban infrastructure and its proportion with
respect to the investment required in the sector is being presented in Exhibit 9-24.
Priority Needs (2015)
As evident from the Exhibit 9-24, Nasrullahganj requires an investment of Rs 12 Lakhs in the short
term which is around 60 % of the total investment identified in this sector. The investment requirement
in the various components of Urban Infrastructure in the short term is being presented in Exhibit 9-24.
Action Plan for Implementation (2012 to 2015)
This section discusses an yearly action plan, as shown in Exhibit 9-25, for the capital investment
proposed in the short term. Action plan has been devised considering the phasing of short term
investment over a period of 5 years.
Exhibit 9-25 Action Plan for Implementation: Urban Governance Urban Infrastructure 12-13 13-14 14-15 15-16
Consolidated Yearly Investment (Rs Lakhs) 3.90 3.90 3.60 0.60
Tasks
Identified
Electronic Items for Computerization
Training Modules
GIS Mapping
Action
Measures
Computerization for improving accountability in the system
GIS mapping for having a wide database which can be used for improving the
revenue, better planning and implementation
9.9. Summary of the Capital Investment Plan
As mentioned that the total investment required for the next five years for the entire city is Rs. 36.97
crores, out of which about Rs. 4.39 crore towards Education and Health sector, which will not be
required by the ULB as implementation agency for these services is state government.
Following section details about the existing plan under which this investments can be considered.
City Development plan for Nasrullahganj 107
10. FINANCIAL AND OPERATING PLAN
10.1. Introduction
The sustainable investment capacity of Nasrullahganj Nagar Parishad is assessed through a
Financial Operating Plan (FOP), which gives a yearly forecast of finances for the short term i.e. year
2012-13 to year 2015-16. A salient feature of the FOP is that all outstanding dues, including debt and
non-debt liabilities if any, have been taken into account.
The accounts data of Nasrullahganj Nagar Parishad for the financial years from year 2006-07 to year
20010-11 have been to determine the past trends in revenue and expenditure. The trends were then
analyzed to arrive at appropriate growth assumptions for various revenue and expenditure items. The
forecasting of revenue and expenditure accounts was followed by the factoring of capital investments
identified under CIP to assess the investment sustainability of Nasrullahganj Nagar Parishad.
The project funding structure comprises of grants under the State scheme (accounting for 30 per cent
of the funding); internal resources and loans accounting for the rest. 75% of the loan repayment would
be the responsibility of the state and rest 25% to be managed by ULB. The level of investment that
Nasrullahganj Nagar Parishad can sustain is determined by studying the overall surpluses/ year-to-
year opening balance and debt service coverage ratio. If the debt service coverage ratio - DSCR
(amount of surplus available to pay interest and to repay principal that is due) falls below 1, then the
investments are reduced gradually till the DSCR exceeds 1 in all the years in the forecast period.
The main items of income and expenditure, classified into the revenue account and the capital
account, are projected in the FOP under the following categories.
Categories of FOP Projections 1. Revenue Account Receipts:
a. Taxes, Non Tax Sources, Assigned Revenue and
b. Grants, Contribution and Subsidies
2. Revenue Account Expenditure:
a. Establishment
b. Operation and Maintenance
c. Debt Servicing- Existing and New Loans
d. Phasing of non-debt liabilities, and
e. Additional O&M
3. Capital Income and
4. Capital Expenditure
10.2. Financing Strategies for the CIP
In determining a long-term financial strategy, Nasrullahganj Nagar Parishad plans to raise resources
and funds for the CIP through:
1. Grants available under the State scheme Framework (as 30 percent State Govt. Grants).
2. Available internal resources and improving upon the same through by following methods:-
a. Revision of the Unit Area Value at certain levels, which would lead to revision in Annual letting
Value (applicable for Nasrullahganj Nagar Parishad )
City Development plan for Nasrullahganj 108
b. Revision of Water charges at specific intervals. Though the revision in water tariff should be
done on annual basis to recover 100% of the O&M cost. However, annual revision is not a
general practice in all the ULBs across the state, so revision after every five years is
envisaged for projections.
c. Introduction of Sewerage Charges in 2014-15, after implementing the Sewerage Project
d. Maintenance of the collection performance of taxes and charges at certain minimum levels for
current and for arrears
e. Borrowings from market or financial institutions
10.3. Finance Projections
Current revenue sources are projected under built-in growth assumptions for income and expenditure
items, to assess the impact of each such revenue enhancement measure being suggested. The
projections also aim at estimating the surplus that will be available for servicing new debt. Part of the
surplus, after meeting the additional O&M expenses on newly created assets and infrastructure, is
translated into debt size and project size (grant component plus debt component) based on certain
assumptions regarding interest rate, repayment method and loan-grant mix.
A spreadsheet FOP model has been customised to depict the financial position of Nasrullahganj
Nagar Parishad; the investment sustaining capacity of Nagar Parishad is assessed based on the FOP
assumptions. The model was used to calculate future surpluses under various scenarios involving
combinations of internal revenue improvement, state support, financing terms, etc.
10.3.1. Municipal Account – Growth Projections and Assumptions
The standard assumptions under which the projections are carried out and certain expenditure control
and revenue augmentation measures proposed in line with the mandatory and optional reforms
implemented by ULB, are presented below in Exhibit 10-1.
Exhibit 10-1 Important assumptions made in the projections Head Assumptions
Guiding Factor for Assessing the Sustaining Capacity
Surplus Positive surplus - year on year basis
DSCR Greater than 1
Project Financing – for admissible Components under JNNURM
Project Costing Unit Cost, with 5 % Cost escalation factor and 5% Physical
contingency
New/Additional O & M and from second
year of investment 5% growth is
considered for the additional O & M
5% of Capital cost
Grant from GoI -
Grant from GoMP 30% of Proposed Projects
If Loan for Balance funding 75% of repayment to be done by the state and ULB to bear the
remaining 25% of repayment. Repayment in 12 years, with 3 year
principal moratorium @ 8 % interest rate
Old Outstanding loans As per existing terms and conditions
Revenue Expenditure
Growth in Expenditure Actual average growth with a minimum 8% and maximum of 12%
(based on last five years trend)
Pay Commission Revision Pay Commission revision- additional 10% from 2013-14 every five
City Development plan for Nasrullahganj 109
Head Assumptions
years
Assumption for assessment of Nasrullahganj Nagar Parishad’s sustainability
Income Items
Growth in revenue income Actual average growth with a minimum 8% and maximum of 12%
(based on last five years trend)
Property Tax: Propose to introduce from FY 2012-13
Annual growth in Assessment 2 % per annum
Increase in Assessments due to Survey/
PT Reforms
888 properties
Initial Revision in 2012-13 150% of the existing
Revision of Tax 50% every five years
Collection Performance 85% or current average whichever is higher by 2015
Income Items- Water Supply
Annual growth in Water Connection 2% per annum
Regularisation of unaccounted
connections
7,075 connections
Coverage 85% of Assessed properties by 2015
Initial revision in water tariffs by 150% in FY 20011
Next Revisions in water tariffs by 50 % every five years
Initial revision – new Connection fee by 150% in FY 20011
Future revision – new Connection fee by 25% every five years
Collection Performance 85% by 2015-16
Income Items- Sewerage
Coverage 100% of water connections by 2015-16
Sewerage Charge 50% of water charges from year 2014-15
Initial revision - new Connection fee Rs. 1000 per connections
Future revision - new Connection fee by 10% every five years
Collection Performance 85% by 2015
10.3.2. Investment Capacity / Sustenance
Given the existing financial position of Nasrullahganj Nagar Parishad, the revenue and capital
accounts are projected against the growth scenario and assumptions presented above. The City
Investment Plan (CIP) prepared in the previous chapter shows that the total investment required to
develop Nasrullahganj City is Rs. 32.74 crore at constant prices till 2015 (of the total Rs. 76.24 crore
investment identified for funding till 2035). It includes about Rs. 4.39 crore towards Education and
Health sector, which are not provided by Nagar Parishad. Hence for FOP is generated from the
sustainable investment point of view in line with current growth trends against the identified
investment for Nagar Parishad of Rs. 14.74 crore at constant prices till 2015, which excludes
investment required for Health and Education sector.
Base Investment Capacity
Base Investment Capacity is estimated considering business as usual case, where Nasrullahganj
Nagar Parishad has not taken any grant under UIDSSMT scheme and has not done any reforms to
increase their revenue income. At this scenario Nagar Parishad will be able to sustain only 6.6 % of
City Development plan for Nasrullahganj 110
the total investment identified for year 2015, which is about Rs. 1.74 crore at constant price and Rs.
2.08 crore at current price.
Impact of Reforms on Investment Capacity of Nasrullahganj Nagar Parishad
Following are the cases considered as shown in Exhibit 10-2 and sustainability was checked.
Exhibit 10-2 Different scenario’s to assess investment sustainability Assumptions (Revenue Improvement Measures)
Base Case Impact of Reforms on Investment Capacity
Scenario 1 Scenario 2 Scenario 3
Property Tax
PT Survey No Yes Yes Yes
Property Growth No Yes Yes Yes
Collection Efficiency No Yes Yes Yes
Rate Change No Yes Yes Yes
Water Supply
Water Audit/ Regularization No Yes Yes Yes
System Refurbishment No Yes Yes Yes
Collection Efficiency No Yes Yes Yes
Revision of Charges No Yes Yes Yes
UGD
Introduction of Sewerage Charges No Yes Yes Yes
Collection Efficiency No Yes Yes Yes
Revision of Charges No Yes Yes Yes
State Funding (GoMP) No No Yes Yes
Contribution to Revolving Fund No No Yes Yes
ULB's Share in CIP Yes Yes Yes Yes
Debt Funding No No No Yes
Scenario 1: With reforms in Property Tax, Water Charges and Sewerage charges
This case assumes the reforms in property tax, Water and Sewerage have been implemented and
accordingly the investment capacity has increased by Rs. 0.79 crore above the base investment
capacity. These reforms will increase the total sustainable capacity to 9.6%.
Scenario 2: Reforms and State Grants ,without debt Funding
This case assumes that all the reforms suggested above are being implemented and UIDSSMT
grants are also availed. In this scenario Nagar Parishad‟s sustainable capacity will increase to 39.6 %,
which is 30% in addition to scenario 1. Now Nagar Parishad will be able to sustain investment of
about Rs. 10.44 crore at constant price and Rs. 10.48 crore at current price.
Scenario 3: Reforms and UIDSSMT grants along with debt Funding
This case assumes that Nagar Parishad can increase their sustainable capacity by taking debt from
any financial institution or private banks in addition to the implementation of reforms suggested above
and grants under with UIDSSMT grants. In this scenario can sustain up to 50.50 % of the total
investment identified, which is 11 % more than without debt funding scenario. Now Nagar Parishad
will be able to sustain investment of about Rs. 13.32 crore at constant price and Rs. 15.91 crore at
current price.
City Development plan for Nasrullahganj 111
The impact of the different scenario on the investment sustainability of Nasrullahganj Nagar Parishad
is shown below in Exhibit 10-3.
Exhibit 10-3 Impact of reforms and grants on investment capacity
10.4. Fund Requirement
For the identified investment for Nagar Parishad of Rs. 26.37 crore at constant prices only Rs. 13.32
crore is sustainable. Exhibit 10-4 shows the funding pattern for sustainable investment
Exhibit 10-4 CIP Funding Pattern S. No Mode of Funding Source Amount (Rs. Crore) % of Total Investment
Nasrullahganj Nagar Parishad
Total Identified Investment till 2015 (current price) 32.58
Investment by Nagar Parishad (current price) 26.29 100
Sustainable Investment till 2015 (constant price) 13.32 50.50
Sustainable Investment (current) 15.91
1 Grants UIDSSMT 13.09 49.7
2 Loans Open Market/ FIs 28.1 1.06
3 Own sources Nagar Parishad 15.91 59.36
From the above analysis, it is very clear that ULB alone even with the grant support under UIDSSMT
scheme and reforms will not be able to implement 100% of the projects identified under the City
Investment Plan (CIP). But they can substantially increase their sustainable capacity with these
reforms. So, it is recommended that ULB along the support from UADD, GoMP should try to develop
few projects at PPP model and additional grant support from GoMP.
It is also recommended that on the same lines of the National Urban Information System (NUIS)
programme for strengthening of information system at Nagar Parishad level, GoMP should also
provide support to all the local bodies in Madhya Pradesh, which are not covered in the mentioned
programme.
10.5. Financial Operating plan
Based on all the assumption for projections discussed in the Exhibit 10 1 and the implementation of
the strategies to improve sustainability of Nagar Parishad, the FOP has been prepared. However, the
summary of final revenue model is presented in Exhibit 10-5.
City Development plan for Nasrullahganj 112
Exhibit 10-5 Financial Operating Plan
Financial Year ------>
2012-
13
2013-
14
2014-
15
2015-
16
2016-
17
2017-
18
2018-
19
2019-
20
2020-
21
Figures in Rs. Lakhs
SUMMARY
i Opening balance 16 42 89 115 127 154 185 227 282
ii Revenue Receipts 175 199 226 254 288 341 377 415 457
iii Revenue Expenditure 122 162 215 261 284 310 336 360 386
iv Municipal receipts 411 655 860 697 310 358 389 428 470
v Municipal expenditure 352 608 833 684 284 327 348 373 400
New Debt Servicing Exp. 3 10 18 27 31 36 40 40 40
New O&M Exp. 11 34 67 91 96 101 106 111 117
vi Revenue Surplus/ Deficit for
the year 53 37 10 (6) 5 31 42 55 71
vii Municipal Surplus/ Deficit for
the year 58 46 27 12 27 31 42 55 71
viii Closing balance 42 89 115 127 154 185 227 282 353
Performance Indicators
DSCR 16.96 4.81 1.57 0.77 1.16 1.85 2.03 2.37 2.75
DSR 63% 68% 74% 79% 85% 86% 86% 87% 87%
PT Collection Performance 16.96 4.81 1.57 0.77 1.16 1.85 2.03 2.37 2.75
10.6. Conclusion
This chapter discussed the Investment sustainability of Nasrullahganj Nagar Parishad. The discussion
on assumptions for various financial projections was followed by detailing of investment capacity of
ULB. The investment capacity was analyzed for four scenarios; Base case, PT improvements &
Sector Reforms, UIDSSMT Grants & Reforms and Debt Funding & Reforms. The investment capacity
analysis was followed by a discussion on the funding requirement of the city.
The next chapter deals with the urban reforms and includes the discussion on the objective and
current status of various reforms mandated under UIDSSMT.
City Development plan for Nasrullahganj 113
11. URBAN REFORMS
11.1. Introduction
In recent times, several initiatives have been taken by GoI and GoMP to a) improve infrastructural
facilities and help create durable public assets and quality oriented services in cities & towns, b)
enhance public-private-partnership in infrastructural development, and c) promote planned integrated
development of towns and cities. A key aspect in achieving the aforementioned goals is improvement
in Urban Governance and Service Delivery. The underlying objective of most of the recent initiatives
is to make ULBs financially sound and enable them to undertake new projects.
The main thrust of the revised strategy of urban renewal is to ensure improvement in urban
governance so that Urban Local Bodies (ULBs) and parastatal agencies become financially sound
with enhanced credit rating and ability to access market capital for undertaking new programmes and
expansion of services. In this improved environment, public-private participation models for
provisioning of various services would also become feasible.
Among various schemes aimed at the urban renewal, the most important schemes are Jawaharlal
Nehru National Urban Renewal Mission (JNNURM) and Urban Infrastructure Development Scheme
for Small & Medium Towns (UIDSSMT). Whereas JNNURM has its own selection criteria for the cities
which can receive funding under it, UIDSSMT expands the ambit of beneficiaries to cover all
cities/towns as per 2001 census excepting cities/towns covered under JNNURM.
UIDSSMT aims at improvement in urban infrastructure in towns and cities in a planned manner. To
achieve this objective, State Governments, Urban Local Bodies and parastatal agencies are required
to accept implementation of an agenda of reforms as funding under UIDSSMT has been linked with
the ULBs performance towards the implementation of anticipated reforms.
The proposed reforms at various level of governance have been categorized into:
1. Mandatory Reforms at the level of the State Government,
2. Mandatory Reforms at the level of the Urban Local Body
3. Optional Reforms at level of the State Government/Urban Local Body
11.2. Mandatory Reforms at the level of the State Government
11.2.1. Implementation of the 74th Constitutional Amendment Act Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/cities in implementing the 74th
Amendment of the Constitution, with the objective of implementing decentralization measures. The
State should ensure meaningful association and engagement of Urban Local Bodies in planning the
function of parastatal agencies as well as the delivery of services to the citizens.
Current Status 1. The State Government has implemented 1) constitution of municipalities, 2) composition of
municipal councils, 3) reservation of seats for women, SCs & STs, 4) constitution of district
planning committees and, 5) incorporation of schedule 12 into the state municipal act. The
Process for constitution of MPCs in Million Plus cities is in progress.
City Development plan for Nasrullahganj 114
2. In addition to incorporation of schedule 12 in the state municipal act, all the functions that were
required to be transferred to ULB has been transferred by MP state government to ULBs.
3. The SFC has been constituted and recommendations have been submitted by the same.
Timeline for Reforms
All the reforms which were applicable under this section have been carried out.
11.2.2. Public Disclosure Law Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in Public Disclosure, with the
objective that municipalities and parastatal agencies will have to publish information about the Nagar
Parishad and its functioning on a periodic basis and disclose it to all the citizens. Such information
includes but is not limited to statutorily audit statements of annual performance covering operating
and financial parameters, and service levels for various services being rendered by the Nagar
Parishad.
Current Status
GoMP has issued instructions to ULBs to disclose as much information as possible through different
means such as web sites, notice board, etc.
Timeline for Action on Reforms
Public Disclosure Law was implemented in 2008-09. Provision has been made in Acts and Rules
have been framed.
11.2.3. Rationalization of Stamp Duty Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/cities to rationalize Stamp Duty, with
the objective of establishing an efficient real estate market with minimum barriers on transfer of
property so as to be put into more productive use.
Current Status
Earlier Stamp duty rates in Madhya Pradesh stood at 7.5% of the Market value. The rates have been
reduced to 5%, and are in effect from 1st April 2011. The computerization of whole system is also in
the progress.
Timeline for Reforms
The reform has been implemented in the state. Reduction in rates by 0.5% were implemented in year
2008-09, that continued for FY 09-10 and 10-11 and then finally rate reduced to 5% w.e.f. 1st April,
2011.
11.2.4. Repeal of Urban Land Ceiling and Regulation Act Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in the Repeal of ULCRA with the
objective of increasing the supply of land in the market, removing the inefficiencies and in the
establishment of an efficient land market.
City Development plan for Nasrullahganj 115
Current Status
The ULCRA has been repealed in the year 2000.
Timeline for Reforms
All the reforms under this section have been carried out.
11.2.5. Rent Control Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in Rent Control, with the
objective of having a system that balances the rights and obligations of landlords and tenants to
encourage construction and development of more housing stock, as well as promoting an efficient
and robust rental/tenancy market, so as to improve the availability of housing across all income
categories.
Current Status
The MP Parisar Kirayedari Vidheyak, 2010 was passed by the State Assembly in March, 2010. Thus,
the reform for rent control in the state has been partially achieved. Bill has been sent to GoI for
Presidential Assent.
Timeline for Reforms
The reforms under this section are in progress.
11.2.6. Community Participation Law Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in Community Participation, with
the objective of institutionalizing citizen participation as well as introducing the concept of the Area
Sabha in urban areas. The larger objective is to involve citizens in municipal functions, e.g. setting
priorities, budgeting provisions, etc. The Community Participation Law refers to the appropriate
provisions that need to be made in the state-level municipal statute(s) for the establishment of such a
3- or 4-tiered structure precisely as described above. These enactments will also need to ensure clear
definition of functions, duties and powers of each of these tiers, and provide for the appropriate
devolution of funds, functions and functionaries as may be decided by the State Government to these
levels.
Current Status
Completed – Mohalla samiti are formed as the third tier. Provisions have been made in Municipal Acts
and Rules have been framed for prescribing procedure.
Timeline for Reforms Community Participation Law is proposed to be enacted on the basis of Model Community
Participation Law.
Constitution of Mohalla Committees to further decentralize the system.
City Development plan for Nasrullahganj 116
11.2.7. City Planning Functions Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in the area of city planning, with
an objective to assign or associate elected ULBs with “city planning functions”.
Current Status
In this area, all reforms have been achieved with the transfer of powers related to the provisioning of
water supply & sewerage, public transport and solid waste management. This has been supported by
the association of ULB with city planning functions. This has been achieved by the active participation
of ULB in the preparation of city development plans.
Timeline for Reforms
All objectives of this reform except related to those of traffic and transport, have been achieved by
various measures taken by state government.
11.3. Mandatory Reforms at the level of the Urban Local Body
11.3.1. Municipal Accounting Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in Municipal Accounting, with the
objective of having a modern accounting system based on double-entry accrual principles, leading to
better financial management, transparency and self-reliance.
Current Status 1. At present, Double Entry Cash Base system of accounting is being followed in NPP.
2. Double Entry Accrual Base accounting has not been adopted in the NPP.
3. State has drafted its own accounting manual which has been revised as per the provision of
NMAM.
4. State has not modified its current laws and regulations to be in compliance with the double entry
accrual based accounting.
5. A resolution has been passed by Government expressing commitment to establish modern
municipal accounting system.
Timeline for Reforms
With the growing thrust on adoption of double entry accrual base system of accounting in state and its
several advantages over the existing system, Nasrullahganj Nagar Parishad should strive to shift to
the new system on the immediate basis. It should carry out all the requisites and migrate to the new
system by year 2014-15. It is also recommended that Nasrullahganj Nagar Parishad should adhere to
timelines, provided in Exhibit 11-1, to achieve the objectives of this reform by year 2015-16.
Exhibit 11-1 Municipal Accounting: Reform Action Plan
S.No. Reform 2012-13 2013-14 2014-15 2015-16
1 Completion and adoption of Manual Yes
2 Training of personnel 40% 80% 100%
3 Migration to Double entry accrual based accounting 30% 70% 100%
City Development plan for Nasrullahganj 117
11.3.2. E-Governance Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in E-Governance, with the
objective of having a transparent administration, quick service delivery, effective MIS, and general
improvement in the service delivery link.
Current Status
Till now, none of the services has been covered by e-governance applications. The applications which
were proposed to bring under e-governance are registration of births & deaths, public grievance
redressal, payment of property tax and bills of other utilities, municipal accounting, works
management system, etc.
Timeline for Reforms
To achieve the objectives of this reform, town would be required to bring many of its services and
procedures under the ambit of e-governance. As the first step, town should procure equipment
required for various applications by year 2011-12, which should be followed by the capacity building
exercises aimed at enabling existing staff and recruitment of new staff competent to carry out the
required duties. The city should aim to carry out registration of births & deaths, public grievance
redressal, payment of property tax and bills of other utilities, municipal accounting, and works
management system through computerization by year 2015-16. It is also recommended that
Nasrullahganj Nagar Parishad should adhere to timelines, provided in Exhibit 11-2, to achieve the
objectives of this reform by year 2015-16.
Exhibit 11-2 E-Governance: Reform Action Plan
S.No. Reform 2011-
12
2012-
13
2013-
14
2014-
15
2015-
16
1 Appointment of State-level Technology Consultant as
State Technology Advisor
Yes
2 Finalization of implementation action plan Work in Progress
3 Appointment of Software consultant(s) / agency for
deployment/training
Yes
4 Implementation of e-governance against the following modules
a Property tax 20% 50% 80% 100%
b Accounting 25% 50% 75% 100%
c Water supply and other utilities 25% 50% 75% 100%
d Birth and death registration 40% 100%
e Citizen‟s grievance monitoring 30% 30% 100%
f Personnel management system 30% 70% 100%
11.3.3. User Charges Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in the levy of User Charges on
different municipal services, with an objective of securing effective linkages between asset creation
and asset maintenance and ultimately leading to self-sustaining delivery of urban services.
City Development plan for Nasrullahganj 118
Current Status
At present, Nasrullahganj Nagar Parishad levies user charges only for Water supply. Nasrullahganj
Nagar Parishad charges Rs 2650 and Rs 3750 as connection fee for domestic and commercial new
connection respectively. The tariff structure is based on flat rate. The tariff for domestic connection is
Rs 50 per month and commercial connection is Rs. 100 per month.
Timeline for Reforms
Firstly, Nagar Parishad should establish a proper accounting system for Water Supply and should
subsequently expand this system to other services such as solid waste management, sewerage, etc.
The accounting system for water supply should be established together with the reforms related to
municipal accounting. A proper accounting system should be in place for all the municipal services by
year 2014-15. During this period, ULB should work in coordination of state government to define a
user charge structure and service standards for each of the services. These initiatives should result in
full recovery of O&M costs by year 2015-16. It is also recommended that Nasrullahganj Nagar
Parishad should adhere to timelines, provided in Exhibit 11-3, to achieve the objectives of this reform
by year 2015-16.
Exhibit 11-3 User Charges: Reform Action Plan
S.No. Reform 2011-
12
2012-
13
2013-
14
2014-
15
2015-
16
1 Formulation and adoption of a policy on user charges
by State/ULB
Yes
2 The State should set up a body for recommending a
user charge structure
To be sorted out by State and ULB
3 Recovery of O&M cost 70% 80% 90% 100%
4 Establishment of proper accounting system for each service so as to determine the O&M cost separately
A Water Supply 20% 50% 80% 100%
B Sewerage NA 100%
C Solid Waste Management 25% 50% 75% 100%
5 Achievement of targeted service standards for the services
A Water Supply (lpcd) 75 75 75 100 135
B Sewerage NA
C Solid Waste Management 70% 70% 80% 85% 90%
6 Defining user charge structure for the services
A Water Supply Yes
B Sewerage Yes
C Solid Waste Management Yes
11.3.4. Basic Services to the Urban Poor Desired Objective
Provision of basic services to the poor including security of tenure at affordable prices, improved
housing, water supply, sanitation and ensuring delivery of other existing universal services of the
Government for education, health and social security.
Current Status
The Nagar Parishad attempts to universalize the coverage of services such as water supply,
sanitation, solid waste management and other infrastructure facilities but has not achieved any break
City Development plan for Nasrullahganj 119
through due to the location disadvantage of these areas and inadequacy of funds available. Nagar
Parishad has also been coordinating with other agencies for the universalization of services like
health and education.
Timeline for Reforms
The Nagar Parishad should attempt to increase the coverage of all services so that all urban poor
have access to a minimum level of service. This can be achieved by means of various sub projects in
a phased manner. Schemes like IHSDP should address the issue of housing and rehabilitation
whereas all new projects should consider delivery of services to the poor as a part of their primary
objective. All projects identified should give a due importance to coverage of town‟s poor population.
In addition to the new developmental works, works related to upgradation or strengthening of service
delivery mechanism should also focus on the town‟s poor population. Town should target a period 5
years to cover all urban poor with basic services.
11.3.5. Internal earmarking for basic services for poor Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in the provision of basic services
to the Urban Poor, with an objective of providing security of tenure at affordable prices, improved
housing, water supply and sanitation. In addition, delivery of other existing universal services of the
government for education, health and social security is to be ensured.
Current Status
State has identified all Urban Below-Poverty-Line families using financial and non-financial criteria.
While financial criterion uses monthly income as the parameter, non-financial criterion attempts to
cover social factors such as housing, water & hygiene, education, literacy, employment, etc.
Timeline for Reforms
A detailed survey to identify the needs of urban poor in the areas of infrastructure and socio-economic
upliftment should be carried out. Based on the findings of this survey and an institutional support from
the state government, Nagar Parishad should allocate certain percentage, ranging from 20 to 25 %, of
their expenditure for the urban poor. It is also recommended that Nasrullahganj Nagar Parishad
should adhere to timelines, provided in Exhibit 11-4, to achieve the objectives of this reform by year
2015-16.
Exhibit 11-4 Internal Earmarking for Poor: Reform Action Plan
S.No. Reform 2011-
12
2012-
13
2013-
14
2014-
15 2015-16
1 A resolution between State Government and ULB
on comprehensive policy on providing basic
services to all urban poor
Yes
2 Defining criteria for identification of the urban poor. Yes
3 Fresh enumeration based on the above Yes
4 Decision on the Funds Allocation Percentage Yes
5 Achievement of actual fund allocation budget 50% 75% 100%
City Development plan for Nasrullahganj 120
11.3.6. Property Tax Desired Objective
JNNURM requires certain reforms to be undertaken by states/ cities in Property Taxes, with the broad
objective of establishing a simple, transparent, non-discretionary and equitable property tax regime
that encourages voluntary compliance. States/cities need to ensure that their desirable objectives for
reforms include these reforms, but need not restrict themselves to these items.
Current Status
Currently, Nasrullahganj Nagar Parishad levies property tax on residential, commercial properties and
its collection during the year 2010-11 was Rs. 111087. The property tax is being calculated on the
basis of Unit Area method.
Timeline for Reforms
Considering the low collection efficiency and gap between properties liable to pay property tax and
properties that actually pay, property tax reforms should be carried out on the immediate basis to
improve the municipal revenues. It is recommended that Nasrullahganj Nagar Parishad should adhere
to timelines, provided in Exhibit 11-5, to achieve the objectives of this reform by year 2015-16.
Exhibit 11-5 Property Tax: Reform Action Plan
S.No. Reform 2011-
12
2012-
13
2013-
14
2014-
15
2015-
16
1 Migration to Self-Assessment System of Property
Taxation Yes
2 Extension to uncovered properties 50% 100%
3 Migration to the GIS-based property tax system 20% 40% 75% 100%
4 Review and Revision of Property Tax guidelines Yes
5 Collection Efficiency 40% 50% 60% 72% 85%
6 Coverage Ratio (Registered Properties / Actual No.
of Properties) 60% 70% 75% 80% 85%
7 Establish Taxpayer education programme Yes
11.4. Optional Reforms at level of the State Government/Urban Local Body
This category consists of reforms are not mandatory and should be taken up by state/ULB on their
own convenience. The status of optional reforms is provided in Exhibit 11-6.
Exhibit 11-6 Optional Reforms: Status
S.No. Reform Status
1 Revision of bye-laws to streamline the approval process for construction of
buildings, development of sites etc.
Completed
2 Simplification of legal and procedural frameworks for conversion of agricultural
land for non-agricultural purposes.
Completed
3 Introduction of Property Title Certification System in ULBs. To be completed
4 Earmarking at least 20-25% of developed land in all housing projects (both Public
and Private Agencies) for EWS/LIG category with a system of cross subsidization.
Work in Progress
5 Introduction of computerized process of registration of land and property. To be completed
6 Revision of bye-laws to make rain water harvesting mandatory in all buildings and
adoption of water conservation measures.
Completed
City Development plan for Nasrullahganj 121
S.No. Reform Status
7 Bye-laws for reuse of recycled water. Completed
8 Administrative reforms i.e. reduction in establishment by bringing out voluntary
retirement schemes, non-filling up of posts falling vacant due to retirement etc.,
and achieving specified milestones in this regard.
To be completed
9 Structural reforms To be completed
10 Encouraging Public Private Partnership To be completed
11.5. Conclusion
This chapter provided the objectives and status of various reforms mandated under UIDSSMT. The
reforms were discussed under the headings of Mandatory Reforms at State level, Mandatory Reforms
at ULB level and Optional Reforms at State and ULB level.
City Development plan for Nasrullahganj 122
ANNEXURES 1: WORKSHOP PROCEEDINGS
First Workshop - Inception Workshop
An Inception workshop was conducted on 2nd Nov 2011 in the office of Nagar Parishad. The
objective of this workshop was to introduce the stake holders of the city (Municipal council members,
municipal officials, representatives from other departments and other eminent citizens) to the concept
of City Development plan as strategy document which would focus on the vision of the city for coming
25 years and to involve the citizens in the City Development Plan (CDP) process and take their
feedback on the identified infrastructure constraints that the city was facing. The meeting was
organised with the help of Nagar Parishad and was attended by the people listed in the exhibit below.
List of stakeholders present for Inception Workshop S. No. Designation / Department Name
1 Santosh Khandelwal councillor
2 Shyam Singh councillor
3 Suresh Cherve Ex- councillor
4 Bhagwan Singh Khansar councillor
5 Salim Khan councillor
6 Rajesh Pawar Councillor
7 Subhash Parsar Nagar Palika Employee
8 Subhati Sandhya Dubey NGO
9 Ashraf Ex- councillor
10 Yapendra Dubey Sub- Eng
11 P.M Lowansmi Sub- Eng
12 M.R Ningwal CMO
13 Ashok Sharma AAI
14 Sbish Kumar Singh Nagar Palika Employee
15 Rajesh Malviya Nagar Palika Employee
16 J V Rathore Nagar Palika Employee
In addition to the above, eminent citizens, press and members from other associations were also
present. Total headcount of the workshop was approximately seventy.
A brief summary of proceedings of “Kick-off” Stakeholder Consultation Workshop is as follows:
1. ICRA Management Consulting Services Limited
(IMaCS) made an inaugural address in which
background to the study was explained which was
followed by an overview of the firm. IMaCS
showcased its capability in doing this kind of study
by demonstrating successful completion of similar
projects in the past.
2. IMaCS explained the need for a long-term plan for
Nasrullahganj and role of IMaCS, with support from
Stakeholders, in preparing the City Development
Plan. IMaCS team also sensitised the stakeholders
to start formulating a vision for the town.
“Kick-off” Stakeholder Consultation Workshop
City Development plan for Nasrullahganj 123
3. Adhayksch and CMO, Nasrullahganj stressed on the need of primary focus on improving overall
quality of life of the citizens in addition to the physical and social infrastructure of the town.
The presentation by IMaCS familiarized the stakeholders with the purpose, process, and expected
outcomes of the CDP study. Members were then requested for their views and suggestions in
formulating the City Development Plan with key stress on following areas:
1. Vision for the town in the next 25 years;
2. Projects to be undertaken and
3. Ward specific issues that need immediate attention .
A few sector wise suggestions that came out of the discussion are as under
Water Supply: Water being an essential and a vital need, needs a proper conservation and a
harvesting plan to provide the town with adequate water supply when required. During the time span
when water sources get fully exhausted, the city needs are fulfilled by various sources like tankers
etc.
Drainage: Existing Drainage system needs a revamping as it is totally dilapidated. Unhygienic
environment is mainly caused by open drains and sewerage getting accumulated at various junctions
in front of the households, which in turn has caused a milieu for the residents and is a potential health
hazard.
Sewerage & Sanitation: The city in general is not equipped with a Sewerage system. A sewerage
system should be developed at the earliest.
Solid Waste Management: Major concern is disposal of solid waste. New disposal sites need to be
identified and existing disposal sites should be properly maintained according to recognized norms in
practice. Best practices from other places can be used to improve the efficiency, effectiveness and
collection of solid waste collection.
Land Utilization / Development: Due importance should be paid to beautification and the provision
of Green spaces in any kind of city infrastructure.
City Development plan for Nasrullahganj 124
City Development plan for Nasrullahganj 125
Second Workshop – Sector Analysis, City Vision & Strategy Formulation
Second workshop was conducted on 23rd December 2011 at Nasrullahganj Nagar Parishad‟s office.
The main agenda of the workshop was to present the existing town profile with detailed sector
analysis and to discuss various sector goals and strategies with the priority actions in order to decide
the vision for the town.
The meeting was organized with the help of Nagar Parishad and was attended by the people listed in
exhibit below.
List of Stakeholders present for Workshop
S.No. Name Designation
1 Dwarka Prasad Agarwal Adhyaksch
2 Shyam Singh Councilor
3 Bhagwan Singh Khansar Councillor
4 Santosh Gaur Councilor
5 Suresh Dhurve councilor
6 Ashok Katariya
7 J P Rathore Employee
8 Santosh Vyas
9 Ashok Sharma AAI
10 Hans Raj Yadav
11 Satish Kumar Sharma Employee
12 Ansaar Khan Computer Operator
13 Narayan Pawar
14 Mayur Tiwari
15 Laxmi Narayan Pawar Employee
16 Deepak Pawaar Employee
17 Vishnu Prasad Yadav Employee
18 Santosh Khandelwal councillor
19 Basubhai Badoliya councilor
Presentation started off with a brief introduction of the study i.e. Preparation of City Development Plan
for Nasrullahganj, so as to bring all the stakeholders on the same platform. Based on the information
collected by various sources, the representative from IMaCS presented city profile which included
demographic and socio-economic profile of the town with spatial component. Demographic profile
dealt with population growth trend and its probable reasons, it also showed the population projections
and the methods used for these projections. The stakeholders agreed on this projected population.
Socio-economic profile comprised of key socio-economic parameters, major economic base and
major potentials and main issues. During this, stakeholders stated that few steps are needed to
increase employment opportunities and improve quality of life in the town to reduce the flow of people
moving out of the town. City profiling was followed by the findings of Sector Analysis which included
Water Supply, Sewerage and Sanitation, Storm Water Drainage, Solid Waste Management,
Transportation, Health, Education and other socio-cultural facilities for short, medium and long term,
i.e. 5 years, 10 years and 25 years respectively. Analysis comprised of existing status of service level
indicators, Demand-Supply Gaps for short , medium term and long term and key observations and
major issues.
City Development plan for Nasrullahganj 126
After covering these sections, IMaCS team
turned the focus on “formulation of a vision for
Nasrullahganj.” This part of the presentation
included definition of vision, major concerns that
need to be addressed while developing a vision
and important aspects that define Nasrullahganj.
It was then followed by few sample Vision
Statements from IMaCS team. Formulation of
City vision and Sectoral goals were
supplemented by a Questionnaire survey.
questionnaire with the aim of obtaining
stakeholders‟ priorities for the city. The
Questionnaire survey was distributed in Hindi
language. Questionnaire survey included stakeholders‟ view of problems in the various sectors,
evaluation of city‟s growth and infrastructure and ranking of major issues and problems of the town,
as perceived by stakeholders.
Further, the stakeholders discussed the Sectoral strategies and vision in detail and share their
concerns and apprehensions on how should the city move forward towards a developmental path.
Amongst the major concerns is-„insufficient water supply‟ to the entire town, and hence there is a dire
need for augmentation of the system for which few potential sources were suggested by the
stakeholders. Further, they highlighted the need of employment opportunities – „in the region‟ , the
lack of which leads to the youths moving out to other cities. One of the important suggestions which
came up during consultations was - Since Nasrullahganj has a strong agricultural base and has a
regional crop market (Mandi), there is a scope for a few small scale agro based industries e.g. Soya
bean plants and Daal mills which can be thought upon to be established in the town. Stakeholders
also had concerns regarding the transportation and traffic aspects in the town. During the discussion,
it also came up that since a substantial percentage of population resides in slums in the town and
there should be a focused strategy to improve the quality of life of all the slum dwellers by providing
basic infrastructure to all of them. The stakeholders also had concerns on non-availability of parks,
playgrounds, community halls and not properly maintained ponds and it was suggested by them that
pond needs to be conserved with pond front development and thus creating a parks and other
recreational infrastructure near them. The Stakeholders also appreciated IMaCS‟ strategies and
sector goals in various infrastructure sectors and helped prioritizing the needs and the actions
required for the development of the town.
Second Workshop
City Development plan for Nasrullahganj 127
City Development plan for Nasrullahganj 128
Third Workshop – Sector Analysis, City Vision & Strategy Formulation
The final workshop for City Development Plan
for Nasrullahganj was held on 27th August 2012
at Nasrullahganj Nagar Parishad Bhawan. The
workshop was attended by approximately 20
stakeholders including, CMO, Sub-engineer,
other staff and citizens.
Broad theme for this workshop was to appraise
the stakeholders with the outcome of the plan
and share with them the Projects which has
come out from the detailed consultations in the
preceding workshops and corresponding
investments to implement those projects on
ground. Municipal interventions which are
needed in order to cope up with the projected
investments and the amount of revenue which the Nagar Parishad can generate upon doing the
proposed reforms were also discussed. CIP and FOP were explained to the stakeholders with a road
map on how to achieve it.
The Exercise was well appreciated by the stakeholders and with that note; the final workshop for the
CDP exercise for Nasrullahganj was completed.
List of Stakeholders present for Inception Workshop
S. No. Name
1 M.R Niwagwal
2 Subhash Chandra Parashar
3 P.M Lowansi
4 Satish kumar Vyas
5 Shahjad Khan
6 Krishna Kumar Yadav
7 Laxmi Narayan Pawar
8 Ansaar Khan
9 Litesh Dabi
10 Ashok Kumar Sharma
11 Krishana Kumar Lowansi
12 Sayeed Khan
13 Sandhya Dube
14 Kashi Ram Rathore
15 Satish Sharma
16 Basant Pawar
17 Vishnu Prasad
18 Hansraj Yadav
19 Kishan Gujjar
20 Devisingh Jat
Workshop during Final Workshop at Nasrullahganj town
City Development plan for Nasrullahganj 129
City Development plan for Nasrullahganj 130
City Development plan for Nasrullahganj 131
ANNEXURE 2: QUESTIONNAIRE
City Development plan for Nasrullahganj 132
City Development plan for Nasrullahganj 133
City Development plan for Nasrullahganj 134
City Development plan for Nasrullahganj 135
City Development plan for Nasrullahganj 136
City Development plan for Nasrullahganj 137
City Development plan for Nasrullahganj 138
ANNEXURE 3: FINANCIAL PROJECTIONS
City Development plan for Nasrullahganj 139
Financial Year ------> 2006
-07
2007
-08
2008
-09
2009
-10
2010
-11
2010
-11
2012
-13
2013
-14
2014
-15
2015
-16
2016
-17
2017
-18
2018
-19
2019
-20
2020
-21
2021
-22
Figures in Rs. Lakhs Actuals
Esti
mate Projection
xx Nagar Panchayat
A SUMMARY
i Opening balance - - 2 29 30 - (16) 43 93 126 147 183 224 276 343 425
ii Revenue Receipts 5 94 144 155 244 144 175 199 226 254 288 341 377 415 457 503
ii
i Revenue Expenditure 686 63 75 92 175 104 121 159 209 252 274 300 325 349 374 402
iv Municipal receipts - 192 260 356 620 217 394 622 815 665 310 358 389 428 470 517
v Municipal expenditure - 189 233 355 282 234 334 572 781 645 274 316 337 361 388 417
New Debt Servicing Exp.
- 3 9 17 25 28 34 37 37 37 37
New O&M Exp.
- 11 32 62 85 89 93 98 103 108 114
vi Revenue Surplus/ Deficit for the year
(681
) 31 68 62 69 40 54 40 17 2 14 41 52 66 82 100
vi
i Municipal Surplus/ Deficit for the year - 2 27 1 338 (16) 60 50 33 21 36 41 52 66 82 100
vi
ii Closing balance - 2 29 30 368 (16) 43 93 126 147 183 224 276 343 425 525
ix Performance Indicators
DSCR
-
18.5
8 5.47 1.98 1.10 1.50 2.22 2.40 2.78 3.20 3.68
PT Collection
Performance 57% 63% 68% 74% 79% 85% 86% 86% 87% 87% 88%
B REVENUE ACCOUNT
0
RECEIPTS
I Own Sources
Tax Revenue
1 Property Tax 0 3 2 3 2 3 7 9 10 11 11 15 16 17 17 18
2 Integrated tax 0 3 2 3 3 2 2 3 3 3 3 4 4 4 5 5
3 Other Taxes 0 2 3 5 6 4 4 4 5 6 6 7 8 9 10 11
Non Tax
1
Rental Income from
Municipal Properties 0 3 3 3 4 4 4 4 4 5 5 6 6 7 7 8
2 Water Charges 5 0 5 6 6 6 17 22 25 28 32 47 50 52 55 57
3 Sewerage Charges
0 0 3 6 11 17 19 20 21 21
City Development plan for Nasrullahganj 140
Financial Year ------> 2006
-07
2007
-08
2008
-09
2009
-10
2010
-11
2010
-11
2012
-13
2013
-14
2014
-15
2015
-16
2016
-17
2017
-18
2018
-19
2019
-20
2020
-21
2021
-22
Figures in Rs. Lakhs Actuals
Esti
mate Projection
4 License and Fees 0 1 2 1 2 2 2 2 2 2 2 3 3 3 3 4
5 Others 0 5 31 32 30 27 31 34 38 43 48 54 61 68 76 85
Sub Total Own
Revenue 5 17 48 53 53 48 67 78 91 104 120 152 167 179 193 209
II Assigned Revenue and Compensations
1 Octroi compensation 0 60 58 78 109 68 76 86 96 107 120 135 151 169 189 212
2 Stamp duty 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3
Passenger tax
compensation 0 11 12 4 4 7 7 8 9 9 10 11 12 13 14 15
4
Income under special
acts 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sub Total assign
revenue 0 71 70 82 114 75 84 94 104 117 130 146 163 182 203 227
II
I
Revenue Grants,
Contributions and Subsidies
1 Road maintenance 0 6 13 7 50 10 11 12 14 15 17 19 21 24 27 30
2 Mid day meal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 State finance commssion
(S.F.C) 0 0 13 13 28 12 14 15 17 19 21 24 27 30 34 38
4 Other grants 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sub total Revenue
Grants 0 6 26 20 78 22 24 27 31 34 38 43 48 54 60 68
Total Revenue Receipts 5 94 144 155 244 144 175 199 226 254 288 341 377 415 457 503
EXPENDITURE
I Salaries/ Wages & Allowances 0 30 46 57 81 62 61 68 74 82 90 99 109 120 132 145
II Administrative Expenses 0 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2
II
I Operation & Maintenance
1 Existing O&M 0 25 25 29 39 26 29 32 35 38 42 46 51 56 62 68
2 New O&M
0 11 32 62 85 89 93 98 103 108 114
I
V Programme Expenses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
V Repayment of Loans
1 Existing Loans 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
City Development plan for Nasrullahganj 141
Financial Year ------> 2006
-07
2007
-08
2008
-09
2009
-10
2010
-11
2010
-11
2012
-13
2013
-14
2014
-15
2015
-16
2016
-17
2017
-18
2018
-19
2019
-20
2020
-21
2021
-22
Figures in Rs. Lakhs Actuals
Esti
mate Projection
2 New Loans
0 3 9 17 25 28 34 37 37 37 37
V
I Other Miscellaneous expenditure 0 5 2 4 54 14 16 17 19 21 23 25 28 30 33 37
Total Revenue Expenses 0 63 75 92 175 104 121 159 209 252 274 300 325 349 374 402
C CAPITAL ACCOUNT
RECEIPTS
I Sale of asset 0 10 3 3 4 0 0 0 0 0 0 0 0 0 0 0
II Loans 0 1 2 1 1 0 38 73 101 69 0 0 0 0 0 0
II
I Public Contribution 0 0 0 0 0 0
I
V Income from Connection Fee
(Water & Sewerage)
0 4 10 12 15 9 4 4 4 4
V Grants & Contributions
1 Special Projects 0 0 0 90 302 0 0 0 0 0 0 0 0 0 0 0
2 Basic services 0 72 86 0 9 36 0 0 0 0 0 0 0 0 0 0
3 UIDSSMT 0 0 0 0 21 0
4 IHSDP 0 0 0 0 2 0
5 Flood relief & NRCP 0 0 6 0 0 1 0 0 0 0 0 0 0 0 0 0
6 T.F.C 0 0 11 11 0 5 5 6 6 6 7 8 8 9 9 10
7 Other Grants 0 11 0 80 42 29 0 0 0 0 0 0 0 0 0 0
8 New Grants
175 340 471 324 0 0 0 0 0 0
Sub Total Grants 0 83 102 181 375 71 180 345 477 330 7 8 8 9 9 10
V
I Other Capital income 0 0 0 10 0 2
Total Capital Receipts 0 93 106 194 380 73 219 423 589 411 22 17 12 13 14 15
EXPENDITURE
I
V CAPEX 0 126 156 262 106 130 213 413 572 393 0 17 12 13 14 15
City Development plan for Nasrullahganj 142
ANNEXURE 4: MAPS
Map 1 - Location map with respect to country/ state/ district
Map 2 - District map showing Railway and road network
Map 3 - Base Map of the town
Map 4A) - Ward
Map 4B) - Population Density
Map 5 - Existing Land-use map
Map 6 - Existing Road network map
Map 7 - Drainage system map
Map 8A - Water supply
Map 8B - Solid Waste
Map 9A - Solid waste (garbage dumping areas, existing location of landfill site)
Map 9B - Physical Infrastructure
Map 10 - Social infrastructure
Map 11 - Slum location map
Map 12 - Proposed land-use map (Broad overview)
Map 13 - Proposed Road network map
Map 14 - Proposed Drainage system map
Map 15 - Proposed Sewerage system map
Map 16 - Proposed Water supply map
Map 17 - Proposed Solid waste management
City Development plan for Nasrullahganj 143
ANNEXURE 5: PRESENTATION OF FINAL WORKSHOP