+ All Categories
Home > Documents > National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP?...

National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP?...

Date post: 24-Aug-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
15
National  AIM Planning Abbas NIKNEJAD Regional Officer, AIM/ATM
Transcript
Page 1: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

National AIM Planning

Abbas NIKNEJADRegional Officer, AIM/ATM

Page 2: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

Global Air Navigation Plan

What is the GANP?• Supports a harmonized global Air Navigation

System• It is an overarching framework• Addresses key civil aviation policy principles• Assists ICAO Regions and States to establish

air navigation priorities for the next 15 years• Assists ICAO Regions and States to prepare

their navigation plans

2

Page 3: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

GANP history

3

Page 4: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

ASBU Framework4 Performance

Improvement Areas6-year blocks (new 2016)

4

Page 5: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

Blocks & Modules

B 1B 1

B 2B 2 B 3B 3

B 0B 0

5

Block—is made up of modules that, when combined, enable significant improvements and benefits (within a defined time frame).

Module — a deployable package based on performance or capability. It offers a clear operational benefit, supported by procedures, technology, regulation/standards as necessary, and a business case. A module will be also characterized by the operating environment within which it may be applied.

PIA 4PIA 3

PIA 2PIA 1

Page 6: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

Performance Area 2Global Interoperable Systems and Data

Increased Interoperability, Efficiency & Capacity through 

Ground‐Ground Integration

Block 0 Block 2

Improved Coordination through multi‐centre Ground‐

Ground integration: (FF‐ICE/1 

& Flight Object, 

SWIM)

Block 3

Improved Operational Performance through the 

introduction of Full FF‐ICE

Block 1

Increased Interoperability, Efficiency & Capacity 

through FF‐ICE/1 

application before 

Departure

6

Page 7: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

PIA 2:  Globally Interoperable Systems and Data

Block 0Thread Block 1 Block 2 Block 3

B0‐AMET B1‐AMET

B2‐SWIM

B2‐FICE B3‐FICE

B1‐SWIM

B3‐AMET

B0‐FICE B1‐FICE

B0‐DATM B1‐DATM

1.  AMET

2.  DAIM

3.  FICE

4.  SWIM

7

Page 8: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

AIM Definition• The dynamic, integrated management of

aeronautical information through theprovision and exchange of quality-assureddigital aeronautical data in collaborationwith all parties. (ICAO Annex 15)

• AIM: the right digital AeronauticalInformation, at the right place, at the righttime.

8

Page 9: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

How to get there?• ICAO Roadmap for the Transition from AIS

to AIM– ICAO has developed in 2009 a roadmap to

reflect the importance of the evolution and toaddress the required changes from AIS toAIM.

– The roadmap identifies major milestones for auniform evolution, the specific steps that needto be achieved and timelines forimplementation.

9

Page 10: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

10

Phase 1Consolidation

Phase 2Going digital

Phase 3Information management

Page 11: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

MID Region AIM implementation Roadmap

11

Page 12: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

National AIM implementation Roadmap Template

12

Page 13: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

Planning considerations• Technical needs/requirements• AIS personnel training• Financial issues• Organizational issues• Other issues that need to be addressed

13

Page 14: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

14

Summary

Page 15: National AIM Planning · Regional Officer, AIM/ATM. Global Air Navigation Plan What is the GANP? • Supports a harmonized global Air Navigation ... 6-year blocks (new 2016) 4. Blocks

Recommended