NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director
Transcript
Page 1: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

NATIONAL PRODUCTIVITY COUNCIL

WELCOMES YOU TO A PRESENTATION

ON

CONTROL CHARTSBy B.Girish

Dy. Director

Page 2: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Three SQC Categories Traditional descriptive statistics

e.g. the mean, standard deviation, and range

Acceptance sampling used to randomly inspect a batch of goods to determine acceptance/rejection

Does not help to catch in-process problems

Statistical process control (SPC) Involves inspecting the output from a process Quality characteristics are measured and charted Helpful in identifying in-process variations

Page 3: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Statistical Process Control (SPC)

A methodology for monitoring a process to identify special causes of variation and signal the need to take corrective action when appropriate

SPC relies on control charts

Page 4: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

SPC Implementation Requirements Top management commitment Project champion Initial workable project Employee education and

training Accurate measurement system

Page 5: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Traditional Statistical Tools The Mean- measure of

central tendency

The Range- difference between largest/smallest observations in a set of data

Standard Deviation measures the amount of data dispersion around mean

n

xx

n

1ii

1n

Xxσ

n

1i

2

i

Page 6: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Distribution of Data Normal distributions Skewed distribution

Page 7: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Sources of Variation Common causes of variation

Random causes that we cannot identify Unavoidable e.g. slight differences in process variables like diameter,

weight, service time, temperature

Assignable causes of variation Causes can be identified and eliminated e.g. poor employee training, worn tool, machine needing

repair

Page 8: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Common Causes

Special Causes

Page 9: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Histograms do not take into account changes over time.

Control charts can tell us when a process changes

Page 10: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Introduction to Control Charts

Important uses of the control chart

1. Most processes do not operate in a state of statistical control

2. Consequently, the routine and attentive use of control charts will identify assignable causes. If these causes can be eliminated from the process, variability will be reduced and the process will be improved

3. The control chart only detects assignable causes. Management, operator, and engineering action will be necessary to eliminate the assignable causes.

Page 11: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Monitor Variation in Data Exhibit trend - make correction before

process is out of control A Process - A Repeatable Series of

Steps Leading to a Specific Goal

Introduction to Control Charts

Page 12: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Show When Changes in Data are Due to: Special or assignable causes

Fluctuations not inherent to a process Represent problems to be corrected Data outside control limits or trend

Chance or common causes Inherent random variations Consist of numerous small causes of random

variability

(continued)Introduction to Control Charts

Page 13: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Graph of sample data plotted over time

020406080

1 3 5 7 9 11

X

Time

Special Cause Variation

Common Cause Variation

Process Average

Mean

UCL

LCL

Introduction to Control Charts

Page 14: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Commonly Used Control Charts

Variables data x-bar and R-charts x-bar and s-charts Charts for individuals (x-charts)

Attribute data For “defectives” (p-chart, np-chart) For “defects” (c-chart, u-chart)

Page 15: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Introduction to Control Charts

Popularity of control charts

1) Control charts are a proven technique for improving productivity.

2) Control charts are effective in defect prevention.

3) Control charts prevent unnecessary process adjustment.

4) Control charts provide diagnostic information.

5) Control charts provide information about process capability.

Page 16: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Control Chart Selection

Quality Characteristicvariable attribute

n>1?

n>=10 or computer?

x and MRno

yes

x and s

x and Rno

yes

defective defect

constant sample size?

p-chart withvariable samplesize

no

p ornp

yes constantsampling unit?

c u

yes no

Page 17: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

SPC Methods-Control Charts

Control Charts show sample data plotted on a graph with CL, UCL, and LCL

Control chart for variables are used to monitor characteristics that can be measured, e.g. length, weight, diameter, time

Control charts for attributes are used to monitor characteristics that have discrete values and can be counted, e.g. % defective, number of flaws in a shirt, number of broken eggs in a box

Page 18: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Control Charts for Attributes –P-Charts & C-Charts

Use P-Charts for quality characteristics that are discrete and involve yes/no or good/bad decisions Number of leaking caulking tubes in a box of 48 Number of broken eggs in a carton

Use C-Charts for discrete defects when there can be more than one defect per unit Number of flaws or stains in a carpet sample

cut from a production run Number of complaints per customer at a hotel

Page 19: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Control Chart Design Issues Basis for sampling Sample size Frequency of sampling Location of control limits

Page 20: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 21: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Developing Control Charts

1. Prepare Choose measurement Determine how to collect data,

sample size, and frequency of sampling

Set up an initial control chart

2. Collect Data Record data Calculate appropriate statistics Plot statistics on chart

Page 22: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Pre-Control

nominal value

Green Zone

Yellow Zones

RedZone

RedZone

LTL UTL

Page 23: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Control LimitsUCL = Process Average + 3 Standard

DeviationsLCL = Process Average - 3 Standard

DeviationsProcess Average

UCL

LCL

X

+ 3

- 3

TIME

Page 24: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Next Steps3. Determine trial control limits

Center line (process average) Compute UCL, LCL

4. Analyze and interpret results Determine if in control Eliminate out-of-control points Recompute control limits as

necessary

Page 25: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Setting Control Limits Percentage of values

under normal curve

Control limits balance

risks like Type I error

Page 26: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 27: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 28: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Comparing Control Chart Patterns

X XX

Common Cause Variation: No Points

Outside Control Limits

Special Cause Variation: 2 Points

Outside Control Limits

Downward Pattern: No Points Outside Control Limits but

Trend Exists

Page 29: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Typical Out-of-Control Patterns Point outside control limits Sudden shift in process average Cycles Trends Hugging the center line Hugging the control limits Instability

Page 30: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Control Charts for Variables

Use x-bar and R-bar charts together

Used to monitor different variables

X-bar & R-bar Charts reveal different problems

In statistical control on one chart, out of control on the other chart? OK?

Page 31: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

� � �

� �

� � �

� �

� � �

� �

� �

� �

� �

� � �

� � � �

� �

� �

� �

Processes In Control

Page 32: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

� �

� �

� �

� �

Process Out of Control

Page 33: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Shift in Process Average

Page 34: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Identifying Potential Shifts

Page 35: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Cycles

Page 36: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Trend

Page 37: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

� �

� �

� �

� � � �

� � �

� �

� �

Sudden stability

� �

� �

Mixtures

� �

� � � �

� �

� �

UCL

Center

line

LCL

PROCESS STREAMS

Page 38: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Chart

ProcessIn

Control

ProcessOut ofControl

Run

Chart points donot form a parti-cular pattern andlie within theupper and lowerchart limits

Chart points form a particular pattern OR oneor more pointslie beyond theuppor or lowerchart limits

Chart points areon one side of thecenter line. The number of pointsin a run is calledthe “length of therun”

UCL 10

x 19

lcl 30

UCL 10

x 19

lcl 30

UCL 10

x 19

lcl 30

UCL 10

x 19

lcl 30

UCL 10

x 19

lcl 30

UCL 10

x 19

lcl 30

The process is stable, notchanging. Doesn’t necesarily mean to leavethe process alone. Maybe opportunities to improvethe process and enjoy substantial benefits

Alerts us that the processis changing. Doesn’t mean you need to take a corrective action. May berelate to a change you havemade. Be sureto identifythe reason\(s) before takingany constructive actions(w)

Suggest the process hasundergone a permanentchange (positive ornegative) and is nowbecoming stable. Often requires tha t you recompute the controllines for future interpre-tation efforts.

Description Example # 1 Example # 2 Interpretation

Interpreting Control Charts

Page 39: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Chart

Trend

Cycle

Hugging

A continued riseor fall in a seriesof points (7 ormore consecutivepoints direction)

Chart ponts showthe same patternchanges (e.g.riseor fall) over equalperiods of time

Chart points areclose to the centerline or to a control limit line(2 out of 3, 3 out of4, or 4 out of 10.)

UCL 10

x 19

lcl 30

UCL 10

x 19

lcl 30

UCL 10

x 19

lcl 30

UCL 10

x 19

lcl 30

UCL 10

x 19

lcl 30

CL 10

x 19

lcl 30

Description Example # 1 Example # 2 Interpretation

12 3

45

67

1/2

1/2

12

34

56

1/2

1/2

Often seen after some changehas been made. Helps tellyou if the change(s) had apositive or negative effect.may also be part of a learning curve associatedwith some form of training

often relates to factors thatinfluence the process in apredictable manner. Factorsoccur over a set time periodand a positive/negative effectHelps determine future workload and staffing levels

Suggests a different type ofdata has been mixed into thesub-group being sampled.Often need to change thesub-group, reassemble thedata, redraw the controlchart

Interpreting Control Charts

Page 40: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

When to Take Corrective Action Corrective Action Should Be Taken

When Observing Points Outside the Control Limits or when a Trend Has Been Detected Eight consecutive points above the

center line (or eight below) Eight consecutive points that are

increasing (decreasing)

Page 41: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Out-of-Control Processes If the Control Chart Indicates an Out-of-

Control Condition (a Point Outside the Control Limits or Exhibiting Trend) Contains both common causes of variation

and assignable causes of variation The assignable causes of variation must be

identified If detrimental to quality, assignable causes of

variation must be removed If increases quality, assignable causes must be

incorporated into the process design

Page 42: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

In-Control Process If the Control Chart is Not Indicating

Any Out-of-Control Condition, then Only common causes of variation exist It is sometimes said to be in a state of

statistical control If the common-cause variation is small,

then control chart can be used to monitor the process

If the common-cause variation is too large, the process needs to be altered

Page 43: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Types of Error First Type:

Belief that observed value represents special cause when, in fact, it is due to common cause

Second Type: Treating special cause variation as if

it is common cause variation

Page 44: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Remember Control does not mean that the

product or service will meet the needs. It only means that the process is consistent (may be consistently bad).

Capability of meeting the specification.

Page 45: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

How to use the results By eliminating the special causes

first and then reducing the common causes, quality can be improved.

Page 46: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Final Steps

5. Use as a problem-solving tool

Continue to collect and plot data

Take corrective action when necessary

6. Compute process capability

Page 47: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Process Capability Product Specifications

Preset product or service dimensions, tolerances e.g. bottle fill might be 16 oz. ±.2 oz. (15.8oz.-16.2oz.) Based on how product is to be used or what the customer expects

Process Capability – Cp and Cpk Assessing capability involves evaluating process variability relative

to preset product or service specifications Cp assumes that the process is centered in the specification range

Cpk helps to address a possible lack of centering of the process

LSLUSL

width process

width ionspecificatCp

LSLμ,

μUSLminCpk

Page 48: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Relationship between Process Variability and Specification Width

Three possible ranges for Cp

Cp = 1, as in Fig. (a), process variability just meets

specifications

Cp ≤ 1, as in Fig. (b), process not capable of producing within specifications

Cp ≥ 1, as in Fig. (c), process exceeds minimal

specifications

One shortcoming, Cp assumes that the process is centered on the specification range

Cp=Cpk when process is centered

Page 49: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Computing the Cp Value at Cocoa Fizz: three bottling machines are being evaluated for possible use at the Fizz plant. The machines must be capable of meeting the design specification of 15.8-16.2 oz. with at least a process capability index of 1.0 (Cp≥1)

The table below shows the information gathered from production runs on each machine. Are they all acceptable?

Solution: Machine A

Machine B

Cp=

Machine C

Cp=

Machine

σ USL-LSL

A .05 .4 .3

B .1 .4 .6

C .2 .4 1.2

1.336(.05)

.4

LSLUSLCp

Page 50: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Computing the Cpk Value at Cocoa Fizz

Design specifications call for a target value of 16.0 ±0.2 OZ.

(USL = 16.2 & LSL = 15.8) Observed process output has

now shifted and has a µ of 15.9 and a

σ of 0.1 oz.

Cpk is less than 1, revealing that the process is not capable

.33.3

.1Cpk

3(.1)

15.815.9,

3(.1)

15.916.2minCpk

Page 51: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Target theis T

12

2 T

CC ppm

10.7171mmat centered is process assumebut above, as same :Example

2 where1

,min3

3

Tolerance

TKKCC

CCC

LTLC

UTLC

ppk

puplpk

pl

pu

Process Capability (2)

086.10868.03

7171.100.11

puC

834.00868.03

5.107171.10

plC

8977.0

868.075.107171.10

1

960.0

2

2

pmC

Page 52: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Capability Versus Control

Control

Capability

Capable

Not Capable

In Control Out of Control

IDEAL

Page 53: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Excel Template

Page 54: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 55: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Special Variables Control Charts

x-bar and s charts x-chart for individuals

Page 56: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 57: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 58: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 59: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 60: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Charts for Attributes Fraction nonconforming (p-chart)

Fixed sample size Variable sample size

np-chart for number nonconforming

Charts for defects c-chart u-chart

Page 61: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 62: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 63: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 64: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 65: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 66: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 67: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 68: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 69: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 70: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.
Page 71: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

p Chart Control Chart for Proportions

Is an attribute chartattribute chart Shows Proportion of Nonconforming (Success Success

) Items E.g., Count # of nonconforming chairs & divide by

total chairs inspected Chair is either conforming or nonconforming

Used with Equal or Unequal Sample Sizes Over Time Unequal sizes should not differ by more than

±25% from average sample size

Page 72: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

p Chart Control Limits

(1 )max 0, 3p

p pLCL p

n

(1 )3p

p pUCL p

n

1

k

ii

nn

k

Average Group Size

1

1

k

iik

ii

Xp

n

Average Proportion of Nonconforming Items

# Defective Items in Sample i

Size of Sample i

# of Samples

Page 73: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

p Chart Example

You’re manager of a 500-room hotel. You want to achieve the highest level of service. For 7 days, you collect data on the readiness of 200 rooms. Is the process in control?

Page 74: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

p Chart Hotel Data

# NotDay # Rooms Ready Proportion

1 200 16 0.0802 200 7 0.0353 200 21 0.1054 200 17 0.0855 200 25 0.1256 200 19 0.0957 200 16 0.080

Page 75: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

1

1

121.0864

1400

k

iik

ii

Xp

n

p Chart Control Limits Solution

16 + 7 +...+ 16

1 1400200

7

k

ii

nn

k

1 .0864 1 .08643 .0864 3

200

.0864 .0596 or .0268,.1460

p pp

n

Page 76: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Mean

p Chart Control Chart Solution

UCL

LCL

0.00

0.05

0.10

0.15

1 2 3 4 5 6 7

P

Day

Individual points are distributed around without any pattern. Any improvement in the process must come from reduction of common-cause variation, which is the responsibility of the management.

p

p

Page 77: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

p Chart in PHStat PHStat | Control Charts | p Chart …

Excel Spreadsheet for the Hotel Room Example

Microsoft Excel Worksheet

Page 78: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Worker Day 1 Day 2 Day 3 All Days

A 9 (18%) 11 (12%) 6 (12%) 26 (17.33%)

B 12 (24%) 12 (24%) 8 (16%) 32 (21.33%)

C 13 (26%) 6 (12%) 12 (24%) 31(20.67%)

D 7 (14%) 9 (18%) 8 (16%) 24 (16.0%)

Totals 41 38 34 113

Understanding Process Variability:Red Bead Example

Four workers (A, B, C, D) spend 3 days to collect beads, at 50 beads per day. The expected number of red beads to be collected per day per worker is 10 or 20%.

Page 79: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Average Day 1 Day 2 Day 3 All Days

X 10.25 9.5 8.5 9.42

p 20.5% 19% 17% 18.83%

Understanding Process Variability:Example Calculations

113.1883

50(12)p

(1 ) .1883(1 .1883)3 .1883 3

50 .1883 .1659

p pp

n

_

.1883 .1659 .0224

.1883 +.1659 .3542

LCL

UCL

Page 80: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

0 A1 B1 C1 D1 A2 B2 C2 D2 A3 B3 C3 D3

Understanding Process Variability:Example Control Chart

.30

.20

.10

p

UCL

LCL

_

Page 81: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Morals of the Example

Variation is an inherent part of any process. The system is primarily responsible for worker performance. Only management can change the system. Some workers will always be above average, and some will be below.

Page 82: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

The c Chart Control Chart for Number of

Nonconformities (Occurrences) in a Unit (an Area of Opportunity) Is an attribute chartattribute chart

Shows Total Number of Nonconforming Items in a Unit E.g., Count # of defective chairs

manufactured per day Assume that the Size of Each Subgroup

Unit Remains Constant

Page 83: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

c Chart Control Limits

3cLCL c c 3cUCL c c

1

k

ii

cc

k

Average Number of Occurrences

# of Samples

# of Occurrences in Sample i

Page 84: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

c Chart: Example

You’re manager of a 500-room hotel. You want to achieve the highest level of service. For 7 days, you collect data on the readiness of 200 rooms. Is the process in control?

Page 85: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

c Chart: Hotel Data# Not

Day # Rooms Ready1 200 162 200 73 200 214 200 175 200 256 200 197 200 16

Page 86: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

c Chart: Control Limits Solution

1 16 7 19 1617.286

7

3 17.286 3 17.285 4.813

3 29.759

k

ii

c

c

cc

k

LCL c c

UCL c c

Page 87: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

c Chart: Control Chart Solution

UCL

LCL0

10

20

30

1 2 3 4 5 6 7

c

Day

c

Individual points are distributed around without any pattern. Any improvement in the process must come from reduction of common-cause variation, which is the responsibility of the management.

c

Page 88: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Variables Control Charts: R Chart Monitors Variability in Process

Characteristic of interest is measured on numerical scale

Is a variables control chartvariables control chart Shows Sample Range Over Time

Difference between smallest & largest values in inspection sample

E.g., Amount of time required for luggage to be delivered to hotel room

Page 89: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

R Chart Control Limits

Sample Range at Time i or Subgroup i

# Samples

From Table4RUCL D R

3RLCL D R

1

k

ii

RR

k

Page 90: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

R Chart Example

You’re manager of a 500-room hotel. You want to analyze the time it takes to deliver luggage to the room. For 7 days, you collect data on 5 deliveries per day. Is the process in control?

Page 91: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

R Chart and Mean Chart Hotel Data

Sample SampleDay Average Range

1 5.32 3.852 6.59 4.273 4.88 3.284 5.70 2.995 4.07 3.616 7.34 5.047 6.79 4.22

Page 92: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

R Chart Control Limits Solution

From Table (n = 5)

1 3.85 4.27 4.223.894

7

k

ii

RR

k

4

3

2.114 3.894 8.232

0 3.894 0

R

R

UCL D R

LCL D R

Page 93: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

R Chart Control Chart Solution

UCL

02468

1 2 3 4 5 6 7

Minutes

Day

LCL

R_

Page 94: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Variables Control Charts: Mean Chart (The Chart) Shows Sample Means Over Time

Compute mean of inspection sample over time

E.g., Average luggage delivery time in hotel

Monitors Process Average Must be preceded by examination of

the R chart to make sure that the process is in control

X

Page 95: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Mean Chart

Sample Range at Time i

# Samples

Sample Mean at Time i

Computed From Table

2XUCL X A R

2XLCL X A R

1 1 and

k k

i ii i

X RX R

k k

Page 96: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Mean Chart ExampleYou’re manager of a 500-room hotel. You want to analyze the time it takes to deliver luggage to the room. For 7 days, you collect data on 5 deliveries per day. Is the process in control?

Page 97: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

R Chart and Mean Chart Hotel Data

Sample SampleDay Average Range

1 5.32 3.852 6.59 4.273 4.88 3.284 5.70 2.995 4.07 3.616 7.34 5.047 6.79 4.22

Page 98: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Mean Chart Control Limits Solution

1

1

2

2

5.32 6.59 6.795.813

7

3.85 4.27 4.223.894

7

5.813 0.577 3.894 8.060

5.813 0.577 3.894 3.566

k

i

i

k

ii

X

X

XX

k

RR

k

UCL X A R

LCL X A R

From Table E.9 (n = 5)

Page 99: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Mean Chart Control Chart Solution

UCL

LCL

02468

1 2 3 4 5 6 7

Minutes

Day

X__

Page 100: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

R Chart and Mean Chartin PHStat PHStat | Control Charts | R & Xbar

Charts …

Excel Spreadsheet for the Hotel Room Example

Microsoft Excel Worksheet

Page 101: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Process Capability Process Capability is the Ability of a

Process to Consistently Meet Specified Customer-Driven Requirements

Specification Limits are Set by Management in Response to Customer’s Expectations

The Upper Specification Limit (USL) is the Largest Value that Can Be Obtained and Still Conform to Customer’s Expectation

The Lower Specification Limit (LSL) is the Smallest Value that is Still Conforming

Page 102: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Estimating Process Capability Must Have an In-Control Process First Estimate the Percentage of Product or

Service Within Specification Assume the Population of X Values is

Approximately Normally Distributed with Mean Estimated by and Standard Deviation Estimated by

X

2/R d

Page 103: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Estimating Process Capability For a Characteristic with an LSL and a

USL

where Z is a standardized normal random variable

(continued)

2 2

P(an outcome will be within specification)

P( )

= P/ /

LSL X USL

LSL X USL XZ

R d R d

Page 104: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Estimating Process Capability For a Characteristic with Only a LSL

where Z is a standardized normal random variable

(continued)

2

P(an outcome will be within specification)

P( )

= P/

LSL X

LSL XZ

R d

Page 105: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Estimating Process Capability For a Characteristic with Only a USL

where Z is a standardized normal random variable

(continued)

2

P(an outcome will be within specification)

P( )

= P/

X USL

USL XZ

R d

Page 106: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

You’re manager of a 500-room hotel. You have instituted a policy that 99% of all luggage deliveries must be completed within 10 minutes or less. For 7 days, you collect dataon 5 deliveries per day. Is the process capable?

Process Capability Example

Page 107: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Process Capability:Hotel Data

Sample SampleDay Average Range

1 5.32 3.852 6.59 4.273 4.88 3.284 5.70 2.995 4.07 3.616 7.34 5.047 6.79 4.22

Page 108: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Process Capability:Hotel Example Solution

5.813X 3.894R 2and 2.326d P(A delivery is made within specification)

= P( 10)

10 5.813= P

3.894 / 2.326

= P( 2.50) .9938

X

Z

Z

5n

Therefore, we estimate that 99.38% of the luggage deliveries will be made within the 10 minutes or less specification. The process is capable of meeting the 99% goal.

Page 109: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Capability Indices Aggregate Measures of a Process’ Ability

to Meet Specification Limits The larger (>1) the values, the more capable

a process is of meeting requirements Measure of Process Potential Performance

Cp>1 implies that a process has the potential of having more than 99.73% of outcomes within specifications

2

specification spread

process spread6 /p

USL LSLC

R d

Page 110: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Capability Indices Measures of Actual Process Performance

For one-sided specification limits

CPL (CPU) >1 implies that the process mean is more than 3 standard deviations away from the lower (upper) specification limit

(continued)

23 /

X LSLCPL

R d

23 /

USL XCPU

R d

Page 111: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Capability Indices For two-sided specification limits

Cpk = 1 indicates that the process average

is 3 standard deviations away from the closest specification limit

Larger Cpk indicates larger capability of meeting the requirements

(continued)

min ,pkC CPL CPU

Page 112: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

You’re manager of a 500-room hotel. You have instituted a policy that all luggage deliveries must be completed within 10 minutes or less. For 7 days, you collect data on 5 deliveries per day. Compute an appropriate capability index for the delivery process.

Process Capability Example

Page 113: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Process Capability:Hotel Data

Sample SampleDay Average Range

1 5.32 3.852 6.59 4.273 4.88 3.284 5.70 2.995 4.07 3.616 7.34 5.047 6.79 4.22

Page 114: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Process Capability:Hotel Example Solution

5.813X 3.894R 2and 2.326d 5n

Since there is only the upper specification limit, we need to only compute CPU. The capability index for the luggage delivery process is .8337, which is less than 1. The upper specification limit is less than 3 standard deviations above the mean.

2

10 5.8130.833672

3 3.894 / 2.3263 /

USL XCPU

R d

Page 115: NATIONAL PRODUCTIVITY COUNCIL WELCOMES YOU TO A PRESENTATION ON CONTROL CHARTS By B.Girish Dy. Director.

Recommended