Natural Gas Supply & Utilization
For Domestic Industries
Bali, 24 April 2015
Kusdi Widodo
General Manager LNG
Company Profile
Background
LNG Sources
Gas Business - Domestic Market
LNG Business – Domestic Market
Energy Cost Comparison
LNG Milestone of Infrastructure
Challenges
Pilot Project in LNG Mining
Outline
COMPANY PROFILE
INTEGRATED
UPSTREAM -
DOWNSTREAM
24,784 EMPLOYEES
REVENUE
$70.9 BILLION
PROFIT
$2.8 BILLION
RANKED in FORTUNE 500 AND FIRST INDONESIA COMPANY IN FORTUNE 500
=
123th
2013 Key figures
Established - PT Perusahaan Minyak Nasional
(PERMINA)
Merger PERMINA & PERTAMIN to be PERTAMINA
Formed Gas Utilization Division
Established PT Pertamina Gas
Established PT Pertagas Niaga (PTGN)
1957
1968
1989
2007
2010
COMPANY HISTORY
Per Men ESDM 19/2009 Unbundling scheme
(Transporter & shipper) 2009
Vision To be a world-class national
gas trading company
Mission Leading natural gas and related
business professionally,
capable in optimizing added
value for stakeholder.
Committed to environment and
prioritizing safety and health
excellence (HSE).
VISION MISSION
Back
OUR BUSINESS PROCESS
Gas Source
• KKKS/PSC
• LNG
• FSRU
• Others
• Distribution Pipeline
• Processing (Mini LNG/CNG/BBG)
• Selling To
• Selling Through
• Gas Processed Trading
Value Creation
Gas Trading
• Gas Source
• Value Creation
• Gas Trading
OUR LINE OF BUSINESS
Piped Gas Distribution
LNG Business
Mini LNG Plant
CNG Product
LNG for
Domestic
Market
City Gas
Back
BACKGROUND
BACKGROUND
UU No. 30/2007 : Energy diversification
program from oil fuel (BBM) to LNG for
transportation sector to decrease & save
oil fuel (BBM) in the country.
Oil & Gas Law :
Perpres No. 5/2006 : The energy mix with
target up to 30% by using gas and oil fuel
from 51% up to 20% in 2025.
Pertagas Niaga was formed to comply to
PerMEN ESDM 19/2009 (unbundling
Scheme)
ENERGY MIX INDONESIA
20%
30% 33%
17%
Gas 857 Mboe
47%
24%
24%
5%
Energy Mix Indonesia 2011
Coal
283 Mboe
NRE
59 Mboe
Oil
553 Mboe
Gas
283 Mboe
Energy Mix Indonesia 2025
Coal
943 Mboe
NRE
486 Mboe
Oil
571 Mboe
100% = 1,176 Mboe 100% = 2,857 Mboe
LNG SOURCES
LNG Terminal in Development
Existing LNG Liquefaction Plants
LNG Liquefaction plants in development
Arun LNG
Terminal
Central
Java FSRU
Bontang LNG Plant
Donggi-Senoro
LNG Palnt
Abadi FLNG
Tangguh
LNG Plant
LNG SOURCES - DOMESTIC
LNG SOURCES – CHENIERE USA
GAS BUSINESS IN
INDONESIA
Piped Natural Gas (PNG)
PIPED GAS (EAST JAVA)
KE-5
SURABAYA
MADURA ISLAND
MADURA STRAIT
KAMBING ISLAND
HUSKY (EX EMOI)
MADURA BD
EAST JAVA
PORONG
ORF PORONG
TERANG (DEVELOPMENT)
SIRASUN (DEVELOPMENT)
KANGEAN BLOCK (bp, ex ARBNI)
PAGERUNGAN PETROKIM
IA GRESIK
TUBAN
KE S
EM
ARAN
G
PGN LINE
Kawasan Industri TANDES
GN. SARI Kawasan Industri KARANG PILANG WARU
Kawasan Industri
RUNGKUT
LAPINDO BRANTAS
HESS UJUNG PANGKAH (DEVELOPMENT)
(TAHAP PRODUKSI)
PLTGU
GRESIK
PG
N
PASU
RU
AN
PLTG
U
PASU
RU
AN
PLTGU GRATI
SANTOS
SAMPANG PSC (DEVELOPMENT)
COPI KETAPANG PSC (EXPLORASI)
JOB SANTA FE TUBAN
4
4
4
4
5
INDOPACIFIC ex GFB BAWEAN PSC
6 7
PT. WIRABUANA KARAPAN PSC (EXPLORASI)
PTM SUCI
Kawasan Industri
PGN GRESIK
EXXON MOBIL
(CEPU)
PTM
KEDUNG TUBAN
BALI
CEPU
CONSUMER NAME
PGN GRESIK
PETROKIMIA GRESIK
PLTGU GRESIK
PGN SURABAYA
PGN PASURUAN
PLTGU PASURUAN
PLTGU GRATI LPG PLAN LEGEND EXISTING LINE FUTURE LINE PGN P/L FUTURE
1 2 3
4
5
6 7
2 1
MOJOSARI 12"
KRIAN
8
8
SANTOS
OYONG
(DEVELOPMENT)
SANTOS MALEO
(ONSTREAM 29/9/06)
7 KM
60 KM
Pipa Pertamina
meledak
(Km 38)
3
ORF
GRESIK
KODECO
Kawasan Industri PORONG
WUNUT
10” 400M
12”
105M
CARAT
Offtake Porong
PGN
POLENG
(KODECO)
ORF SEMARE
Next
LEGEND :
CONSUMER
COMPRESSOR STATION
GAS SUPPLY
CITY
EXISTING LINE
FUTURE LINE
AVB
AVA
AVSA
ZU JUNCTION
P FLOW (Existing) Platform Mods
BIMA
ZUK 4 Wells NEW Tripod
MM-COMP
LL-COMP
KL
BZZ
ARJUNA LNG PLANT
19
4
5
7
6
9
9A
8
10
12 11
17 16
18
13
14 15 MUARA KARANG TANJUNG
PRIOK
24” – 74 km
BITUNG
SERPONG
MARGONDA
16” “Y” CIMANGGIS
8” – 10 km
CIBINONG
BOGOR
NAGRAK
JAKARTA
TEGAL GEDE
24” – 45 km
18” – 45 km
CICAUH
10
” &
18
”– 3
.6 k
m
CITARIK
CILAMAYA UTARA
PASIRJADI
6”
– 2
5 k
m
SUBANG
DAWUAN CIKAMPEK
CILAMAYA
KANDANG HAUR TIMUR
6”
– 2
0 k
m
14” – 34 km
BALONGAN
8” – 29 km TUGU BARAT
MUNDU
LPG SDK
RANDEGAN CIREBON
SUKABUMI
CIANJUR CIMAHI
BANDUNG
L PARIGI
WEST JAVA
CNOOC AREA
ONWJ BP AREA
PGN JABAR
21
20
GRISSIK GAS PLANT (400 MMSCFD)
PALEMBANG
PAGARDEWA (SPG)
LABUHAN MARINGGAI
TANJUNGKARANG
2 3
K. STEEL
4”
4”
MERAK
CILEGON
BANGKA ISLAND
1
36”
Lampung
SSWJ II 32” 440
MMSCFD
MUARA BEKASI
RAWA MAJU
BANTEN
TERBANGGI BESAR
APN
PERTAMINA GAS PLANT
(250 MMSCFD)
SSWJ I 32”
530 MMSCFD
B
U
E F
MTPP
PIPED GAS (WEST JAVA)
Back
Compressed Natural Gas (CNG)
CNG Mother Station
Citra CNG
IEV
Cipta CNG
BMI
Reethau
Suropati
MS
MS Bitung
8 Industrial Mother
Station
More than 10 Offtaker
Around 50 - 60 Industries
Total volume 25 MMSCFD
CNG
Customer
eddyss, apr 14
CNG (BITUNG - WEST JAVA)
Next
City Gas
SENGKANG PRABUMULIH
JAMBI
LOKASI
Provinsi : Sumatera Selatan
Kota : Prabumulih
Kecamatan : Prabumulih Barat,
Prabumulih Utara
Kelurahan : Prabumulih, Muntang
Tapus, Patih Galung, Pasar 1, Pasar 2,
Wonosari
INFRASTRUKTUR
Jumlah pelanggan : 4.650 SR
Jumlah MR/S : -
Jumlah R/S : 13 unit
GAS SOURCE
Source : PT Pertamina EP
Alokasi gas : 0.5 MMSCFD
LOKASI
Provinsi: Sulawesi Selatan
Kabupaten : Wajo
Kecamatan: Pamanna, Tempe
Kelurahan : Lempa, Sitampae,
Maddukeleng, Attakae,
Siengkang, Paddupa,
Lapongkoda, Bulu Pabbulu
INFRASTRUKTUR
Jumlah pelanggan : 4.172 SR
Jumlah MR/S : 1 unit
Jumlah R/S : 15 unit
GAS SOURCE
Source : Energy Equity Epic Sengkang Pty. Ltd.
Alokasi gas : 0,5 MMSCFD
LOKASI
Provinsi : Jambi
Kota : Jambi
Kecamatan : Jambi Selatan, Jelutung
Kelurahan : Thehok, Handil Jaya
INFRASTRUKTUR
Jumlah pelanggan : 4.000 SR
Jumlah MR/S : 1 unit
Jumlah R/S : 14 unit
GAS SOURCE
Source : JOB Pertamina Talisman
Jambi Merang
CITY GAS
LNG BUSINESS –
DOMESTIC MARKET
LNG Domestic Business Model
Mining, Transportation and Other Sectors
Bontang
FOB in Bontang
Provide shipping & Trucking for LNG
Provide LNG at Plant Gate Customer
(Provide Trucking on Site)
Provide LNG to end customers
(Provide all logistic supply)
Shipping
Receiving Terminal Trucking Customers
Provide LNG Receiving
Terminal on Site
Facilities by Pertamina Gas & Partners
Trucking
Alternative custody transfer
Operational Excellence, 20 – 30 % cost saving compared with HSD
High Caloric Content Energy per unit vol. – easy and efficient to deliver and storage
Not Require Asset Exchange – just need converter for vehicle, small investment
Minimum Losses – easy to control compare with HSD, no thief
Clean Energy - Lower Emissions
HSE – Controllable
Benefit Of Using LNG
Current Diesel Fueling Model Future LNG Fueling Model
LNG tanks with small diesel tank on truck
Diesel tank on truck
On site refueling
On site refueling
On site storage Transport
On site storage
Transport
Crude Oil
Natural Gas
Refinery
LNG Liquification
LNG for Mining & Transport - LNG VS Diesel Supply Chain
Sources : Caterpillar Back
ENERGY COST COMPARISON
Energy Comparison of Gas vs Fuel Oil
22 LNG
*Depend on logistic and assumption crude oil price @ 100 US$/Barel
*
PNG 09
1986 2000 2006 2010 2013 2015
Price CNG (Rp/LSP)
190 450 2562 3100 3100 3100
Price BBM Subsidized (Rp/LSP)
385 1150 4500 4500 6500 7400
% Price CNG Vs. Price BBM
49% 39% 57% 69% 48% 42%
Prices Comparison of CNG (BBG) vs Fuel Oil (BBM) for Transport
Back
LNG MILESTONES OF
INFRASTRUCTURE
ROADMAP INFRASTRUCTURE PERTAMINA OF LNG FOR MINING, TRANSPORTATION & OTHERS PROJECT IN INDONESIA
Des ‘14 – Phase 1, LNG Filling LNG Station at Plant 26 Bontang with 1 ISO Tank per day (0.42 mmscfd)
2014 2015
Des ‘13 – Temporary Filling LNG Station at Zona 1 with 1 ISO Tank per 9 days (0.05 mmscfd)
Mid ‘16 – Phase 2, LNG Filling LNG Station at Cargo Dock Bontang with design capacity 72 ISO Tank per day (30 mmscfd)
2016 2017 2018
Des ‘18 – Phase 3, Bontang Loading Dock#3 can be berthed by Coastal ship and Small LNG Carrier ( <10,000 m3)
2019
Des ’17 - LNG Some Daughter Stations (SPBG LNG) for Transportation in Java and Kalimantan
Build Satellite Terminal (Receiving Facility) at End User by Pertamina or Joint Venture with end user
Building supporting facility for ISO Tank delivery by LCT/Sea Transportation Starting distribute LNG ISO Tank by LCT from Badak to End User
1. Starting deliver LNG by Coastal Ship from Badak to End User’s Daughter Station
2. Starting deliver LNG by Small LNG Carrier (>10.000 m3) from Badak to Satelite Terminal
Have appointed independent consultant (RE) to establish Pre Feasibility Study of supply chain management LNG distribution
Sept ‘15 Commissioning LNG Filling Station di PAG Arun with design capacity 20 mmscfd
Existing Infrastructure
SUPPLY & MANAGING SMALL SCALE LNG DISTRIBUTION
NEW FILLING STATION
PLANT-24
PT BADAK NGL Bontang Site
PLANT-26
LNG Filling Station: Plant-24 : capacity 1 ISO tank/ 9 days Plant-26 : capacity 1 ISO tank/ day New Plant : More than 70 ISO tank/day Future : Loading Dock #3 modification
NEW PLANT CARGO DOCK
LCT Gantry Crane
SEMI TRAILER
CARGO DOCK
Bontang
FILLING STATION ISO TANK
1st Filling Station for LNG ISO Tank in Indonesia
LNG SOURCE - Location : PT Badak NGL, Bontang
- Loading Capacity : Phase 1 = 1 – 6 ISO Tanks Per Day
LNG FILLING STATION PLANT 26 at PT BADAK LGL Bontang
LNG VALUE CHAIN
LNG Distribution
List of Equipment: - Isotank (20 or 40 ft) - Head Truck + Trailer - LNG Refueling Unit
1. Truck will carry Isotank 2. Isotank will stay on site and truck return to
filling point with empty tank. 3. Isotank can be used as refueling unit as well
LNG Refueling Unit
LNG Value Chain Mining Sector
Bontang
1
3
4
FSU
Oil Fuel Tank Trucking
Dispensing Unit
Fuel Tank & Converter Kit
5
6
2
Legal & Administration
1. LNG Commercial License/Permit
2. Transportation Permit
3. Custody Transfer
4. SKPP/SKPI
Human Resources
Team competencies in sales, technical, & marketing.
Financial
1. Financial support, Capital for Logistic & facility investment.
2. Strategic Partnership
Technical
1. Loading & Unloading Facility
2. LNG Handling, Converter, etc.
Challenges
Need strong commitment from management
CHALLENGES IN LNG BUSINESS
BERAU COAL
INDOMINCO
BALCONY MALL 1. Deliver by Truck 330 HP and ISO tank 20 ft. 2. LNG Pilot Project:
a. Berau Coal = 500 Km or 3 Days (Aug’14, Mining Dump Truck Komatsu HD – 645 )
b. Indominco = 25 Km or 1 Hours (Dec ‘13, Mining Dump Truck Volvo) c. Balcony Mall (Balikpapan) = 240 Km or 12 Hours (Dec’14,Genset &
Chiller)
WHAT WE’VE DONE
PILOT PROJECT Loading LNG to Isotank at PT Badak NGL
PILOT PROJECT Launching LNG for Fuel/ Truck – Patra Niaga
PILOT PROJECT Mining Berau Coal
PILOT PROJECT Loading LNG to Komatsu HD 645
PILOT PROJECT Mining Indominco
Back
PILOT PROJECT Loading LNG to Volvo F-16
Tank Location – Komatsu HD 645